Loading...
ARC Transfer Center Phase I Project THE CITY OF 41 % ***** Dubuque DUBB E All erica City Masterpiece on the Mississippi 2012 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Public Hearing for the Request for Bid for the Construction of the ARC Transfer Center Phase I Project DATE: July 31, 2012 Director of Transit Operations Barbara Morck recommends City Council approval of the plans, specifications, form of contract and the estimated cost of $298,357 for the ARC Transfer Center Phase I project. I concur with the recommendation and respectfully request Mayor and City Council approval. /7AAh kt1&1 Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Barbara Morck, Director of Transit Operations Dave Heiar, Economic Development Director Masterpiece on the Mississippi TO: Michael Van Milligen, City Manager FROM: Barbara Morck, Director of Transit Operations CC: David Heiar, Economic Development Director Kelley Deutmeyer, Executive Director of ECIA Dubuque All- America City 1 2007 SUBJECT: Public Hearing for the Request For Bid (RFB) for the Construction of the ARC Transfer Center Phase I project DATE: July 31, 2012 BACKGROUND In August 2010 staff of ECIA, The Jule and Area Residential Care (ARC) began collaborating on a construction of a transfer center, to be located at the new ARC, Inc. facility located at the JFK Circle (the old Econo Foods building). The parties agreed to pursue the project which, based on cost, was been split into two phases: Phase I is to be a canopy attached to the new ARC facility that will offer protection from the weather for passengers waiting to board and de- boarding from fixed route and paratransit buses. Phase I also allows The Jule's Bus Operators access to the building's restroom facilities. DISCUSSION In October 2010 a Public Transit Infrastructure Grant (PTIG) for $298,357 was awarded for the Phase I construction to The Jule. The PTIG funding requires a 20% local match, which is being provided by ARC, Inc. On March 28, 2012 City Council awarded IIW a contract for the final design, compilation of construction documents, construction bid and oversight of the construction of the Phase I canopy, as well as the preliminary design work of the Phase ll portion of the project. On May 7, 2012 and as part of this project an Easement Agreement, which includes the area immediately below the canopy area as well as driveway access to /from the canopy, between the City of Dubuque and ARC, Inc. was approved by City Council. A committee, which was comprised of City staff (David Heiar) Jule Staff (Barbara Morck and Jodi Johnson), ECIA staff (Mark Munson) and ARC staff (Jon Romaine and Karl Stieglitz), and a member of the Transit Advisory Board (Matt Esser), was formed to review the design elements of the canopy. All parties came to an agreement on the elements in the final design in May 2012, and the blueprints and required construction documents (e.g. building plans and specifications) have been prepared for release through a Public Bid process (aka Request for Bid). PROJECT SCHEDULE Initiate Public Bidding Process Publish Notice to Bidders, Advertise for Bids Publish Public Hearing Notice on Plans and Specifications Plans and Specifications made available to Public for Review Site Tour and Pre -bid Conference Public Hearing Receipt of Bid Proposals (Bid - letting) Award Construction Contract Final Project Completion Date July 16, 2012 July 17, 2012 July 17, 2012 July 18, 2012 August 3, 2012 August 6, 2012 August 28, 2012 September 3, 2012 December 10, 2012 On July 16, 2012, the City Council sent a public hearing for August 6, 2012. BUDGET IMPACT The estimate of probable cost for the ARC Transfer Center Phase I project is as follows: Construction Contract Contingency (10 %) Davis -Bacon Monitoring Engineering /Contract Administration Fixtures (bus benches, trash containers, etc.) Total Construction Contract Project Cost The project funding summary is as follows: CIP Funding Source 6002235 Public Transit Infrastructure Grant (PTIG) — 80% 6002235 Local Match, provided by ARC, Inc. — 20% (soft match = improvements in the form of paving, gate closures, concrete work, etc.) Total Estimate $223,516 $22,352 $1,050 $48,440 $3,000 $298,357 Amount $298,357 $74,589 Project Cost $372,946 RECOMMENDATION /ACTION STEP Following the August 6th Public Hearing, I recommend that the City Council approve the plans, specifications, form of contract, and the estimated cost for the ARC Transfer Center Phase I project. RESOLUTION NO. 213 -12 ARC TRANSFER CENTER PHASE I CANOPY - 2012 PROJECT APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE ARC TRANSFER CENTER PHASE I CANOPY - 2012 PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNICL OF THE CITY OF DUBUQUE, IOWA: The proposed plans, specifications, form of contract and estimated cost for the ARC Transfer Center Phase I Canopy - 2012 Project, in the estimated amount of $223,516, are hereby approved and ordered filed in the office of the City Clerk for public inspection. Passed, adopted and approved this 6th day of August, 2012 Attest: Kevin irnstahl, City er 040 oy D. Buol, Mayor NOTICE OF PUBLIC HEARING ON THE PLANS, SPECIFICATOIN, FORM OF CONTRACT, AND ESTIMATED COST FOR THE ARC TRANSFER CENTER PHASE I CANOPY - 2012 PROJECT NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the ARC Transfer Center Phase I Canopy - 2012 Project, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 6th day of August, 2012, in the Historic Federal Building Council Cham- bers (second floor), 350 West 6th Street, Dubuque, Iowa. Said proposal plans, speci- fications, form of contract and estimated cost are now on file in the' office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: The ARC Transfer Center Phase I Canopy - 2012 Project includes the construction of an approximately 45' x 130' canopy structure. The canopy structure will consist of cast in place concrete col- umns, precast beams and steel joists and roof deck structure with standing seam metal roofing. Finished include limited paint - ing of the structure, metal wall panel and soffit panels. Electrical lighting and the conduit for a future surveillance system will be part of this project. Limited site work will be completed around the canopy building including con- crete work to tie into existing pavement and concrete islands. Any visual or hearing impaired persons need- ing special assistance or persons'with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563)1690 -6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the 16th day of July, 2012. Kevin S. Firnstahl, City Clerk it 1/17 SECTION 001000 NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC TRANSIT PROJECT. ARC TRANSFER CENTER CANOPY PHASE I -2012 PROJECT Time and Place for Filing Sealed Propo- sals. Sealed bids for the work comprising each improvement as stated below must be filed before 2:00 p.m: on August 28, 2012, in the Office of the City Clerk, City Hall - First Floor, 50 West 13th Street, Dubuque, Iowa. Time and Place Sealed Proposals Will be Opened and Considered. Sealed proposals will be opened and bids . tabulated at 2:00 p.m. on August 28, 2012, at City Hall - Conference Room A, 50 West 13th Street, Dubuque, Iowa, for consideration by the City Council (Council) at its meeting on September 4, 2012. The City of Dubuque, Iowa, reserves the - right to reject any and all bids. Time for Com- mencement , Completion of ork. Work on each improvement shall be commenced within 10 days after the Notice to Proceed has- been issued and shall be completed by Decem -1 ber 10, 2012. Bid Security. Each bidder shall accom- pany its• bid with a bid security as security that the successful bidder will enter into a• contract for the work bid upon and will furnish after the award of contract a corporate surety bond, accept- able to the govern- mental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the . amount of the con- tract The bid security shall be in the amount of ten percent (10 %) of the amount of the contract and shall be in the form of a cashier's check or certified check drawn on a state - chartered or federally chartered bank, or a certified share draft drawn on a state- chartered or federally chartered credit union, or the governmental entity may provide for a bidder's bond with corporate surety satis- factory to the govern- mental entity. The bid bond shall - contain no conditions excepted as provided in this section. - Contract Docu- ments. Copies of the Construction Bidding Documents may be obtained by contacting Tri -State Blue Print & _Framing Company, .696 - Central Avenue, Dubu- que, Iowa 52001, 563- 556.3030. A deposit of $50.00 per, set of documents or receipt of AGC;- AMC, AMEC, MBI or NECA card is required. Deposits will be refunded upon return of the Construction Bidding Documents in good condition within ten (10) days after bid opening. Plans will be available for review after July 18, 2012. Copies of the construction docu- ments may be viewed at: the Office of the City Clerk, City Hall - r First Floor, 50 West 13th Street, Dubuque, Iowa; or at the Office of '11W, P.C., 4155 Pennsylvania Avenue, Dubuque, Iowa. If there are any questions and /or additional information is needed, contact 11W Project Manager Mark Fass- binder, AIA - LEED AP BD +C, at m.fassbinder ®iiwengr.com or by calling (563) 556 -2464, Project information will also be posted on the City's - website at www.cityofdubuque.org. Statement- of State and/or Federal Par- ticipation. This project will be partially funded with State (Federal pass- through) funds from the Iowa Depart- ment of Transportation / Office of Public Transit (Iowa DOT / OPT) and therefore is subject 'to the State and Federal laws and regulations associated with that program. Davis -Bacon Feder- al Prevailing Wage Requirements. Davis- Bacon Federal prevail- ing predetermined, wage rates and related labor requirement and regulations WILL APPLY to work under the contract. Preference for Iowa Products and Labor. Equipment or products authorized to be purchased with federal funding awarded for this contract must be American -made to the maximum extent feasible, in accordance with Public Law 103- 121, Sections 606 (a) and (b). Sales Tax. The bidder should not include sales tax in its bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. General Nature of Public Improvement. The ARC Transfer Center Phase d project consists of construc- tion of an approxi- mately 45' x 130' canopy structure. The canopy structure will consist of cast in place concrete columns, precast beams and steel joists and roof deck structure with standing seam metal roofipg. Finished in- clude limited painting of the structure, metal wall panel and soffit panels.' ' Electrical lighting and the conduit for a future surveillance system will be part of this project Limited site work will be completed around the canopy building including concrete work to tie into existing pavement and concrete islands. Pre -Bid Construc- tion Conference. Each prospective bid- der is encouraged to attend the Pre -Bid I Construction Confer- ence to be held at 10:00 AM on Friday, August 3, 2012, at the offices of I1W, 4155 Penn- sylvania Avenue, Dubu- que, Iowa. Attendance by prospective bidders is not mandatory but highly recommended. Published in the Telegraph Herald, and posted on the City of Dubuque and the IA DOT websites on July 17, 2012. END OF SECTION. 001000 It 7/17 STATE OF IOWA {SS: DUBUQUE COUNTY CERTIFICATION OF PUBLICATION I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald,a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: July 17, 2012, and for which the charge is $93.96. Subscribed to before m a Notary Public in and for Dubuque County, Iowa, this /169 day of , 20 /Z. . otary Public in and for Dubuque County, Iowa. MARY K. WESTERMEYER Commisalon Numhar 1542•x5