Loading...
11th Street Stair and Hand Railing Repair ProjectTHE CITY OF D Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager 1 FROM: Gus Psihoyos, City Engineer DATE: September 10, 2012 RE: 11 th Street Stair and Handrail Repair Dubuque ANUMIUM I. 2012 The purpose of this memorandum is officially record in the minutes of the City Council the award and completion of the 11th Street Stair & Rail Repair. BACKGROUND The project provided for the removal and reconstruction of approximately 19 riser steps, 220 s.f. of 4" sidewalk removal and replacement and 200 lineal foot of railing. DISCUSSION On May 31, 2012 informal bids for the 11th Street Stair and Handrail Repair Project received in the amounts of: Drew Cook & Sons Exc. $19,527.14 Tschiggfrie Excavating $35,449.95 Based on Iowa Code § 384.103 and § 364.12(3)(c), and Iowa Code, Section 26.14, through the informal bid process for public improvements, this project was awarded on May 31, 2012 to Drew Cook & Sons of Dubuque, IA, in the amount of $19,527.14. Additional railing was added to the project bringing the total construction cost to $20,462.84 plus $3,069.43 for engineering. Funds for this project are from CIP #3501432. REQUESTED ACTION I respectfully request in accordance with the above codes the 11th Street Stair & Handrail Repair Project costs be officially recorded in the minutes of the City Council. cc: Barry Lindahl, City Attorney Jenny Larson, Budget Director Bob Schiesl, Assistant City Engineer Jon Dienst, PE CITY OF DUBUQUE ENGINEERING 08/23/2012 CONTRACTOR: Drew Cook & Sons Excavating Contract Amount $19,527.14 FINAL PAYMENT ( #3) PROJECT NAME: 11th Street Stair & Railing Repair Payments previously approved: 1 $7,654.24 7. 2 $11,785.46 8. 3 9. 4 10. 5 11. 6 12. TOTAL $19,439.70 prices of work and material shown on the face of this Partial Payment form are correct that all work has been performed and materials supplied in full accordance with the terms and conditions QTY. of the contract documents and authorized changes thereto: that the following is a true and AMOUNT QTY. correct statement of the contract account up to and including the last day of the period covered AMOUNT ITEM QTY. UNIT UNIT COST this Period EARNED this Pe to Dale EARNED to Date DEMOLITION & REMOVAL $20,462.84 TOTAL PREVIOUSLY APPROVED .. ............................... $19,439.70 TOTAL AMOUNT DUE ........... ............................... $1,023.14 1 further certify that all claims outstanding as of this date against the under- 1. Removal of Existing Steps, Sidewalk 326.00 S. F. $8.00 0.00 0.00 326.00 $2,608.00 EXCAVATION & STONE BY: TITLE: CERTIFICATE OF THE CITY ENGINEER I certify that I have verified this payment, and that to the best of my knowledge 2. Excavation, Unclassified 12.07 CY $12.00 0.00 0.00 12.07 $144.84 3. Graded Slone Base 7.90 TON $25.00 0.00 0.00 5.65 $141.25 4. Backfill, Topsoil 13.50 SY $40.00 0.00 0.00 13.50 $540.00 SIDEWALK & STEPS 5. PCC Steps, Treads (includes Footing & Reinforcement 23.08 LF $60.00 0.00 0.00 29.80 $1,788.00 6. PC Concrete Sidewalk, 6 ", Construct 220.00 SF $7.00 0.00 0.00 225.00 $1,575.00 MISCELLANEOUS 7. Install New Stair Railing 200.00 L.F. $55.00 0.00 $0.00 208.25 $11,453.75 8. Seeding, Mulching, and Watering 13.50 SY $12.00 0.00 $0.00 13.50 $162.00 9. Erosion Control Plan, Operating Procedures 1.00 Lump Sum $250.00 0.00 $0.00 1.00 $250.00 10. Traffic Control and Safety Control 1.00 Lump Sum 300.00 0.00 $0.00 1.00 $300.00 11. Mobilization 1.00 Lump Sum $1,400.00 0.00 $0.00 1.00 $1,400.00 EXTRA WORK: 12. Excelsior Mat Lump Sum $100.00 0.00 $0.00 1.00 $100.00 Construction Total $0.00 $20,462.84 Payments previously approved: 1 $7,654.24 7. 2 $11,785.46 8. 3 9. 4 10. 5 11. 6 12. TOTAL $19,439.70 prices of work and material shown on the face of this Partial Payment form are correct that all work has been performed and materials supplied in full accordance with the terms and conditions of the contract documents and authorized changes thereto: that the following is a true and correct statement of the contract account up to and including the last day of the period covered by this payment and that no part of the 'Total Amount Due" has been received: TOTAL AMOUNT EARNED TO DATE ............................... $20,462.84 RETAINED PERCENTAGE ........ ............................... $0.00 TOTAL EARNED LESS RETAINED PERCENTAGE ..................... $20,462.84 TOTAL PREVIOUSLY APPROVED .. ............................... $19,439.70 TOTAL AMOUNT DUE ........... ............................... $1,023.14 1 further certify that all claims outstanding as of this date against the under- signed as contractor for labor, materials, and expendable equipment employed in the perfor- mance of said contract up to this date have been paid in full accordance with the require- ments of said contract. CO TOR: DREW COOK SONS EXCAVATING DATE: BY: TITLE: CERTIFICATE OF THE CITY ENGINEER I certify that I have verified this payment, and that to the best of my knowledge and belief it is a true and correct statement of work performed and materials supplied by the Contractor, and that the Contractor's certified statement of the account and the amount due is correct and just, and that all work and material included in this Partial Payment have been performed in full accordance with the terms and conditions of the contract documents and authorized changes thereto. CITY OF DUB�Q E" DATE: ,� 1 ✓ 'VCS U V� BY: f - ` TITLE: r / , City of Dubuque FINAL CONTRACT Date: 8/23/12 PROJECT NAME: 11th Street Stair & Railing Repair Contract Amount $19,527.14 CONTRACTOR: Drew Cook & Sons Excavating QTY. TOTAL ITEM QTY UNIT UNIT COST TO DATE COST DEMOLITION & REMOVAL 1. Removal of Existing Steps, Sidewalk 326.00 S. F. $8.00 326.00 $2,608.00 EXCAVATION & STONE 2. Excavation, Unclassified 12.07 CY $12.00 12.07 $144.84 3. Graded Stone Base 7.90 TON $25.00 5.65 $141.25 4. Backfill, Topsoil 13.50 SY $40.00 13.50 $540.00 SIDEWALK & STEPS 5. PCC Steps, Treads (includes Footing & Reinforc 23.08 LF $60.00 29.80 $1,788.00 6. PC Concrete Sidewalk, 6 ", Construct 220.00 SF $7.00 225.00 $1,575.00 MISCELLANEOUS 7. Install New Stair Railing 200.00 L. F. $55.00 208.25 $11,453.75 8. Seeding, Mulching, and Watering 13.50 SY $12.00 13.50 $162.00 9. Erosion Control Plan, Operating Procedures 1.00 Lump Sum $250.00 1.00 $250.00 10. Traffic Control and Safety Control 1.00 Lump Sum 300.00 1.00 $300.00 11. Mobilization 1.00 Lump Sum $1,400.00 1.00 $1,400.00 EXTRA WORK: 12. Excelsior Mat Lump Sum $100.00 1.00 $100.00 TOTAL DUE CONTRACTOR $20,462.84 ENGINEERING $3,069.43 I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager City of Dubuque,lowa The undersigned, , contractor for the above improvement, does hereby accept the above "Total Due Contractor ", as full settlement for all claims for said improvement. CONTRACTOR: BY: TOTAL CONSTRUCTION COS' $23,532.27 Gus Psihoyos City Engineer