Loading...
2012 CDBG Ramps Installation Project CompletionTHE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2012 CDBG Access Ramp Installation Project CIP: 2601236 DATE: November 27, 2012 Dubuque kital All- America City II 111! 2012 Through the informal bid process for public improvements, the 2012 CDBG Access Ramp Installation Project was awarded on May 11, 2012, to D & D Superior Concrete in the amount of $24,750.65 for 11 ramps. Due to the favorable bid prices, an additional 16 ramps were added to the project, bringing the total construction cost to $41,307.38, plus $2,065.37 for engineering. City Engineer Gus Psihoyos recommends that the award and completion of the 2012 CDBG Access Ramp Installation Project be officially recorded in the minutes of the City Council. I concur with the recommendation and respectfully request Mayor and City Council approval. hrit44 krt.,74, Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: FROM: SUBJECT: DATE: Michael C. VanMilligan, City Manager Gus Psihoyos, City Engineer 2012 CDBG Access Ramp Installation Project CIP: 2601236 November 26, 2012 INTRODUCTION Dubuque AI-America City I 2012 The purpose of this memorandum is to officially record in the minutes of the City Council the award and completion of the 2012 CDBG Access Ramp Installation Project. BACKGROUND The 2012 CDBG Access Ramp Installation Project provided for the replacement of 27 access ramps at various locations throughout the City. DISCUSSION On May 11, 2012 the City of Dubuque received informal bids for the 2012 CDBG Access Ramp Installation Project in the amounts of: D & D Superior Concrete Skyline Construction McDermott Excavating Eastern Iowa Exv & Conc. Tschiggfrie Exc. Co. Max Smith Construction $24,750.65 $28,790.50 $29,997.53 $31,852.60 $40,135.59 $43,517.50 Based on Iowa Code § 384.103 and § 364.12(3)(c), and Iowa Code, Section 26.14, through the informal bid process for public improvements, this project was awarded on May 11, 2012 D & D Superior Concrete of Dubuque, IA, in the amount of $24,750.65. Originally eleven ramps were to be constructed; due to favorable bid prices and approval from Aggie Tauke, Community Development Specialist, an additional sixteen ramps were added to the project bringing the total construction cost to $41,307.38 plus $2,065.37 for engineering. Funds for this project are from CIP #2601236 BUDGET IMPACT The project cost summary for the 2012 CDBG Access Ramp Installation Project is: Award Final Construction $24,750.65 $41,307.38 Contingency 2,475.06 0.00 Engineering 4,083.86 2,065.37 Total Project Cost $31,309.57 $43,372.75 The funding summary for the project is as follows: CIP Funding Source Fund Amount 2601236 Wheel Chair Ramps $43,372.75 REQUESTED ACTION I respectfully request in accordance with the above codes the 2012 CDBG Access Ramp Installation Project costs be officially recorded in the minutes of the City Council. Prepared by Jane Smith, Engineering Assistant cc: Jenny Larson, Budget Director Aggie Tauke, Community Development Jon Dienst, Civil Engineer II City of Dubuque FINAL CONTRACT Date: 11/6/12 PROJECT NAME: 2012 CDBG ACCESS RAMP INSTALLATION PROJECT Contract Amount $24,750.65 CONTRACTOR: D & D Concrete QTY. TOTAL ITEM UNIT UNIT COST TO DATE COST Demoltion & Removal 1. PC Concrete Sidewalk, Remove 2023.00 S.F. $1.00 4236.92 $4,236.92 2. Remove Curb & Gutter 255.00 L.F. $8.00 385.50 $3,084.00 Construction 3. Graded Stone Base 31.00 Ton $15.00 59.33 $889.95 4. PC Concrete Sidewalk, 6" Construct 2023.00 S.F. $4.95 1209.92 $5,989.10 5. PC Concrete Curb & Gutter, 2.5' 255.00 L.F. $22.00 385.50 $8,481.00 Construct 6. PC Concrete Access Ramp 18.00 Each $110.00 30.50 $3,355.00 Detectable Warning Area (Each = 2'x4') 7. Backfill, Topsoil 51.70 S.Y. $14.00 26.85 $375.90 8. Sod 13.00 S.Y. $15.00 112.50 $1,687.50 9. Traffic Control & Safety Control 1.00 Lump Sum $300.00 1.00 $300.00 10. Erosion Control 1.00 Lump Sum $200.00 1.00 $200.00 11. Mobilization 1.00 Lump Sum $1,200.00 1.00 $1,200.00 ADDED ITEMS 12. PC Concrete Sidewalk, 4" Construct S.F. $4.00 2827.00 $11,308.00 13. Traffic Control & Mobilization - extra areas Lump Sum $1.00 200.00 $200.00 TOTAL DUE CONTRACTOR $41,307.37 ENGINEERING $2,065.37 TOTAL CONSTRUCTION COS" $43,372.74 I hereby certify that the above statement shows in detail the correct amount of all work requl to complete the above improvement. APPROVED: Michael Van Milligen, City Manager City of Dubuque,lowa The undersigned, /�e,�`t i2 He , contractor for the above improvement, does hereby accept thdabove "Total Due Contractor ", as full settlement for all claims for said improvement. CONTRACTOR: BY: Gus Psihoyos City Engineer CITY OF DUBUQUE ENGINEERING Date: November 21, 2012 CONTRACTOR: D & D Concrete Partial Payment Number: 4 - Retainage 2012 CDBG ACCESS RAMP INSTALLATION PROJECT QTY. AMOUNT QTY. AMOUNT ITEM QTY. UNIT UNIT COST this Period EARNED this Perioc to Date EARNED to Date Demoltion & Removal 1. PC Concrete Sidewalk, Remove 2023.00 S.F. $1.00 0.00 $0.00 4236.92 4236.92 2. PC Concrete Curb & Gutter, 2.5' 255.00 L.F. $8.00 0.00 $0.00 385.50 3084.00 Removal Construction 3. Graded Stone Base 31.00 Ton $15.00 0.00 $0.00 59.33 889.95 4. PC Concrete Sidewalk, 6" Construct 2023.00 S.F. $4.95 0.00 $0.00 1209.92 5989.10 5. PC Concrete Curb & Gutter, 2.5' 255.00 L.F. $22.00 0.00 $0.00 385.50 8481.00 Construct 6. PC Concrete Access Ramp 18.00 Each $110.00 0.00 $0.00 30.50 3355.00 Detectable Warning Area (Each = 2' x 4' area) 7. Backfill, Topsoil 51.70 S.Y. $14.00 0.00 $0.00 26.85 375.90 8. Sod 13.00 S.Y. $15.00 0.00 $0.00 112.50 1687.50 9. Traffic Control & Safety Control 1.00 Lump Sum $300.00 0.00 $0.00 1.00 300.00 10. Erosion Control 1.00 Lump Sum $200.00 0.00 $0.00 1.00 200.00 11. Mobilization 1.00 Lump Sum $1,200.00 0.00 $0.00 1.00 1200.00 ADDED ITEMS 12. PC Concrete Sidewalk, 4" Construct S.F. 13. Traffic Control & Mobilization - extra areas Lump Sum Construction Total $4.00 $1.00 0.00 0.00 $0.00 $0.00 $0.00 Payments previously approved: 1 24897.70 7. 2 9367.01 8. 3 4977.30 9. 4 10. 5 11. 6 12. 0.00 0.00 11308.00 200.00 41307.37 TOTAL prices of work and material shown on the face of this Partial Payment form are correct that all work has been performed and materials supplied in full accordance with the terms and conditions of the contract documents and authorized changes thereto: that the following is a true and correct statement of the contract account up to and including the last day of the period covered by this payment and that no part of the 'Total Amount Due" has been received: $39,242.01 TOTAL AMOUNT EARNED TO DATE $41,307.37 RETAINED PERCENTAGE $0.00 TOTAL EARNED LESS RETAINED PERCENTAGE $41,307.37 TOTAL PREVIOUSLY APPROVED $39,242.01 TOTAL AMOUNT DUE $2,065.36 I further certify that all claims outstanding as of this date against the under- signed as contractor for labor, materials, and expendable equipment employed in the perfor- mance of said contract up to this date have been paid in full accordance with the require- ments of said contract. CONTRACTOR: D & D Concrete DATE: BY: TITLE: �e .d -e,r)r CERTIFICATE OF THE CITY ENGINEER I certify that I have verified this payment, and that to the best of my knowledge and belief it is a true and correct statement of work performed and materials supplied by the Contractor, and that the Contractor's certified statement of the account and the amount due is correct and just, and that all work and material included in this Partial Payment have been performed in full accordance with the terms and conditions of the contract documents and authorized changes thereto. CITY OF DUBUQUE BY: �tl DATE: TITLE: 2012 CDBG RAMP PROJECT LISTING OF LOCATIONS Lincoln at Whittier SE Corner 2060 Whittier NE Corner 1802 Lincoln Lincoln at Emerson SE Corner 1870 Lincoln NE Corner 2090 Emerson NW Corner 1925 Lincoln SW Corner 2125 Emerson Lincoln at Roosevelt SE Corner 2085 Roosevelt NE Corner 2080 Roosevelt NW Corner 2105 Roosevelt SW Corner 1975 Lincoln Lincoln at Stanton SE Corner 2096 Lincoln NE Corner 2108 Lincoln Lincoln at Shiras SE Corner 2090 Shiras NE Corner - City Pump House *SW Corner 2108 Shiras (just add domes - epoxy - concrete is ok as is) This corner will be a pilot test with Armor Tile surface applied tile - City will supply tile. Added locations: Library 11th & Bluff St. George at Tressa (4 corners) St. George at Levi (2 corners) 12th & Main NE & NW (2 corners) Geraldine at Patricia N Grandview & University N Grandview & Atlantic