Loading...
NW Arterial Fiber Optics Conduit Accept D'U~~E ~~~ MEMORANDUM December 14, 2005 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Northwest Arterial Fiber Optics Conduit CIP 1001113/010284: Fiber Optic Conduit along Northwest Arterial City Engineer Gus Psihoyos is recommending acceptance of the Northwest Arterial Fiber Optics Conduit Project, as completed by Volkens, Inc., in the final contract amount of $114,624.00, which is a 1.42% increase from the original contract in the amount of $113,024.00. I concur with the recommendation and respectfully request Mayor and City Council approval. l ~ 17 M.Jt L( '7 .1[1 r~ Michllel c. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer . -., D~~~E ~ck~ MEMORANDUM December 13, 2005 FROM: Michael C. Van Milligen, City Man~V) Gus Psihoyos, City Engineer .Y M . TO: SUBJECT: Northwest Arterial Fiber Optics Conduit CIP 1001113/010284: Fiber Optic Conduit along Northwest Arterial) INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the Northwest Arterial Fiber Optics Conduit Project. BACKGROUND The Northwest Arterial Fiber Optics Conduit Project included the installation of four-inch conduit, with four one-inch inner-ducts, for traffic signal communications along the Northwest Arterial traffic signals and the US 20 interconnect system (Chavenelle Drive, Pennsylvania Avenue, and Asbury Road). Additional empty conduits were installed at three signalized intersections to supplement the existing traffic signal conduits that are at capacity. DISCUSSION The Northwest Arterial Fiber Optics Conduit Project was completed by Volkens, Inc. of Dyersville, Iowa, in the final contract amount of $114,624.00, which is a 1.42% increase from the original contract in the amount of $113,024.00. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $114,624.00. BUDGET IMPACT The project cost summary for the Northwest Arterial Fiber Optics Conduit Project is as follows: Bid Final Construction Contract $113,024.00 $114,624.00 Contingency 14,782.50 0 Engineering 24,391.13 14,601.00 Total Project Cost J152.197.63 .$129.225.00 The project will be funded from the Fiscal Year 2004 Northwest Arterial Fiber Optics Capital Improvement Project originally budgeted as $165,000.00. This realizes a total project cost savings of $35,775.00. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final construction cost for the Northwest Arterial Fiber Optics Conduit Project. Prepared by David Ness, PE cc: Dawn Lang, Budget Director Chris Kohlmann, Information Services Manager David Ness, PE RESOLUTION NO. 531-05 ACCEPTING THE NORTHWEST ARTERIAL FIBER OPTICS CONDUIT PROJECT Whereas, the contract for the Northwest Arterial Fiber Optics Conduit Project (the Project) has been completed and the City Manager has examined the work and filed a certificate stating that the Project has been completed according to the terms of the contract, plans and specifications and that the City Manager recommends that the Project be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Manager is approved and the Project is hereby accepted. Section 2. The City Treasurer is hereby directed to pay to the contractor from the the Fiscal Year 2005 Northwest Arterial Fiber Optics Capital Improvement Project appropriation for the contract amount of $114,624.00 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 19th day of December, 2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk RESOLUTION NO. 532-05 FINAL ESTIMATE Whereas, the construction contract for the Northwest Arterial Fiber Optics Conduit Project, has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $129,225.00 and the said amount shall be paid from the allocation from the Fiscal Year 2004 Northwest Arterial Fiber Optics Capital Improvement Project. Passed, approved and adopted this 19th day of December, 2005. Terrance M. Duggan, Mayor. Attest: Jeanne F. Schneider, CMC, City Clerk City of Dubuque - Council Form Project Name' Northwest Arterial Fiber Optics Date: 1211412005 CIP #1001113 Contractor: Contractor: Volkens Inc Contract Amount: $113,024.00 .'d Unit QTY Amount Earned Item # Code Item Unit Quantity Cost To Date To Date 1 Special 4~ HOPE Empty Bored LF 982 $12.00 982 $11,784.00 2 Special 4~ HOPE Empty + 2" HOPE Bored Together LF 350 $14.00 350 $4,900.00 3 Special 4" HOPE Empty + 4~ HOPE with 4-1~ HOPE Bored Together LF 970 $22.00 970 $21,340.00 4 Special 4" HOPE Trenched (with 4-1~ HOPE inside) LF 6500 $6.00 6,500 $39,000.00 5 Special 5" PVC Sch 40 Trenched (with 4-1" HOPE inside) LF 100 $6.50 100 $650.00 . Special 4-1" HOPE installed into existing 5~ PVC LF 3100 $2.50 3,100 $7,750.00 7 Special Type 1 Hand-hole Installed Each 12 $750.00 11 $8,250.00 . Special Type 2 Hand-hole Installed into Existing Conduit Each 3 $850.00 3 $2,550.00 . Special Type 2 Hand-hole Installed Each 7 $750.00 7 $5,250.00 10 Special Fiber Vault Installed Each 5 $2,000.00 6 $12,000.00 11 Special 2" Trenched LF 100 $3.00 100 $300.00 12 Special 2" and 4~ Trenched LF 100 $5.00 100 $500.00 ADDITIONAL ITEMS Type 1 Manhole and Lid Supplied (Not Installed) Each o $350.00 1 Total Due Contraclor Engineering Tolal Construction Costs $350.00 $114,624.00 $14,601.00 $129,225.00 Certfficate of the City Manager I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen. City Manager City of Dubuque, Iowa APPROVED X4~) Gus Psihoyos. City Engineer /.- S. City of Dubuque, Iowa Certificate of the Conlractor I undersigned. contractor for the above improvement, does hereby accept the above "Total Due Contractor". as full settlement for all claims for said improvement. '-::E fM;< DATE: _ _