Asphalt Paving Prl 2005 - amend final accept DU~~E ~<k.~ MEMORANDUM January 4, 2006 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2005 Asphalt Paving Project CIP 3001719 - Fiscal Year 2006 Annual Street Program On January 3, 2006 the City Council approved a resolution setting the final estimate for the 2005 Asphalt Paving Project at $936,260.16. It has been discovered that two extra items were not added correctly in the final payment spreadsheet, therefore $5,973.00 is still owed the contractor. City Engineer Gus Psihoyos recommends the City Council rescind Resolution No. 5-06, and approve a resolution establishing a new final estimate for the 2005 Asphalt Paving Project in the amount of $942,433.16. I concur with the recommendation and respectfully request Mayor and City Council approval. ;11t) ft.,A~ Michael C. Van Milligen " MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gus Psi hoyos, City Engineer .; i5~~~E ~<k~ MEMORANDUM January 4, 2005 FROM: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer qjQ TO: SUBJECT: 2005 Asphalt Paving Project CIP 3001719 - Fiscal Year 2006 Annual Street Program INTRODUCTION The purpose of this memorandum is to request that the City Council rescind the resolution passed on January 3, 2006 that set the final estimate for the 2005 Asphalt Paving Project at $936,460.16 and adopt a new resolution setting the final estimate at $942,433.16. DISCUSSION After the project was accepted and the final payment documentation was being prepared, it was noted that that an arithmetic miscalculation has been found in the final payment worksheet. Two extra items were not added correctly in the final payment spreadsheet resulting in a shortage of $5973.00 which is still owed the contractor. RECOMMENDATION I recommend that the City Council accept the improvements and establish the revised final contract at $942,433.16. BUDGET IMPACT The project cost summary for the 2005 Asphalt Paving Project is as follows: Construction Contract Contingency Construction Engineering & Inspection Bid Award $1,107,558.26 178,753.48 137,044.34 Revised Final $942,433.16 o 86,637.92 Total Project Cost $1,423.356.08 $1.029.071.08 The project funding summary is as follows: CIP No. Fund Description 3001719 FY2006 Annual Street Program 7401405 FY2006 Water Main Replacement Funds 7201066 FY2006 Storm Sewer General Repair Funds 7101355 FY2006 Sanitary Sewer Manhole Replacement Funds 7101638 FY2006 Street Program Related Sanitary Sewer Funds Total Project Funding ACTION TO BE TAKEN Fund Amount $829,777.75 51,166.95 2,895.13 83,862.62 61,368.63 $1.029.071.08 The City Council is requested to adopt the attached resolutions rescinding Resolution No. 5-06 and establishing a new final estimate for 2005 Asphalt Paving Project (Fiscal Year 2006). Prepared by Jon Dienst, PE cc: Dawn Lang, Budget Director Don Vogt, Public Works Director John Klostermann, Operations & Maintenance Supervisor Bob Green, Water Plant Manager Bob Schiesl, Assistant City Engineer Deron Muehring, Civil Engineer ~ RESOLUTION NO. 14-06 RESCINDING RESOLUTION NUMBER 5-06, SETTING THE FINAL ESTIMATE FOR THE 2005 ASPHALT PAVING PROJECT (FISCAL YEAR 2006) Whereas, by Resolution No. 5-06, the City Council set the final estimate for the 2005 Asphalt Paving Project (Fiscal Year 2006); and Whereas, subsequent events necessitate a different final estimate. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That Resolution Number 5-06 is rescinded. Passed, approved and adopted this 17th day of January, 2006. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 15-06 FINAL ESTIMATE Whereas, the construction contract for the 2005 Asphalt Paving Project (Fiscal Year 2006), has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $1,029,071.08 and the said amount shall be paid from the FY2006 Annual Street Program Funds, FY2006 Water Main Replacement Funds, FY2006 Storm Sewer General Repair Funds, FY2006 Sanitary Sewer Manhole Replacement Funds and FY2006 Street Program Related Sanitary Sewer Funds of the City of Dubuque, Iowa. Passed, approved and adopted this 17th day of January, 2006. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk S. GRANDVIEW AVE. & CARMEL ST. 32 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-1 LS $ 1,900.00 1.00 $ 1,900.00 33 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-2 LS $ 4,100.00 1.00 $ 4,100.00 34 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-3 LS $ 6,000.00 1.00 $ 6,000.00 35 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-4 LS $ 36 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-5 LS $ 5,720.00 1.00 $ 5,720.00 37 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-6 LS $ 5,100.00 1.00 $ 5.100.00 38 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-7 LS $ 4,500.00 1.00 $ 4,500.00 39 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-8 LS $ 4,100.00 1.00 $ 4,100.00 40 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-9 LS $ 4,100.00 1.00 $ 4,100.00 41 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-10 LS $ 3,900.00 1.00 $ 3,900.00 42 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-11 LS $ 5,000.00 1.00 $ 5,000.00 43 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-12 LS $ 44 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-13 LS $ 2,875.00 1.00 $ 2,875.00 45 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-14 LS $ 2,000.00 1.00 $ 2,000.00 46 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-15 LS $ 3,100.00 1.00 $ 3,100.00 47 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-16 LS $ 2,900.00 1.00 $ 2,900.00 48 Sanitary Sewer Manhole, Remove and Reconstruct, Complete SG-17 LS $ 4,500.00 1.00 $ 4,500.00 -I 'lfr '~~J- 49 Storm Sewer Manhole, Remove and Replace, Complete Each $ 50 Storm Sewer, Intake 101-B Each $ 51 Replace Basin Top Each $ 325.00 7.00 $ 2,275.00 52 Storm Sewer, Intake 101-C Each $ 53 Storm Sewer, Intake 104-B Each $ 54 Curb Box Storm Drain Each $ 125.00 3.00 $ 375.00 ill Illfr5!1i'.!F" , 55 Water Valve Box, (Street) Replace Upper Sections and Lids Each $ 80.00 59.00 $ 4,720.00 56 Water Valve Box, (Street) Replace Middle Sections Each $ 90.00 29.00 $ 2,610.00 57 4" Dip LF $ 30.00 5.00 $ 150.00 58 6" Dip LF $ 25.00 76.50 $ 1,912.50 59 8" Dip LF $ 30.00 29.50 $ 885.00 60 10" Dip LF $ 33.00 8.00 $ 264.00 61 4" Gland Pack Each $ 11.00 $ 62 6" Gland Pack Each $ 14.00 5.00 $ 70.00 63 8" Gland Pack Each $ 20.00 10.00 $ 200.00 64 10" Gland Pack Each $ 20.00 $ 65 6" Mega Lug Each $ 50.00 21.00 $ 1,050.00 66 4" 441 Coupling Each $ 110.00 1.00 $ 110.00 67 6" 441 Coupling Each $ 150.00 4.00 $ 600.00 68 8" 441 Coupling Each $ 200.00 8.00 $ 1,600.00 69 10" 441 Coupling Each $ 300.00 2.00 $ 600.00 70 6" 90" Bend Each $ 130.00 1.00 $ 130.00 71 Valve Box Each $ 130.00 10.00 $ 1,300.00 72 6x6x6 Anchor Tee Each $ 200.00 1.00 $ 200.00 73 1Ox10x6 Anchor Tee Each $ 400.00 1.00 $ 400.00 74 8x8x6 Anchor Tee Each $ 275.00 3.00 $ 825.00 75 8x8x4 Anchor Tee Each $ 225.00 1.00 $ 225.00 76 Hydrant Each $ 2,500.00 6.00 $ 15,000.00 77 4" Valve Each $ 520.00 1.00 $ 520.00 78 6" Valve Each $ 600.00 6.00 $ 3,600.00 79 8" Valve Each $ 850.00 3.00 $ 2,550.00 80 10" Valve Each $ 1,100.00 1.00 $ 1,100.00 81 Backfill Topsoil SY $ 2.77 515.13 $ 1,426.91 82 Sodding SY $ 12.00 400.00 $ 4,800.00 83 Pavement Marking LF $ 0.30 3432.00 $ 1,029.60 84 FlaQQer Dav $ 235.00 27.00 $ 6,345.00 85 Traffic and Safety Control LS $ 33,400.00 1.00 $ 33,400.00 86 Mobilization LS $ 5,510.00 1.00 $ 5,510.00 TOTAL AMOUNT EARNED 1 $ 922,057.80 I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, River City PavinQ- Div. Of Mathy Construction contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: BY: Construction DATE: Ah'.6-/9 /?7A'7v4/,,~ L/ .,1?9,v 0 4 TITLE: