Port of Dubuque Watermain Extension Project TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Port of Dubuque Watermain Extension Project C I P: 7402261 DATE: September 11, 2012 City Engineer Gus Psihoyos recommends initiation of the public bidding procedure for the Port of Dubuque Watermain Extension Project, and further recommends that a public hearing be set for October 1, 2012. I concur with the recommendation and respectfully request Mayor and City Council approval. / AAh kt1&1 Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manage FROM: Gus Psihoyos, City Engineer DATE: September 10, 2012 SUBJECT: Port of Dubuque Watermain Extension Project CIP: 7402261 INTRODUCTION Dubuque it 1.r 2012 The enclosed resolutions authorize the public bidding procedure for the Port of Dubuque Watermain Extension Project. DISCUSSION The Port of Dubuque Watermain Extension Project will involve the installation of a 12" watermain into the Port of Dubuque at 5th Street. The 12" watermain connection will connect to the existing 20" watermain that was constructed as part of the Historic Millwork District Complete Streets Project along the hike /bike trail off of Jackson Street. A map of the proposed alignment is attached. During the development of the Historic Millwork District (HMO) Complete Streets Project, the Water Department made Engineering aware of their desire to extend a 12" watermain into the Port of Dubuque from the 20" watermain already scheduled to be installed near 5th and White Streets. Some years ago a section of water main near 4th Street in the Port of Dubuque had to be abandoned due to a failure. The failure occurred under the RR tracks and would have been cost prohibitive to fix, not to mention very disruptive to the railroad if it had not been abandoned. The project will include: — Directional boring casement pipe under existing Canadian National Railway tracks — 175 feet of trenched 12" Watermain construction. — 287 feet of trenched 12" watermain construction with restrained joints. — 64 feet of trenched 10" watermain construction with restrained joints. — 195 feet of directional bored 12" Watermain construction — Installation of 5 watermain valves and 2 fire hydrants PROJECT SCHEDULE The schedule for the project is as follows: Initiate Public Bidding Process Publish Notice to Bidders, Advertise for Bids Notice of Public Hearing on Plans& Specifications Public Hearing Receipt of Bids Award Construction Contract Project Completion Date RECOMMENDATION September 17, 2012 September 21, 2012 September 21, 2012 October 1, 2012 October 4, 2012 October 15, 2012 December 31, 2012 I recommend that the City Council establish a date for the public hearing and authorize the City Clerk to advertise for proposals. BUDGETIMPACT The Water Department has identified funds to pay for this work. They are proposing using funds that were left over from the utility relocation project to accommodate the 10th Street and Central Avenue parking ramp. The Water Department estimates that the amount remaining from the 20" Transmission Main Relocation Replacement Project is $153,000. Veenstra & Kimm, Inc. originally estimated the cost for this additional work to be $130,000. Based on current bid unit prices, this estimate is still reasonable. This work involves extending 12" watermain under the railroad tracks for the Canadian National Railway. In order to get the watermain under these tracks, the pipe will need to be directionally bored, so as to not disturb railway operations. The estimate of probable cost for the Port of Dubuque Watermain Extension Project is as follows: Estimate Construction Contract $120,000.00 Contingency 13,000.00 Construction Engineering & Inspection 20,000.00 Total Project Cost $153,000.00 The project funding summary is as follows: Fund CIP No. Fund Description Amount 7402261 20" Transmission Main Relocation Project $153,000.00 Total Project Funding $153,000.00 ACTION TO BE TAKEN The City Council is requested to establish the date of the public hearing and to authorize the City Clerk to advertise for proposals through adoption of the enclosed resolutions for the Port of Dubuque Watermain Extension Project. Prepared by Jon Dienst, Civil Engineer cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Bob Green, Water Department Manager Bob Schiesl, Assistant City Engineer RESOLUTION NO. 252 -12 PORT OF DUBUQUE WATERMAIN EXTENSION PROJECT PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND ORDERING THE ADVERTISEMENT FOR BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: the proposed plans, specifications, form of contract and estimated cost for the Port of Dubuque Watermain Extension Project, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. a public hearing will be held on the 1st day of October, 2012, at 6:30 p.m. in the Historic Federal Building Council Chambers at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. The Port of Dubuque Watermain Extension Project is hereby ordered to be advertised for bids for construction. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. The City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the attached Notice to Bidders to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four but not more than forty -five days before the date for filing bids before 2:00 p.m. on the 4th day of October, 2012. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at 6:30 p.m. on the 15th day of October, 2012, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Passed, adopted and approved this 17th day of se . t - mb e '2012. Attest: Kevi S. Firnstahl, M , y Clerk oy D. Buol, Mayor NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE PORT OF DUBUQUE WATERMAIN EXTENSION PROJECT NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Port of Dubuque Watermain Extension Project, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 15t day of October, 2012, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: Installation of 12" watermain into the Port of Dubuque from the existing 20" watermain at 5th and White Streets: — Directional boring casement pipe under existing Canadian National Railway tracks — 175 feet of trenched 12" Watermain construction. — 287 feet of trenched 12" watermain construction with restrained joints. — 64 feet of trenched 10" watermain construction with restrained joints. — 195 feet of directional bored 12" Watermain construction — Installation of 5 watermain valves and 2 fire hydrants Any visual or hearing- impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589 -4120 or TDD at (563) 690 -6678 at least 48 hours prior to the meeting. 2012. Published by order of the City Council given on the _ day of Kevin S. Firnstahl, CMC, City Clerk NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT PORT OF DUBUQUE WATERMAIN EXTENSION PROJECT Time and Place for Filing Sealed Proposals. Sealed bids for the work comprising each improvement as stated below must be filed before 2:00 p.m. on the 4�h day of October, 2012, in the Office of the City Clerk, City Hall - First Floor, 50 West 13th Street, Dubuque, Iowa. Time and Place Sealed Proposals Will be Opened and Considered. Sealed proposals will be opened and bids tabulated at 2:00 P.m. on 4th day of October, 2012, at City Hall - Conference Room A, 50 West 13t Street, Dubuque, Iowa, for consideration by the City Council (Council) at its meeting on 15th day of October, 2012. The City of Dubuque, Iowa, reserves the right to reject any and all bids. Time for Commencement and Completion of Work. Work on each improvement shall be commenced within 10 days after the Notice to Proceed has been issued and shall be fully completed by 31 st day of December, 2012. Bid Security. Each bidder shall accompany its bid with a bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bid security shall be in the amount of ten percent (10 %) of the amount of the contract and shall be in the form of a cashier's check or certified check drawn on a state - chartered or federally chartered bank, or a certified share draft drawn on a state - chartered or federally chartered credit union, or the governmental entity may provide for a bidder's bond with corporate surety satisfactory to the governmental entity. The bid bond shall contain no conditions excepted as provided in this section. Contract Documents. Copies of the construction documents may be obtained at the Engineering Department, City Hall — Second Floor, 50 West 13th Street, Dubuque, Iowa 52001. No plan deposit is required. Preference for Iowa Products and Labor. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. Sales Tax. The bidder should not include sales tax in its bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. General Nature of Public Improvement. Port of Dubuque Watermain Extension Project: — Directional boring casement pipe under existing Canadian National Railway tracks — 175 feet of trenched 12" Watermain construction. — 287 feet of trenched 12" watermain construction with restrained joints. — 64 feet of trenched 10" watermain construction with restrained joints. — 195 feet of directional bored 12" Watermain construction — Installation of 5 watermain valves and 2 fire hydrants Published in the Telegraph Herald, 21 st day of September, 2012. THE CTTY OF Port of Dubuque Watermain Extension DAGIS;� DUB E Masterpiece on the Mississippi Proposed Route DUBUQUE AREA GEOGRAPHIC INFORMATION —TER r�`i 1 DISCLAIMER: This Infi. oration --piled sing the Dubuque Area Geographic Information SVStem IDAGIS), which Includes data created by both the City of Dubuque and Dubuque County . It Is understood that, while the Clty of Dubuque and arte patilt agencies util lAed the most current and __,te Information aval lab le, DAGIS and Its supple s do not uva —t the -c—cv of cui,enry of the Information or data contained hei-ein. The city and partlolpatl ng agencyshall notbeheld 11 bbl anv dhect, Indhe t, Indden al, ,,fsequentl0' punitive, or special damages, whether foreseeable or ocesmeabl e, Tising out of the authorized or unauthm,ed use of this data or the Inability to uste this data or out of anv breach of wa —ty ,lbbts vei- NMap Prepared by: City of Dubuque 1 inch = 62 feet W E Engineering Division 50 West 13th Street Dubuque, Iowa 52001 60 30 0 60 Feet c Phone: (563) 589 -4270 S Fax: (563)589 -4205