2012 Brick Manhole Bid Package #3 Project AcceptanceMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2012 Brick Manhole Replacement Project, Bid Package 3 C I P : 7202332, 7401405 DATE: November 27, 2012 Dubuque kital All- America City II 111! 2012 City Engineer Gus Psihoyos is recommending acceptance of the public improvements for the 2012 Brick Manhole Replacement Project, Bid Package 3, and authorization for final payment to the contractor, McDermott Excavating, in the final contract amount of $78,749.20, which is $15,068.30 below the contract amount of $93,817.50, due to the elimination of unneeded watermain work. I concur with the recommendation and respectfully request Mayor and City Council approval. kr,„ 7)4, Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: November 26, 2012 RE: 2012 Brick Manhole Replacement Project, Bid Package 3 CIP: 7202332, 7401405 INTRODUCTION Dubuque krAll Afl Amer+cacnr 1111 tr 2012 The purpose of this memo is to recommend acceptance of the public improvements and authorize final payment to the contractor for the 2012 Brick Manhole Replacement Project, Bid Package 3. BACKGROUND The City of Dubuque, Iowa has entered into a Consent Decree in the case of The United States of America, and the State of Iowa v. The City of Dubuque, Iowa, Civil Action No. Case 2:11 -CV- 01011 -EMJ, Civil Action Number 2008V00041, DOJ Case Number 90- 5 -1 -1- 09339, United States District Court for the Northern District of Iowa. The provisions of the Consent Decree apply to and are binding upon the City and its officers, directors, employees, agents, servants, successors, assigns, and all persons, firms and corporations under contract with the City to perform the obligations of the Consent Decree. The City is actively rehabilitating brick manholes and sanitary sewer pipes that were identified in the plan to be deficient. DISCUSSION The 2012 Brick Manhole Replacement Project, Bid Package 3 was completed by McDermott Excavating of Dubuque, Iowa, in the final contract amount of $78,749.20. RECOMMENDATION I recommend that the City Council accept the improvements and authorize payment of the contract amount of $78,749.20 to McDermott Excavating for the 2012 Brick Manhole Replacement Project, Bid Package 3. BUDGET IMPACT The cost summary for the 2012 Brick Manhole Replacement Project, Bid Package 3 is as follows: Award Final Construction Contract $ 93,817.50 $ 78,749.20 Contingency 9,381.75 0 Construction Engineering & Inspection 15,479.89 3,150.00 $118,679.14 $81,899.20 The contract decrease can be attributed to the elimination of unneeded watermain work. The project funding summary is as follows: CIP Fund Description Fund Amount 7202332 Stormwater Infiltration and Inflow $78,257.70 7401405 Watermain Replacements 3,641.50 Total Project Funding $81,899.20 ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolutions accepting the improvements and authorizing payment of the contract amount of $78,749.20 to McDermott Excavating for the 2012 Brick Manhole Replacement Project Bid Package 3. cc: Jenny Larson, Budget Director Charles Gau, Engineering Technician RESOLUTION NO. 331-12 ACCEPTING THE 2012 BRICK MANHOLE REPLACEMENT PROJECT BID PACKAGE 3 AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 2012 Brick Manhole Replacement Project Bid Package 3 (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the 2012 Brick Manhole Replacement Project Bid Package 3 appropriations for the contract amount of $78,749.20 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 3rd day of December 2012. Roy D. Buol, Mayor Attest: • Ke 'n S. Firnstahl, CM 4 -'t'y Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2012 BRICK MANHOLE REPLACEMENT PROJECT BID PACKAGE 3 The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2012 Brick Manhole Replacement Project Bid Package 3, and that said Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $81,899.20. Dated this day of L /'Ii' , 2012. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on th% day of , 2012. Kevi S. Firnstahl, C° ity Clerk THE CITY OF Dui Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589 -4270 PROJECT CLOSE OUT FORM Project Name: CIP Number: Project Contract Amount: Project Completion Date: 2012 BRICK MANHOLE REPLACEMENT PROJECT BID PACKAGE #3 CIP: 7202332 $93,817.50 16- Nov -12 Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: McDermott Excavating 14407 Hwy 20 West Dubuque, Iowa 52003 -9709 563 - 583 -4633 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE MH 05335 - 11.00' deep 1 LS $ 4,785.00 1.00 $ 4,785.00 100.00% 100.00% 100.00% 0.00% 100.00% 0.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 0.00% 56.20% 51.73% 125.00% 225.00% 70.68% 0.00% 0.00% 102.96% 46.77% 4.12% 233.70% 0.00% 126.09% 236.33% 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 15.63% 50.00% 0.00% 0.00% 37.50% 50.00% 0.00% 75.00% 0.00% 50.00% 100.00% 28.84% 0.00% 79.32% 10.00% 1 2 MH 06939 - 11.00' deep 1 LS $ 4,822.00 1.00 $ 4,822.00 3 MH 05588 - 9.00' deep 1 LS $ 4,672.00 1.00 $ 4672.00 4 MH 05580 - 6.00' deep - (Removed From Project) 1 LS $ - 0.00 $ - 5 MH 05579 - 10.00' deep 1 LS $ 4,709.00 1.00 $ 4,709.00 6 MH 05574 - 8.00' deep - (Removed From Project) 1 LS $ - 0.00 $ - 7 MH 06789 - 8.00' deep - (Decided to Eliminate MH) 1 LS 1 $ 2,292.00 1.00 $ 2,292.00 8 MH 05562 -7.00' deep 1 LS $ 4,061.00 1.00 $ 4,061.00 9 MH 05534 - 6.00' deep 1 LS $ 3,955.00 1.00 $ 3,955.00 10 MH 05543 - 8.00' deep 1 LS $ 4,381.00 1.00 $ 4,381.00 11 MH 05539 - 5.00' deep - (Decided to Eliminate MH) 1 LS 1 $ 1,432.50 1.00 $ 1,432.50 12 MH 05544 - 4.00' deep 1 LS $ 3,081.00 1.00 $ 3,081.00 13 8" PVC SDR -26 100 LF $ 33.50 0.00 $ - 14 6" PVC SDR -26 50 LF $ 32.50 28.10 $ 913.25 15 4" PVC SDR -26 Lateral 100 LF $ 19.00 51.73 $ 982.87 16 8" x 4" PVC Wye 4 EA $ 75.00 5.00 $ 375.00 17 6" x 4" PVC Wye 4 EA $ 70.00 9.00 $ 630.00 18 PC Concrete Curb And Gutter - Remove and Construct 25 LF $ 28.00 17.67 $ 494.76 19 PC Concrete Sidewalk 4" - Remove and Construct 96 SF $ 5.75 0.00 $ - 20 PC Concrete Sidewalk / Approach 6" - Remove and Construct 10 SY $ 55.00 0.00 $ - 21 Bedding Stone, 1" Clean - Includes Filter Fabric 72 Ton $ 16.00 74.13 $ 1,186.08 22 Granular Subbase, IOWA DOT Gradaton #12a 700 Ton $ 9.65 327.41 $ 3,159.51 23 Granular Backfill, IOWA DOT Gradaton #32 (Man sand) 700 Ton $ 9.65 28.85 $ 278.40 24 Graded Stone Base 60 Ton $ 9.65 140.22 $ 1,353.12 25 Trench Stabilization Stone 45 Ton $ 10.50 0.00 $ - 26 HMA 300K Surface Course, 1/2" (PG 64 -22) 45 Ton $ 120.00 56.74 $ 6,808.80 27 PC Concrete Base (8 ") - Remove and Construct 60 SY $ 45.00 141.80 $ 6,381.00 28 Landscape Restoration (Hydro Seed) 1 LS $ 600.00 1.00 $ 600.00 29 12" DIP, Class 52 W / Wrap 100 LF $ 25.00 0.00 $ - 30 12" 45 Degree Bend 4 EA $ 100.00 0.00 $ - 31 12" 22.5 Degree Bend 4 EA $ 100.00 0.00 $ - 32 12" Solid Sleeve 4 EA $ 100.00 0.00 $ - 33 12" Mega Lug 16 EA $ 35.00 0.00 $ - 34 12" Valve 1 EA $ 150.00 0.00 $ - 35 12 "x12 "x6" Tee 1 EA $ 135.00 0.00 $ - 36 6" DIP, Class 52 W / Wrap 100 LF $ 18.00 15.63 $ 281.34 37 6" 45 Degree Bend 4 EA $ 80.00 2.00 $ 160.00 38 6" 22.5 Degree Bend 4 EA $ 80.00 0.00 $ - 39 6" Solid Sleeve 4 EA $ 80.00 0.00 $ - 40 6" Mega Lug 16 EA $ 25.00 6.00 $ 150.00 41 6" Valve 2 EA $ 100.00 1.00 $ 100.00 42 6 "x6 "x6" Tee 1 EA $ 100.00 0.00 $ - 43 Water Service Reconnect 4 EA $ 500.00 3.00 $ 1,500.00 44 2" Ridgid Insulation Board 1 EA $ 50.00 0.00 $ - 45 Hydrant 2 EA $ 350.00 1.00 $ 350.00 46 Traffic Control And Project Safety 1 EA $ 2,625.00 1.00 $ 2,625.00 47 Sawcut, Asphalt 720 LF $ 1.50 207.67 $ 311.51 48 Sawcut, Concrete 220 LF $ 3.50 0.00 $ - 49 Sawcut, Composite (HMA over PCC) 500 LF $ 3.50 396.59 $ 1,388.07 50 Excavation, Rock 18 CY $ 100.00 1.80 $ 180.00 Payment Totals $ 68,399.20 Total Contract Work Performed to Date: $ 68,399.20 Total Change Order Work Performed to Date: $ 10,350.00 Total Contract and Change Order Work Performed to Date: $ 78,749.20 Miscellaneous Costs Engineering 3,150.00 TOTAL FINAL PROJECT COSTS: $ 81,899.20 ORDER rCHANGE 1 14- Aug -12 Add extra MH at Altlantic and Decorah = $4150 2 15- Aug -12 Eliminate MH at 1650 Atlantic St. = $2,100 3 16- Aug -12 Add extra MH at Altlantic and Delaware = $4100 I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City M Dubuque, Iowa Gus Psihoyos, City Engineer Dubuque, Iowa The Undersigned contractor for the above improvement, does hereby accept the above 'Total Due Contractor ", as full settlement for all claims for said improvement. APPROVED: BY: hic I)Cf,�cl� XC6,v 1 b , c Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589 -4270 PROJECT CLOSE OUT FORM Project Name: CIP Number: Project Contract Amount: Project Completion Date: 2012 BRICK MANHOLE REPLACEMENT PROJECT BID PACKAGE #3 CIP: 7202332 $93,817.50 16- Nov -12 Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: McDermott Excavating 14407 Hwy 20 West Dubuque, Iowa 52003 -9709 563 - 583 -4633 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE MH 05335 - 11.00' deep 1 LS $ 4,785.00 1.00 $ 4,785.00 100.00% 100.00% 100.00% 0.00% 100.00% 0.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 0.00% 56.20% 51.73% 125.00% 225.00% 70.68% 0.00% 0.00% 102.96% 46.77% 4.12% 233.70% 0.00% 126.09% 236.33% 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 15.63% 50.00% 0.00% 0.00% 37.50% 50.00% 0.00% 75.00% 0.00% 50.00% 100.00% 28.84% 0.00% 79.32% 10.00% 1 2 MH 06939 - 11.00' deep 1 LS $ 4,822.00 1.00 $ 4,822.00 3 MH 05588 - 9.00' deep 1 LS $ 4,672.00 1.00 $ 4,672.00 4 MH 05580 - 6.00' deep - (Removed From Project) 1 LS $ - 0.00 $ - 5 MH 05579 - 10.00' deep 1 LS $ 4,709.00 1.00 $ 4,709.00 6 MH 05574 - 8.00' deep - (Removed From Project) 1 LS $ - 0.00 $ - 7 MH 06789 - 8.00' deep - (Decided to Eliminate MH) 1 LS 1 $ 2,292.00 1.00 $ 2,292.00 8 MH 05562 - 7.00' deep 1 LS $ 4,061.00 1.00 $ 4,061.00 9 MH05534- 6.00'deep 1 LS $ 3,955.00 1.00 $ 3,955.00 10 MH 05543 - 8.00' deep 1 LS $ 4,381.00 1.00 $ 4,381.00 11 MH 05539 - 5.00' deep - (Decided to Eliminate MH) 1 LS 1 $ 1,432.50 1.00 $ 1,432.50 12 MH 05544 -4.00' deep 1 LS $ 3,081.00 1.001 $ 3,081.00 13 8" PVC SDR -26 100 LF $ 33.50 0.00 $ - 14 6" PVC SDR -26 50 LF $ 32.50 28.10 $ 913.25 15 4" PVC SDR -26 Lateral 100 LF $ 19.00 51.73 $ 982.87 16 8" x 4" PVC Wye 4 EA $ 75.00 5.00 $ 375.00 17 6" x 4" PVC Wye 4 EA $ 70.00 9.00 $ 630.00 18 PC Concrete Curb And Gutter - Remove and Construct 25 LF $ 28.00 17.67 $ 494.7.6 19 PC Concrete Sidewalk 4" - Remove and Construct 96 SF $ 5.75 0.00 $ - 20 PC Concrete Sidewalk / Approach 6" - Remove and Construct 10 SY $ 55.00 0.00 $ - 21 Bedding Stone, 1" Clean - Includes Filter Fabric 72 Ton $ 16.00 74.13 $ 1,186.08 22 Granular Subbase, IOWA DOT Gradaton #12a 700 Ton $ 9.65 327.41 $ 3,159.51 23 Granular Backrill, IOWA DOT Gradaton #32 (Man sand) 700 Ton $ 9.65 28.85 $ 278.40 24 Graded Stone Base 60 Ton $ 9.65 140.22 $ 1,353.12 25 Trench Stabilization Stone 45 Ton $ 10.50 0.00 $ - 26 HMA 300K Surface Course, 1/2" (PG 64 -22) 45 Ton $ 120.00 56.74 $ 6,808.80 27 PC Concrete Base (8 ") - Remove and Construct 60 SY $ 45.00 141.80 $ 6,381.00 28 Landscape Restoration (Hydro Seed) 1 LS $ 600.00 1.00 $ 600.00 29 12" DIP, Class 52 W / Wrap 100 LF $ 25.00 0.00 $ - 30 12" 45 Degree Bend 4 EA $ 100.00 0.00 $ - 31 12" 22.5 Degree Bend 4 EA $ 100.00 0.00 $ - 32 12" Solid Sleeve 4 EA $ 100.00 0.00 $ - 33 12" Mega Lug 16 EA $ 35.00 0.00 $ - 34 12" Valve 1 EA $ 150.00 0.00 $ - 35 12 "x12 "x6" Tee 1 EA $ 135.00 0.00 $ - 36 6" DIP, Class 52 W / Wrap 100 LF $ 18.00 15.63 $ 281.34 37 6" 45 Degree Bend 4 EA $ 80.00 2.00 $ 160.00 38 6" 22.5 Degree Bend 4 EA $ 80.00 0.00 $ - 39 6" Solid Sleeve 4 EA $ 80.00 0.00 $ - 40 6" Mega Lug 16 EA $ 25.00 6.00 $ 150.00 41 6" Valve 2 EA $ 100.00 1.00 $ 100.00 42 6 "x6 "x6" Tee 1 EA $ 100.00 0.00 $ - 43 Water Service Reconnect 4 EA $ 500.00 3.00 $ 1,500.00 44 2" Ridgid Insulation Board 1 EA $ 50.00 0.00 $ - 45 Hydrant 2 EA $ 350.00 1.00 $ 350.00 46 Tragic Control And Project Safety 1 EA $ 2,625.00 1.00 $ 2,625.00 47 Sawcut, Asphalt 720 LF $ 1.50 207.67 $ 311.51 48 Sawcut, Concrete 220 LF $ 3.50 0.00 $ - 49 Sawcut, Composite (HMA over PCC) 500 LF $ 3.50 396.59 $ 1,388.07 50 Excavation, Rock 18 CY $ 100.00 1.80 $ 180.00 Payment Totals $ 68,399.20 Total Contract Work Performed to Date: $ 68,399.20 Total Change Order Work Performed to Date: $ 10,350.00 Total Contract and Change Order Work Performed to Date: $ 78,749.20 Miscellaneous Costs Engineering 3,150.00 TOTAL FINAL PROJECT COSTS: $ 81,899.20 CHANGE ORDER 1 14- Aug -12 Add extra MH at Altlantic and Decorah = $4150 2 15- Aug -12 Eliminate MH at 1650 Atlantic St. = $2,100 3 16- Aug -12 Add extra MH at Altlantic and Delaware = $4100 I hereby certify that the above stateme shows, in detail, the correct amount of all work required to co ry a the above improvement. APPROVED: Michael Van Milligen, City M Dubuque, lowa 9 Gus Psihoyos, City Engineer Dubuque, Iowa The Undersigned contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. APPROVED: BY: Irnc. ef,�G`�} Kcav ;1-.