5 Points Signal Reconstruction Project Rebid THE CITY OF 41 % Dubuque DUBB E All-America City Masterpiece on the Mississippi 2012 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 5 Points Traffic Signal Reconstruction Project - Rebid C I P 1021920 DATE: August 1, 2012 City Engineer Gus Psihoyos recommends City Council approval of the plans, specifications, form of contract and the estimated cost of $180,215.30 for the 5 Points Traffic Signal Reconstruction Project — Rebid. I concur with the recommendation and respectfully request Mayor and City Council approval. /7AAh kt1&1 Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manage FROM: Gus Psihoyos, City Engineer SUBJECT: 5 Points Traffic Signal Reconstruction Project - Rebid CIP 1021920 DATE: July 30, 2012 INTRODUCTION Dubuque hitd All-America City eqr 2012 The enclosed resolution is in reference to the public hearing for the 5 Points Traffic Signal Reconstruction Project - Rebid. DISCUSSION The 5 Points Traffic Signal Reconstruction Project —Rebid will provide for the reconstruction of traffic signals at the intersection of Rhomberg Avenue and 20th and Elm Streets. Improvements will include: pedestrian buttons for the crosswalks; a dedicated left turn for the westbound traffic on Rhomberg Avenue to Elm Street; and the reconstruction of curb ramps to bring the intersection to ADA standards. This newly - rebuilt signal will be tied into the City -wide traffic management operations center at City Hall. New traffic controller equipment, battery backup and mastarms have already been purchased for the project from other CIPs to eliminate the long lead time in equipment ordering. This project was originally bid in the fall of 2010 but came in over the engineers estimate. In 2011 the geometrics of the intersection were studied to see if it could be reconfigured to a standard 4 way intersection. It was determined that it should remain as a 5 way intersection. The plans were updated to include current MUTCD and ADA requirements. This intersection will also be tied into the Traffic Operations Center located at City Hall. RECOMMENDATION I recommend that the City Council approve the plans, specifications, form of contract and the estimated cost for the 5 Points Traffic Signal Reconstruction Project - Rebid. BUDGET IMPACT The estimate of probable cost for 5 Points Traffic Signal Reconstruction Project — Rebid is as follows: Construction Contract Contingency Engineering /Contract Administration Total Construction Contract Project Cost Pre - Purchased Equipment Estimate $ 144,173.00 14,417.30 21,625.00 $180,215.30 $ 26,362.00 Total Cost $206.577.30 The project funding summary is as follows: CIP Funding Source Amount 102 -1920 5 Points Intersection Rhomberg — 20th — Elm $ 78,384.80 300 -2044 Fiber Optic Conduit Miscellaneous 45,000.00 300 -1011 Signalization Program 28,012.10 102 -1608 Downtown Streetlight Replacement 15,000.00 300 -1133 Traffic Signal Mastarm Retrofit 13,818.40 Total Project Cost $180,215.30 ACTION TO BE TAKEN The City Council is requested to approve the plans, specifications, form of contract and the estimated cost for the 5 Points Traffic Signal Reconstruction Project - Rebid. Prepared by David Ness, Civil Engineer II cc: Jenny Larson, Budget Director Julie Neebel, Project Manager, IIW RESOLUTION NO. 212 -12 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE 5 POINTS TRAFFIC SIGNAL RECONSTRUCTION PROJECT - REBID NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the 5 Points Traffic Signal Reconstruction Project, in the estimated amount $180,215.30, are hereby approved. Passed, adopted and approved this 6th day of August , 2012. Attest: () Roy D. uol, Mayor NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE 5 POINTS TRAFFIC SIGNAL RECONSTRUCTION PROJECT - REBID NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the 5 Points Traffic Signal Recon- struction - Project - Rebid, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 6th day of August, 2012, in the Historic Federal Building Coun- cil Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: Reconstruction of traffic signals at the intersection of Rhom- berg Avenue and 20th and Elm Streets. Improvements will include: pedestrian but- tons for the cross- walks; a dedicated left turn for the westbound traffic on Rhomberg Avenue to Elm Street; and the reconstruction of curb ramps to bring the intersection to ADA standards. Any visual or hearing - impaired persons need- ing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589 -4120 or TDD at (563) 690 -6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the 16th day of July. 2012. Kevin S. Firnstahl, City Clerk It 7/20 NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT 5 POINTS TRAFFIC SIGNAL RECONSTRUCTION PROJECT - REBID Time and Place for Filing Sealed Propos- als. Sealed bids for the work comprising each improvement as stated below must be filed before 2:00 p.m. on August 9, 2012, in the Office of the City Clerk, City Hall - First Floor, 50 West 13th Street, Dubuque, Iowa. Time and Place Sealed Proposals Will be Opened and Considered. Sealed proposals will be opened and bids tabulated at 2:00 p.m. on August 9, 2012, at City Hall - Traffic Operations Center, 50 West 13th Street, Dubuque, Iowa, for consideration by the City Council (Council) at its meeting on August 20, 2012. The City of Dubuque, Iowa, reserves the right to reject any and all bids. Time for Commence- ment and Comple- tion of Work. Work on each improvement shall be commenced within 10 days after the Notice to Proceed has been issued and shall be fully com- pleted by October 19, 2012. Bid Security. Each bidder shall accom- pany its bid with a bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, accept- able to the govern- mental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the con- tract. The bid security shall be in the amount of ten percent (10 %) of the amount of the contract and shall be in the form of a cashier's check or certified check drawn on a state - chartered or federally chartered bank, or a certified share draft drawn on a state - chartered or federally chartered credit union, or the governmental entity may provide for a bidder's bond with corporate surety satis- factory to the governmental entity. The bid bond shall contain no conditions excepted as provided in this section. Contract Docu- ments. Copies of the construction docu- ments may be obtained at the Engineering Department, City Hall - Second Floor, 50 West 13th Street, Dubuque, Iowa 52001. No plan deposit is required. Preference for Iowa Products and Labor. By virtue of statutory authority, preference will be given to products and provi- sions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. Sales Tax. The bidder should not include sales tax in its bid. A sales tax exemption certificate will be available for all mater- ial purchased for incor- poration in the project. General Nature of Public Improvement. 5 Points Traffic Signal Reconstruction Project - Rebid CIP 1021920 Reconstruction of traffic signals at the intersection of Rhom- berg Avenue and 20th and Elm Streets. Improvements will include: pedestrian but- tons for the cross- walks; a dedicated left turn for the westbound traffic on Rhomberg Avenue on Elm Street; and the reconstruction of curb ramps to bring the intersection to ADA standards. Published in the Telegraph Herald, July 20, 2012. It 7/20 STATE OF IOWA {SS: DUBUQUE COUNTY CERTIFICATION OF PUBLICATION I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald,a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: July 20, 2012, and for which the charge is $63.96. Subscribed to before me, ; otary Public in and for Dubuque County, Iowa, this i day of , 20 . Notary Public in and for Dubuque County, Iowa. 'nr FAN' K, NEGTi RW-i',(F, (jiirnmlfflii, MY