Loading...
Sewer Master Plan RFP's D~~~E ~ck~ MEMORANDUM March 15, 2006 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: RFP for Engineering and Design Services for the Comprehensive Sanitary Sewer Master Plan City Engineer Gus Psihoyos recommends City Council approval of the issuance of a Request for Proposal for engineering and design services for the Comprehensive Sanitary Sewer Master Plan. I concur with the recommendation and respectfully request Mayor and City Council approval. {}l i{,,>lidl Mic ael C. Van Milligen - MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer ,,' 5U~~E ~ck~ MEMORANDUM March 14,2006 TO: FROM: Michael C. Van Milligen, City Ma D.ge Gus Psihoyos, City Engineer . .' , SUBJECT: RFP for Engineering and Design Services for the Comprehensive Sanitary Sewer Master Plan INTRODUCTION The purpose of this memo is to present an RFP for engineering and design services for the Comprehensive Sanitary Sewer Master Plan (CIP 7101644). BACKGROUND The City is in need of a sanitary sewer master plan to ensure that the city's present and future service demands are met. To that end, $240,000 was included in the five-year (FY06-10) capital improvement budget for the Comprehensive Sanitary Sewer Master Plan. The funding includes $90,000 in FY06 and $150,000 in FY07. In January, the City Manager approved an RFP committee consisting of Ken TeKippe, Finance Director; Jonathan Brown, Water Pollution Control Manager; John Klostermann, Street and Sewer Maintenance Manager; Gus Psihoyos, City Engineer; Deron Muehring, Civil Engineer II; and Todd Irwin, Engineering Assistant II. DISCUSSION The study will be the first, and most important, step towards establishing a comprehensive management plan for the City's sanitary sewer system. The plan will involve the development of a model that accurately represents the particulars of the large diameter sewers in the system (interceptor and collector sewers), use the model to identify existing deficiencies while predicting deficiencies that might happen as a result of future development, and outline a prioritized list of recommended improvements. A detailed RFP has been developed. The tentative schedule for the consultant selection process is as follows: RFPs released to public: Responses due: Staff recommendation to City Manager City Manager Recommendation to Council: Project Initiated by Consultant: March 21, 2006 April 13, 2006 May 8,2006 May 15, 2006 May 29, 2006 RECOMENDATION I recommend that the City release the attached RFP, soliciting proposals from qualified consultants for engineering and design associated with the Comprehensive Sanitary Sewer Master Plan. BUDGET IMPACT The estimated cost for the preparation of the Comprehensive Sanitary Sewer Master Plan is estimated to be $240,000. Funds will come from the Comprehensive Sanitary Sewer Master Plan FY2006 and FY2007 appropriations of $90,000 and $150,000 respectively. ACTION STEP I respectfully request authorization to release the RFP to the public. Prepared by Deron Muehring CC: Dawn Lang, Budget Director Ken TeKippe, Finance Director Don Vogt, Operations & Maintenance Manager John Klostermann, Street and Sewer Maintenance Manager Jonathan Brown, Water Pollution Control Manager Deron Muehring, Civil Engineer II Todd Irwin, Engineering Assistant II CITY OF DUBUQUE ENGINEERING DEPARTMENT REQUEST FOR PROPOSALS FOR Photo: North Fork Catfish Creek Interceptor Sewer Service Area Comprehensive Sanitary .Sewer Master Plan (Spring of 2006) RFP Organization COMPREHENSIVE SANITARY SEWER MASTER PLAN 1.0 Generallnformation 2.0 Introduction 3.0 Project Objectives 4.0 Project Budget and Schedule 5.0 Scope of Services 6.0 Proposal Requirements 6.1 Letter of Transmittal 6.2 Qualifications of the Firm 6.3 Fees and Compensation 7.0 Services by the City 8.0 Selection Criteria 9.0 Submission Requirements Attachment A: Maps Attachment B: Iowa Wastewater Facilities Design Standards, Chapter 12: Iowa Standards for Sewer Systems (May 1987) Attachment C: City of Dubuque Insurance Requirements for Professional Services 2 1.0 GENERAL INFORMATION The City of Dubuque (City) is located in northeastern Iowa just across the Mississippi River from Illinois and Wisconsin. The City is approximately 27 square miles in area, with a population of nearly 60,000 persons. Providing a full range of services, the City's annual operating and capital budget is nearly $100 million. More information about the City organization can be found on the City's official web site at www.citvofdubuQue.orQ. The City of Dubuque' Engineering Department is seeking a consulting engineer to prepare the City's Comprehensive Sanitary Sewer Master Plan (SSMP). See the "Scope of Services" section of this Request for Proposals for more details on the work to be performed. In general, the successful consultant shall analyze existing hydraulic conditions of the sanitary sewer collection system; develop a hydraulic model of the City's large diameter interceptor and collector sewers; analyze the system under existing and potential future development to identify system deficiencies; and develop a sanitary sewer master plan that proposes specific improvements to address the City's short and long range needs. Proposals must be received no later than 4:00 p.m. CDT on April 13, 2006 at: City of Dubuque C/O Jeanne Schneider, City Clerk 50 West 13th Street Dubuque, Iowa 52001-4864 Please direct all questions and correspondence regarding this RFP to Todd Irwin: email (tirwin@cityofdubuque.org), phone (563-589-4201), or fax (563-589-4205). All questions must be submitted in writing no later than April 7, 2006. No questions will be responded to after this time. Responses to the questions will be in an addendum format and provided no later than the end of the business day on April 10, 2006. 2.0 INTRODUCTION The City of Dubuque is seeking a design team with a specialized background and project experience in hydraulic modeling and master planning of sanitary sewer systems for communities of a similar size and topography. 3.0 PROJECT OBJECTIVES The objectives of the SSMP are: 3.1 Build a computer model that accurately reflects the City's interceptors and collectors; 3.2 Utilizing the model, identify deficiencies within the system 3 3.2.1 Existing 3.2.2 Predicted 3.3 Prepare a prioritized list of recommended improvements, replete with conceptual design and cost estimates. 4.0 PROJECT BUDGET AND SCHEDULE A budget of $240,000 has been established for the SSMP. The anticipated project schedule is as follows: RFPs released to public: Responses due: Selection or Short list established: Interviews (if required): Staff recommendation to City Manager City Manager Recommendation to Council: Project Initiated by Consultant: March 21, 2006 April 13, 2006 April 20, 2006 Week of April 25, 2006 May 8, 2006 May 15, 2006 May 29, 2006 5.0 SCOPE OF SERVICES The scope of the work for the sanitary sewer master plan study shall, at a minimum consist of performing the tasks described below in order to develop a sanitary sewer master plan that is cost effective, reliable, flexible, and expandable to meet future needs. The City will provide the successful consultant with the AutoCAO@electronicfile and OTM of the attached maps. The City reserves the right to modify the breadth of the scope following receipt of proposals and following selection of the consultant. The tasks below describe the broad areas of consideration and nature of the work to be performed for each sanitary sewer interceptor and sanitary sewer collector basin. A more detailed work program may be negotiated with the selected consultant(s). 5.1 Development of Sewer System Hydraulic Model Input 5.1.1 Compile Sewer Computer Model Input 5.1.1.1 Request, gather, collate, and examine all existing data; 5.1.1.2 Translate or convert all existing sewer system data to computer model format. 5.1.1.3 Update any system information not yet recorded including related databases and as-built drawings as they become available; 5.1.1.4 Collect survey field data on all identified interceptor sewers and collector sewers. The collection of field data shall consist of, but is not limited to; locating the center of all manholes on the interceptor sewers; the main collector lines of each identified basin; and the first upstream manhole of all connecting branch sewers; measure depth to flow line of all located manholes to establish elevations of all pipes; identify pipe sizes and 4 types at each manhole; inspect and describe condition of all located manholes. Note that a limited amount of City-survey support is available at no cost to the consultant. The extent of the City provided survey support will be providing coordinates and ties to existing GIS control points. GPS may be used to collect field survey data. The accuracy of the collected data, weather by GPS or conventional survey methods, shall be plus or minus 0.1 feet vertically and plus or minus 0.5 feet horizontally. 5.1.2 Build and Calibrate Sewer Computer Model 5.1.2.1 Develop a computer model of the City's sewer collection system incorporating existing data and data collected in the field. The model must have the option of including additional sewer pipes. The City has a 500- node licensed version of XP-SWMM 10 but the City is not committed to it use; 5.1.2.2 Field verify existing pipe networks and correct sewer basin boundaries, provided by the City, and add any additional basin boundaries determined by field observations or examination of existing records. Update the model and pipe networks maps; 5.1.2.3 Develop a sewer flow-monitoring framework to collect data to improve the calibration of the model Flow meters shall be left in place long enough to record several rainfall events during both wet and dry weather conditions. Note that the process of monitoring, improving, and calibrating the model with flow data will continue after the consultant's work is complete; 5.1.2.4 Calibrate the new model to actual sewage-flow measurements; and 5.1.2.5 Document and report all assumptions, methodologies, and quality assurances and controls (QA/QC) used. 5.2 Analyze the Current Sewer System 5.2.1 Determine the existing sewer system flow capacity and identify any problem areas such as surcharging, pipe-size deficiencies, and other inefficiencies within each interceptor and collector sewer; 5.2.2 Detail the sewer network in a "current-condition report" by sub- basin, describing current problems, and show all problems by type on the map(s); 5.2.3 Develop an Infiltration and Inflow (1&1) modeling strategy and compare sewer dry-flow versus rainfall data. Analyze 1&1 results and report problem sub basins that may require further study; 5.2.4 Map and tabulate the current system, showing recommended capital improvements to the existing system. Tabulate the existing 5 available sewer-reserve peak-flow capacity in thematic maps and calculate the peak flows that will trigger the need for new pipes; 5.3 Analyze System Based on Future Growth Alternatives 5.3.1 Research, collect, and compile all planning data and demographics by sub-basin. The City has provided a current (10/05) zoning map of the entire city, and a preliminary map of possible annexation areas. 5.3.2 Using several scenarios (designed in cooperation with City staff), run the sewer model, analyze and report the sewer-system capacity deficiencies for the predicted growth, and show the current level of growth that each sub-basin network can absorb (i.e. how many more residential units can be added to the system before full capacity is reached) 5.3.3 Analyze and report on sewer-system capacity expansions required as modeled for current land use patterns. Using the reserve peak flow, calculate when and where new pipes - up and downstream - will be required to cope with maximum and minimum growth predictions. 5.3.4 Provide a map of proposed collection system construction projects or system expansions. 5.4 Develop Capital Project Implementation Program 5.4.1 Develop a project-numbering scheme that differentiates between current and proposed projects. 5.4.2 Develop a list of all short and long-range construction projects and improvements for the existing and proposed sewer system required in the next 20-years. Provide justification for project priorities as defined by their flow capacity limits. 5.4.3 Tabulate a theoretical project timeline that will accommodate when projects will be required 5.4.4 Develop estimated budgets for each project to assist in the financial consultant plan for future system improvements. 5.5 Documentation and Presentations 5.5.1 The consultant(s) shall be responsible for final document development, editing, the addition of tables and graphics for any section(s) related to this scope of work. 5.5.2 Ensure any project and policy recommendations are consistent with current legislation, regulations, and guidelines, including the Iowa Department of Natural Resources Iowa "Iowa Wastewater Facilities Design Standards, Chapter 12: Iowa Standards for Sewer Systems," May 1987 (see Appendix B). 5.5.3 The consultant(s) shall be expected to make presentations as required, to the Public, the City of Dubuque City Council, and City staff. 6 5.6 Transition Sewer Model to City of Dubuque Personnel 5.6.1 Validate and correct all sewer data before providing it to the City. 5.6.2 Deliver the final and updated version of data, system maps, AutoCAD drawing files, and attribute databases used in the hydraulic model. The consultant shall not retain this information unless agreed upon for demonstration purposes to promote the City of Dubuque's work. 5.6.3 Provide training and support to assist in establishing an effective City-sewer modeling capability. This will include familiarizing at least two City Engineering staff members with model- development effort and other assistance as needed. This task shall be an ongoing effort throughout the consultants input. 5.6.4 Provide model documentation to include development assumptions, strategies, and problem solutions. Include a f1ow- monitoring strategic plan. 6.0 PROPOSAL REQUIREMENTS The City of Dubuque, Iowa, reserves the right to reject any and all proposals received. The proposal should present and discuss a project approach to accomplish the objectives of the project outlined herein. The proposal should discuss if the proposed project approach differs from the scope of services in this RFP and present the rational for the departure. The fees and compensation proposal (see below) must reflect the scope of services outlined in the RFP and any departure thereof proposed by the consultant. The proposal will include the following information and must be organized in the manner specified below. 6.1 Letter of Transmittal Provide a letter of transmittal briefly outlining the consultant's understanding of the work and the name, address, telephone number and fax number of the consultant's primary contact person. 6.2 Profile of Firm Provide and present the following information in a clear and concise format. Consultants should present material that illustrates the firm's experience and expertise with this type of project. Provide the Firm's official name, address, and principal offices 6.3 Qualifications 6.3.1 Provide project references illustrating the experience such as sanitary sewer design, sanitary sewer system studies, and sanitary sewer master plan development of the team members proposed for the City of Dubuque's SSMP. 6.3.2 For at least three references list: 6.3.2.1 Project name and location; 7 6.3.2.2 Contact person and telephone number; 6.3.2.3 Cost of work (actual cost vs. initial estimated cost); 6.3.2.4 Time required to complete the project; and 6.3.2.5 The role and responsibility the members of the firm's proposed "Comprehensive Sanitary Sewer Master Plan" team. 6.3.3 Provide abbreviated resumes highlighting their experience in relation to the work referenced above of the personnel who will be working on the Comprehensive Sanitary Sewer Master Plan (including sub-consultants). Include their education, as well as, specialized and technical competence to perform the tasks they will be called on to do in conjunction with the Comprehensive Sanitary Sewer Master Plan. 6.4 Schedule Specify the Firm's ability to integrate this project into its work schedule and when the firm would initiate the work. Provide the estimated time, in months, to perform the scope of services for each sanitary sewer basin. 6.5 Scope Include any thoughts that would improve the development of the plan and recommend any work not identified in this RFP that is considered essential for the preparation of the Comprehensive Sanitary Sewer Master Plan. 6.5.1 The proposal should include a list of deliverables. 6.5.2 The proposal should specify anticipated City resources in terms of personnel, facilities or equipment utilized by the consultant during the project contract period. 6.6 Fees and Compensation Complete Appendix A, outlining the proposed compensation structure for the completion of the project. The purpose is to help the City better understand the relative costs associated with the different aspects of the project. It will also allow the City to gauge the level of effort identified by responders for each of the project tasks. Do not enter the actual dollar amount of each task in Appendix A, list only the task as a percentage of the total project cost. Appendix A is to be submitted with the proposal. The actual fees should be in a separate enclosure as the proposals will be reviewed initially without the benefit of knowing the consultant's proposed fee for services. Taxes The City of Dubuque is exempt from all State sales tax. Do not include sales tax in the Firm's proposal price. Tax exemption certificates will be supplied upon request. 8 6.7 Contract A contract for the project and the scope outlined in the consultant's proposal shall be included with the submittal in a separate enclosure. The contract must address the City's insurance requirements (see attachment). 7.0 SERVICES BY THE CITY The City of Dubuque has a geographical information system referred to as the Dubuque Area Geographical Information System, or DAGIS. Available topographical mapping includes 2-foot contours, digital terrain data, parcel outlines, building outlines, edge of pavement, storm sewers, sanitary sewers, water main, and aerial orthogonal photos. 8.0 SELECTION CRITERIA Proposals will be screened to ensure that they meet the minimum requirements of the proposal format. A review of qualifying proposals will identify firms that most closely meet the needs of the City of Dubuque. The City will evaluate proposals based upon the following criteria (not necessarily listed in order of importance): 8.1 Qualifications and experience of the firm, reference checks, achievements and completion of similar projects. 8.2 Project team qualifications and experience with similar projects of the principal consulting staff proposed to work on the project, variety and application of various disciplines within the team, and availability and qualifications of any subcontracting staff. 8.2.1 Project Manager 8.2.2 Lead Project Engineer(s) 8.2.3 Staff Engineers 8.2.4 Field Crew 8.3 Grasp of the project requirements, the firm's understanding of the scope, preparation and level of interest. 8.4 Design approach/methodology in completing the scope of work and services, technical alternatives, and creativity. 8.5 Responsiveness, general attitude and ability to communicate to audiences with varying technical backgrounds. 8.6 Local economic impact, ability to incorporate local firms. 8.7 Schedule evaluation, time required to complete the project. 8.8 Fees. As additional information becomes available, the City reserves the right to modify selection criteria at any time during the selection process. All proposers will be notified of any said change in criteria and allowed to respond. 9.0 SELECTION PROCESS 9.1 Prooosal Review: The RFP committee will review the proposals and rank them based on which consultants best meet the criteria listed above. 9 9.2 Interviews: Consultants remaining after the initial screening may be invited to interview. 9.3 Staff Recommendation: City staff will make a recommendation to the City Manager as to the consultant who, in the opinion of the committee, would best meet the needs of the City for the Comprehensive Sanitary Sewer Master Plan. 9.4 Consultant Selection bv City Council: The City Council will choose the consultant for the Comprehensive Sanitary Sewer Master Plan. The City of Dubuque is an Equal Employment Opportunity Employer. 10.0 SUBMISSION REQUIREMENTS Proposals are to be signed by an officer of the firm authorized to bind the submitter to its provisions. Proposals are to contain a statement indicating the period during which the proposal will remain valid. A period of not less than ninety (90) days is required. The proposal submitted by the firm shall become an integral part of the contract between the City and the Firm and representations, covenants, and conditions therein contained shall be binding upon the person, firm or corporation executing the same. Failure to manually sign proposal will disqualify it. An original plus 10 copies of the proposal must be received in the office of the City Clerk by 4:00 p.m. CDT on April 13, 2006 at: City of Dubuque C/O Jeanne Schneider, City Clerk 50 West 13th Street Dubuque, Iowa 52001-4864 Each firm assumes full responsibility for delivery and deposit of the completed proposal package on or before the deadline. Proposals received after the specified time will be returned unopened. The City of Dubuque is not responsible for any loss or delay with respect to delivery of the proposals. The City of Dubuque is not liable for any cost incurred by any firm before the execution of an agreement or contract. Nor shall the City of Dubuque be liable for any costs incurred by the firms not specified in contract documents. The City shall become owners of the proposals upon submission. 10 APPENDIX A Task Group % of Project Cost Startup, Project Management and Miscellaneous Project Tasks Collect survey field data on all identified interceptor sewers and collector sewers. Develop a computer model of the City's sewer collection system incorporating existing data and data collected in the field. Develop and install a sewer flow-monitoring framework Calibrate the model to actual sewage-flow measurements Determine the existing sewer system flow capacity and identify any problem areas such as surcharging, pipe-size deficiencies, and other inefficiencies within each interceptor and collector sewer Develop an Infiltration and Inflow (1&1) modeling strategy and compare sewer dry-flow versus rainfall data. Analyze 1&1 results and report problem sub basins that mav reauire further studv Using several scenarios (designed in cooperation with City staff), run the sewer model, analyze and report the sewer-system capacity deficiencies for the predicted growth, and show the current level of orowth that each sub-basin network can absorb Develop a list of all short and long-range construction projects and improvements for the existing and proposed sewer system required in the next 20-years. Provide justification for project oriorities as defined bv their flow caoacitv limits. Documentation and Presentations Provide training and support to assist in establishing an effective City-sewer modeling caoabilitv. NOTE: If there are other tasks that do not fit within the task groups outlined above that you, the Consultant, feel are essential to achieve the project's objective, please include the new tasks and their corresponding percent of the total project's cost. 11 ~ ~ ~ ~ ~ .....:J ~ ~ ;::s ~ ;::s ~ VJ ~ ~ ~ -:S 8 ~ e Cj :::::,. <::: :::: o 0- ..... <::: ~ <..l "" s] .~ ~ <..l "" _ .... - - ~.;: '" ;:: <:J} .~ - "" ..... t: E C<:: ~ o~ (3 '";! "" - ::::"1::: - - "" ..... :::: H ...:::: d ~ ~ ;::: "" os "" C<:: I !lj" · {: ~p U p~. d'~ !l,Hdp i'j't Iii 1'1 H hU . ~ , ~ <0::: ;::-s :g ~ ~ ;::-s <0::: ...!::l ..::: ;::-s =:: - Q ~ '-&~ 0- ~-;:: .~ ~ U 6: - <::: 0- ..... :::: {j Otii "" C<:: ~ ..... Otii :::: "" a " "" ~ ;::: a .... o ~ - 0- E ~ "" ~ - Vi - - o Otii os :.;;:; ~ ;::: Cf) "" ~ - <::: 0- ..... :::: {j Otii "" C<:: "1::: "" " ~ a ("I'J a C"-l - <::: 0;:: ..... '" ;::: "1::: :::: - is' <::: ::C: ~ - 0- E ~ , 0- ..... - ;::: :< "" <..l <::: :::... Cf) :::: ~ i: o 0: - <::: :::: o 0- ..... ;::: ..... 0- ..... '" :::: - :::: 0<;; 6:: "1::: o 0 o I "t" ....... ~ .- ~ ~ ~ a ~ "" <..l ~ ~ ;::: ~ IDDIIIIDI~DIID a '" a N a. '" ::;: '" '" ::> "0 c: '" ...J i'! ::l :; U. co .<::: '" '" E Ii; c: ~ '" ~ CD a I r-- N1 ~ a w ! , '" ~! 1 ii ~I~ ~ :l~ ( ~\ii~ 'T)~~ \.,~ ~ LL ~ J~ o ~ z >- UJ t:: ~o ti} : II . (I) . : II " o o ~I7 I- ;... II'!J 0<3 2~ 0: o :I: c:: f- ~ Z w z :5 Z c:I (I) o Cl. 0 Z 0: - ..... &: !;; ~ f- ~ !;j: c:I...:!i<l;Uw Z ~ W f- ~:;: ow 00:;: (/).... Z c::: ::l "" ::J ~ 0 ~ t;::!;j: t;:: g s U ~ ::; w ::; z~~ en f- 0: ~ ~oo:~ f- W f- W a> a> LL W Z 0: W wb:w ::; Z 0: <( W 0: OwO ~ :::> f- :2 f- () <l;U<( ~ ~ ,n ~ ZC::~ tlJ :2 en:; ~:s: 1)5 -W~ " ~ ~ < "W " h 0 /',- t;; 0:0::; ~ ~~!;j: I ~ LL ~ ffi a~ () / @ g (3 f- M () () . <( M ) m '---f"t~.. \:" M V,', ~iJ\ ~ :i\, ~""~~ ,K. ~ ~"""'~r', ~ f~ - · 1 -/. ~'~~l \ii, ~ 1\.," dlJ"''' ~ . ~~- -", '<:...--~ ~"I\" V\';(, II J, r;~~ 1'0'1, ~i. . '''"~ ~ ~~<:!~~ ""'~'+~'\,t hJ!'Al'jJ,~..~t;;!\('>:=Y1""~~~ '~.{~J ffi 6'", ""'. Wi ,. \ ~JI(; '"...-. ""~~"~ ,7 l..'l . '_,' 0 :' u ~ . ~.. " '. .~ c:- "",\" ',..~~""i'\ u~\. .C"'" v,;~ rf,: I "." ~'--',., ., l.l'!~. ~ ~i 'i 'l (/ "n .11 """'~ W~'a '4 '.;;. ~r~:'(. . ~ , ,fj~,= ~ ~ '-t-,. '.>K'" .1 oJ=' .-/~ '" ~ ,.... ~ " '. "" M! ',1 '1! · I' 1 "" 10 "'" ''''~ "0 ~ 6'Q JJ'-/ ,0\ ~b!!I ~ i. .. :tjl' ; ~~,~ ..i .. ,?c "''fJ frlJ~~ 0 IL? ~ ;!.f~ 4.~~ "" . f\'fKr. ll'~~ I v ="~~ 'Ii I.'~' ,~" ,\./j · ;TJ'--'" Q"Jf '1i!" , '-. ~ % ';.u'" I~" 'l\':"~() L ' i:.!; ~ f>-- -.l1>'\"\"<(;:~~1>>U[~1,~~~,~~~~ . -. !F-' ~~, ...::::. fir::.. W'''' ; / it ~~~ ~~~.'~p _ ~':./fl --Y'-J ~ ~ !i!(ar(r~~\-1'.. ""-'~, fA" flJ<" f ~1. G k " \ J_, '..- '" Ill, '< ' " . .~, :>,,"" " ~", ~.' , z I~~ f ".,R <t H 'h~r~\~'.4:1";te' ~ ~ v. ~~~.._'5i"lY:~~~ . ,,\\~ '''1,- /, li6~~ 7; ,,-" /' , I::" d"" ~'\~--"l!tS \ 'tIL.o, .' 'ih }I'J. ~ '3 n,~ y C): :>/ \..~~).' J~~ ~~ ?;;;J~ ;P-i:/!J~{f.: ~~ , r ~Ji' 2-~ ~'l:i I 1...\ ,'~. ; ~""'S-&" ,," " Fe "" !;0'/J:!ti'(!'/~1rjii{! Vr:i % l~ V) ~g : "":. '\ H~, r .)/7, · ,. , - ~ IJ'! /I' I ,# e : · ",' 1<1; lib ~... T ,'ry "", . a J ~ , '- " > ~\\' r; , "" '" l0i'~,;, "';:;\,~~ J I ifv '51':","'17;: 7. I r ~'> "A'<. I '::::") ?-.'-.i ~ ~\\'/)~I'"!:r0' ,~;; ~",1Zi ~ WfL ~_ ,ct'< ~~ ~_ 0 ~;;:':;:'-0.,':~:LA :;::'>J^~~..>~~_ ~ ""J. .V~-" ~1~~ F ~~\\~~1: ,(; \)~Z~ ')\ \ ~~~ \.\. S ,,~~',:/J~; '~~iJf ~~~ \(~'fi~ r;:, .~ L(~'~~~ . < (I .) ~ .~vt -..- L--I I ~- YJ \=. '- "l ,) ~lL:t ~^L.." . '(( I\S - Q l;.lli' 'tf, ~~\'l . ~ l.-lli v. ,/ ~ (1 (J h ~ ' --1'~~'5~~~" '711"\ 'it Z\I (en 5~ \ . l\-RvL 1L" mD'H s.do: C ,d 'J ,,; /, 1 J~.~ uv, :-::., ;;/0 r \' '1>.2 ~'I\'~ r f k ~ 1..._.....- - rvv ill < I "'~ ' M r" 0 L'- ~O:.{jj ~'- ~ :: ~-c-: Ie; ~ "'.... 'i 0 ~ ,~~) \5i, ~C'J '~~:...r"',J :t- .0 ''0) ~ ) ) C. l>{L ~ ~r~t~ ~ _ ~ h;ik. /? :;7 I.... d:'. . c' (r"" ' \ \ ! :c ,r..--~)) v ~ ~[u_~r;: i) .')~ '~ ~ (5 ~i ~~~i 15 ~ J~ >-~ (9 >- z _ w ~O tJ) z o ~ en f- u.. ::; f- UJ UJ 0:: f- en 0:: <( o UJ ~ z <( :2 UJ () 0:: o u.. b 'I en f- ~ ::; z o f= ~ f- u.. ::; f- UJ UJ a: f- en -J <( z :2 a: UJ f- ~ ~ f- Z :5 U- f- Z UJ :2 ~ UJ a: z f- <( a: :2 ~ ~ ~ a: UJ o f- u.. en g ~ z o ~ f- en f- u.. ::; ~ UJ UJ a: () I en u::: ~ () <> o ~~ ; O:~ 0<5 Z~ ii: o J: . ATTACHMENT B Adopted Sept. 6, 1978 Amended March 28, 1979 Amended May 20, 1987 IOWA WASTEWATER FACILITIES DESIGN STANDARDS CHAPTER 12 IOWA STANDARDS FOR SEWER SYSTEMS 12.0 GLOSSARY 12.0,1 Lateral- A sewer that discharges into a sub-main or other sewer and has no other common sewer tributary to it. 12.0.2 Sub-main - A sewer into which the wastewater from two or more laterai sewers is discharged and which discharges into a main or trunk. 12.0.3 Main - The principal sewer to which sub-mains are tributary; also called trunk sewer. 12.0.4 Trunk - The principal sewer to which sub-mains are tributary; also called main sewer. 12.0.5 Interceptor - A sewer used to transport the fiows from main and trunk sewers to a central point for treatment and discharge. 12.0.6 Out-fall - A sewer that receives wastewater from a treatment plant and carries it to a point of final discharge. 12.1 GENERAL The Iowa Standards for Sewer Systems are designed to be used for review of plans and specifications and the construction of sanitary sewer systems and extensions to such systems. When engineering justification satisfactory to the executive director is provided, substantially demonstrating that variation from the standards will result in either 1) at least equivalent effectiveness while significantiy reducing costs, or 2) improved effectiveness, such a variation from standards may be accepted by the executive director. 12.2 DESIGN PERIOD In general, sewer system design shall consider the estimated ultimate tributary popuiation, except in considering parts of the system that can be readily increased in capacity. Simiiarly, consideration shall be given to the maximum anticipated capacity of institutions, industrial parks, etc. Laterais and sub-mains shall be designed for estimated ultimate development. The design of trunks (mains) and interceptors shall take into consideration a reasonable planning period (50 years) and cost effectiveness. When the project does not provide for the ultimate capacity, a report detailing a plan for providing the ultimate capacity shall be developed. 12.3.1 Assumptions 12.3 MINIMUM BASIS OF DESIGN 12.3.1.1 12.3.1.2 12.3.1.3 12.3.1.4 12.3.1.5 12.3.1.6 Dry Weather Flow One hundred gallons per capita per day (gpcd) shall be used in design calculations as the minimum average dry weather flow. This 100-gpcd value may, with adequate justification, include maximum allowable infiltration for proposed sewer lines. Sewer Design Capacity Maximum hourly domestic flow, additional maximum wastewater flow from industrial plants, inflow and groundwater infiltration, and sewage pumping station capacity shall be considered in determining the required capacities of sanitary sewers. Infiltration Design Allowance If no actual data is available, an assumed infiltration design allowance for existing sewers should be added to the design flow. For existing systems, the minimum infiltration design allowance for the existing sewers shall be no less than 200 gallons per inch of pipe diameter per mile of pipe (gpdpipm). Allowance for service lines should be included. Design Flow The minimum design flow may be determined when the average dry weather flow is known. The minimum design flow may be calculated by multiplying the average dry weather flow by the ratio found in Appendix I. Minimum Design Equivalents Type of development: a. single famiiy - 3-3.5 units/acre, 3 people/unit, or 10 people/acre b. multi-family (med. Density - 4.5 units/acre, 3 people/unit, or 15 people/acre c. multi-family (high density) - 6-12 units/acre, 2.5 people/unit, or 30 people/acre d. commercial - 5000 gpd/acre e. industrial- 10,000 gpd/acre Carrying Capacity of Pipe Pipe sizes 8" - 15" shall carry the design flow at a depth of no more than 0.75 of the pipe diameter. 2 12.4 MATERIALS Standards shall be listed below for the respective materials. a. Rinid Pines Material Soec. Joint Snec. Clav ASTM C 700-75 ASTM C425-75 Non Reinforced Concrete ASTM C 14-75 ASTM C 443-76 Reinforcement Concrete ASTM C 76-76 ASTM C 443-76 ASTM C 655-73 Concrete Pressure Pioe ASTM C 361-76 ASTM C 361-76 Cast Iron ANSI A21-1-67 (AWWA C101-67) ANSI A21-6-75 (AWWA C106-75) ANSI A21.8-75 ANSI A21-11-72 (AWWA C108-75) IAWWA C111-72\ ANSI/AWWA C11 0-77 Ductile Iron ANSI A21.50-76 ANSIA21.11-72 IAWWA C150-76) IAWWA C111-72)- ANSI A21.51-76 (AWWA C151-76) ANSI/AWWA C110-77 ASTM A536-77 b. Fiexible Pi es Material Sec. Joint Sec. Pol vin I Chloride PVC ASTM D3212-76 ASTM D2855-77 c. Com osite Pi es Material Sec. Joint Sec. ASTM D2680-76 ASTM D2680-76 d. Pressure Pipe All pipes for pressure applications shall conform insofar as appropriate, to the standard specifications referred to in the "Iowa Standards for Water Supply Distribution Systems". All other sewer pipe material shall conform with the appropriate ANSI, AWWA or ASTM specifications. 3 12.5 DETAILS OF DESIGN 12.5.1 Diameter No public gravity sanitary sewer shall be less than eight inches in diameter, with the following exception. For un-sewered communities, six-inch diameter sewers may be used for the last 800 feet (approximately two blocks) of sewer, provided the six-inch sewer has sufficient hydraulic capacity and is a dead end not subject to future extension. A manhole or a clean out must be provided at the end of the six-inch lateral sewer pipe. 12.5.2 Depth Sewers should be sufficiently deep so as to receive sewage from basements and to prevent freezing. Precautions such as insulation and increased slope shall be provided for sewers that cannot be placed at a depth sufficient to prevent freezing. 12.5.2 Slope All sewers shall be designed and constructed to give average velocities when flowing full of not less than 2.0 feet per second based on Kutter's formula using an "n" value of 0.013 for raw sewage. The following are the minimum slopes which shall be provided. Sewer Size Minimum Slope (ft.l100 ft.) 8" 10" 12" 15" 18" 21" 24" 27" 30" 36" 0.400 0.280 0.220 0.150 0.120 0.100 0.080 0.067 0.058 0.046 Smaller "n" values may be considered when the wastes are treated, or for pipes 48 inches or larger. A velocity less than 2.0 fps may be considered only under the following conditions. a. Deep or continuous rock excavation. b. Velocities down to 1.5 feet per second may be accepted only when a lift station can be eliminated, and where the ratio of the cost of constructing a lift station and sewer to the cost of constructing a sewer only is greater than five. Cost ratios shall be based on a lift station designed to meet not more than the minimum standards of the Iowa Department of Water, Air and Waste Management. Under no circumstances will the average design velocity when flowing full be allowed to drop below 1.5 feet per second based on Kutter's formula using an "n" value of 0.013. The following exceptions to the above requirements in this section shall apply for unsewered communities only. A minimum velocity of 2.0 feet per second when flowing full should be maintained in all sewer mains. However, in specific cases where savings in sewer cost are possible or a lift station couid be eliminated, a minimum sewer velocity of 1.5 feet per second when flowing full will be permitted. An "n" value of 0.013 shall be used for design of PVC pipe, vitrified clay pipe, and ASS truss pipe. Minimum slopes for 8" sewers flowing full at 2.0 feet per second and 1.5 feet per second shall be 0.40 ft.l100 ft. and 0.22 fl./100 ft. Minimum slopes for 6" sewers flowing full at 2.0 feet per second and 1.5 feet per second shall be 0.60 ft.l100ft. and 0.34 ft.l100 ft. In cases where a minimum sewer design velocity of 1.5 feet per second is 4 used, the city will be required to give written assurance to the department that any additional sewer maintenance required by reduced slopes and velocities will be provided. 12.5.4 Alignment Sewers 24 inches or less shall be laid with straight alignment between manholes. The following exceptions to the above requirement in this section shall apply for unsewered communities only. Vertical and horizontal curved or variable grade sewer construction may be proposed by the design engineer. Whenever curved or variable grade sewer construction is proposed, the design engineer is to develop a proposed design basis and submit it to the department for review. The city will be required to give written assurance that arrangements will be made for hydrauiic sewer cleaning equipment to be available when necessary for cleaning curvilinear sewers. 12.5.5 Increasing Size When sewers of different sizes and greater than 10 inches in diameter are joined, the inverts should be placed to maintain energy gradient. An approximate method for securing these resuits is to place the 0.8 depth point of both sewers at the same elevation. 12.5.6 High Velocity Protection Where velocities greater than 15 feet per second are attained, special provisions shall be made to protect against displacement by erosion and shock. 12.5.7 Manholes 12.5.7.1 Location a. Manholes shall be installed: 1. at the end of each sewer line; 2. at all changes in pipe size, grade or alignment; 3. at all sewer pipe intersections; 4. at intervals not exceeding 400 feet for sewers 24 inches or less or at intervals not exceeding 500 feet when adequate cleaning equipment is available. b. Spacing of manholes over 500 feet may be permitted in sewers larger than 24 inches if the owner has adequate cleaning equipment. c. Clean outs may be permitted in place of a manhole at the end of lines which are less than 150 feet in length. d. The following exceptions to the requirements for manhole iocation and clean outs in this section shall apply for unsewered communities only. Manhole spacing for 6 and 8-inch sewers shall be a maximum of 400 feet or at intervais not exceeding 500 feet when adequate cleaning equipment is available. All other sewers shall have a maximum manhole spacing of 800 feet, with manholes also to be placed at the junctions of sewers. When the manhole spacing exceeds 400 feet, the city will be required to give written assurance that appropriate sewer cleaning equipment suitable to clean the distances between manholes will be made available when necessary. Cleanouts can be installed at the ends of sewers of any size in lieu of manholes. If the sewer is ever extended, the clean out must be removed and a sewer manhole 5 12.5.7.2 12.5.7.3 12.5.7.4 12.5.7.5 12.5.7.6 constructed at that point if the maximum distance between manholes has been reached. Cleanout lids should be bolted down to prevent entry of foreign objects. Drop Type A drop pipe should be provided for a sewer entering a manhole at an elevation of 24 inches or more above the manhole invert. Where the difference in elevation between the incoming sewer and the manhole invert is less than 24 inches, the invert should be filleted to prevent solids deposition. Diameter The minimum diameter of manholes shall be 48 inches. The minimum diameter of manhole openings shall be 22 inches. Water Tightness Manholes shall be pre-cast or poured in place concrete. Manholes shall be waterproofed on the exterior. Inlet and outlet pipes shall be joined to the manhole with a gasketed flexible watertight connection or any watertight connection arrangement that allows differential settlement of the pipe and manhole wall to take place. Frame and Cover Assembly Manhole covers shall be non-vented; however, covers with a pick hole are acceptable. Frame and cover assemblies shall weigh at least 300 pounds when installed in areas subject to vehicular traffic and at least 200 pounds in other areas. Watertight cover assemblies shall be required on manholes subject to flooding. Bolt down cover assemblies shall be required on manholes subject to inundation on a floodplain. Flow Channel The flow channel through manholes shall be made to conform in shape and slope to that of the sewers. 12.5.8 Protection of Water Supplies 12.5.8.1 12.5.8.2 12.5.8.3 Cross Connections There shall be no physical connection between a public or private potable water supply and a sewer, or appurtenance thereto, which would permit the passage of any wastewater or polluted water into the potable water supply. Wells Sewers constructed of standard sewer materials shall not be laid within 75 feet of a public well or 50 feet of a private well. Sewers constructed of water main materials may be laid within 75 feet of a public well and within 50 feet of a private well but no closer than 25 feet to either. Horizontal Separation of Gravity Sewers from Water Mains Gravity sewer mains shall be separated from water mains by a horizontal distance of at least 10 feet unless: 6 a. the top of a sewer main is at least 18 inches below the bottom of the water main, and b. the sewer is placed in a separate trench or in the same trench on a bench of undisturbed earth at a minimum horizontal separation of 3 feet from the water main. When it is impossible to obtain the required horizontal clearance of three feet and a vertical clearance of 18 inches between sewers and water mains, the sewers must be constructed of water main materials meeting both a minimum pressure rating of 150 psi and the requirements of Sections 8.2 and 8.4 of the "Iowa Standards for Water Supply Distribution Systems." However, a linear separation of at least 2 feet shall be provided. 12.5.8.3 Separation of Sewer Force Mains from Water Mains Sewer force mains and water mains shall be separated by a horizontal distance of at least 10 feet unless: a. the force main is constructed of water main materials meeting a minimum pressure rating of 150 psi and the requirements of Section 8.2 and 8.4 of the "Iowa Standards for Water Supply Distribution Systems" and b. the sewer force main is laid at least four linear feet from the water main. 12.5.8.5 Separation of Sewer and Water Main Crossovers Vertical separation of sanitary sewers crossing under any water main should be at least 18 inches when measured from the top of the sewer to the bottom of the water main. If physical conditions prohibit the separation, the sewer may be placed not closer than 6 inches below a water main or 18 inches above a water main. The separation distance shall be the maximum feasible in all cases. Where the sewer crosses over or less than 18 inches below a water main one full length of sewer pipe of water main material shall be located so both joints are as far as possible from the water main. The sewer and water pipes must be adequately supported and have watertight joints. A low permeability soil shall be used for backfill material within 10 feet of the point of crossing. 12.5.8.6 Exceptions Should physical conditions exist such that exceptions to Sections 12.5.8.3, 12.5.8.4, and 12.5.8.5 of this standard are necessary, the design engineer must detail how the sewer and water main are to be engineered to provide protection equal to that required by these sections. 12.5.9 Connection of Dissimilar Pipe Suitable couplings shall be used for joining dissimilar materials. The leakage limitations on these joints shall be in accordance with Section 12.7 of these standards. 12.5.10 Inverted Siphons Inverted siphons should have not less than 2 barrels, with a minimum pipe size of 6 inches and shall be provided with necessary appurtenances for convenient flushing and maintenance; the manholes shall have adequate clearance for rodding; and in general, sufficient head shall be provided and pipe sizes selected to secure velocities of at least 3.0 feet per second for average flows. The inlet and outlet details 7 shall be arranged so that the normal flow is diverted to 1 barrel, and so that either barrel may be cut out of service for cleaning. 12.5.11 Sewer Crossing Under a Waterway The top of all sewers entering or crossing streams shall be at a depth below the naturai bottom of the stream bed sufficient to protect the line. One foot of cover over the top of the line is required where the sewer is located in rock or cased and three feet of cover is required in other material. In major streams, more than the three feet of cover may be required. In paved channels, the top of the sewer line should be placed below the bottom of the channel pavement. Sewer out falls, headwalls, manholes, gate boxes, or other structures shall be so located that they do not interfere with the free discharge of flood flows of the stream. Sewers located along streams shall be located outside of the stream bead. Sewers entering or crossing streams shall be constructed of cast or ductile pipe with mechanical joints or shall be so otherwise constructed that they will remain water tight and free from changes in alignment or grade. Sewer systems shall be designed to minimize the number of stream crossings. The stream crossings shall be designed to cross the stream as nearly perpendicular to the stream flow as possible. Construction methods that will minimize siltation shall be employed. Material used to backfill the trench shall be stone, course aggregate, washed gravel or other materials which will not cause siltation. Upon completion of construction, the stream shall be returned as near as possible to its original condition. The stream banks shall be seeded and planted, or other methods employed to prevent erosion. The design engineer shall include in the project specifications the method or methods to be employed in the construction of sewers in or near streams to provide adequate control of siltation. 12.5.12 Aerial Crossings Support shall be provided at all joints in pipes utilized for aerial crossings. The supports shall be designed to prevent overturning and settlement. Precautions against freezing, such as insulation and increased slope, shall be provided. Expansion jointing shall be provided between above-ground and below-ground sewers. For aerial stream crossings, the impact of floodwaters and debris shall be considered. The bottom of the pipe should be placed no lower than the elevation of the 50-year flood. 12.6 DETAILS OF CONSTRUCTION 12.6.1 Excavation 12.6.1.1 Trench Bottom The trench shall be excavated to grade. Bell holes shall be the minimum size that will permit construction of satisfactory joints and ensure uniform bearing of the barrel on the trench bottom, while avoiding bearing on the bells. 12.6.1.2 Trench Width The width of the trench shall be ample to allow the pipe to be laid and jointed properly and to allow the backfill to be placed and compacted as needed. The trench sides shall be kept as nearly vertical as possible. When wider trenches are dug, appropriate bedding class and pipe strength shall be used. 12.6.1.3 Rock Removal Ledge rock, boulders and large stones shall be removed to provide a minimum clearance of four inches below and on each side of all pipe. S 12.6.1.4 12.6.2 Bedding 12.6.2.1 12.6.2.2 12.6.2.3 12.6.2.4 12.6.3 Installation 12.6.3.1 12.6.3.2 12.6.3.3 Dewatering All water entering the excavations or other parts of the work shall be removed until all the work has been completed. No sanitary sewer shall be used for the disposal of trench water, unless specifically approved by the engineer and then only if the trench water does not ultimately arrive at existing pumping or sewage treatment facilities. Rigid Pipe Bedding classes A, B, or C, as described in ASTM C12-74 (ANSI A106.2) or ASCE MOP No. 37, shall be used for all rigid pipe provided the proper strength pipe is used with the specified bedding to support the anticipated load. Flexible Pipe Bedding classes I, II, or III, as described in ASTM D2321-74 (ANSI K65.171) shall be used for all flexible pipe provided the proper strength pipe is used with the specified bedding to support the anticipated load. Composite Pipe Except as described in ASTM D2680-76, the bedding classes for composite pipe shall be the same as for flexible pipe. Bearing and Support If the material encountered at the bottom of the trench is not satisfactory for bedding pipe, the unsatisfactory material shall be removed and replaced by material that will give proper support and compaction. Rigid Pipe Installation procedures, as described in ASTM C12-74 (ANSI A106-2) shall be used for all rigid pipe provided the proper strength of pipe is used. Flexible Pipe Installation procedures, as described in ASTM D2321-74 (ANSI K65.171) shall be used for all flexible pipe provided the proper strength pipe is used. Composite Pipe Installation procedures for composite pipe shall be the same as for flexible pipe except as specified in ASTM D2680-76. 9 12.6.4 Backfill Backfill shall be of suitable material removed from excavation except where other suitable material is specified. Debris, frozen materials, large clods or stones, organic matter, or other unstable materials shall not be used for backfill within 2 feet of the top of the pipe. Backfill shall be placed in such a manner as not to disturb the alignment of the pipe. 12.7 TESTING 12.7.1 Deflection Test Deflection tests shall be performed on all flexible pipe. The deflection test shall be conducted after the final backfill has been in place at least 30 days. No pipe shall exceed a deflection of 5%. If the deflection test is to be run using a rigid ball or mandrel, it shall have a diameter equal to 95% of the inside diameter of the pipe and the tests shall be performed without mechanical pulling devices. 12.7.2 Allowable Leakage The maximum allowable infiltration or exfiltration for any new gravity sanitary sewer section, including all manholes, is 200 gallons per inch of diameter per mile of pipe per day. Manholes may be tested separately. 12.7.3 Leakage Test 12.7.3.1 Line Infiltration Test Using a Weir The crown of the pipe shall be covered with not less than two feet of water at the highest point in the section tested. The test head shall be maintained for not less than 24 hours before a weir measurement is made. The infiltration should be measured by means of a V-notch weir located in the downstream manhole. All service connections and stubs shall be capped or plugged to prevent the entrance of ground water into the line at these connections. 12.7.3.2 Line Exfiltration Test The inlet of the upstream and downstream manholes shall be closed with watertight bulkheads. Then the sewer and the upstream manhole shall be filled with water until the elevation of water in the upstream manhole is two feet higher than the top of the pipe in the line being tested, or two feet above the existing ground water in the trench, whichever is the higher elevation. The exfiltration will be measured by determining the amount of water required to maintain the initial water elevation for one hour from the start of the test. If the average head above the section being tested exceeds two feet, then allowable leakage can be increased by 5% for each additional foot of head. This test is preferable for dry areas where ground water head over the pipe does not exist at the time of the test. 12.7.3.3 Line Low-Pressure Air Test ASTM C828-76T, Low Pressure Air Test of Vitrified Clay Pipe Sewer Lines (4 to 12 in.), shall be utilized when air testing sewer pipe. 10 12.7.3.4 Manhole Exfiltration Test The inlet and outlet of the manhole shall be plugged and the manhole filled to at least the depth that is used in testing the line. Allow the water to stand one hour and refill to the original elevation. After a specific time, usually 15 minutes to 1 hour record the difference in elevation and convert into gallons per hour lost through manhole leakage. To get actual line exfiltration subtract manhole loss from loss determined during line exfiltration test. 12.7.3.5 Exceptions Replacement of existing sewers, which have service connections, may be exempted from the leakage testing requirements. 12.7.4 AlignmentTest Sewers shall be checked for alignment by either using a laser beam or lamping. The light should be visible through the section of pipe lamped. The results of the alignment test shall be evaluated by the design engineer. 11 INSURANCE SCHEDULE C INSURANCE REQUIREMENTS FOR PROFESSIONAL SERVICES TO THE CITY OF DUBUQUE 1. All policies of insurance required hereunder shall be with an insurer authorized to do business in Iowa. All insurers shall have a rating of A better in the current A.M. Best Rating Guide. 2. All policies of insurance shall be endorsed to provide a thirty (30) day advance notice of cancellation to the City of Dubuque, except for 10 day notice for non- payment, if cancellation is prior to the expiration date. This endorsement supersedes the standard cancellation statement on the Certificate of Insurance. 3. shall furnish a signed Certificate of Insurance to the City of Dubuque, Iowa for the coverage required in Paragraph 6 below. Such Certificates shall include copies of the following endorsements: a) Commercial General Liability policy is primary and non-contributing. b) Commercial General Liability additional insured endorsement. c) Governmental Immunities Endorsement. shall also be required to provide Certificates of Insurance of all subcontractors and all sub-sub contractors who perform work or services pursuant to the provisions of this contract. Said certificates shall meet the same insurance requirements as required of 4. Each certificate shall be submitted to the contracting department of the City of Dubuque. 5. Failure to provide minimum coverage shall not be deemed a waiver of these requirements by the City of Dubuque. Failure to obtain or maintain the required insurance shall be considered a material breach of this agreement. 6. Contractor shall be required to carry the following minimum coverage/limits or greater if required by law or other legal agreement: a) COMMERCIAL GENERAL LIABILITY General Aggregate Limit Products-Completed Operations Aggregate Limit Personal and Advertising Injury Limit Each Occurrence Limit Fire Damage limit (anyone occurrence) Medical Payments $2,000,000 $1,000,000 $1,000,000 $1,000,000 $ 50,000 $ 5,000 10f2 June 2005 INSURANCE SCHEDULE C (Continued) INSURANCE REQUIREMENTS FOR PROFESSIONAL SERVICES TO THE CITY OF DUBUQUE This coverage shall be written on an occurrence form, not claims made form. All deviations or exclusions from the standard ISO commercial general liability form CG 0001 or Business owners BP 0002 shall be clearly identified. Form CG 25 04 03 97 'Designated Location (s) General Aggregate Limit' shall be included. Governmental Immunity endorsement identical or equivalent to form attached. Additional Insured Requirement: The City of Dubuque, including all its elected and appointed officials, all its employees and volunteers, all its boards, commissions and/or authorities and their board members, employees and volunteers shall be named as an additional insured on General Liability including "ongoing operations" coverage equivalent to ISO CG 20100704. b) Automobile $1.000,000 combined sinale limit. c) WORKERS COMPENSATION & EMPLOYERS LIABILITY Statutory for Coverage A Employers Liability: Each Accident Each Employee Disease Policy Limit Disease $ 100,000 $ 100,000 $ 500,000 $1,000,000 d) PROFESSIONAL LIABILITY e) UMBRELLA/EXCESS LIABILITY . 'Coverage and/or limit of liability to be determined on a case-by-case basis by Finance Director. Completion Checklist o Certificate of Liability Insurance (2 pages) o Designated Location(s) General Aggregate Limit CG 25 04 03 97 o Additional Insured CG 20 10 07 04 o Governmental Immunities Endorsement 20f2 June 2005 A~QRQ. PRODUCER (563)556-0272 INSURANCE AGENCY STRHT ADDRESS cm, STATE, ZIP CODE CATE IMMiDDlYYYY) 02/28/2005 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMENO, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POUClES BELOW. THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDIN' AWi REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCllIBEO HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS POLICY EFFIECTlYE POUCY EXPlRATION CERTIFICATE OF LIABILITY INSURANCE FAX (563)556-4425 I....... C~ny Street Address City, State, Zip Code INSURERS AFFORDING COVERAGE _..._.._......_._.._----,-~- INSURER' Insurance ~any INSURER B INSURER C INSURER 0 INSURER E TYPEOFIN~ GEHI!R^l UASlUTY X COMMERCIAL GENERAl LlABILff"r' CLAIMS ~ [!] OCCUR POLICY NUMBER LIMITS $ $ MED EXP (Any 008 petliOO) $ PERSONAl & ADV INJURY $ $ PRODUCTS - CQMP/OP AGO .s EACH OCCURRENCE DAMAGE TO RENTEO A x GENERAL AGGREGATE A X AHYAUTO AlL OWNED AUTOS SCHEDULED AUTOS HtREOAUTOS NOH-OWNED AUTOS COMBINED SINGLE liMJT $ (Ea&l:::ciOOra) BOOll y tNJURv $ {Per person) <- BODiLY INJURY $ (Pl'lraccideot) PROPERTY DAMAGE $ (?Qf~j AUTO ONLY. EA ACCIDENT $ OTHER THAN "ACe $ AUTO ONLY AGG $ EACH OCCURRENCE $ $ $ $ $ x GARAGE i.iA8JUTY ANY AUTO EXCESSlUMBRELLA UA8lUTY X OCCUR 0 CLAIMSMAOE DEDUCTtBLE X RETENTION 1 WORKERS COMPENSATfONAND EMPLOYERS' UAElUTY A PH'( PAOPRtETORIPARTNERiEXECUTIVE OFFICEflJMEMBER EXCLUDED? If yes. <lNCl'IbeU!'lll:W SPECW. PROVtstONS below UEsSIONAL LIABILm E L. EACH ACCIDENT S E.L.D1SEASE-EAEMPlOYE $ E L. DISEASE. POLICY lIMIT $ $1,000.000 NAlCtI 1000 50, 5, 1,000 2000 1,000, 100, 100 500 DEacRP110N OF OPERA'f'JQMI1 LOCAT1OHSI VEHIClES I EXct.U8IOHS ADDED BY ENOOftSi1IIENT J SPECIAL PROVISfONS E CTIY OF DUBUQUE IS AN ADDITIONAL INSURED ON GENERAL lIABIlITY POLICIES INCL. ONGOING " COMPLETED ERATIONS COVERAGE EQUIVILANT TO ISO CG 2010 0704 " CG 2037 0704. GENERAL LIABILITY POLICY IS PRIMARY NON-CONTRIBUTING. FORM CG 2504 0397 "DESIGNATED LOCATIONS" GENERAL LIABILITY AGGREGATE LIMIT SHALL BE WOED. GOVERNMENTAL IPIlUNITIES ENDORSEMENT IS INCLUDED. ALL POLICIES OF INSURANCE SHALL BE ENDORSED PROVIDE T1fIRTY (30) OAY ADVANCE NOTICE OF CANCElLATION m THE CITY OF DUBUQUE. SHOuLD AHY OF THEADOve DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRAllON DATE fHEReOF, THE'1SSUiNGtNSUReR'WK.l-~MAlL ~ DAYS WRITTEN NOTICE 1'0 THE CERTIFlCATS HOWER NAMED TO THE LEFT, _'OMlCI~Ill)l_lmllllgiX/llX'*IiIClln1OIlIMICiIIIB~XX --lO(lUliIIlllICIIIlIllCftJlIIIUll(lIKlWI'W"'~li'J(XXXXXXXXX AUTtIQftIZEO RIPftE8ENTAnYe cm OF DUBUQUE cm HALL 50 W. Blll STREET DUBUQUE, IA 52001 ACORD 26 (20011081 @ACORDCORPORATlON 1988 IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights lothe certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this tonn does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it allinnatively or negatively amend, extend or alter the coverage afforded by the po~cies listed thereon. SPECIMEN '081 , ROLle)' NUMBER: COMMERCIAL GENERAL LlABlun CG 25 04.03 97 THIS ENDORSEMENT CHANGES THE POLICY, PLEASE READ IT CAREFULLY. DESIGNATED LOCA TION(S) GENERAL AGGREGATE LIMIT This endorsement modifies insurance provided under the fOllowing: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE ANY AND ALL COVERED Designated Location(s): Of no entry appears above, information required to complete thiS endorsement will be shown in the Declarations as applicable to this endorsement.) A. For all sums which the insured becomes legally obligated to pay as damages caused by 'occurrences" under COVERAGE A (SECTION I), and for all medical expenses caused by acci- dents under COVERAGE C (SECTION I), which can be attributed only to operations at a single designated "location" shown In the Schedule above: 1. A separate Designated location General Aggregate Limit applies to each designated "location", and that limit Is equal to the amount of the General Aggregate Limit shown in the Declarntlons. %. The Designated Location General Aggregate Limit is the most we will pay for the sum of all damages under COVERAGE A, except darn- ages because of "badDy Injury" or "property damage' included in the "producls:completed operations hazard", and for mediCal expenses under COVERAGE C regardless of the, nurn- berof: a. 'Insureds; b. Claims made or "suits" brought; or Co Persons or organizations making claims orbringing "suits". 3. Any payments made under COVERAGE A for damages or under COVERAGE C for medical expenses shall reduce the Desig- nated Location General Aggregate Umit for that designated "location". Such payments shall not reduce the General Aggregate limit shown in the Declarations nor shall they I1l- duce any other Designated Location General Aggregate Limit for any other designated "location" shown in the Schedule above. 4. The limits shown in the Declarations for Eacl1 Occurrence, Fire Damage and Medical ex- pense continue to apply. However, instead of being subject to the General Aggregate Limit shown in the Declarations. sUSllJlmits will be subject to the applicable Designated Location General Aggregate Limit. SPECIMEN CG 25 04 03 97 Copyright, Insurance Services Office, Inc., 1996 Page 1 of2 o rl._._ .a. ~ '\ . POLICY NUMBER: C.OMMERCIAL GENERAL LIABILITY CG 20 10 07 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZA nON This endorsement modifies insurance provided under the following: COMMERCIAL GENERAl LIABILITY COVERAGE PART SCHEDULE The City of Dubuque, including all its elected and appointed officials, all its employees and volunteers, all its boards, commissions and/or authorities and their board members, employees and volunteers. Location s Of Covered 0 rations A. Section II - Who Is An Insured is amended to include as an additional insured the person{s) Of organlzatlon{s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or In part, by: 1. Your acts or omissions; or 2. The acts Of omissions of those acting on your behalf; In the performance of your ongoing operations for the additional insured(s) at the location{s) desig- nated above. SPECIMEN B. With respect to the insurance afforded to these additional insure<ls, the following additional exclu- sions apply: This insurance does not apply to 'bodily injury" or "property damage" occurring after: 1. All work, including materials. parts or equip- ment furnished in connectlon with such work, on the project {other than service, maintenance or repairs} to be performed by or on behalf of the additional insured(s} at the location of the covered operations has been completed; or 2. That portion of "your work" out of which the injury or damage arises has been put to Its in- tended use by any person or organlzatlon other than another contractor or subcontractor en- gaged in performing operations for a principal as a part of the same project. CG 20 10 07 04 @ ISO Properties, Inc., 2004 Cl Page 1 of 1 CITY OF DUBUQUE, IOWA GOVERNMENTAL IMMUNITIES ENDORSEMENT 1. Nonwaiver of Governmentallmmunitv. The insurance carrier expressly agrees and states that the purchase of this policy and the including of the City of Dubuque, Iowa as an Additional Insured does not waive any of the defenses of governmental immunity available to the City of Dubuque, Iowa under Code of Iowa Section 670.4 as it is now exists and as it may be amended from time to time. 2. Claims Coveraqe. The insurance carrier further agrees that this policy of insurance shall cover only those claims not subject to the defense of governmental immunity under the Code of Iowa Section 670.4 as it now exists and as it may be amended from time to time. Those claims not subject to Code of Iowa Section 670.4 shall be covered by the terms and conditions of this insurance policy. 3. Assertion of Government Immunitv. The City of Dubuque, Iowa shall be responsible for asserting any defense of governmental immunity, and may do so at any time and shall do so upon the timely written request of the insurance carrier. 4. Non-Denial of Coveraqe. The insurance carrier shall not deny coverage under this policy and the insurance carrier shall not deny any of the rights and benefits accruing to the City of Dubuque, Iowa under this policy for reasons of governmental immunity unless and until a court of competent jurisdiction has ruled in favor of the defense(s) of governmental immunity asserted by the City of Dubuque, Iowa. No Other Chanqe in Policv. The above preservation of governmental immunities shall not otherwise change or alter the coverage available under the policy. SPECIMEN 1 of 1 June 2005