SUBJECT: Developer Selection/Dubuque Star Brewery Project
In September 2005, the City Council authorized staff to issue a new RFP to solicit
qualified developers or development teams for the continued redevelopment of the
Dubuque Star Brewery building and site in the Port of Dubuque. Two developers
responded to the request by the November 18, 2005 deadline: 1) The Alexander
Company, asking to continue their relationship with the City on this project; and 2) the
Port of Dubuque Development, LLC, a subsidiary of Epic Construction.
A Selection Committee comprised of the following persons reviewed the RFP submittals
and interviewed the two prospective developers:
Cindy Steinhauser, Assistant City Manager
Dawn Lang, Budget Manager
Rich Russell, Building Services Manager
Dave Heiar, Economic Development Director
Pam Myhre, Economic Development Planner
Amy Wickham, Greater Dubuque Development Retail Expansion Specialist
Economic Development Director David Heiar is recommending the selection of the Port
of Dubuque Development, LLC, as developer for the Dubuque Star Brewery Project,
and that a development agreement be negotiated.
The Port of Dubuque Development, LLC proposal is an estimated $6.5 million proposal
involving a winery operation on the first floor. A microbrewery/brewpub restaurant has
also expressed interest in the project. Retail space would also be located on the first
floor. Additional restaurant seating would be located on the second floor, along with
office space. The developer has proposed starting construction in the spring of 2006,
with occupancy by summer 2007. The developer has also committed to completing the
entire renovation project regardless of having tenants signed for the entire building.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
f21J( C::h/ff?vfL
Michael C. Van Milligen
MCVM/jh
Attachment
cc: Barry Lindahl, Corporation Counsel
Cindy Steinhauser, Assistant City Manager
David Heiar. Economic Development Director
CITY OF DUBUQUE, IOWA
MEMORANDUM
January 4, 2006
TO: Michael Van Milligen, City Manager
FROM:
David Heiar, Economic Development Director L... \~~ \ .
-
SUBJECT: Developer Selection/Dubuque Star Brewery Project
INTRODUCTION
This memorandum provides a recommendation to the City Council regarding the
selection of a developer for the continued redevelopment of the former Dubuque Star
Brewery building and site. A Resolution is attached approving a developer for the
project.
BACKGROUND
In 2002, the City initiated a request for qualifications process to select a developer for
the Dubuque Star Brewery project. The Alexander Company of Madison, Wisconsin
was selected as the preferred developer at the end of that process with anticipation of a
$5+ million redevelopment project to include a microbrewery operation, restaurant and
bar. However, the local partners involved in the brewery production portion of the
planned redevelopment were unable to finance their planned project.
The City moved ahead with a 1-year lease with Alexander during which time both
parties were to finalize a development agreement and long-term lease. Since then,
Alexander has supervised over $1 million in renovation costs using City funds, including
gutting the building, sandblasting paint from interior walls, necessary brick replacement,
complete tuckpointing of the exterior masonry, reroofing 2/3 of the building and
demolition of a metal addition.
The Alexander Company marketed the building regionally, hired Prudential Realty to
market the property locally and had multiple showings of the property without
successfully signing an anchor tenant for the building. An amendment to the 1-year
lease in March 2005 provided for a 5-month extension to continue their marketing
efforts. A further amendment extended the lease until December 31, 2005. Without an
anchor tenant and a certain percentage of the building leased, Alexander could not
secure conventional financing for the overall project.
In the last lease amendment with Alexander, it was agreed that the City would issue a
new Request for Proposals (RFP), with Alexander encouraged to submit another
proposal if they so desired.
DISCUSSION
In September 2005, the City Council authorized staff to issue a new RFP to solicit
qualified developers or development teams for the continued redevelopment of the
Dubuque Star Brewery building and site in the Port of Dubuque. Two developers
responded to the request by the November 18, 2005 deadline: 1) The Alexander
Company, asking to continue their relationship with the City on this project; and 2) the
Port of Dubuque Development, LLC, a subsidiary of Epic Construction.
A Selection Committee comprised of the following persons reviewed the RFP submittals
and interviewed the two prospective developers:
Cindy Steinhauser, Assistant City Manager
Dawn Lang, Budget Manager
Rich Russell, Building Services Manager
Dave Heiar, Economic Development Director
Pam Myhre, Economic Development Planner
Amy Wickham, Greater Dubuque Development Retail Expansion Specialist
The RFP asked potential developers to provide information regarding, among other
things, the planned reuse of the building, the proposed cost and extent of renovation
and the proposed project schedule.
The Alexander Company's proposal continues the Brewery development project that
they have been working on for the past several years. They have guided the Phase 1
renovation of the building and have been seeking tenants to fill a portion of the space
before moving ahead with additional rehabilitation work. For the past six months, they
have been working with an out-of-town dinner theatre company as possible tenants of
the first floor space. Their RFP submittal involves both the 400-seat dinner theatre
tenant and a local winery as first floor tenants, with restaurant and office opportunities
on the upper floors (though uncommitted at this time). Their overall estimated project
cost is $6.3 million. They would move ahead with renovation of the first floor space
(completion within 5-6 months) but would not likely commit funds to renovation of the
upper floors until additional tenants are secured. Since meeting with the committee, the
City has learned that The Alexander Company has severed its relationship with the
dinner theatre company and would propose to demolish the rear cement block addition
that would have served as the primary theatre space. They would continue the project
with the winery tenant on the first floor.
The Port of Dubuque Development, LLC proposal also involves the winery operator
as a first floor tenant and indicates that a microbrewery/brewpub restaurant has also
expressed interest in the project. Retail space would also be located on the first floor.
Additional restaurant seating would be located on the 2nd floor, along with office space.
The developer estimates total costs at $6.5 million, including retaining the cement block
addition (to be refaced). The developer has proposed starting construction in Spring
2006 with occupancy by Summer 2007. The developer has also committed to
completing the entire renovation project (excluding final tenant improvements)
regardless of having tenants signed for the whole building.
After interviewing the developers and considering additional information requested of
them, both developers were found to have the expertise and financial ability to
complete the projects proposed. Both plan to use historic tax credits in financing the
project and both will require City tax increment financing assistance. The committee
also considered both developers' local development track record in making their
assessment.
RECOMMENDATION
After reviewing the proposals, the committee recommends the selection of the Port of
Dubuque Development, LLC as developer for the Dubuque Star Brewery project. Once
approved, staff will begin negotiating a formal Development Agreement and Lease with
the developer. The Development Agreement will identify the redevelopment terms,
conditions and obligations of both City and the LLC. We anticipate the documents
should be ready for City Council approval in 60-90 days.
ACTION STEP
The action step for the City Council is to adopt the attached Resolution approving the
Port of Dubuque Development, LLC as developer of the Dubuque Star Brewery project
and direct staff to negotiate a formal Development Agreement and Lease with the
company for City Council approval at an upcoming meeting.
attachment
Prepared by: Pamela Myhre
Economic Development Planner
F:\USERS\Pmyhre\WPDOCS\LOANDOC\Briggs-BreweryLLC\selection .mem.doc
v
,
RESOLUTION NO. 28-06
RESOLUTION APPROVING THE SELECTION OF A DEVELOPER FOR
THE DUBUQUE STAR BREWERY BUILDING AND SITE.
Whereas, the City Council of the City of Dubuque, Iowa issued a Request for
Proposals in September 2005 to solicit qualified developers for the continued
redevelopment of the Dubuque Star Brewery building and site; and
Whereas, The Alexander Company of Madison, Wisconsin and the Port of
Dubuque Development, LLC (a subsidiary of Epic Construction) of Dubuque, Iowa
submitted proposals for the redevelopment project; and
Whereas, a selection committee has recommended the Port of Dubuque
Development, LLC as developer for the project.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. That the City Council of the City of Dubuque, Iowa approves the
selection of the Port of Dubuque Development, LLC as the developer for the Dubuque
Star Brewery building and site.
Section 2. That the City Manager is hereby authorized and directed to negotiate
a Development Agreement and Lease with the Port of Dubuque Development, LLC as
related to the redevelopment of the Dubuque Star Brewery and site for City Council
approval.
Passed, approved and adopted this 17th day of January 2005
Roy .D. Buol, Mayor
Attest: Jeanne F. Schneider, City Clerk
F:IUSERSIPmyhreIWPDOCSILOANDOCIBriggs-BreweryLLClseieclion. res.doc
i Pam Myhre - Star Proposal.pdf
I 145 Eas/Badgerflo6d, Sui/e200 Madison. WI 53713 (608)258-5580 Fax:(6tJB)258-5599 Web:ltIfW.a~.com
~II'"
.;1l1,r.IIPI~fE
CIJDlP'01
REDEVELOPMENT PROPOSAL
DUBUQUE STAR BREWERY
DUBUQUE, IOWA
NOVEMBER 18, 200S
I.STATEMENT OF QUALIFICATIONS
D. DEVELOPMENT TEAM
Developer. The Alexander Company
David G. Vas - Development Project Manager.
David's role is to oversee all redevelopment activities for the project, including,
comrnercialleasing, design, construction and asset management. David's resume
is attached as Exhibit 1a.
Chris Gosch - Architectural Project Manager
Chris's Role will be to directly oversee the preparation of construction
Documents and the Contract administration of the project.
Commercial Brokerage - Alexander Urban Resources and Prudential Friedman
Really
Sean O'Rourke - Commercial Leasing Specialist for the Urban Resources has
made numerous contacts to Regional and National interests and works as the
inside contact for the Alexander Company in negotiating lease requirements.
David Frommelt is the Local Commerial Leasing Specialist with strong ties and
Knowledge of the greater Dubuque market. David will continue to market and
show the property and assist Sean with the obtaining lease requirements.
b. LEGAL NAME OF DEVELOPMEN ENTITY
The Legal name of the development entity is Historical Star Redevelopment
L.L.C., an Iowa limited liability Company. The Alexander Company, loe, a
Wisconsin Corporation, is the managing member of the LLC. The LLC was
fonned in April of 2004. The Alexander Company was formed in 1984
1 RealPropertyRescu1cesNalianwide
"
11
21
I Pam Myhre - Sl,!r Proposal.pdf
c. RELEVANT PROJECTS
In addition to the projects listed in the original proposal, The Alexander Company
has since completed the Cayuga Court Project in Middleton. This project included
the redevelopment of three city blocks. The development now houses
condominiums (both new and historic adaptive reuse), Retail uses including
restaurants, wine boutique, jeweler and health and fitness center, an extended stay
hotel. a dentist underground and surface parking and numerous second floor
office uses.
The Verona Main Street Project has also been oompleted. This project included
condominiums and retail spaces with underground parking.
Currently we have five developments under construction. These include:
Capitol West (phase 1 scheduled for oompletion in 2006)
Madison, Wisconsin
3-phase master development
400 condominium units and conunercial space
National Park Seminary (Phase 1 scheduled for completion in late 2006)
Silver Spring, Maryland
2-pbase master development
117 Mixed condominium and rental residential units planned for phase 1
The Historic Professional Buiiding (Scheduled for completion in summer of 2006)
Kansas City. Missouri
132 residential units and commercial space
Novation Campus (Ongoing 65-acre master development)
Madison, Wisconsin
Mixed office and commercial space
Three building completed, and two currently under construction
Historic Crescent District (Phase 1 complete, phase 2 scheduled for completion in 2006)
Davenport, lowa
4-phase master development
73 residential units complete, 53 units under construction, 150+ planned.
Further descriptions and photos of the developments may be found on the Company's
website @ www.alexandercompany.com
d. REFERENCES
Karyn Knaak - US Bank (608) 252-4202 (lender)
I Pam Myhre - Star Proposal-pdt
3\
Michael Jacobs - National Equity Fund (312) 697-6443 (investor)
Ryan Kraemer - Kraemer Brothers (608) 251-5027 (contractor)
e. FINANCIAL INFORMATlON
Financial Statements for The Alexander Company, managing member and
Randall P Alexander, its president, have been included as Exhibit Ie. This
information is confidential and shall only be shared with City staff directly
involved in the evaluation of this proposal unless express written consent is give
by Randall P. Alexander.
f. LITlGATlON SUMMARY
The Alexander Company is not currently I involved in any litigation that would
have any impact on our ability to execute this project.
2. PROJECT DESCRIPTION
Our goal is to anchor the project with strong ground floor retail/entertaimnent
uses. This is the most critical part of the project because the viability of the
amphitheater and riverwalk rest heavily on 'good sound sustainable uses that will
promote tourism and the port of Dubuque experience. Much of our focus has been
on attempting to develop interest from these types of end-users. Our experience in
placing Iowa's Enterprise Zone and Historic credits as well as Federal Historic
and New Market Credits give us the tools necessary to provide the best financial
value to prospective tenants and the City. Our lenders and equity providers are
quite comfortable with our ability to complete the project and are eager to jump in
as soon as we have a viable tenant.
We now have a letter of intent from an operator who wishes to lease slightly over
18,000 square feet of the first floor, including the concrete block structure for use
as a 400 seat dinner theater. We will be receiving their business plan for
evaluation on Monday, November 28 and will forward a copy to the City's
Economic Development Department at that time. The Financing for the project is
identified in the financial model dated October 18, 2005. (Exhibit 2). The Site
Plan (with the inclusion of the concrele block structure) provides for 189 vehicle
spaces plus an additional 7 parking spaces for buses (See exhibit 8.). Should the
business plan and financial information meet our satisfaction and that of our
lender, we would anticipate entering into a leas by early Hjanuary and complete
conslruction by fall of 2006.
We have meet with representatives from who wishes to
explore the poissibility of leasing the balanCe of the first floor for a Winery and a
Wine tasting room. The combination of the winery and the dinner theater would
provide great synergy for those wishing to make day or weekend trips to the port
Pam Myhre - Star Proposal.pdf
".. ., ...............,......"^. ........................ ..
41
of Dubuque as well as an area draw as a cultural and entertainment venue. The
winery would conduct tours of its wine making facility and provide a lounge and
gift shop for displaying and selling its wares.
Should the Dinner Theater nol come to fruition, the concrete block building
would be torn down and the western half of the structure would be outfitted with
storefronts for other retail and service uses. The site plan would be modified as
shown in Exhibit 2B "Alternate Site Plan". We have begun pricing the propose
layout provided to us from h and will present the financing package to
the City Economic Development Staff during the first full week of December.
Occupancy could happen as early as summer of 2006.
The upper floors of the building will continue to be marketed towards prospective
restaurants (second floor) and offices (second through fifth floors). David
Frommelt has compiled a list of interested parties that have toured the facility
over the past year. This list is attached as "Exhibit 2C". This list is to remain
confidential and shall only be shared with City staff directly involved in the
evaluation of this proposal unless express written consent is give by David
Frommelt.
3. SPACE PROGRAM
Dinner Theater
Winery
Restaurant
Office
18,000 SF (First Floor)
7,800 SF (First Floor)
3,400 SF (Second Floor)
10,000 SF (Second through Fifth Floors)
4. TIMELlNE
The timeline is based upon receiving executed leases form the tenants. (See
section 2 above)
5,6,7. DEVELOPMEN COSTS, FINANCING, AND PROFORMA
Development Costs, Financing and Proforma for the proposed Dinner Theater are
identified in the allached Proforma. (Exhibit 5). Development costs for the winery
and other prospective tenants will be provided to the Dubuque Department of
Economic Development for review on a case by case basis.
8. SITE PLAN
\!;,
The Site Plan and Alternate Sile Plan are induded as exhibits 8 and 8a.
f.
Pam Myhre - Star Proposal.pdf
51
I Look forward to our continued relationship with the City of Dubuque with the sincere
interest of bring this project to completion, I look forward to meeting with the City to
explain our proposal and exploring means to accomplish our goal.
Sincerely.
2dl;~
Development Project Manager
I Pam Myhre - Exhibits 2a & 2b.pdf
~.4_
-
-
~tlO..",a.ol1"~
~
-.-~
~
e<....Io.-J.>:,. 2'1
SITE PLAN
STAR BREWERY
DUBUQUE, lOW ^
-
II
-
ST.....laEWO.y
1\
L
~
~
Pam Myhre- Exhibits 2a & 2bpdf
21
----
~1"~~
$lAAI_V
1;\{TI!l!Ir:\i
-
::..."'===~
==-
e........t.~ 2.b
Al TERNA TE SITE PLAN
STAR BREWERY
DUBUQUE, lOW ^
~
;...;..:.....;
i Pam Myhre - Exhibit 1 a. pdf
11
EXHIBIT lA
David G. Vos
Senior Development Project Manager
The Alexander Company, Inc.
Dave has worked for the Alexander Company for fifteen years. He is currently a Senior
Development Project Manager and was formerly the Director of Alexander Urban
Resources. He continues to provide consulting services on historic adaptive reuse
projects. His unique ability to identify owner's interests and risks, his understanding of
building systems, historic building codes, New Markets Tax Credits, L1HTC and Historic
Tax Credit programs make him highly sought after for project oversight services. His
clients have included municipalities, state government, private developers, property
owners, lenders, investors and the Nationai Trust for Historic Preservation.
Dave attended the University of Wisconsin, School of Civil Engineering and Madison
Area Technical Coliege Associate Architectural Program. He is a Registered Architect
in the State of Wisconsin. He Is a member of the American Institute of Architects, the
Construction Specifier's Institute, the Urban Land Institute and the National Trust for
Historic Preservation.
He represents building owners and developers on the Wisconsin Code Council for both
the Historic Building Code and the Alteration/Change of Occupancy Code. He is a
consultant to the Waunakee Plan Commission where he served as an appointed
commission member for two years. He is also the former Chairman of the
Waunakee/Westport Joint Plan Commission. He frequently serves as the deveioper
member on Advisory Services Panels for the Urban Land Institute.
Dave worked as an Architectural Job Captain for Marshali Erdman and Associates for
five years and as Director of Development for Western Center Properties for two years.
He joined the Alexander Company in 1989 and has been involved In the feasibility
analysis, design, historic tax credit application process and construction of nearly 100
historic structures in twelve states since that time.
[Pam Myhre- Exhibit 1b.pdf
11
EXHIBIT 1 B
Christopher Gosch, AIAA
Architectural Project Manager
The Alexander Company, Inc.
Chris joined the Alexander Company In 2005 and is Involved in new construction and
historic renovation projects throughout the Midwest.
Chris attended Iowa State University and received a Bacheior of Architecture degree
with a secondary emphasis in painting and printmaking.
Prior to becoming part of the Aiexander Company team, he was involved in a wide
range of building and construction types, from residential to hotel resort properties, as
well as experience with renovation of buildings in Wisconsin and Kansas City, MO.
Chris also had the opportunity to travel nationwide to supervise construction for retail
stores which were placed in constrained and/or underutilized urban environments.
Chris is involved in design, feasibility studies, building and project assessments,
programming and construction administration on projects throughout the Midwest for
the Alexander Company.
[PDrn
November 18, 2005
Dave Heiar, Economic Development Coordinator
City of Dubuque
City Hall
50 West 13th Street
Dubuque,IA 52001
Response To: Request for Proposal
Redevelopment of the Former Dubuque Star Brewery Building & Site
Dubuque, IA
Item 1 - Statement of Qualifications
a. Development Team
Wayne Briggs, President/CEO
Chad Walsh, Project ManagerlEstimator
Brad Bierman, Project Manager/Estimator
Please see attachments 1 a-I, 1 a-2, 1 a-3 for resumes
b. Legal Name of Development Entitv
Port of Dubuque Development, LLC (Subsidiary of Epic Construction)
Established November, 2005
c. Listing of Relevant Proiects
Please see attachment 1 c
d. Professional References
Wayne Briggs:
John Schmidt, Heartland Financial
1398 Central Avenue
Dubuque, IA 52001
(563) 589-2100
Arnie Honkamp, Honkamp Krueger & Co., PC
2345 JFK Road
Dubuque, IA 52002
(563) 556-0123
EPIC CONSTRUCTION, INC. / GENERAL CONTRACTORS
137 MAIN STREET / SUITE 500 / DUBUQUE, IA 52001/ PHONE: 563-5B3-2169/ FAX: 563-583-2412/ WEB: EPICGC.COM
Tom Luksetich
2744 Linda Court
Dubuque, IA 52001
(563) 582-4766
Chad Walsh:
Frank Fiorenza, Potosi Village President and Board Member of Potosi
Brewery Foundation
105 N. Main Street
Potosi, WI 53820
(608) 763-2261
Jim Harkness, Administrator for The Grandview Estates
540 Pleasant Street
Elizabeth, IL 61028
(815) 858-2275
Ron Kirchhoff, Owner of Kirchhoff Distributing Company
5035 Chavenelle Drive
Dubuque, IA 52002
(563) 556-8911
Brad Bierman:
Jim Theisen, Owner of Theisen's Supply, Inc.
4949 Chavenelle Drive
Dubuque, IA 52002
(563) 556-4738
Tim Hodge, Owner of Hodge Company
1111 Purina Drive
Dubuque, IA 52002
(563) 583-9781
Mike Ruden, The Durrant Group
700 Locust Street
Suite 942
Dubuque, IA 52001
(563) 583-9131
e. Financial Information
If selected for the project, Honkamp Krueger will be able to provide any
required information for Port of Dubuque Development, LLC.
f. Pending Litigation
None
EPIC CONSTRUCTION, INC. / GENERAL CONTRACTORS
137 MAIN STREET / SUITE 500 / DUBUQUE, IA 52001/ PHQNE: 563-583-2169/ FAX: 563-583-2412 / WEB: EPICGC.CQM
Item 2 - Project Description
Our vision of the Brewery project begins with the main level. A Winery and a Micro-
brewery/Brewpub restaurant have expressed interest in this project. These businesses
would fill the main level along with a portion ofthe second level. The remainder of the
second level along with third would be designated as office space. The fourth level
would be set aside for a conference room, which could be leased by the day or week by
individuals or corporations for private functions. The fifth level will be a lookout tower
for people to view the area surroundings.
We see the Dubuque Star Brewery restoration as an important piece to a larger
development in making the Port of Dubuque a destination point for tourists from around
the world.
Item 3 - Development Space Program
First Floor: Winery
Micro-brewery / Brewpub restaurant
Retail and Common area
Second Floor: Additional restaurant seating
Office space
Office space
Conference room
Lookout tower
Third Floor:
Fourth Floor:
Fifth Floor:
8,426 SF
12,462 SF
3,340 SF
1,822 SF
6,812 SF
5,200 SF
3,408 SF
489 SF
Total: 41,959 SF
Item 4 - Development Timeline
We are proposing to begin work in the Spring of2006 with space being available by the
Summer of2007.
Item 5 - Development Costs
'0"
C~I~ t;]
!1 ~.
We are estimating that renovation costs will be between $7 and $7.5 million.
Development fees are included in this estimate.
Item 6 - Development Financing
We have many parties interested in becoming a part of the entire Port development that
would come on board if we are selected as the Developer for this project. Please see
attached letter from DB&T regarding our financial credibility.
Item 7 - Proforma Analysis
To be developed.
EPIC CONSTRUCTION, INC. I GENERAL CONTRACTORS
137 MAIN STREET / SUITE 500 / OUBUOUE. IA 52001 / PHONE: 563-583-2169/ fAX: 563-583-2412/ WEB: EPICGG.GOM
Item 8 - Site Plans
See attached floor plan for a First Floor conceptual layout.
EPIC CONSTRUCTION, INC, I GENERAL CONTRACTORS
137 MAIN STREET / SUITE 500 / DUBUQUE, IA 52001/ PHONE: 563-583-2169/ FAX: 563-583-2412/ WEB: EPiCGC.COM
Attachment 1a-1
Wayne Briggs
137 Main Street, Suite 400
Dubuque,IA 52001
(563) 557-2504
Email: wbriggs(a)pltnm.com
Work History:
Platinum Services, Inc., Insurance Agency, Dubuque, IA
From 1996 - Present
Owner, President/CEO
Epic Construction, General Contractor; Dubuque, IA
May 2002 - Present
Owner; President
Developments:
Tiffany Ridge Subdivision; Dubuque, IA - $2 Million subdivision consisting
of24 lots and 30 acres of development ground.
Platinum Plaza; Dubuque, IA - $4 Million office/retail complex.
Dubuque Westend Development; Dubuque, IA - $4 Million office/retail complex.
Briggs Brothers; Galena, IL - $4 Million property with 612 acres
for future development consisting of residential homes, golf course/
resort and air strip.
GTW Pennsylvania; Dubuque, IA - $2 Million office/retail complex.
Dubuque Casino Hotel, LLC - Dubuque, IA - $13 Million Hilton Garden Inn
and Houlihan's Restaurant.
Lower Main Development, LLC - Dubuque, IA - $3.5 Million renovation of
the former Weber Paper Building into an office/retail complex.
Platteville 81, LLC - Platteville, WI - $1 Million retail/apartment building.
Prairie Properties, LLC - Prairie du Chien, WI - $4 Million Country Inn &
Suites and Buckhorn Grill & Pub.
PR Platteville, LLC - Platteville, WI - $600,000 Pizza Ranch Restaurant.
Radford Road Real Estate, LLC - Dubuque, IA - $2 Million property with 6.5
acres for future development consisting ofretail/office buildings.
EPIC CONSTRUCTION, INC. / GENERAL CONTRACTORS
137 MAIN srREET / SUITE 500 / DUBUQUE. IA 52001/ PHONE: 563-583-2169/ FAX: 563-5B3-2412/ WEB: EPICGC.COM
Attachment 1a-2
Chad Walsh
137 Main Street, Suite 500
Dubuque,IA 52001
(563) 583-2169
Email: cwalshla1eoic!!c.com
Education:
University of Wisconsin - Stout; Menomonie, WI
Bachelor of Science Degree, Construction Management
Graduation Date: May 1999, GPA 3.8
Work History:
Epic Construction, General Contractor; Dubuque, IA
May 2002 - Present
Owner; Vice President; Project Manager
Prism Corporation, General Contractor; Kieler, WI
May 1999 - May 2002
Project Manager, Commercial Construction
Proiects of
Distinction:
Commercial
Kirchhoff Distributing; Dubuque, IA - $3.2 Million
Potosi Fire Station; Potosi, WI - $650,000
Honkamp Krueger & Company; Dubuque, IA - $700,000
Westend Development; Dubuque, IA - $1 Million
Herrig Condominiums; Dubuque, IA $475,000
Historical Renovation
Potosi Brewery Restoration; Potosi, WI - $3.4 Million (In Progress)
Weber Paper Renovation; Dubuque, IA - $3.5 Million
HotellRestaurant
Country Inn & Suites; Galena, IL - $4.2 Million
Emmy Lou's; Galena, IL - $450,000
Pizza Ranch; Dubuque, IA - $600,000
Industrial
Flynn Ready Mix; Dubuque, IA - $650,000
IMPRO Products; Waukon, 1A - $650,000
Lextron Animal Health; Manchester, IA - $500,000
Kowalski Kieler Batch Plant; Kieler, WI - $1.2 Million
Custom Pak; DeWitt, IA - $1.2 Million (In Progress)
Institutional
YMCA; Dubuque, IA - $1 Million
Grandview Estates; Elizabeth, IL - $1.5 Million (In Progress)
Retail
A1di's; Dubuque, IA - $1.5 Million
Comelec Services; Dubuque, IA - $1 Million
Steve's Ace Hardware; Dubuque, IA - $1 Million
Platteville 81; Platteville, WI - $580,000
Demolition
Dubuque Packing Company; Dubuque, IA - $3 Million (In Progress)
EPIC CONSTRUCTION, INC. / GENERAL CONTRACTORS
137 MAIN STREET / SUITE 500 / DUBUDUE, IA 52001/ PHONE: 563-583-2169/ FAX: 563-583-2412 / WEB: EPICGC.COM
Attachment la-3
Bradley A. Bierman
137 Main Street, Suite 500
Dubuque,lA 52001
(563) 583-2169
Email: bbierman(iil.epicl!c.com
Education:
University of Wisconsin-Platteville; Platteville, WI
Bachelor of Science Degree, Engineering and Technology
Graduation Date: May 1993, GPA 3.5
Work History:
Epic Construction, General Contractor; Dubuque, IA
May 2002 - Present
Owner; Vice President; Project Manager
Prism Corporation, General Contractor; Kieler, WI
November 1995 - May 2002
Project Manager, Commercial Construction
Proiects of
Distinction:
Commercial
Theisen's; Marshalltown, 1A - $2 Million
Platinum Plaza Phase I; Dubuque, 1A - $1 Million
Platinum Plaza Phase II; Dubuque, IA - $1 Million
Darlington Municipal Building; Darlington, WI - $2 Million
Theisen's Building Addition; Dubuque, IA - $1 Million
Healthcare
PDC Memorial Hospital- OB/Surgery Addition; Prairie du Chien, WI - $4 Million
PDC Memorial Hospital- Administrative Addition; Prairie du Chien, WI - $2 Million
Medical Associates Clinic Addition; Platteville, WI - $260,000
HotellRestaurant
Country Inn & Suites; Prairie du Chien, WI - $3.7 Million
Hilton Garden Inn/Houlihan's Restaurant; Dubuque, IA - $13 Million
Industrial
Eagle Window & Door; Dubuque, IA - $12 Million
Hodge Material Handling Info-Safe Building; Dubuque, IA - $1 Million
Miracle Car Wash; Dubuque, IA - $1 Million
Institutional
UW-Platteville Doudna Hall; Platteville, WI - $6 Million
UW-Platteville Doudna Hall Childcare; Platteville, WI - $1 Million
UW-Platteville Russell Hall; Platteville, WI - $8 Million
UW-Platteville Fieldhouse Locker Room; Platteville, WI - $400,000
Scales Mound School; Scales Mound, IL - $3.5 Million
Potosi School Addition; Potosi, WI - $1 Million
Southwest WI Technical College Conference Center; Fennimore, WI - $500,000
Southwest WI Technical College Dining Room Remodel; Fennimore, WI - $520,000
Retail
Menard's Inc.; Dubuque, IA - $6 Million
Hawkeye Boat Sales; Dubuque, IA - $2 Million
Yuan Retail Building; Dubuque, IA - $1.25 Million (In Progress)
EPIC CONSTRUCTION, INC. / GENERAL CONTRACTORS
131 MAIN STREET 1 SUITE 500 1 DUBUQUE, IA 510011 PHONE: 563.583.11691 FAX: 563-583-14111 WEB: EPICGC,CDM
Attachment t-c
Platteville 8 I, LLC
Type of Project:
Major Tenants:
Occupancy:
Completed Value:
Lender:
Construction Date:
BBW 151, LLC
Type of Project:
Major Tenants:
Occupancy:
Completed Value:
Lender:
Construction Date:
Hwv 151/61 Development, LLC
Type of Project:
Major Tenants:
Occupancy:
Completed Value:
Lender:
Construction Date:
Dubuque Casino HoteL LLC
Type of Project:
Major Tenants:
Occupancy:
Completed Value:
Lender:
Construction Date:
Prairie Properties. LLC
Type of Project:
Major Tenants:
Occupancy:
Completed Value:
Lender:
Construction Date:
Addition offour apartments and 9,200 sf of retail space to existing strip
mall in Platteville, WI
The Cash Store, Security Finance, Tan World, The Dollar Store
All apartments and retail spaces have signed leases
$ 1,25 Million
Mike Gukeisen, American Trust & Savings Bank
May 2004-0ctober 2004
New 5,600 sf building in Platteville, WI
Fastenal Co.
Signed lease through 2010
$500,000
Dan Raduns, Fidelity Bank
April 2004-June 2004
40 acre commercial parcel
Pending
Site is currently undergoing demolition
$40 Million
Darin Fischer, Premier Bank
Duane Frick, Dubuque Bank & Trust
Site is currently undergoing demolition
75,000 sf Hilton Garden Inn hotel and Houlihan's restaurant in Dubuque,
IA
Hilton Garden Inn and Houlihan's
$13 Million
Duane Frick, Dubuque Bank & Trust
October 2004-0ctober 2004
45,000 sf Country Inn & Suites hotel/waterpark and Buckhorn Grill & Pub
in Prairie du Chien, WI
Country Inn & Suites and Buckhorn Grill & Pub
$5 Million
Darin Fischer, Premier Bank
May 2003-June 2004
EPIC CONSTRUCTION, INC. / GENERAL CONTRACTORS
137 MAIN STREET / SUITE 500 / DUBUQUE. IA 52001/ PHONE: 563-583-2169/ FAX: 563-583-2412/ WEB: EPiCGG.COM
Potosi Brewerv Restoration
Type of Project:
Major Tenants:
Occupancy:
Completed Value: $3.6 Million
Lender: Grants and Private Donations
Construction Date: February 2003-July 2007
**Note: This building is listed on the National Register of Historical Places.
in Wisconsin's top ten most endangered historic landmarks. * *
12,350 sf Historical Renovation in Potosi, WI
National Brewery Museum (American Brewiana Association)
It is also listed
EPIC CONSTRUCTION, INC. I GENERAL CONTRACTORS
137 MAIN STREET / SUITE 500 1 DUBUQUE, IA 510011 PHQNE: 563-583-11691 FAX: 563-583-14111 WEB: EPICGC.COM