Loading...
Eagle Point Bluff Documents . D~~~E ~ck~ MEMORANDUM January 9, 2006 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Work Session - January 12, 2006 Eagle Point Bluff Attached is the PowerPoint that will be presented at the Work Session on Thursday night, January 12, 2006. The Work Session will be held at the 3rd Floor Auditorium at Carnegie-Stout Public Library, instead of Five Flags. The session will begin at 5:00 p.m. There will be no pre-meeting meal. The PowerPoint presentation will take almost one hour. The presenters will be Dr. Bill Gates, Ph.D. of Kleinfelder, Inc. Also there from Kleinfelder, Inc. will be Geological Engineer Chad Lukkarila, PE. City staff in attendance will be City Engineer Gus Psihoyos, Assistant City Engineer Bob Schiesl, Civil Engineer" Deron Muehring, Assistant City Manager Cindy Steinhauser and Corporation Counsel Barry Lindahl. As you are aware, I will not be able to attend. Also attached is a page from the Fiscal Year 2007 budget recommendation that you will receive for the January 17, 2006 City Council meeting. This Capital Improvement Program recommendation does not assume any City liability or financial contribution, it just provides funds should the City Council decide that is an appropriate course of action. Finally, included with the packet is the November 17, 2005 memorandum asking that this Work Session be scheduled. Michael C. Van Mi igen MCVM/jh Attachments cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gus Psi hoyos, City Engineer , Results of Phase I of the Eagle Point Bluff Study City Council Work Session January 12,2006 K E L N F o R E L E ,.EXPECT MORE Presentation Overview . Project Background . Historical Information . Geological Information . 2003 Excavation Summary . Bluff Cross-Section 2 Evaluation . Rock Mass Characteristics . Rock Mass Kinematic (Potential Motion) Analysis . Rock Mass Stability Assessment . Bluff Stabilization Options K L E I N F E L 0 E R >EXPECT MORE Project Background . In 2003, developer initiated excavation of portions bluff . Utilized mechanical methods and blasting for excavation, concluded blasting in Nov. 2003 . Section of bluff collapsed in 2004 . Initial investigation indicated that sections of bluff are unstable . City retained Kleinfelder in June 2005 to conduct Rock Engineering Investigation K L E N F E L D E R >EXPECT MORE Eagle Point Bluff 1885 4 K L E N F E L D E R >EXPECT MORE 2 Eagle Point Bluff History K L E .\ . 1885 - Eagle Point Lime Works and Quarry . Early 1900's - Eagle Point Toll Bridge 5 - Used quarry stone for bridge foundation - Bluff was excavated for toll booth and bridge approach N F E L D E R >EXPECT MORE Eagle Point Bluff History . Toll Bridge Restaurant - Original bridge foundation . Built 1985 . Demolished Circa 2002 L E F E L D E R 6 K >EXPECT MORE 3 2003 Excavation: Blastin . Excavation began on September 16, 2003 . Type of Blasting - Production - Controlled . Pre~split 7 . Cushion (Trim) . Blasting plan review indicated standard blasting techniques - Blasting technique within limits . Blasting completed on November 19,2003 K L E N F E L D E R >EXPECT MORE Controlled Blasting Half Casts F E L D E R . Used for wall control . Cushion (Trim) Blasting . Presplit (Preshear) Blasting 8 . Evidence: Half casts - Suggests good blasting technique - Good wall control K L E N >EXPECT MORE 4 2003 Mechanical Excavation 9 . Utilized mechanical methods to excavate bluff . Track hoe used to remove rock, loose sections and excavate at base of bluff . Wrecking ball used in January 2004 K l E N >EXPECT MORE 2003 Site Inspection Summary . City of Dubuque Personnel - Onsite during excavation activities 10 . Field notes & Observations - Blasting techniques appeared good - Noted slides composed of mud, rock & trees during excavation - Identified safety concerns - Inspected bluff daily for rock slides & unstable areas K l E N F E l D E R "EXPECT MORE 5 II 2004 Bluff Collapse K March 9, 2004 N F E l R l E D E "EXPECT MORE 2004 Bluff Collapse , '- ~.t< . '... '-'#: ,..""'" K January 9, 2004 March I, 2004 l E N F E l D E R >EXPECT MORE 6 Existing Bluff Conditions . 300 feet in length and 90 feet in height . Bluff face dips to the east . North end of bluff that dips to the south/southeast IJ . Vertical to overhanging . Fractures primarily sub- vertical with prominent sub- horizontal bedding . Colluvium (loose soil/rock) and tree roots along brow K l E N F E l D E R General Approach to Bluff Design . Geomechanical rock mass information and classification . Rock quality designation (RQD) . Strength ]4 . Markland analysis . Hoek-Brown strength - Overall strength of rock mass . Rockfall hazard mitigation . Stabilization design options K l E N F >EXPECT MORE E l D E R >EXPECT MORE 7 Phase I: Investigation 15 . Conduct geotechnical investigation - Conduct horizontal and vertical geological mapping - Collect specific geological and geomechanical information of the rock mass K l E N F E l D E R "EXPECT MORE Geologic Mapping Locations K N Bluff Distance Reference R l E F E l D E >EXPECT MORE 8 Geologic Mapping . Number of fracture 17 sets . Strength . Fracture spacing . Aperture/filling . Weathering . Water K l E N F E l I. Dip and dip direction of rock discontinuities 2. Rock mass characteristics o E R >EXPECT MORE Rock Quality Designation RQD % = liS - (3.3 Jv) Jv = Ifxs (x+y+z/mJ) Example: 18 RQD=115-(3.3(2+ 1+2)) RQD = 99% ::::- Excellent Rock K l E N F R E l D E >EXPECT MORE 9 Uniaxial Compressive Strength IRS IlIt&elrock ~trel1~h ',i1l1Vl~ mUll" ~1 rangt (}(Pal <'\.25 crurubko<.mhlllld I 2~ . 5 thin Wal.K bro!"ak t~,~, in Mnd ]9 S -12.5 Thin \lab\ brtak by hta,')' hand p'fi- ,~, 125-50 hll11p'> brokm by b~hl h.mllUff blow'!> 5(}.100 l~brol.:mb...Ma"yh:wuuer blow" 100 - 200 lun~ ollly (hip by lu-ny MllIn-.n blo....." >200 rocb rill! on l"'Il1D\t'I" blOln - \~lb fly K l E N F E l D E R >EXPECT MORE Stability Analysis and Design 20 Conduct analysis and design of bluff Gcomcchanical rock mass classifications Slope stability analyses via Markland Analyses & Kinematic Analysis . Study of potential motion Rock slope stability design methodology via Hock-Brown Strength Analysis RockfaIl hazard analysis Stability design options K l E N F E D E R l >EXPECT MORE 10 Rock Mass Rating (RMR) l. Strength of intact rock material 2. Rock quality designation (RQD) 3. Spacing of discontinuities 21 4. Condition of discontinuities 5. Groundwater conditions 6. Orientation of Rock Mass Rating (RMR). otherwise discontinuities relative to known as the Gcomechanical Cla.;;sification, the rockslope was developed by Z.T. Bieniawski in the early 1970's and revised in the latc 1980's. K L E N f E L D E R :.EXPECT MORE Rock Mass Rating (RMR) Descriptors Rock Mass 81-100 61-80 41-60 21-40 <20 Ratin Class No. I II III IV V 22 Description Very Good Fair Poor Very good rock rock rock poor rock rock K L E N f E L D E R ..EXPECT MORE II Rock Mass Properties 23 . Moderately strong to strong rock (7,000-14,000 psi) . Good quality rock (RMR>60) . Fracture aperture < 2mm . Fracture surface: Rough and undulating . Fracture filling: No filling or unconsolidated soillrock . Bedding spacing: I to 4 feet . Fracture spacing: I to 6+ feet . No groundwater observed K L E N F E l D E R >EXPECT MORE Markland Stability Analysis . Plot of the orientation of the discontinuities . Dip, dip direction and friction angle of rock mass 24 . Ifplunge of intersecting fractures exceeds friction angle => FOS < 1.0 . IdentifY translational sliding or toppling failures K l E N F E l D E R >EXPECT MQR!; 12 I Example: Structurally-Controlled Rock Slope: Planar & Toppling Failures "~ ,. +-........ I.' ,"'. \ ~';.'.',.' "-. ..-. . \.,. - "- '/< . -~- .,/" K L E N F E L D E R >EXPECT MORE Bluff Stability - Unstable Blocks ~1 J"...~ Ifuvhl '.,. Bluff Distance Reference K L E N F E L D E R >EXPECT MORE 13 Wedge 1 Stability Analysis 27 K L E N F E L D E R >EXPECT MORE Bluff Cross Section Evaluation . Prior to 2003 excavation Before 2003 I / - Angle of 65 to 85 degrees , '\' I " ' ; - Height of20 to 55 feet ~ . After the 2003 excavation ~ After 2003 - Angle of77 to 89 degrees 28 with average of 80 degrees - Some sections overhang : i \ N past vertical - Height of 35 to 90 feet From McGhie and Betts, 2004 K L E N F E L D E R :..EXPECT MORE 14 Bluff Stability Assessment Park Stairwa . Bluff stability prior to 2003 excavation - Angle of bluff face matched angle of fractures 29 . Bluff stability after 2003 excavation - Bluff face is steepened potential for wedges - Overhanging rock - Colluvium exposed lEI N K Pre-excavation Post excavation F E l D E R "EXPECT MORE Bluff Stability - Unstable Blocks K N Bluff Distance Reference R l E F E D l E ..EXPECT MORE 15 Bluff Stability - Repeating Fractures 31 K L E N F E L D E R :.EXPECT MORE Bluff Stabilit - Unstable Blocks 32 Wedge I - 100 ft Block I -120 ft K LEI N FE L D E R :.EXPECT MORE 16 Bluff Stability - Unstable Blocks 33 K 34 K Tower 3 - 180 fI lEI N F E R :l>EXPECT MORE - Unstable Blocks F Blocks 3 and 4 - 200 fI E l D E R :.EXPECT MORE 17 Bluff Stability - Unstable Blocks 35 Blocks 5 and 6 - 230 ft Blocks 7 to 12 - 240 to 255ft K LEI N FE L 0 E R >EXPECT MORE Bluff Stability - Colluvium and Trees 36 Colluvium - 230 to 260 ft K L E N F E L 0 E R >EXPECT MORE 18 Example: Tree Pry Bars 37 K R >EXPECT MORE Risk of Failure 38 . Risk of failure in identified blocks ranges from low to high - Function of the geometry . Tension fractures present - Indicate movement of block(s) . Overhanging blocks . Stability analyses indicate Safety Factors < 1.0 K l E N F E l D E R >EXPECT MORE 19 Stabilization Options Three land-use scenarios for stabilization options: I. Commercial development 2. Residential development 3. Undeveloped Stabilization options: 1. Controlled blasting 2. Controlled blasting and rock bolt reinforcement 3. Rock bolt reinforcement 4. Wire mesh drape slope protection . . 39 K l E N F E l D E R >EXPECT MORE Commercial Zoning Options Stabilization Steps: . Tree removal - 15 - 20 ft behind brow . Scale loose rock Stability Options: 40. Controlled blasting or stabilize in place with rock bolts . Install horizontal drains . Scale colluvium or drape with wire mesh K lEI N F E l D E R >EXPECT MORE 20 Residential Zoning Options Undeveloped Options Stabilization Steps: . Tree removal - 15 - 20 ft behind brow . Scale loose rock Stability Options: 42. Controlled blasting or stabilize in place with rock bolts . Install horizontal drains . Scale colluvium . Fence off area K LEI N F E L D Stabilization Steps: . Tree removal - 15 - 20 ft behind brow . Scale loose rock Stability Options: 41. Controlled blasting or stabilize in place with rock bolts . Tecco@ Mesh Slope Protection . Install horizontal drains . Scale colluvium or drape with wire mesh K L E N ~ - .1, . tl.;"'i . . rJI. t I '. ;.j . !;t'" .,.,..~ . f>, ~':I;'j.,. ,. ~ . ~", .'-.. H)'f"", ''',t. 'W-;rJ i ~~. '4 - "'..;~ 1.-,)I.1f J + ,"..- . :~ "': ~: ~io__,_, ~.!itf.,.,,+ 't,IJi;';$' :""'.,.I~;: ~-'i!:.7!l:l.-. . ~.; 'I;$."P...:: . ...~'.....I ~", ; ..:.." :; *.'::' '" KJi"'I' ." .. .~.. ~~ . ,,',": " , - , ,-, H ~- ,~...., -'. r "~'. --.....~.,."',.1'.a.l> T ~~_~ _....~ F E L D E R >EXPECT MORE E R :o.EXPECT MORE 21 43 44 K K l E N F l D E R :>EXPECT MORE Artist's Rendition of Bluff Controlled-Blasting of Bluff l E N F E l D E R >EXPECT MORE 22 Artist's Rendition of Bluff 45 ~- K Stabilization of Bluff by Rock Bolting E I N F E l D R l E >EXPECT MORE 46 K ,. , . -. F E R US 97, Washington l E N l D E >EXPECT MORE 23 48 47 K Artist's Rendition of Bluff L E D R >EXPECT MORE Wire Mesh Drape Example J( @ From Geobl1Jgg~ LEI Cheyenne Mountain, Colorado Springs, CO F E L D E R N >EXPECT MORE 24 Tecco@ Mesh Example K l E N F E l D E R >EXPECT MORE Slope Monitoring . Tension fractures present behind blocks . Tower 3 - tension fracture ranges from 3 to 18 inches wide 50 . Monitoring recommended if stabilization does not occur in the next 6 to 12 months . Options include survey points, surface jointmeters, or displacement transducers K l E N F E l D E R >EXPI;CT MORE 25 Estimate of Stabilization Cost . Commercial Development I. Option 1: Blasting - Approx. $180,000 2. Option 2: Rock bolts, wire mesh - Approx. $200,000 . Residential Development 1. Option I: Blasting - Approx. $180,000 2. Option 2: Rock bolts, wire mesh - Approx. $200,000 3. Option 3: Tecco Mesh - Approx. $350,000 . Undeveloped I. Option I: Blasting - Approx. $180,000 2. Option 2: Rock bolts - Approx. $190,000 51 K l E N F E l D E R Conclusions >EXPECT MORE The bluff is unstable Future collapses are possible Potential for: a) Wedge and toppling-type failures Causes for instability and failure a) Oversteepening of bluff b) Exacerbated by mechanical excavation methods Risk of failure: low to high based on geometry Stability options include a combination of: a) Controlled blasting, slope scaling, rock bolts, horizontal drains, and wire mesh slope protection 7. Stabilization costs range from $180,000 to $350,000 K lEI N FE l D E R I. 2. 3. 4. 52 5. 6. >EXPECT MORE 26 Questions? 27 a: o:g ii:)- a.u. 0.0 XI- W ~ ~ o N ~ ~ o ~ o N o ~ a. o o N '" o '" o o N <Xl o ,..:. o o N .... o J, o o N I- W ~ C :::> OJ I- U W .., o a: a. Ul :;:g> W 'C I- Ol W:g~ a: .0,0 :::> c:: . I-WiY C06--g Z c:: '" W .21-c a. "' c:: X Ol '" WO...J < o o o. o o ~ o 0 o 0 o 0 o c:i "' "' N '" '" '" '" c:: .Q tl 2 ...J 1i5 CD <( is ~ b (,) 0 I- '" '" '" '" '" '" '" '" '" '" 00 00 00 cici "' "' '" '" '" '" ~ z U z c:: <( 0 ~~ I- .;:: U u; w 0 --.J .., <( <( OiYti g:OI- OJ '" '" '" '" OJ c:: ~ '" J3 "0 ~ o ~ c o u Ol "0 :J 13 .s >- Ol .c:: I- :0= :J J3 Ol E Ol ~ J3 '" u; B "' c:: .Q 0. o rn z ~ o ~ i= ~ a. "' a: ~ Uo rn > w .S c I-tl Ol CJ '0' ~~ o "' et::.c 0.1- c:: .Q tl Ol o Ci. Ol "- o u; .c:: "' Ol E Ol ~ .j; "0 c:: '" "' c:: .iij -c rn c o N .~ .c:: 2 o .0 -" U e 0, .s rn u "' Ol "- o u; '" .~ ~ mlDC .~ W ~ i: Ein ~ro~ oZro Q.l -a '13 "0 c:: ~ '(3 ::J Q) Ol 0 E -o'0E '(3 c 0 c:: u g ai ~ (,)"O=> >- Qi :::0 :=:'Eo.> () '(ij f; ~S:::?; - >- 0 -a.Cl03 "S-C.!:l o Ol >- .c::Et CI) 0 ~ cD't:: 0 . (I) <1l c..8 c:: "- 0 Q} >- Q) - Q."'CI-C 0 X :::J - LO <1l(Jjo~ >- Ol Cj:Stn.8 -=>0 -rnQ)QJO U)c..co ~ '0 ~ 0 's; 0.. 0 ~ U..9:la1E ro OJ (f) 0 ro co..:: 3lw.ccu Q) Q) I/) O'J :5 ..c c c: ~g~ E u) 0. (/) ..E (/) 0 w w~aro c.. 0:;:::; E 32 a. ;:s t:; :Jw:=Q.) o 0)-0 en ..c"'C ro 0 (/) :::J in U ,.C.Cl Q) C U ~ :g.,Q .c::Ol ON :s 13 - E 2 romV)~ ;>-~8 c ro:fi . 'E ~ I- Q) '- u: a. co Q)a>wL: ., "0 -o-EQ57ii '13 -5>~ ,9 C :::J (1)- =>0- O.....;::S::::-O L)f; ~ .b E e ii5 ~ ~~ ~ f; e CD 0 "0 c.. c.. U "S~.2~ o .8 U) ,!Q .c:: Ol U) Q) ro 5 -0:::00:;:::; Q) ~ U) ro "t:I 'co cb N c: > 0:= OlE ro 19 ~ Ol - E..ocoCl) 0"00 z~-s~-o o 0 IJ} 2i ~.~ $: ';:: 0 <(wUl'QO) (.) OJ"O > _1:JcQiw ~.6~~~ m(J'JrJ)-C :):E<1l "'C ..,~:5l~ N .,.; rn o (!J c Ol E Ol ijj c:: OJ .in Ol o c:: '" .0 ~ :::> "0 c:: '" Ol "' :::> "0 c:: '" ...J "' .c:: '" 0:: Ol en .~ I- c:: U Ol w~ co. 0: E a. 0 0:(,) W Ol :z:E I-~ o c:: o Ol I- E a.~ - "- :z: E rn .- ztl o.~ ~a. ...J "' WE 0:1- - " '" \~k\lor) 1'F:r', S THE CITY OF ~ DUB E ~ck~ MEMORANDUM November 17, 2005 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Eagle Point Bluff Study - Results of Rock Slope Investigation City Engineer Gus Psihoyos is recommending that a Work Session be scheduled to discuss the results of the Eagle Point Bluff Study. I respectfully request that the Mayor and City Council establish a date for the Work Session, Staff will then verify availability with the consultant. i/11J! tr~ //2111 Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Laura Carstens, Planning Services Manager D~~~E ~<!k-~ MEMORANDUM November 17, 2005 TO: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer _up SUBJECT: Eagle Point Bluff Study - Results of Rock Slope Investigation FROM: INTRODUCTION The purpose of this memo is to transmit the findings of the Eagle Point Bluff Study - Rock Slope Investigation performed by Kleinfelder, Inc (Bellevue, WA). BACKGROUND On August 2, 2004, the City Council authorized the solicitation of proposals from qualified consulting/engineering firms for the Eagle Point Bluff Study. On December 17, 2004, the City Council endorsed the RFP for the Eagle Point Bluff Study and authorized its release to the public. The RFP separated the project into three phases: Phase I The Consultant must obtain all necessary data either from City records or site reconnaissance to thoroughly characterize the present stability of the bluff and if the bluff is found to be unstable, the probable cause of instability. Moreover, if the bluff is found to be unstable, the Consultant is to draw on its experience and expertise in dealing with rock bluffs to consider multiple stabilization techniques (such as rock removal, grouting, bolting, etc.) and work with the City to identify which method best suits the needs of the City. Phase II (if necessary) Consultant would prepare plans and specifications for the Eagle Point Bluff Stabilization Project based on the optimum stabilization technique identified in Phase I. Phase III (if necessary) Consultant would act as project engineer for the construction phase of a stabilization project outlined in Phase II. Page 2 The City received eight responses to the RFP. After careful review of the proposals, presentations, review of fees, and reference checks, the proposal review committee concluded that Kleinfelder, Inc. had the best combination of project experience, project understanding, and project approach to best serve the City for the Eagle Point Bluff Study. On May 2, 2005, the City Council approved the selection of Kleinfelder, Inc. to provide professional consulting services for the Eagle Point Bluff Study. DISCUSSION Kleinfelder, Inc. has completed Phase I of the Eagle Point Bluff Study and presented its findings in two documents: 1. Eaqle Point Bluff Studv Phase I - Rock Slope Investiqation This document is an unabridged guide to the Study and it includes the engineering methods, testing, and analysis used to perform the bluff investigation and establish recommendations. 2. Eaqle Point Bluff Studv Phase I - Rock Slope Investiqation Citizen Guide This document contains a condensed version of the investigation. The technical aspects of the engineering behind the Study are not included. Figure 1 shows the location of the part of the bluff which is the subject of the Study. It is below Eagle Point Park and adjacent to the remnant bridge abutment near Lock and Dam NO.11. Fi~ure 1. Location of the Eagle Point Bluff Study. \J..:",';..~)' Bluff Study Area Page 3 Historical photographs show the Eagle Point Bluff tree covered except for the main high bluff that is not part of the Study. The Eagle Point Toll Bridge was constructed circa 1901-1902 from Eagle Point on the Iowa side to Kimball's Slough on the Wisconsin side of the Mississippi River. According to the Kleinfelder, Inc. Study, photographs taken after the construction of the bridge show a "barren, steep rock slope" in the vicinity of Eagle Point Bluff (see Citizen Guide, Appendix A: Photos 2-4). It appears that the bluff was quarried and excavated to make room for the bridge. Deemed unsafe, the bridge was torn down in 1982. The Toll Bridge Inn was constructed on the old bridge foundation and operated as a restaurant until 2003. Figure 2 is a photo taken in September of 2003, prior to the 2003 excavation. In general, rock bluffs in the Dubuque area are near vertical in nature. Minor erosion and weathering is prevalent and occasional rock falls are commonplace as witnessed at the former quarry site just south of Eagle Point Bluff now occupied by C.R. Boats. The Kleinfelder Study states, "because of the fractured nature of the rock mass, it is suspected that minor rockfall occurred at the bluff (prior to the 2003 excavation)." Figure 2 shows the fractured nature of the bluff even prior to the 2003 excavation. _:>0:.' ,--..,.' . A.. -~ ~ """," "---\-; . "'~f! ~~". .... A .. ,~ -. - . , , .. - ~;.~~ . ,)a. ~C> , -f' .. 'l. ,,_.\ , 11m!! Page 4 The Kleinfelder Study concludes that there is now a high level of risk of a large-scale failure on some parts of the bluff. The risk has been increased because of the 2003 excavation that steepened the slope from 75 to 80 degrees and increased the height from 35 to 60 feet. While the Study finds no fault with the blasting operations on the bluff, striking the rock face with a track hoe and wrecking ball "exacerbated the instability of the rock slope." Figure 3 shows the wrecking ball hitting the rock face. "- " ."'" ". \\ The Kleinfelder Study presents multiple stabilization options for the bluff stabilization depending on whether the use of the property below the bluff is commercial, residential, or undeveloped. Although stabilization is recommended for all three uses, more additional measures are recommended if the site is developed for commercial or residential use. Options include controlled blasting, slopes scaling, rock bolts, horizontal drains, and wire mesh slope protection. The construction cost estimates range from $80,000 to $250,000. The City Manager, the Corporation Counsel, and Engineering staff have begun identifying potential actions that the City could take based on the Study findings. The following list of actions is offered for consideration: Page 5 1) Budget funds for a stabilization project by the City; 2) Explore the possibility of collaborating on the stabilization project with the developer; 3) Consider declaring the risk of falling rock a public nuisance and requesting the developer to install a fence to keep the public away from the area and require implementation of one of the recommended stabilization methods outlined by the Kleinfelder Study if and when the property is developed for commercial or residential use. This list is only offered as a starting point for discussions that will lead to the appropriate response to the findings presented in the Eagle Point Bluff Study. RECOMMENDATION I recommend that the City Council schedule a work session at which time Dr. William Gates of Kleinfelder, Inc. would present and discuss the Eagle Point Bluff Study. BUDGET IMPACT Phase I of the stabilization study has been completed at a cost of $49,800. If a stabilization project is considered, the estimated costs are: Engineering $ 45,000 (Phase II as outlined in the RFP) Construction Observation $ 55,000 (Phase III) Estimate Subtotal $100,000 Project Construction $ 80,000 - $250,000 (Dependent on Stabilization Method Used) Total Project Estimate $180,000 - $350,000 ACTION TO BE TAKEN I respectfully request the City Council be requested to schedule a work session to allow Dr. William Gates of Kleinfelder, Inc. to present and discuss the Eagle Point Bluff Study. Prepared by Deron Muehring cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Laura Carstens, Planning Services Manager Bob Schiesl, Assistant City Engineer Deron Muehring, Civil Engineer II