Signed Contracts_Miron Construction Change Order 17 WPCP ModificationsTO: Michael C. Van Milligen, City Manager FROM: Steve Sampson- Brown, Project Manager t' • t "Ef R 1 SUBJECT: Water Pollution Control Plant Modifications Miron Construction Co., - Change Order No. 17 DATE: September 11, 2012 Attached is the Change Order No. 17 for the June 30, 2010 agreement between Miron Construction, Inc. and the City for the Water Pollution Control Plant (WPCP) Modifications Project. It would be appreciated if you would execute the attached Change Order No. 17 for the Miron Construction Inc. contract. Upon completion, please return to the Engineering office. Attach. Dubuque All- AmeficaCity I.F 2012 TO: Michael C. Van Milligen, City Manager FROM: Steve Sampson Brown, Project Manager 041. V� SUBJECT: Water Pollution Control Plant Modifications Miron Construction Co., Inc. — Change Order No. 17 DATE: September 10, 2012 Attached is Change Order No. 17 for the June 30, 2010 agreement between Miron Construction, Inc. and the City for the Water Pollution Control Plant (WPCP) Modifications Project. Change Order No. 17 adjusts the contract completion dates as a result of the July 11, 2011, wind event and the July 28, 2011, flood event. The city has negotiated with Miron Construction to determine the final number of calendar days that the schedule will be extended. Revised Project Dates: • Substantial Completion September 3, 2013 • Final completion February 3, 2014 No additional costs are related to this change order. ACTION TO BE TAKEN The execution of Change Order No. 17 of the Miron Construction, Inc. contract is requested. cc: Jenny Larson, Budget Director Gus Psihoyos, City Engineer Jonathan Brown, Water & Resources Recovery Center Manager Attachs. FAPROJECTS \Water Pollution Control Plant Replacement\ Construction Admin\ WCD's_CO's & _CCD's \Change Orders \Change Order 17.docx Page 1 of 1 l Strand. ikasociates, Inc.' 910 West Wingra Drive Madison, WI 53715 (P) 608 -251 -4843 S Cj RAN - (F) 608- 251 -8655 S z S0C9A TESo August 21, 2012 - �- p�i�';;r tt8j CHANGE ORDER NO. 17 PROJECT: Water Pollution Control Plant Modifications c�titP�n;� OWNER: City of Dubuque CONTRACT: 1 -2010 CONTRACTOR: Miron Construction Co., Inc. Description of Change 17a Adjust Contract Completion dates as a result of the July 11, 2011, ADD $0 wind event and the July 28, 2011, Hood event. See Contract Completion Date Adjustments below. TOTAL VALUE OF THIS CHANGE ORDER: ADD $0 Contract Price Adjustment Original Contract Price $49,750,000 Previous Change Order Adjustments $ 4,981,712 Adjustment in Contract Price this Change Order $ 0 Current Contract Price including this Change Order $54,731,712 Contract Completion Date Adjustment Original Milestone 1 Contract Completion Date March 1, 2012 Original Milestone 2 Contract Completion Date July 2, 2012 Original Substantial Contract Completion Date March 31, 2013 Original Contract Completion Date August 31, 2013 Milestone 1 Contract Completion Date Adjustments due to previous Change April 2, 2012 Orders Milestone 2 Contract Completion Date Adjustments due to previous Change August 2, 2012 Orders Substantial Contract Completion Date Adjustments due to previous Change April 23, 2013 Orders Final Contract Completion Date Adjustments due to previous Change Orders September 25, 2013 GWT:dih \S:\MAD \1100 - -1 i99 \1154 \023 \Wrd \Change Orders \CO 17.docx Arizona I Illinois I Indiana I Kentucky I Ohio I Wisconsin k1wtw.st: and.corn City of Dubuque —Miron Construction Co., Inc. Contract 1 -2010, Change Order No. 17 Page 2 August 21, 2012 Milestone 1 Contract Completion Date Adjustments due to this Change Order Milestone 2 Contract Completion Date Adjustments due to this Change Order Substantial Contract Completion Date Adjustments due to this Change Order Final Contract Completion Date Adjustments due to this Change Order k�-A nd E�.. z.ocl elf €c° October 4, 2012 February 6, 2013 September 3, 2013 February 3, 2014 This document shall become a supplement to the Contract and all provisions will apply hereto. �0� YNYBBy6oy4., LADED ® a RANDA LL A. ". ®UJ a IRTZ Ei NEER_— Strand Ass ciate Inc. 16137 m ° • ° °° ;PROVE WN ACTOR- -Miron Constfiction Co., Inc. David G. Voss Jr., Presid t APPROVED OWNER —City of Dubuque GWT:dlli \S:\MAD \1100 -- 1199 \I 154 \023 \Wrd \Change Orders \CO 17.doex � /'U Date Date Vo Da�f //A Date wwW.strand. o.m. INEBR® Work Change Directive Directive No.: 44 Contract: 1 -2010 Owner City of.Dubugue By: GM Contractor: Mixon Construction Co... Inc. Date: 219112 Description of Work- Cost Deduction Cost Addition Due to wind damage on July 11, 2011, and flooding damage on July 28; 2011, this Work Change Directive extends original Milestone 1 contract completion date by 130 working days from March 1, 2012, to September 4, 2012. Due to wind damage on July 11, 2411, and flooding damage on July 28; 2011, this Work. Change Directive extends original. Milestone 2 contract completion date. by 18ftorking days from July2, 2012, to January 7.2413. Total Remarks: Contractor has requested 130 working day extensions to all four liquidated damage dates. The Butner Is still reviewing the extension to the substantial and final completion liquidated damage dates. The 130 working day extension to construction contract Milestones 1 and 2 Is not negotiable. Change in Contract Price b Supplemental Unit Price ❑ Unit Price ❑ Lump Sum Requested by: Miron Construction 11130111 Date Recommended by: (Engineer) 219112 Date Accepted by: { Date Approved by: (Owner) Date -THIS FORM IS NOTA SUBS77ill TE FOR A PROPERLYPREPARED AND EXECUTED CHANGE ORDER i 1S'.V MIiOO-- I— iMii84=MWidWorh Chw►g® MvcUmVhcM N044.We stones.d= Re: Wind and flood Event Delays Dubuque Water Pollution Control Plant Dear Steve: Thank you for taking the time to meet yesterday. This letter is to sununarize the narrative of remaining schedule. discussed: yesterday. Miron Construction Co., Inc. has also.issued schedule update 15R which reflects- actual progress to May 25 "' as well as the. current planned sequence of remaining work. The two remaining structures with the longest durations are the Aeration Tanks (Structure 40) and the Final Clarifiers ( Stntcture 50). These structures are scheduled to. be completed next Autist 2013. 11 Miron is currently working in both these structures; but is only allowed to shutdown a portion of each Structure to allow the existingg plant to remain in operation during construction. Work on Structure 50 will be suspended during winter months as a. large portion of work in this structure has temperature sensitive coatings. However; Miron anticipates worknb on effluent gates for Structure 50-during those winter months.. With the completion of Structures 40 and 50 next August 2013 Mixon anticipates conipleting the bypass of the Aeration Tank Splitter (Structure 37) and associated site-work shortly after.. Miron anticipates that by September 3, 2,013 only final landscaping will remain and the work will be substantially complete. Miron requests that the project isubstantial completion date be extended via change order to September 3, 2'013, and the Final Completion date be correspondingly adjusted to February 3, 2014 Please advise if the requested extension is acceptable to the City of Dubuque. Please contact Jonathan Daniels at (920) 969 -7392 with any questions. Sincerely, 1VIIRON CONSTRUCTION CO., INC. Jonathan C. Daniels Project Manager Cc: Timothy Kippenhan, Mixon Construction Co., inc.. Paul O' Brien, Miron Construction Co., Inc. William E. NlcCardell, Esq. DeWitt Ross & Stevens, S.C. Mlran- ConStructionxotJ't Mr. Jonathan C. Daniels Miron Construction Co., Inc. 1471 McMahon Drive Neenah, W1 54945 Engineering Department City Hall 50 W. 13th Street Dubuque, Iowa 52001 563.589.4270 563.589.4205 (fax) tivww,d!yofdubugue.or August 16, 2012 RE: Contract Time Extension for Wind and Flood Events Dubuque Water Pollution Control Plant Dear Jonathan: The City has reviewed your June 8, 2012 letter regarding Miron's request to extend the project's Substantial Completion date to September 3, 2013 and the Final Completion date to February 3, 2014. The City agrees with Miron's proposed dates and will direct Strand. Associates to prepare a change order to formally extend the dates. .sincerely, Steve Sampson Brown Project. Manager Strand ,A—ssociates, Inc.' 910 West Wingra Drive Madison, WI 53715 (P) 608- 251 -4843 VRRA N D (F) 608 - 251 -8655 August 21, 2012 CHANGE ORDER NO. 17 PROJECT: Water Pollution Control Plant Modifications OWNER: City of Dubuque CONTRACT: 1 -2010 CONTRACTOR: Miron Construction Co., Inc. Description of Change 17a Adjust Contract Completion dates as a result of the July 11, 2011, ADD $0 wind event and the July 28, 2011, flood event. See Contract Completion Date Adjustments below. TOTAL VALUE OF THIS CHANGE ORDER: ADD $0 Contract Price Adjustment Original Contact Price $49,750,000 Previous Change Order Adjustments $ 4,981,712 Adjustment in Contract Price this Change Order $ 0 Current Contract Price including this Change Order $54,731,712 Contract Completion Date Adjustment Original Milestone 1 Contract Completion Date March 1, 2012 Original Milestone 2 Contract Completion Date July 2, 2012 Original Substantial Contract Completion Date March 31, 2013 Original Contract Completion Date August 31, 2013 Milestone 1 Contract Completion Date Adjustments due to previous Change April 2, 2012 Orders Milestone 2 Contract Completion Date Adjustments due to previous Change August 2, 2012 Orders Substantial Contract Completion Date Adjustments due to previous Change April 23, 2013 Orders Final Contact Completion Date Adjustments due to previous Change Orders September 25, 201.3 GWT:dIh\S:\NTAD \1100 -4199 \1154 \023 \Wrd \Change Orders \CO 17.doex Arizona I Illinois I Indiana I Kentucky I Ohio I Wisconsin �--.rviw.stra rid. con i City of Dubuque —Miron Construction Co., Inc. Contract 1 -2010, Change Order No. 17 Page 2 August 21, 2012 Milestone I Contract Completion Date Adjustments due to this Change Order Milestone 2 Contract Completion Date Adjustments due to this Change Order Substantial Contract Completion Date Adjustments due to this Change Order Final Contract Completion Date Adjustments due to this Change Order October 4, 2012 February 6, 2013 September 3, 2013 February 3, 2014 !x`01 a 3 a ° This document shall become a supplement to the Contract and all provisions will apply hereto. OMME ED ate_" 6 moo 7' E?fNEER— Strand Associa \PROVED CONTRACTOR —NAron David G. Voss Jr., APPROVED OWNER —City of Dubuque ., Inc. GWT:dIh \S:\MAD\1100 -- 1199 \1154 \023 \Wrd \Change Orders \CO 17.docx � r -z- Date Date r D to WwmsArand.COE i s Work Change Directive Directive No: 44 Contract: 1 -2010 Owner: Ch of Dubuque BY.,GWi Contractor: Mixon Construction Co Inc Date: 2/9112 Description of Work Cast Deduction Cost Addition Due to wind damage on July 11, 2011, and flooding damage on July 28, 2011, this Work Change Directive extends original Milestone 1 contract completion date by 130 working days from March 1, 2012, to September 4, 2412. Due to wind damage on July 11, 2011, and flooding damage on July 28; 2011, this Work_ Change Directive extends original. Milestone 2 contract completion date by 130 working days #rum July 2; 2012, to January 7, 2013. Total Remarks; Contractor has requested 130 working day extensions to all four liquidated damage dates. The Owner is still reviewing the extension to the substantial and final completion liquidated damage dates. The 130 working: day extension to construction contract Milestones 1 and 2 is not negotiable. Change in Contract Price by. [] Supplemental Unit Price ❑ Unit Price O Lump Sum Requested by: Miron Construction 11/30/11 Date Recommended by. (Engineer) 219112 mate Accepted by: Date Approved by: —(Owner) 2 - �S = . Date -THIS FORM IS NOTA SUBSTITUTE FOR A PRoPERLYPREPARED AND EXECUTED CHANGE CWWER- It�fa1�1S; 1MA{ N1iU0— tt9911iS4i0231vVrtltwOiiiGh2nge N44A.A�1 .d�cx Vdffdlp4 -!ftf ll ca June- 8, 2012 Mr. Steve Sampson Brown, Project Manager City of Dubuque 50 W. 13`" Street Dubuque, !A 52001 Re: Wind, and Flood Event Delays Dubuque Water Pollution Control Plant Dear Steve: Thank you for taking the time to meet yesterday. This. letter is to surninalize the narrative of remaining schedule, discussed yesterday-.Miron Construction Co., Inc. has ' also issued schedule update 15R *hich reflects actual, progress to May 2511 as well as, the, current planned. sequence of remaining work. Tile two remaining structures with the longest durations are the Aeration Tanks (Structure 40) and the Final Clarifiers (Structure 50). These structures es are scheduled to be completed next August 2013. a portion of each u Miron is currently working in both these structures, but is only allowed to shutdown strac truction. Wqrk on Structure 50 ,t!lr6 to allow the existing plant to remain in operation during cons will be suspended during winter months as a. large portion of work in this structure has temperature sensitive coatings. 14owever, Miron anticipates working- on effluent gates for Structure SO'during those winter months. With the completion of Structures 40 an(f 50 next August 2013 Miron anticipates completing the bypass of the Aeration Tank Splitter (Structure 37) and associated sitevork shortly after. Miron anticipates that by September 3, 2013 only final landscaping . wilt remain and the work will be substantially complete. Miron requests that the project substantial completion date be extended via change order to Septe-mber, 3, 2043, and the Final Completion date be correspondingly adjusted to February 3, 2014 0 Tj1e City contact Jonathan Please advise if the requested extension is acceptable t Ci of Dubuque, Pleas co t t on Daniels at- (920) 969-7392 with any questions, Sincerely, MIRON CONSTRUCTION Co., INC. Jonathan C. Daniels Project Manager Cc: Timothy Kippenhan, Miron Construction Co., file., Paul O'Brien, Miron Construction Co., Inc. William 't. McCardell, Esq. DeWitt Ross & Stevens, S.C. 7-; m1ron-Construction.com Engineering Department City Hall 50 W. 13th Street Dubuque, Towa 52001 563.589.4270 563.589.4205 (fax) www,cityofdubuc.ue.orZ August 16, 2012 Mr. Jonathan C. Daniels Miron Construction Co., Inc. 1471 McMahon Drive Neenah; WI 54945 RE: Contract Time Extension for Wind and Flood Events Dubuque Water Pollution Control Plant Dear Jonathan: The City has reviewed your June 8, 2012 letter regarding Miron's request to extend the project's Substantial Completion date to September 3, 2013 and the Final Completion date to February 3, 2014. The City agrees with Miron's proposed dates and will direct Strand Associates to prepare a change order to formally extend the dates. Sincerely, Steve Sampson Brawn Project Manager ,z 910 West Wingra Drive Madison, WI 53715 n (P) 608- 251 -4843 STRAND (F) 608- 251 -8655 i %SSo C I'A'A' So August 21, 2012 CHANGE ORDER NO. 17 PROJECT: Water Pollution Control Plant Modifications OWNER: City of Dubuque CONTRACT: 1 -2010 CONTRACTOR: Miron Construction Co., Inc. Description of Change 17a Adjust Contract Completion dates as a result of the July 11, 2011, ADD $0 wind event and the July 28, 2011, flood event. See Contract Completion Date Adjustments below. TOTAL VALUE OF THIS CHANGE ORDER: ADD $0 Contract Price Adjustment Original Contract Price $49,750,000 Previous Change Order Adjustments $ 4,981,712 Adjustment in Contract Price this Change Order $ 0 Current Contract Price including this Change Order $54,73 1,712 Contract Completion Date Adjustment Original Milestone 1 Contract Completion Date March 1, 2012 Original Milestone 2 Contract Completion Date July 2, 2012 Original Substantial Contract Completion Date March 31, 2013 Original Contract Completion Date August 31, 2013 Milestone 1 Contract Completion Date Adjustments due to previous Change April 2, 2012 Orders Milestone 2l Contract Completion Date Adjustments due to previous Change August 2, 2012 Orders Substantial Contract Completion Date Adjustments due to previous Change April 23, 2013 Orders Final Contract Completion Date Adjustments due to previous Change Orders September 25, 2013 GWT.dlh \S: \MAD \1100 -- 1199 \1154 \023 \Wrd \Change OrdersTO 17.docx Arizona I Illinois I Indiana I Kentucky I Ohio I Wisconsin vvwvv.strand.com City of Dubuque —Miron Construction Co., Inc. Contract 1 -2010, Change Order No. 17 Page 2 August 21, 2012 Milestone 1 Contract Completion Date Adjustments due to this Change Order Milestone 2 Contract Completion Date Adjustments due to this Change Order Substantial Contract Completion Date Adjustments due to this Change Order Final Contract Completion Date Adjustments due to this Change Order October 4, 2012 February 6, 2013 September 3, 2013 February 3, 2014 ® 's®% � jiE i ii j jhiss document shall become a supplement to the Contract and all provisions will apply hereto. °°IW -Mm NDE Co! RANDALL A. q VVIRT �ENG ER- StrandAssSociates, 96937 •�,® c� �C• * -ROVED / Co., Inc. David G. Voss Jr., Ili' ` omm OWNER:--City of OWT:dili \S:WAD \1100 --1199 \1154 \023\Wrd\Cliange Orders \CO 17.doex- Date Date Date vvww.strand.colrl Directive No.: 44 Contract: 1 -2010 Owner. City of Dubuque Sy: Gam' Contractor: Miron Construction Co.. Inc. Date: ?1/112 Description of Work Cost Deduction Cost Addition Due to wind damage on July 11, 2011, and tloodl% damage on July 28, 2011, this Work Change. Directive extends original Milestone 1 contract completion date by 130 worming days from March 1, 2012, to September 4, 2012. Due to wind damage on July 11, 2011, and flooding damage on July 28; 2011, this Work. Change Directive extends original. Milestone. 2 contract completion date by 130 working days from July 2, 2012, to January 7. 2013. Total Remarks; Contractor has requested 130 working day extensions to all four liquidated damage4ates. The Owner is still reviewing the extension to the substantial and final completion liquidated damage dates,. The 130 working day extension to construction contract Milestones 1 and 2 is not negotiable. Change in Contract Price b t] Supplemental Unit Price Io Unk Price ❑ Lump Sum Requested by; Miron Construction I I Q0 1 Date Recommended by; (Engineer) 21/112 Date Accepted by: ( Date Approved by.,.. (Owner) 2 -15` I �- Date --THIS FORM IS NOTA SUBSTITUTE FOR A PROPERLYPREPARED AND EXECUTED CHANGE O tWU;SY $'.WAD11i0Q- IiMI154023kWWWotk Cis np DhoWa N444.t d= Dear Steve:. Thant: you for taking the time to meet yesterday. This letter is to slimnarize the narrative of remaining schedule discussed yesterday..lvliro. Construction Co., Inc. has. also issued schedule update 15R which reflects actual progress to- May 25'mh; as well as, the current planned. sequence of remaining work. The two remaining structures with the longest durations are the Aeration Tanks (Structure 40) and the Final Clarifiers (Structure 50). These structures are scheduled to. be completed next august 2013. Miron is currently working in both these structures; but is only allowed to shutdown a portion of each Structure to allow the existing plant to remain in operation during construction. Work on Structure 50, will be suspended during winter months as alarge portion of work in this structure has temperature sensitive coatings. flowever, Miron;antieipates working. on effluent gates %r Structure 50 during chose - Winter months. With the completion of Structures 40 and 50 next August 2013 Miron anticipates completing the bypass of the Aeration Tank S.plitter (Structure 37) and associate. d site•work shortly of ter —Miron anticipates that by September 3, 2013 only final landscaping Will remain and the work will be substantially complete. Miron requests that the project substantial completion elate be extended via change order to September 3, 201.3, and the Final Completiqu date be correspondingly adjusted to February 3, 2014 Please advise if the requested extension:is acceptable to the City of Dubuque. Please contact Jonathan Daniels at (920) 969 -7392 with any questions: Sincerely, 1VIIRON CONSTRUCTION CO., INC. Jonathan C. Daniels Project Manager Cc: Timothy Kippenhan, Miron Construction Co, lne.. Paul O'Brien, Miron Construction Co., inc. William E. McCardell, Esq. DeWitt Ross & Stevens, S.C. i�'i n�i `�f..rf'," :`i' �i1 is r !,''; �r: .?h ,..t .... lr-r�. F <_�i .:P. 5 • :i�:� �3�if- -si•t. Jl�i� + �. .7, {.I. Se. ('T� <�_,,. . >. »Mron- Consiruction.com ;t; i5 -'�+ f it" .. t? r;t; . i ;; e :,:Yr cr <• Mr. Jonathan C. Daniels Miron Construction Co., Inc. 1471 McMahon Drive Neenah; WI 54945 Engineering Department City Hall 50 W. 13th Street Dubuque, Iowa 52001 563.589.4270 563.589.4205 (fax) www.cityofdubuque.org August 16, 2012 RE: Contract Time Extension for Wind and Flood Events Dubuque Water Pollution Control Plant Dear Jonathan: The City has reviewed your June 8, 2012 letter regarding Miron's request to extend the project's Substantial Completion date to September 3, 2013 and the Final Completion date to February 3, 2014. The City agrees with Miron's proposed dates and will direct Strand Associates to prepare a change order-to formally extend the dates. Sincerely, Steve Sampson Brown Project. Manager