Asphalt Paving Pro FY 2006 Annual Street Program D~~~E ~ck~ MEMORANDUM December 21, 2005 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2005 Asphalt Paving Project CIP 3001719 - Fiscal Year 2006 Annual Street Program City Engineer Gus Psihoyos is recommending acceptance of the 2005 Asphalt Paving Project, as completed by River City Paving, in the final contract amount of $936,460.16, which is a 15.4% decrease from the original contract in the amount of $1,107,558.26. I concur with the recommendation and respectfully request Mayor and City Council approval. f1~j{ ~/)t~ Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gus Psi hoyos, City Engineer D~~~E ~ck~ MEMORANDUM December 21 , 2005 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: 2005 Asphalt Paving Project CIP 3001719 - Fiscal Year 2006 Annual Street Program INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the 2005 Asphalt Paving Project. BACKGROUND The 2005 Asphalt Paving Project included the following four (4) street improvement project locations, which were approved and included in the Annual Five-Year Street Program. The length of this year's program is approximately 2.76 miles of asphalt pavement resurfacing. 1. 2. 3. 4. Bluff Street South Grandview Avenue Carmel Drive Carter Road From 9th Street to 14th Street From Southern Avenue to Carmel Drive From South Grandview Avenue to End From Hillcrest Road to West 32nd Street DISCUSSION The 2005 Asphalt Paving Project was completed by River City Paving, Division of Mathy Construction Inc. of Kieler, Wisconsin, in the final contract amount of $936,460.16, which is a 15.4% decrease from the original contract in the amount of $1,107,558.26. The majority of this savings is due to less full-depth patching, curb and gutter replacement and driveway repairs being required on the project. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $936,460.161. BUDGET IMPACT The project cost summary for the 2005 Asphalt Paving Project is as follows: Construction Contract Contingency Construction Engineering & Inspection Bid Award $1,107,558.26 178,753.48 137,044.34 Total Project Cost $1.423,356.08 The project funding summary is as follows: CIP No. 3001719 7401405 7201066 7101355 7101638 Fund Description FY2006 Annual Street Program FY2006 Water Main Replacement Funds FY2006 Storm Sewer General Repair Funds FY2006 Sanitary Sewer Manhole Replacement Funds FY2006 Street Program Related Sanitary Sewer Funds Total Project Funding ACTION TO BE TAKEN Final $936,460.16 o 86,637.92 $1 ,023,098.08 Fund Amount $823,804.75 51,166.95 2,895.13 83,862.62 61,368.63 $1 ,023,098.08 The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final construction cost for the 2005 Asphalt Paving Project (Fiscal Year 2006). Prepared by Jon Dienst, PE cc: Dawn Lang, Budget Director Don Vogt, Public Works Director John Klostermann, Operations & Maintenance Supervisor Bob Green, Water Plant Manager Bob Schiesl, Assistant City Engineer Deron Muehring, Civil Engineer RESOLUTION NO. 4-06 ACCEPTING THE 2005 ASPHALT PAVING PROJECT (FISCAL YEAR 2006) Whereas, the contract for the 2005 Asphalt Paving Project (Fiscal Year 2006) (the Project) has been completed and the City Manager has examined the work and filed a certificate stating that the Project has been completed according to the terms of the contract, plans and specifications and that the City Manager recommends that the Project be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Manager is approved and the Project is hereby accepted. Section 2. The City Treasurer is hereby directed to pay to the contractor from the FY2006 Annual Street Program, FY2006 Water Main Replacement Funds, FY2006 Storm Sewer General Repair Funds, FY2006 Sanitary Sewer Manhole Replacement Funds and FY2006 Street Program Related Sanitary Sewer Funds appropriation for the contract amount of $936,460.16 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 3 rd day of January ,2006. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, City Clerk RESOLUTION NO. 5-06 FINAL ESTIMATE Whereas, the construction contract for the 2005 Asphalt Paving Project (Fiscal Year 2006), has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $1,023,098.08 and the said amount shall be paid from the FY2006 Annual Street Program Funds, FY2006 Water Main Replacement Funds, FY2006 Storm Sewer General Repair Funds, FY2006 Sanitary Sewer Manhole Replacement Funds and FY2006 Street Program Related Sanitary Sewer Funds. Passed, approved and adopted this 3rd day of January, 2006. Roy D. Buol, Mayor. Attest: Jeanne F. Schneider, CMC, City Clerk City of Dubuque - Engineering Division Council Final Payment Form PAYMENT NO, COUNCIL FINAL DATE: December 20, 2005 PROJECT NAME: 2005 Asphalt Paving Project (FY 06) Bluff, South Grandview, Carmel Drive, Carter Road CONTRACTOR River City Paving- Div. Of Mathy Construction CONTRACT AMOUNT: $ 1,107,558.26 BID ITEM DESCRIPTION II UNIT II UNIT COST I AMOUNT EARNED TO DATE 1 Backfill Limestone Ton 2 Graded Slone Base Ton $ 10.00 683.97 $ 6,839.70 3 HMA Full Depth Repair Patches SY $ 46.70 704.39 $ 32,895.01 4 HMA 300k Weadge & Leveling Courses, 1/2" (PG 64~22) Ton $ 43.19 3475.05 $ 150,087.41 5 HMA 300k Surface Course, 1/2" (PG 64-22) Ton $ 43.19 707.05 $ 30,537.49 6 HMA 300k Surface Course, 1/2" (PG 64.34) Ton $ 46.58 4560.64 $ 212,434.61 7 HMA Hand Patching Ton $ 85.00 303.34 $ 25,783.90 8 HMA Surfacing of Driveway and Patches Ton $ 85.00 12.81 $ 1,088.85 9 HMA Pavement Scarification SY $ 1.75 47893.78 $ 83,814.12 10 HMA Sawcut IF $ 2.00 $ 11 CleaninQ and Preparation of Base SY $' 0.94 54213.30 $ 50,960.50 12 Adiustment of Fixtures Manhole Each $ 325.00 26.00 $ 8,450.00 13 Adiustment of Fixtures Gas Valves Each $ 325.00 $ 14 PC Concrete Pavement Scarification SY $ 4.24 4046.52 $ 17,157.24 15 Remove and Replacement of PC Concrete Curb & Gutter IF $ 20.50 1914.00 $ 39,237.00 16 PC Concrete Curb Ramp, 6" SF $ 10.00 94.25 $ 942.50 17 PC Concrete Curb Ramp, Detectable WaminQ Each $ 360.00 1.00 $ 360.00 18 PC Concrete Driveway, 6", Remove and Construct SY $ 54.00 43.00 $ 2,322.00 19 PC Concrete Sidewalk, 4", Remove and Construct SF $ 4.75 230.92 $ 1,096.87 20 PC Concrete Full Depth Repair Patches SY $ 66.00 187.12 $ 12,349.92 21 Sawcut Concrete IF $ 5.00 $ 22 Adjustment of Fixtures Water Valves Each $ 325.00 71.00 $ 23,075.00 23 HMA Full Depth Repair Patches Manhole Replacement SY $ 41.00 739.50 $ 30,319.50 24 PC Concete Full Depth Repair Patches Manhole Replacement SY $ 66.00 321.26 $ 21,203.16 25 Sanitary Sewer Repair 12" PVC SDR.26 w/lnitial Backfill B1 lS $ 1,875.00 1.00 $ 1,875.00 Sanitary Sewer Repair 12" PVC SDR-26 w/lnitial Backfill B2 lS $ 1,875.00 1.00 $ 1,875.00 Sanitary Sewer Repair 12" PVC SDR-26 w/lnitial Backfill B3 lS $ 900.00 1.00 $ 900.00 BLUFF STREET 26 Sanitary Sewer Manhole, Remove and Reconstruct, Complete B-1 lS $ 2,950.00 1.00 $ 2,950.00 27 Sanitary Sewer Manhole, Remove and Reconstruct, Complete B-2 lS $ 2,875.00 1.00 $ 2,875.00 28 Sanitary Sewer Manhole, Remove and Reconstruct, Complete B-3 lS $ 29 Sanitary Sewer Manhole, Remove and Reconstruct, Complete B-4 lS $ 2,900.00 1.00 $ 2,900.00 30 Sanitary Sewer Manhole, Remove and Reconstruct, Complete B-5 lS $ 2,150.00 1.00 $ 2,150.00 31 Sanitary Sewer Manhole, Remove and Reconstruct, Complete B-6 lS $ S. GRANDVIEW AVE. & CARMEL ST. 32 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-1 LS $ 1,900.00 1.00 $ 1,900.00 33 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-2 LS $ 4,100.00 1.00 $ 4,100.00 34 Sanitary Sewer Manhole, Remove and Reconstruct. Complete SG-3 LS $ 6,000.00 1.00 $ 6,000.00 35 Sanitary Sewer Manhole. Remove and Reconstruct, Complete SG.4 LS $ 36 Sanitary Sewer Manhole, Remove and Reconstruct. Complete SG-5 LS $ 5,720.00 1.00 $ 5,720.00 37 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-6 LS $ 5,100.00 1.00 $ 5,100.00 38 Sanitary Sewer Manhole, Remove and Reconstruct. Complete SG-7 LS $ 4,500.00 1.00 $ 4,500.00 39 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-8 LS $ 4,100.00 1.00 $ 4,100.00 40 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-9 LS $ 4,100.00 1.00 $ 4,100.00 41 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-10 LS $ 3,900.00 1.00 $ 3,900.00 42 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-11 LS $ 5,000.00 1.00 $ 5,000.00 43 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-12 LS $ 44 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-13 LS $ 2.875.00 1.00 $ 2,875.00 45 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG.14 LS $ 2,000.00 1.00 $ 2,000.00 46 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-15 LS $ 3,100.00 1.00 $ 3,100.00 47 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-16 LS $ 2,900.00 1.00 $ 2.900.00 46 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG.17 LS $ 4,500.00 1.00 $ 4,500.00 49 Storm Sewer Manhole, Remove and Replace, Complete Each $ 50 Storm Sewer, Intake 101-B Each $ 51 Replace Basin Top Each $ 325.00 7.00 $ 2,275.00 52 Storm Sewer, Intake 101-C Each $ 53 Storm Sewer, Intake 104-B Each $ 54 Curb Box Storm Drain Each $ 125.00 3.00 $ 375.00 55 Water Valve Box, (Street) Replace Upper Sections and Lids Each $ ao.Oo 59.00 $ 4,720.00 56 Water Valve Box, (Street) Replace Middle Sections Each $ 90.00 29.00 $ 2,610.00 57 4" Dip LF $ 30.00 5.00 $ 150.00 58 6" Dip LF $ 25.00 76.50 $ 1,912.50 59 8" Dip LF $ 30.00 29.50 $ 885.00 60 10" Dip LF $ 33.00 8.00 $ 264.00 61 4" Gland Pack Each $ 11.00 $ 62 6~ Gland Pack Each $ 14.00 5.00 $ 70.00 63 8" Gland Pack Each $ 20.00 10.00 $ 200.00 64 10" Gland Pack Each $ 20.00 $ 65 6" Mega Lug Each $ 50.00 2100 $ 1,050.00 66 4~ 441 Coupling Each $ 110.00 1.00 $ 110.00 67 6" 441 Coupling Each $ 150.00 4.00 $ 600.00 68 8" 441 Coupling Each $ 200.00 8.00 $ 1,600.00 69 1 O~ 441 Coupling Each $ 300.00 2.00 $ 600.00 70 6~ 90. Bend Each $ 130.00 1.00 $ 130.00 71 Valve Box Each $ 130.00 10.00 $ 1,300.00 72 6x6x6 Anchor Tee Each $ 200.00 1.00 $ 200.00 73 10x10x6 Anchor Tee Each $ 400.00 1.00 $ 400.00 74 8x8x6 Anchor T se Each $ 275.00 3.00 $ 825.00 75 8x8x4 Anchor Tee Each $ 225.00 1.00 $ 225.00 76 Hydrant Each $ 2,500.00 6.00 $ 15,000.00 77 4~ Valve Each $ 520.00 1.00 $ 520.00 78 6" Valve Each $ 600.00 6.00 $ 3,600.00 79 8" Valve Each $ 850.00 3.00 $ 2,550.00 80 1 O~ Valve Each $ 1,100.00 1.00 $ 1,100.00 81 Backfill Topsoil SY $ 2.77 515.13 $ 1,426.91 82 Sodding SY $ 12.00 400.00 $ 4,800.00 83 Pavement Marking LF $ 0.30 3432.00 $ 1,029.60 84 FlaQger Day $ 235.00 27.00 $ 6,345.00 85 Traffic and Safety Control LS $ 33,400.00 1.00 $ 33,400.00 86 Mobilization LS $ 5,510.00 1.00 $ 5,510.00 TOTAL AMOUNT EARNED i $ 922,057.80 I . ;(;if-4iiG~~oiipi!1i,tOO;RA WORK ITEMS 87 E1 - 4" Meqa Luq 88 E2 - 8" Meqa LUQ a9 E3 - 10" Mega Luq 90 E4 - MH SG-17 Modified 91 ES - 12" DIP 92 E6 - Cone. CB lop 93 E7 - 85 Manhole 94 EB - 84 Manhole 95 E9. 81 Manhole 10x12 96 E10 - Watermain Relocate 97 E11 - 63 Repair 98 E12 - Grandview WaterValve 99 E13 - pee Manhole Adi. 99 E14 - pee Water Valve Adj. 99 E13 - pee Tel. Manhole Adj. 100 Manhole Ring & cover 101 Extra Painted Symbols APPROVED: I hereby certify that the above statement shows in detail the correct amount of all work required 10 complete the above improvement. Michael Van Milligan, City Manager City of Dubuque, Iowa APPROVED: ~jj;u1 -' Q<1LJ: "'-':k'kI.-) ~ .L.S. Gus Psihoyos, City Engineer City of Dubuque, Iowa The undersigned, CERTIFICATE OF THE CONTRACTOR: contractor for the above improvement, does hereby River City PavinQ. Div. Of Mathy Construction CONTRACTOR: accept the above NTotal Due Contractorn, as full settlement for all claims for said improvement. Construction TITLE: BY: DATE: