Port of Dubuque Watermain Extension Project Award TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Port of Dubuque Watermain Extension Project C I P: 7402261 DATE: October 5, 2012 Sealed bids were received for the Port of Dubuque Watermain Extension Project. City Engineer Gus Psihoyos recommends award of the contract to the low bidder, Tschiggfrie Excavating, Inc., in the amount of $160,310.40, which is 19.79% over the estimate of probable cost. The higher than anticipated cost is due to the required casing pipe that needs to be installed under the railroad tracks and contractor expense of needing railroad liability insurance. I concur with the recommendation and respectfully request Mayor and City Council approval. /7AAh kt1&1 Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Port of Dubuque Watermain Extension Project CIP: 7402261 DATE: October 5, 2012 INTRODUCTION Dubuque All-America Cffy �I 1 1 1' 2012 The enclosed resolution authorizes the award of the construction contract for the Port of Dubuque Watermain Extension Project. DISCUSSION The Port of Dubuque Watermain Extension Project will involve the installation of a 12" watermain into the Port of Dubuque under the existing Canadian National Railway tracks at 5th Street. The 12" watermain connection will connect to the existing 20" watermain that was constructed as part of the Historic Millwork District Complete Streets Project and will reconnect an essential water distribution loop for the Port of Dubuque and downtown area. A map of the proposed alignment is attached. The project will include: • Directional boring casement pipe under the existing Canadian National Railway tracks • 175 feet of trenched 12" watermain construction. • 287 feet of trenched 12" watermain construction with restrained joints. • 64 feet of trenched 10" watermain construction with restrained joints. • 195 feet of directional bored 12" watermain construction • Installation of 5 watermain valves and 2 fire hydrants BID RESULTS Sealed bids were received on the project on October 4, 2012. Tschiggfrie Excavating, Inc. of Dubuque, Iowa, submitted the low bid in the amount of $160,310.40. This amount is 19.79% over the estimate of probable cost. The higher than anticipated cost is due to the required casing pipe that needs to be installed under the railroad tracks and contractor expense of needing railroad liability insurance. A summary of the bid proposals received is as follows: Contractor Name Total Bid Tschiggfrie Excavating $160,310.40 Drew Cook & Sons Excavating $175,884.00 Connolly Construction $189,025.60 Portzen Construction $193,902.00 Top Grade Excavating $201,930.00 McClain Excavating $216,303.00 RECOMMENDATION I recommend that the contract for the Port of Dubuque Watermain Extension Project be awarded to Tschiggfrie Excavating in the amount of $160,310.40. BUDGET IMPACT The estimate of probable cost for the Port of Dubuque Watermain Extension Project is as follows: Estimate Award Construction Contract $133,826.13 $160,310.40 Contingency 13,000.00 13,000.00 Construction Engineering & Inspection 20,000.00 20,000.00 Total Project Cost $166,826.13 $193,310.40 The project funding summary is as follows: Fund CIP No. Fund Description Amount 7402261 20" Transmission Main Relocation Project Total Project Funding ACTION TO BE TAKEN $193,310.40 $193,310.40 I recommend that the City Council adopt the attached resolution awarding the Port of Dubuque Watermain Extension Project to Tschiggfrie Excavating in the amount of $160,310.40. Prepared by Jon Dienst, P.E., Civil Engineer II cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Bob Green, Water Department Manager Bob Schiesl, Assistant City Engineer RESOLUTION NO. 290 -12 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE PORT OF DUBUQUE WATERMAIN EXTENSION PROJECT Whereas, sealed proposals have been submitted by contractors for the Port of Dubuque Watermain Extension Project (the Project) pursuant to Resolution No. 252 -12 and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 21st day of September, 2012, and Whereas, said sealed proposals were opened and read on the 4th day of October, 2012 and it has been determined that Tschiggfrie Excavating of Dubuque, Iowa with a bid proposal in the amount of $160,310.40, is the responsive, responsible bidder for the Project, and Whereas, it has been determined that it is in the best interest of the City of Dubuque to enter into an improvement contract with Tschiggfrie Excavating for said Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Tschiggfrie Excavating and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 15th day of Octobe , 2012. Attest: I Kevin : Firnstahl, MC, Ci y Clerk Roy D. Buol, Mayor $ 133,826.13 1 City of Dubuque - Engineering Division - BID TABULATION SHEET Bid Proposal BID TABULATION FOR: Port of Dubuque Watermain Extension Project BASE BID: BID ITEM DESCRIPTION ITEM ITEM 3 Topsoil, Furnish + Spread 6 Granular Subbase 7 Shoulder Finish, Earth 44 Removal of Pavement 58 Safety Closure 68 Traffic Control 70 Patch, Full -Depth Finish, By Area 71 Patch, Full -Depth Finish, By Count 72 Mobilization 77 Water Main, Trenched, DIP, 8" 79 Water Main, Trenched, DIP, 12" 81A Water Main /CAS, Trenchless, DIP 12" 84A Fittings By Count, DI, Reducer, 12x6 84B Fittings By Count, DI, Reducer, 12x10 88A Fittings By Count, DI, Tee, 10X8 90 Fittings By Count, DI, Tee, 12x6 91 Fittings By Count, DI, Tee, 12X8 92A Fittings By Count, DI, Tee, 12x12 97A Fittings By Count, DI, 11.25 Degree Bend, 12 in. 97B Fittings By Count, DI, 22.5 Degree Bend, 12 in. 100 Fittings By Count, DI, 45 Degree Bend, 12 in. 103A Fittings By Count, DI, 90 Degree Bend, 12 in. 111 Valve, Gate, DIP 8" 112 Valve, Gate, DIP 10" 113 Valve, Gate, DIP 12" 118 Fire Hydrant Assembly 127 Connection to Existing Water Main, 8 in. 128 Connection to Existing Water Main, 10 in. 129 Connection to Existing Water Main, 12 in. 148A Water Main, Trenched, DIP, 10" (Restrained Joint) 148B Water Main, Trenched, DIP, 12" (Restrained Joint) 176 Sod 178 Silt Fence 179 Removal of Silt Fence UNIT CY SY STA SY Each LS SY Each LS LF LF LF Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each LF LF SO LF LF BID DATE: 10/4!2012 ESTIMATED QUANTITY ESTIMATE UNIT COST 210 $ 35.00 310 $ 15.00 $ 4650.00 0.60 $ 750.00 $ 450.00 310 $ 7.00 $ 2,170.00 3 $ 25650 $ 770.40 1 $ 2500.00 $ 2,000.00 310 $ 50.00 $ 15500.00 1 $ 500.00 $ 500.00 1 $ 10,000 .00 $ 10,000.00 10 $ 49.86 $ 498.60 175 $ 61.90 $ 10,832.50 195 $ 90.00 $ 17,550.00 1 $ 537.14 $ 537.14 1 $ 537.14 $ 537.14 1 $ 800.00 $ 800.00 1 $ 799.29 $ 799.29 1 $ 904.15 $ 904.15 1 $ 952.30 $ 952.30 1 $ 762.91 $ 762.91 2 $ 762.91 $ 1,525.82 1 $ 762.91 $ 762.91 1 $ 762.91 $ 762.91 1 $ 1,600.00 $ 1,600.00 1 $ 2200.00 $ 2200.00 3 $ 2500 .00 $ 7,800.00 2 $ 3531.00 $ 7,062.00 2 $ 498.62 $ 997.24 1 $ 583.15 $ 583.15 1 $ 722.25 $ 722.25 64 $ 70.00 $ 4,480.00 287 $ 72.00 $ 20564.00 114 $ 44.53 $ 5,076.42 450 $ 3.00 $ 1,350.00 450 $ 1.50 $ 675.00 TOTAL COST $ 7,350.00 BASE BID ESTIMATE: (Bid Items No.3 to 179 Total) BIDDER: Tschiggfrie Excavating BIDDER: Drew Cook Excavating BIDDER: Connolly Construction In' Excavating Co. Inc. UNIT COST TOTAL COST .00 $ 2,310.00 $ 7.00 $ 2,170.00 $ 429.00 $ 257.40 $ 11.00 $ 3,410.00 $ 125.00 $ 375.00 $ 1500.00 $ 1500.00 $ 47.00 $ 14 570.00 $ 360.00 $ 360.00 $ 8,443.00 $ 8,443.00 $ 81.00 $ 810.00 $ 65.00 $ 11 75.00 $ 280.00 $ 64 500.00 $ 399.00 $ 399.00 $ 469.00 $ 469.00 $ 706.00 $ 706.00 $ 747.00 $ 747.00 $ 777.00 $ 777.00 $ 954.00 $ 954.00 $ 572.00 $ 572.00 $ 587.00 $ 1,174.00 $ 655.00 $ 655.00 $ 752.00 $ 752.00 $ 1267.00 $ 1267.00 $ 1729.00 $ 1729.00 $ 2,140.00 $ 6,420.00 $ 3,855.00 $ 7710.00 $ 473.00 $ 946.00 $ 561.00 $ 561.00 $ 662.00 $ 662.00 $ 68.00 $ 4,352.00 $ 78.00 $ 22,386.00 $ 53.00 $ 6542.00 $ 2.00 $ 900.00 $ 1.00 $ 450.00 Bid Sub- total: $ 160,310.40 Under/Over: 19.79% UNIT COST TOTAL COST $ 8.00 $ 6.50 $ $ 200.00 $ 120.00 $ 11.00 $ 3,410.00 $ 125.00 $ 375.00 $ 1,000.00 $ 1500.00 $ 55.00 $ 17550.00 $ 1525.00 $ 1525.00 $ 3,500.00 $ 3,500.00 $ 60.00 $ 600.00 $ 68.00 $ 11 500.00 $ 318.00 $ 62510.00 $ 550.00 $ 550.00 $ 600.00 $ 600.00 $ 850.00 $ 850.00 $ 860.00 $ 860.00 $ 870.00 $ 870.00 $ 1220.00 $ 1220.00 $ 750.00 $ 750.00 $ 750.00 $ 1,500.00 $ 800.00 $ 800.00 $ 900.00 $ 900.00 $ 1565.00 $ 1565.00 $ 1,850.00 $ 1,850.00 $ 2275.00 $ 6,825.00 $ 4,180.00 $ 8,360.00 $ 1,350.00 $ 2700.00 $ 1,450.00 $ 1,450.00 $ 1,450.00 $ 1,450.00 $ 79.00 $ 5556.00 $ 83.00 $ 23,821.00 $ 53.00 $ 6542.00 $ 2.00 $ 900.00 $ 0.40 $ 180.00 3780.00 2.015.00 Bid Sub- total: $ 175584.00 Under/Over: 31.43% UNIT COST TOTAL COST $ 37.30 $ 755 $ 2433.50 $ 460.00 $ 276.00 $ 9.20 $ 2,852.00 $ 145.00 $ 435.00 $ 1,137.00 $ 1,137.00 $ 47.10 $ 14,601.00 $ 340.00 $ 340.00 $ 10,515.00 $ 10,515.00 $ 138.00 $ 1,380.00 $ 77.00 $ 13,475.00 $ 325.00 $ 63,375.00 $ 436.00 $ 436.00 $ 540.00 $ 540.00 $ 745.00 $ 745.00 $ 925.00 $ 925.00 $ 960.00 $ 960.00 $ 1215.00 $ 1215.00 $ 715.00 $ 715.00 $ 730.00 $ 1,460.00 $ 778.00 $ 778.00 $ 859.00 $ 859.00 $ 1,605.00 $ 1,605.00 $ 2,164.00 $ 2,164.00 $ 2,517.00 $ 7,551.00 $ 4 059 00 $ 8,118.00 $ 370.00 $ 740.00 $ 530.00 $ 530.00 $ 640.00 $ 640.00 $ 92.85 $ 5,942.40 $ 86.00 $ 24682.00 $ 65.55 $ 7,472.70 $ 2.60 $ 1,170.00 $ 2.50 $ 1,125.00 7.833.00 Bid Sub- total: $ 189,025.60 Under /Over: 41.25% 1 $ 133,826.13 1 City of Dubuque - Engineering Division - BID TABULATION SHEET Bid Proposal BID TABULATION FOR: Port of Dubuque Watermain Extension Project BASE BID: BID ITEM DESCRIPTION ITEM ITEM 3 Topsoil, Furnish + Spread 6 Granular Subbase 7 Shoulder Finish, Earth 44 Removal of Pavement 58 Safety Closure 68 Traffic Control 70 Patch, Full -Depth Finish, By Area 71 Patch, Full -Depth Finish, By Count 72 Mobilization 77 Water Main, Trenched, DIP, 8" 79 Water Main, Trenched, DIP, 12" 81A Water Main /CAS, Trenchless, DIP 12" 84A Fittings By Count, DI, Reducer, 12x6 84B Fittings By Count, DI, Reducer, 12x10 88A Fittings By Count, DI, Tee, 10X8 90 Fittings By Count, DI, Tee, 12x6 91 Fittings By Count, DI, Tee, 12X8 92A Fittings By Count, DI, Tee, 12x12 97A Fittings By Count, DI, 11.25 Degree Bend, 12 in. 97B Fittings By Count, DI, 22.5 Degree Bend, 12 in. 100 Fittings By Count, DI, 45 Degree Bend, 12 in. 103A Fittings By Count, DI, 90 Degree Bend, 12 in. 111 Valve, Gate, DIP 8" 112 Valve, Gate, DIP 10" 113 Valve, Gate, DIP 12" 118 Fire Hydrant Assembly 127 Connection to Existing Water Main, 8 in. 128 Connection to Existing Water Main, 10 in. 129 Connection to Existing Water Main, 12 in. 148A Water Main, Trenched, DIP, 10" (Restrained Joint) 148B Water Main, Trenched, DIP, 12" (Restrained Joint) 176 Sod 178 Silt Fence 179 Removal of Silt Fence UNIT CY SY STA SY Each LS SY Each LS LF LF LF Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each LF LF SO LF LF BID DATE: 10/4!2012 ESTIMATED QUANTITY ESTIMATE UNIT COST TOTAL COST BIDDER: Portzen Construction BIDDER: Top Grade Excavating BIDDER: McClain Excavating UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST TOTAL COST 210 $ 35.00 $ 7,350.00 $ 30.00 $ 6,300.00 $ 25.00 $ 5,250.00 $ 50.00 $ 10500.00 310 $ 15.00 $ 4650.00 $ 5.50 $ 1705.00 $ 9.00 $ 2790.00 $ 6.75 $ 2092.50 0.60 $ 750.00 $ 450.00 $ 1,000.00 $ 600.00 $ 1,000.00 $ 600.00 $ 3,850.00 $ 2,310.00 310 $ 7.00 $ 2,170.00 $ 9.00 $ 2790.00 $ 15.00 $ 4,650.00 $ 11.00 $ 3,410.00 3 $ 25680 $ 770.40 $ 150.00 $ 450.00 $ 125.00 $ 375.00 $ 300.00 $ 900.00 1 $ 2500A0 $ 2,000.00 $ 1,500.00 $ 1,500.00 $ 1500.00 $ 1,000.00 $ 1500.00 $ 1500.00 310 $ 50.00 $ 15500.00 $ 75.00 $ 23250.00 $ 54.00 $ 16740.00 $ 67.50 $ 20,925.00 1 $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ 1,400.00 $ 1,400.00 $ 250.00 $ 250.00 1 $ 10,000.00 $ 10,000.00 $ 9,000.00 $ 9,000.00 $ 24,000.00 $ 24,000.00 $ 26,500.00 $ 26,500.00 10 $ 49.86 $ 498.60 $ 75.00 $ 750.00 $ 65.00 $ 650.00 $ 60.00 $ 600.00 175 $ 61.90 $ 10,832.50 $ 75.00 $ 13,125.00 $ 72.00 $ 12,600.00 $ 70.00 $ 12250.00 195 $ 90.00 $ 17,550.00 $ 315.00 $ 61 A26.00 $ 260.00 $ 50,700.00 $ 295.00 $ 57525.00 1 $ 537.14 $ 537.14 $ 600.00 $ 600.00 $ 540.00 $ 540.00 $ 460.00 $ 460.00 1 $ 537.14 $ 537.14 $ 625.00 $ 625.00 $ 575.00 $ 575.00 $ 500.00 $ 500.00 1 $ 800.00 $ 800.00 $ 900.00 $ 900.00 $ 805.00 $ 805.00 $ 685.00 $ 685.00 1 $ 799.29 $ 799.29 $ 925.00 $ 925.00 $ 855.00 $ 855.00 $ 735.00 $ 735.00 1 $ 904.15 $ 904.15 $ 960.00 $ 960.00 $ 890.00 $ 890.00 $ 770.00 $ 770.00 1 $ 952.30 $ 952.30 $ 1,300.00 $ 1,300.00 $ 1200.00 $ 1200.00 $ 935.00 $ 935.00 1 $ 762.91 $ 762.91 $ 825.00 $ 825.00 $ 780.00 $ 780.00 $ 585.00 $ 585.00 2 $ 762.91 $ 1525.82 $ 850.00 $ 1700.00 $ 800.00 $ 1 500.00 $ 595.00 $ 1,190.00 1 $ 762.91 $ 762.91 $ 900.00 $ 900.00 $ 850.00 $ 850.00 $ 640.00 $ 640.00 1 $ 762.91 $ 762.91 $ 975.00 $ 975.00 $ 925.00 $ 925.00 $ 710.00 $ 710.00 1 $ 1,600.00 $ 1,600.00 $ 2,100.00 $ 2,100.00 $ 2,100.00 $ 2,100.00 $ 1575.00 $ 1575.00 1 $ 2200.00 $ 2200.00 $ 2,600.00 $ 2,600.00 $ 2,900.00 $ 2$00.00 $ 2,050.00 $ 2550.00 3 $ 2 ,000.00 $ 7,800.00 $ 3200.00 $ 9,600.00 $ 3,400.00 $ 10200.00 $ 2,425.00 $ 7,275.00 2 $ 3$31.00 $ 7,062.00 $ 3,850.00 $ 7700.00 $ 4,000.00 $ 8,000.00 $ 4,350.00 $ 8,700.00 2 $ 498.62 $ 997.24 $ 500.00 $ 1,000.00 $ 500.00 $ 1,000.00 $ 2,000.00 $ 4,000.00 1 $ 583.15 $ 583.15 $ 600.00 $ 600.00 $ 600.00 $ 600.00 $ 2550.00 $ 2550.00 1 $ 722.25 $ 722.25 $ 800.00 $ 800.00 $ 750.00 $ 750.00 $ 2590.00 $ 2590.00 64 $ 70.00 $ 4,480.00 $ 80.00 $ 5,120.00 $ 86.00 $ 5,504.00 $ 72.50 $ 4,640.00 287 $ 72.00 $ 20 ,064.00 $ 89.00 $ 25543.00 $ 98.00 $ 28126.00 $ 81.50 $ 23390.50 114 $ 44.53 $ 5,076.42 $ 56.00 $ 6,384.00 $ 100.00 $ 11,400.00 $ 102.50 $ 11,685.00 450 $ 3.00 $ 1,350.00 $ 2.50 $ 1,125.00 $ 2.50 $ 1,125.00 $ 2.50 $ 1,125.00 450 $ 1.50 $ 675.00 $ 0.50 $ 225.00 $ 1.00 $ 450.00 $ 1.00 $ 450.00 BASE BID ESTIMATE: (Bid Items No.3 to 179 Total) Bid Sub- total: $ 193 502.00 Bid Sub- total: $ 201,930.00 Bid Sub- total: $ 216,303.00 Under/Over: 44.89% % Under /Over: 50.89% % Under /Over: 61.63%