Sixth, 7th & Washington Park Pro - Accept D~~~E ~~~ MEMORANDUM January 23, 2006 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 6th and 7th Street Reconstruction and Washington Park Renovation Project City Engineer Gus Psihoyos is recommending acceptance of the 6th & 7th Street Reconstruction and Washington Park Renovation Project, as completed by Portzen Construction, Inc., in the final contract amount of $786,666.02, which is a $3,886.26 increase from the original contract in the amount of $782,779.76. I concur with the recommendation and respectfully respect Mayor and City Council approval. { . , . . C/ / l' (ll/v ldl,"r/lL Michael C. Van Milligen --- MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer ,. .., _.,-..., Dii~~E ~<k~ MEMORANDUM January 23, 2006 TO: Michael C. Van Milligen, City Manager FROM: Gus Psi hoyos, City Engineer SUBJECT: 6th & 7th Street Reconstruction and Washington Park Renovation Project INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the 6th & 7th Street Reconstruction and Washington Park Renovation Project. BACKGROUND The 6th & 7th Street paving project provided for the complete reconstruction of the roadway sub-base and pavement, between Bluff and Locust Street. Sixth Street was constructed to the City standard 41-foot wide concrete roadway and 7th Street was reduced from the original 35-foot width to a 33-foot wide concrete roadway. The sidewalks along both sides of 6th Street, on the south side of 7th Street, and those abutting Washington Park on Bluff and Locust Streets were reconstructed to incorporate the "Flat-Iron Park" sidewalk design standard (buff-colored sidewalk section, with a brick red stamped parkway area). The project included underground utility improvements; the installation of historic street lighting; the upgrade and replacement of traffic signalization poles and equipment at both the 7th and Locust intersection and the 6th and Bluff intersection; concrete curb and gutter replacement along both Bluff and Locust Streets and the asphalt pavement resurfacing on Bluff Street between 6th & ih and on Locust Street between 6th & 8th. The Washington Park Renovation Project included the complete reconstruction of pedestrian sidewalk with buff-colored sidewalk within the park interior along with substantial improvements and upgrades to both the electrical and water systems. The new historic pedestrian lighting within the park included power outlets to support special events, while new power service pedestals were installed along both 6th and 7th Streets to support community festivals. The project was substantially completed by the specified September 8, 2005 date; however the contractor did not quality for the early completion incentive bonus of $2,000 per calendar day for each day the project was completed before September 8th. The maximum incentive was set at $10,000 (5 calendar days). DISCUSSION The 6th & 7th Street Reconstruction and Washington Park Renovation Project was completed by Portzen Construction, Inc. of Dubuque, Iowa, in the final contract amount of $786,666.02, which is a $3,886.26 increase from the original contract in the amount of $782,779.76. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $786,666.02. BUDGET IMPACT The project cost summary for the 6th & 7th Street Reconstruction and Washington Park Renovation Project is as follows: Total Project Cost Bid Award $782,779.76 42,530.75 89,338.71 10,000.00 $963,335.48 Construction Contract Contingency Construction Engineering & Inspection Project Completion Incentive The project funding summary is as follows: CIP No. 3001626 1001134 1021605 7401405 7201008 7101638 1021017 3001011 Fund Description FY 2005 - Street Construction Fund FY 2005/06 - Washington Park Sidewalks FY 2006 - Washington Park Renovation FY 2006 - Water Main Replacement Fund FY 2006 - Storm Sewer Improvement Fund FY 2006 - Street Program Related Sanitary Sewer Improvements FY 2006 - Fiber Optic Conduit - Paving Projects FY 2006 - Signalization Program Dubuque Museum of Art - Brick Paver Cost Share Total Project Funding Final 786,666.02 o 47,278.25 o $833.944.27 Fund Amount $234,946.58 249,000.00 187,710.00 61,852.88 14,620.79 20,819.99 32,073.04 21,578.36 11,342.64 ~833,944.27 The Dubuque Museum of Art agreed to incur all project costs associated with the removal, the salvaging and replacing of brick pavers as required to facilitate the construction of a bump-out and drop-off area in front of the Dubuque Museum of Art. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final construction cost for the 6th & 7th Street Reconstruction and Washington Park Renovation Project. Prepared by Bob Schiesl, PE, Assistant City Engineer cc: Dawn Lang, Budget Director Bob Green, Water Plant Manager Gil Spence, Leisure Services Manager Don Vogt, Public Works Director RESOLUTION NO. 32-06 ACCEPTING THE 6TH & 7TH STREET RECONSTRUCTION AND THE WASHINGTON PARK RENOVATION PROJECT Whereas, the contract for the 6th & 7th Street Reconstruction and the Washington Park Renovation Project (the Project) has been completed and the City Manager has examined the work and filed a certificate stating that the Project has been completed according to the terms of the contract, plans and specifications and that the City Manager recommends that the Project be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Manager is approved and the Project is hereby accepted. Section 2. The City Treasurer is hereby directed to pay to the contractor from the Fiscal Year 2005 Street Construction Fund, Fiscal Year 2005/2006 Washington Park Sidewalks, Fiscal Year 2006 Washington Park Renovation, Fiscal Year 2006 Water Main Replacement Fund, Fiscal Year 2006 Storm Sewer Improvement Fund, Fiscal Year 2006 Street Program Related Sanitary Sewer Improvements, Fiscal Year 2006 Fiber Optic Conduit - Paving Projects, Fiscal Year 2006 Signalization Program and the cost share on behalf of the Dubuque Museum of Art for brick paver replacement for the contract amount of $786,666.02 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 6th day of February, 2006. /s/ Roy D. Buol, Mayor Attest: Jeanne F. Schneider, City Clerk ~ eanne F. Schneider, CMC, City Clerk RESOLUTION NO. 33-06 FINAL ESTIMATE Whereas, the construction contract for the 6th & 7th Street Reconstruction and the Washington Park Renovation Project, has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $833,944.27 and the said amount shall be paid from the Fiscal Year 2005 Street Construction Fund, Fiscal Year 2005/2006 Washington Park Sidewalks, Fiscal Year 2006 Washington Park Renovation, Fiscal Year 2006 Water Main Replacement Fund, Fiscal Year 2006 Storm Sewer Improvement Fund, Fiscal Year 2006 Street Program Related Sanitary Sewer Improvements, Fiscal Year 2006 Fiber Optic Conduit - Paving Projects, Fiscal Year 2006 Signalization Program and cost share on behalf of the Dubuque Museum of Art for brick paver replacement. Passed, approved and adopted this 6th day of February, 2006. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, City Clerk eanne F. Schneider, CMC, City Clerk 38 Storm Sewer, Manhole Ring & Cover Each $350.00 3.00 $ 1,050.00 39 Flowable Mortar CY $75.00 $ 40 Sanitary Sewer, 8" DIP LF $31.00 323.86 $ 10,039.66 41 Sanitary Sewer, Manhole 48" Dia., Complete Each $2,400.00 4.00 $ 9,600.00 42 Water Main, 6" - 441 Sleeve Each $160.00 5.00 $ 800.00 43 Water Main, 6" Valve MJ w/Box Each $700.00 7.00 $ 4,900.00 44 Water Main, 6" Mega Lug MJ Each $62.00 17.00 $ 1,054.00 45 Water Main, 6" 45 Degree Bend MJ Each $245.00 $ 46 Water Main, 6"DIP, Class 52 LF $26.00 210.90 $ 5,483.40 47 Water Main, Hydrant MJ Each $1,795.00 3.00 $ 5,385.00 48 Water Main, 8" Valve MJ w/Box Each $925.00 7.00 $ 6,475.00 49 Water Main, 8"X8"X6" Anchoring Tee MJ Each $410.00 3.00 $ 1,230.00 50 Water Main, 8" Mega Lug MJ Each $72.00 18.00 $ 1,296.00 51 Water Main, 8" 45 Degree Bend MJ Each $295.00 2.00 $ 590.00 52 Water Main, 8" 90 Degree Bend MJ Each $310.00 $ 53 Water Main, 8"X6" Reducer MJ Each $272.00 2.00 $ 544.00 54 Water Main, 8"X6" Cross MJ Each $470.00 1.00 $ 470.00 55 Water Main, 8" DIP, Class 52 LF $28.00 629.30 $ 17,620.40 56 Water Main, 12" Valve MJ w/Box Each $1,810.00 2.00 $ 3,620.00 57 Water Main, 12" - 441 Sleeve Each $425.00 2.00 $ 850.00 58 Water Main, 12"X12"X8" Anchoring Tee MJ Each $720.00 2.00 $ 1,440.00 59 Water Main, 12" DIP, Class 52 LF $41.50 39.75 $ 1,649.63 60 Water Service, 3/4" Ball Valve Each $60.00 7.00 $ 420.00 61 Water Service, Woodford Y95 Yard Hydrant Each $435.00 6.00 $ 2,610.00 62 Water Service, Pedistal Drinking Fountain MDF 400 Series Each $900.00 1.00 $ 900.00 63 Water Service, Meter & RPZ Enclosure wlPad Each $3,200.00 1.00 $ 3,200.00 64 Water Service, 3/4" Copper Service Line, TYPE K LF $2.50 1403.50 $ 3,508.75 65 Water Service, Conbraco 40 - 200 1 1/2" RPZ Back Flow Preventer Each $500.00 1.00 $ 500.00 66 Water Service, 1 1/2"X3/4" Manifold 1 - 1 1/2" Inlet, 7 - 3/4" Outlet Each $500.00 1.00 $ 500.00 67 Water Service, SR - EC 1 112" Water Meter Each $400.00 1.00 $ 400.00 68 Water Service, 1 1/2" Ball Valve Each $50.00 1.00 $ 50.00 69 Water Service, 1 1/2" Union Each $40.00 1.00 $ 40.00 70 Water Service, 1 1/2" Tap Installation Each $450.00 1.00 $ 450.00 71 Water Service, 1 1/2" Copper Service Line TYPE K LF $13.00 20.00 $ 260.00 72 Historic Street Light wI Precast Concrete Foundation Each $2,915.00 27.00 $ 78,705.00 73 Historic Intersection Light wI Precast Concrete Foundation Each $4,850.00 4.00 $ 19,400.00 74 Flag Pole Lights Each $675.00 3.00 $ 2,025.00 75 Electrical Service, Main Controller #1 Each $4,500.00 1.00 $ 4,500.00 76 Electrical Service #1, PC Concrete Slab Each $2,037.00 1.00 $ 2,037.00 77 Electrical Service, Main Controller #2 Each $4,550.00 1.00 $ 4,550.00 78 Electrical Service #2, PC Concrete Slab Each $1,575.00 1.00 $ 1,575.00 79 Electrical Service, CT Cabinet w/Meter Socket Each $1,771.00 2.00 $ 3,542.00 80 Electrical Service, Power Service Pedestal, wlPrecast Concrete Foundation Each $2,691.00 6.00 $ 16,146.00 81 Electrical Service, Power Outlet Pedestal Each $759.00 1.00 $ 759.00 82 Pull Box, Colored, 11 "X18" Each $390.00 1.00 $ 390.00 83 Pull Box, Standard, 17"X30" Each $420.00 $ 84 Pull Box, Colored, 17"X30" Each $505.00 2.00 $ 1,010.00 85 Conduit, 2" PVC Sch 40 LF $3.70 3462.10 $ 12,809.77 858 Conduit, 1/2" PVC Sch 40 LF $2.97 46.00 $ 136.62 86 Electrical Cable #1/0 XHHW LF $1.98 1759.20 $ 3,483.22 87 Electrical Cable #4 XHHW LF $0.89 1065.00 $ 947.85 88 Electrical Cable #6 XHHW LF $0.68 $ 89 Electrical Cable #8 XHHW LF $0.50 15817.40 $ 7,908.70 90 Electrical Cable #10 XHHW LF $0.43 1402.90 $ 603.25 91 Traffic Signal, Signal Light PC Concrete Foundation New Each $635.00 8.00 $ 5,080.00 92 Conduit, 2" PVC 8ch 40 LF $3.70 90.70 $ 335.59 93 Conduit, 2" PVG 8ch 80 wfTrace Wire LF $4.40 672.60 $ 2,959.44 94 Conduit, 4" PVC 8ch 80 wfTrace Wire LF $6.91 $ 95 Traffic Signal, Control Cabinet Pad Each $600.00 2.00 $ 1,200.00 96 Pull Box, Standard, 11"X18" Each $305.00 4.00 $ 1 ,220.00 97 Pull Box, Colored, 11 "X18" Each $390.00 4.00 $ 1 ,560.00 98 Pull Box, Colored, 24"X36" Each $699.00 2.00 $ 1 ,398.00 99 Conduit, 4" PVC 8ch 40 wfTrace Wire Bored LF $21.00 669.30 $ 14,055.30 100 Conduit, 4" PVC 8ch 40 wfTrace Wire LF $7.40 1097.60 $ 8,122.24 101 Conduit 4" PVC 8ch 80 wfTrace Wire LF $8.85 112.00 $ 991.20 102 Pull Box, Standard, 17"X30" Each $422.00 $ 1 03 Pull Box, Colored, 17"X30" Each $504.00 4.00 $ 2,016.00 1 04 Fiber Optics Junction Vault, 48 Inch Diarn., Precast Concrete Each $2,535.00 2.00 $ 5,070.00 105 Brick Pavers, Remove, Salvage & Store SF $3.00 648.00 $ 1,944.00 106 Brick Pavers, Salvaged Paver Installation, Complete SF $8.00 648.00 $ 5,184.00 107 Brick Pavers, New Paver Installation, Complete SF $8.00 526.83 $ 4,214.64 108 Trench Grate, Furnish & Install, Complete LF $75.00 71.35 $ 5,351.25 109 Sawcut, Concrete LF $3.00 540.10 $ 1,620.30 110 Sawcut, Asphalt LF $2.50 315.00 $ 787.50 111 Sod SY $11.00 158.45 $ 1,742.95 112 Seed SY $2.00 3330.00 $ 6,660.00 113 Tree Preservation Measures LS $500.00 1.00 $ 500.00 114 Erosion Control Plan - Operating Proceedures LS $500.00 1.00 $ 500.00 115 Temporary Fencing (Park Perimeter) LS $2,750.00 1.00 $ 2,750.00 116 Traffic & Safery Control LS $11,500.00 1.00 $ 11,500.00 TOTAL AMOUNT EARNED TO DATE - BASE BID: 1$ 726,801.90 I IAL TERNATE BID ITEMS INCLUDED: 117 Traffic Signal, Equipment Installation (6th & Bluff Intersection) Each $2,105.00 1.00 $ 2,105.00 118 Traffic Signal, Equipment Installation (7th & Locust Intersection) Each $2,257.00 1.00 $ 2,257.00 Bluff Street - Curb & Gutter Replacement, HMA Overlay 119 HMA Surface Course, Machine Laid Ton $44.75 83.54 $ 3,738.42 120 Fixture Adjustment Each $325.00 7.00 $ 2,275.00 121 Removal of Pavement, Milling, 2 1/2" SY $2.50 $ 122 Remove and Replacement of PC Concrete Curb & Gutter 2.50' LF $18.00 247.50 $ 4,455.00 Locust Street. Curb & Gutter Replacement, HMA Overlay 123 HMA Surface Course, Machine Laid Ton $44.75 266.82 $ 11,940.20 124 Fixture Adjustment Each $325.00 2.00 $ 650.00 125 Removal of Pavement, Milling, 2 1/2" SY $2.50 2127.32 $ 5,318.30 126 Remove and Replacement of PC Concrete Curb & Gutter 2.50' LF $18.00 241.80 $ 4,352.40 TOTAL AMOUNT EARNED TO DATE - ALTERNATE BID ITEMS: 1$ 37,091.31 I 127 Temporary Electric Service, Street Lights on Bluff Street Feeder LS $1,280.00 1.00 $ 1,280.00 128 Directional Signage for Dbq. Museum of Art LS $240.00 1.00 $ 240.00 129 Exploratory Excavation for Possible Historic Fountain LS $361.00 1.00 $ 361.00 130 Storm Sewer 18" RCP LF $32.00 12.70 $ 406.40 131 Water Service, 12" Mega Lug Each $125.00 16.00 $ 2,000.00 132 Storm Sewer, Remove Manhole Top Portion & Plug Pipes 133 Watermain,Remove Manhole Vault with Old Service 134 Watermain, Remove Manhole with Old Faucet 135 Storm Sewer, Intake 101-B Special 136 Modify Intersection Pavement Color, Dark Gray (Item No. 28) 137 Modify Light Pole Mounting Base Flange, Rotate 45-degrees 138 Water Main, Hydrant - Relocate at SE Corner 7th & Bluff 139 Remove Existing Light & Base, Install Precast Foundation at Museum 140 Traffic Signal Pull Box, Adjust Elevation 141 Historic Street Light - Rotate Poles 142 Traffic Signal- Install Emergency Pre-Empt Sensors 143 Conduit, 2" PVC 8ch. 40 Bored 144 PC Concrete Sidewalk, 4" Intregal Red wI Color Shake - Broom Finish 145 Water Main, 4"DIP, Class 52 146 Water Main, 4" - 441 Sleeve 147 Water Main, 4" - Valve MJ wI Box 148 Water Main, 6"x4" Reducer MJ 149 (Black) Integral Concrete Medallions 150 Pull Box, Quazite 151 Deduct - Brickform Herringbone Stamp Each Each Each Each SY LS LS LS LS Each Each LF SF LF Each Each Each SF Each LS $126.50 $383.00 $308.00 $2,100.00 $8.50 $1,059.00 $999.67 $799.00 $320.00 $65.79 $330.00 $14.00 $7,95 $40,00 $270.00 $675.00 $210,00 ($6.00) $1,150,00 ($2,883.45) 2,00 1.00 1.00 1.00 227,65 1.00 1.00 1.00 1.00 19.00 2.00 90.00 1056,60 2.33 1.00 1.00 1.00 126.00 1.00 1.00 TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS: I $ TOTAL AMOUNT EARNED TO DATE: I $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 253.00 383.00 308,00 2,100,00 1,935.03 1,059.00 999,67 799,00 320,00 1,250.00 660.00 1,260.00 8,399.97 93.20 270.00 675.00 210.00 (756.00) 1,150.00 (2,883.45) 22,772,81 I 786,666,02 I TOTAL DUE CONTRACTOR: 1$ 786,666.02 I ENGINEERING: 1$ 47,278,25 I TOTAL CONSTRUCTION COST: 1$ 833,944,27 I CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the corre~Yjmou~~( 01 e" work I r APPROVED: ' LLv '! ili -- Michael Van Milligen, City Manager City of Dubuque, Iowa APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa The undersigned, PORTZEN CONSTRUCTION, INC, CERTIFICATE OF THE CONTRACTOR: contractor for the above improvement, does hereby CONTRACTOR: accept the above "Total Due Contractor", as full settlement for all claims for said improvement. TITLE; DATE: BY: P/~1, ?' /'" f" { / /~1. I above improvement.