Loading...
Bergfeld Rec Area final accept D~~~E ~<k~ MEMORANDUM February 28, 2006 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Bergfeld Recreation Area Development Project Leisure Services Manager Gil Spence is recommending acceptance of the Bergfeld Recreation Area Development Project as completed by Drew Cook & Sons Excavating, in the final contract amount of $506,512.99, which is $36,988.39 over the bid amount. With contingency, the entire project cost is $12,047.16 under budget. I concur with the recommendation and respectfully request Mayor and City Council approval. (lVl41, ;7;, I Michael C. Van Milllgen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gil D. Spence, Leisure Services Manager -',_J .. CITY OF DUBUQUE, IOWA MEMORANDUM February 27,2006 FROM: Gil D. Spence, Leisure Services Manage TO: Michael C. Van Milligen, City Manager SUBJECT: Bergfeld Recreation Area Development Project INTRODUCTION The purpose of this memorandum is to recommend that the City Council accept the Bergfeld Recreation Area Development Project. DISCUSSION The Bergfeld Recreation Area Development Project has been completed by Drew Cook and Sons, Excavating, in the final contract amount of $506,512.99. A summary of the project costs is as follows: Bid Amount Final Cost Construction contract change order #1 change order #2 change order #3 change order #4 change order #5 $469,524.60 $469,524.60 9,425.00 24,324.15 2,068.29 14,084.40 - 12.913.45 $506,512.99 Change order #1 added the sidewalk along Chavenelle Drive. Change order #2 eliminated the need for a retaining wall on the south side of the pond, added the accessible ramp from the walkway to the rest room building, added the pedestrian bridge by the waterfall, and added stone between the pond and walkway due to the steep slope. Change order #3 provided for extra excavation of rock and flowable mortar needed to address conditions discovered during excavation for the accessible ramp. Change order #4 provided for solid rock removal for light poles and flag pole bases' and the filter rocks needed to protect the pond from runoff. Change order #5 reduces the contract because unit pricing was used and less work was done then specified. bergfeld recreation area development project, page two The following is a summary of the project costs: Estimated Actual Construction contract Contingency Design fees $469,524.60 100,000.00 70,750.00 $640,274.60 $640,276.60 $469,524.60 36,988.39 82,535.00 $589,047.99 39,181.45 $628,229.44 Play unit/inspection/miscellaneous TOTAL PROJECT COSTS ACTION STEP The action requested is that the City Council adopt the attached resolutions accepting the improvement and setting the final contact price at $506,512.99. GDS:jlr attachments (2) Preparer: Gil D. Soence Address: 2200 Bunker Hill Rd Phone: (563) 5894263 RESOLUTION NO. 67-06 ACCEPTING IMPROVEMENT WHEREAS, the contract for the Bergfeld Recreation Area Development Project has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW, THEREFORE, BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the General Fund in amount equal to the amount of his contract, less any retained percentage provided for therein. Passed, approved and adopted this 6th day of March ,2006. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, City Clerk PK Preparer: GiI D. Spence Address; 2200 Bunker Hill Rd Phone; (563) 589-4263 RESOLUTION NO. 68-06 FINAL ESTIMATE WHEREAS, the contract for the Bergfeld Recreation Area Development Project has been completed and the Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs; NOW, THEREFORE, BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $506,512.99, and the said amount shall be paid from the General Fund of the City of Dubuque, Iowa. Passed, approved and adopted this 6th day of March ,2006. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, City Clerk PK