Beverly Avenue Storm Sewer Project AcceptanceMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Beverly Avenue Storm Sewer Replacement Project DATE: November 27, 2012 Dubuque kital All- America City II 111! 2012 City Engineer Gus Psihoyos is recommending acceptance of the public improvement for the Beverly Avenue Storm Sewer Construction Project and authorization for final payment to the contractor, Drew Cook and Sons Excavating Co., Inc., in the final contract amount of $19,090.08, which is 44.7% over the contract amount of $13,189.00, due to rock excavation and additional work associated with topsoil, HMA patch, and erosion controls necessary to satisfactorily complete the project. I concur with the recommendation and respectfully request Mayor and City Council approval. kr,„ 7)4, Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: November 26, 2012 RE: Beverly Avenue Storm Sewer Replacement Project CIP: 7201008 INTRODUCTION Dubuque Al-America City 2012 The purpose of this memorandum is to recommend final acceptance of the public improvement and authorize final payment to the contractor for the Beverly Avenue Storm Sewer Construction Project through the adoption of the enclosed resolution. BACKGROUND This project involved the placement of approximately 130 feet of 18" HDPE and 8 feet of 30" RCP pipe to extend the existing storm sewer from the south end of Beverly Avenue. Some additional work involved with the project entails relocating a water hydrant, placing rip rap, and fencing. DISCUSSION The Beverly Avenue Storm Sewer Replacement Project was completed by Drew Cook & Sons Excavating Co. Inc. of Dubuque, Iowa in the final contract amount of $19,090.08. This is 44.7% over the contract amount of $13,189.00. The overage is due to rock excavation and additional work associated with topsoil, HMA patch, and erosion controls necessary to satisfactorily complete the project. The project was awarded based on a competitive quotation process for public improvements in accordance with Iowa Code, Section 26.14. RECOMMENDATION I recommend that the City Council accept the improvements and authorize payment of the contract amount of $19,090.08 to Drew Cook & Sons Excavating Co. Inc. for the Beverly Avenue Storm Sewer Replacement Project BUDGET IMPACT The cost summary for the Beverly Avenue Storm Sewer Replacement Project is as follows: The project funding summary is as follows: CIP Award Final 7201008 Storm Sewer Improvements /Extentions Construction Contract $13,189.00 $19,090.08 Contingency 1,319.00 0 Construction Engineering 2,176.20 1,319.00 Total Project Cost $16,684.20 $20,409.08 The project funding summary is as follows: CIP Fund Description Fund Amount 7201008 Storm Sewer Improvements /Extentions $20,409.08 Total Project Funding $20,409.08 ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution accepting the improvements and authorizing payment of the contract amount of $19,090.08 to Drew Cook & Sons Excavating Co. Inc. for the Beverly Avenue Storm Sewer Replacement Project. cc: Jenny Larson, Budget Director Deron Muehring, Civil Engineer RESOLUTION NO. 330 -12 ACCEPTING BEVERLY AVENUE STORM SEWER CONSTRUCTION PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Beverly Avenue Storm Sewer Construction Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Beverly Avenue Storm Sewer Construction Project appropriations for the contract amount of $19,090.08 Tess any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 3rd day of December 2012. Attest: /� mor Kevi S. Firnstahl, CM y Clerk Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE BEVERLY AVENUE STORM SEWER CONSTRUCTION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the, that the Beverly Avenue Storm Sewer Construction Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $20,409.08. Dated thisc day of0M41,2012. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on thq" day o Kevi' S. Firnstahl, CM , ity Clerk Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589-4270 PROJECT CLOSE OUT FORM Project Name: CIP Number: Project Contract Amount: Project Completion Date: Beverly Avenue Storm Sewer Construction 5200 Wolff Road CIP # 3002142 $13,189.00 14- Sep -12 Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: Drew Cook & Sons 5200 Wolff Road Dubuque, Iowa 52002 563 -582 -9292 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Excavation, Rock 50 CY $70.00 79.32 $ 5,552.40 158.64% 82.11% 100.00% 100.00% 122.96% 100.00% 100.00% 100.00% 100.00% 0.00% 150.00% 100.00% 100.00% 100.00% 125.00% 118.33% 100.00% 100.00% 100.00% Bedding Stone, Class 1 65 TON $17.00 53.37 $ 907.29 Manhole, 48" Diameter, Complete (Install Only) 2 EACH $500.00 2.00 $ 1,000.00 Apron, Concrete, 30 in. (Install Only) 1 EACH $250.00 1.00 $ 250.00 Storm Sewer, 18" HDPE (Install Only) 131 LF $15.00 160.71 $ 2,410.65 Storm Sewer, 30" RCP, Class III (Install Only) 8.0 LF $50.00 8.00. $ 400.00 Revetment Stone, Riprap Class E 30 TON $20.00 30.00 $ 600.00 Remove Exisitng & Install New Field Fence (Match Exi 160 LF $6.40 160.00 $ 1,024.00 Temporary Fence 160 LF $3.50 160.00 $ 560.00 Remove & Salvage Apple Trees 2 EACH $100.00 $ - Remove Stump 1 EACH $425.00 1.50 $ 637.50 Hydrant MJ (Install Only) 1 EACH $350.00 1.00 $ 350.00 6" Valve MJ w /Box (Install Only) 1 EACH $150.00 1.00 $ 150.00 6" 90 Bend MJX (Install Only) 1 EACH $150.00 1.00 $ 150.00 6" Mega Lug MJ (Install Only) 4 EACH $15.00 5.00 $ 75.00 6" DIP, Class 52 w. /Polywrap (Install Only) 10 LF $25.00 11.83 $ 295.83 6" Cap MJ (Install Only) 1 EACH $200.00 1.00 $ 200.00 Erosion Control & Landscape Restoration 1 LS $800.00 1.00 $ 800.00 Traffic Control & Project Safety 1 LS $200.00 1.00 $ 200.00 Total Contract Work $ 15,562.67 EXTRA WORK PC Curb & Gutter LF $30.00 8.00 $ 240.00 HMA Patch Tons $130.00 5.10 $ 663.00 Topsoil, Delivered and Spread Load $225.00 4.00 $ 900.00 Limestone Backfill Tons $7.00 40.63 $ 284.41 Erosion Control Matting, Installed Rolls $160.00 9.00 $ 1,440.00 Total Extra Work $ 3,527.41 I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete th bove improvement. APPROVED: Total Contract Work Performed to Date: $ Total Extra Work Performed to Date: $ Total Contract and Change Order Work Performed to Date: ' $ Miscellaneous Costs Engineering 15,562.67 3,527.41 19,090.08 1,319.00 Michael Van Milligen, City Manager Dubuque, Iowa ,/ Gus Psihoyos, City Engineer Dubuque, Iowa TOTAL FINAL PROJECT COSTS: $ 20,409.08 The Undersigned, , contractor for the above improve ent, does hereby accept the above "Total Due Contractor ", as .full settle en • I claims for said improve nt. APPROVED: k-7( ,�