March 27, 2006
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Bonson Road Reconstruction Project
CIP 3001813: Fiscal Year 2007 Street Construction Program
City Engineer Gus Psihoyos recommends City Council approval of the plans and
specifications and the Resolution of Necessity for the Bonson Road Reconstruction
Project.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
(1).1 L/ 111 IL
\ 1 C"':I L L..I
Mict"lael c. Van Milligen
MCVM/jh
Attachment
cc: Barry Lindahl, Corporation Counsel
Cindy Steinhauser, Assistant City Manager
Gus Psi hoyos, City Engineer
C..,,
(~i
-i
D~~~E
~<k~
MEMORANDUM
March 24, 2006
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer~G
SUBJECT: Bonson Road Reconstruction Project
CIP 3001813: Fiscal Year 2007 Street Construction Program
INTRODUCTION
The enclosed resolutions are in reference to the public hearing on the Bonson Road
Reconstruction Project.
BACKGROUND
The Bonson Road Reconstruction Project will provide for the reconstruction of
underground utilities, roadway sub-base and the construction of a new 31-wide concrete
roadway. The project will include new curbing and sidewalk on both sides of the street.
The road will be widened from its existing 24 feet to 31 feet.
The project also provides for the reconstruction of two (2) sanitary sewer manholes.
There are no individual sanitary sewer services on this street. The project will also
include the construction of approximately 690 lineal feet of new storm sewer and catch
basins to improve the storm water conveyance in the area and the installation of fiber
optics telecommunications conduit infrastructure. The project will incorporate upgrades
to the existing water system that include the complete reconstruction of approximately
1,325 lineal feet of new watermain, mainline valves and fire hydrants. There are no
individual water services on this street.
Due to the desire to protect existing trees and the steep grade on the side yards, three
(3) segmental block retaining walls will be installed along the east side of this project.
In an effort to inform the impacted residents along Bonson Road, the Engineering
Department conducted two (2) public informational meetings-one in 2005 and another
this year. The open forum meetings allowed staff to discuss the scope of the project,
construction schedule, special assessment procedures, availability of financial
assistance, as well as to answer any other questions relating to the project. The public
informational meetings proved to offer mutual benefit to both staff and residents that
attended.
RECOMMENDATION
I recommend that the City Council approve the plans and specifications and the
Resolution with Respect to the Adoption of the Resolution of Necessity for the Bonson
Road Reconstruction Project.
ACTION TO BE TAKEN
The City is requested to approve the plans and specifications and the Resolution with
Respect to the Adoption of the Resolution of Necessity through the adoption of the
enclosed resolutions for the Bonson Road Reconstruction Project.
Prepared by Jon Dienst, PE
cc: Dawn Lang, Budget Director
Bob Green, Water Plant Manager
Don Vogt, Public Works Director
Bob Schiesl, Assistant City Engineer
Deron Muehring, Civil Engineer
Greg Doeden, Civil Engineer
Jon Dienst, PE
RESOLUTION NO. 120-06
RESOLUTION ADOPTING PLANS AND SPECIFICATIONS
Whereas, on the 1st day of March, 2006, plans, specifications, form of
contract and estimated cost were filed with the City Clerk of Dubuque, Iowa for
the Bonson Road Reconstruction Project.
Whereas, notice of hearing on plans, specifications, form of contract, and
estimated cost was published as required by law.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF DUBUQUE, IOWA:
That the said plans, specifications, form of contract and estimated cost are
hereby approved as the plans, specifications, form of contract and estimated cost
for said improvements for said project.
Passed, adopted and approved this 3rd day of April, 2006.
Roy D. Buol, Mayor
.
Attest:
Jeanne F. Schneider, CMC, City Clerk
RESOLUTION NO. 121-06
RESOLUTION WITH RESPECT TO THE ADOPTION OF THE
RESOLUTION OF NECESSITY PROPOSED FOR THE BON SON
ROAD RECONSTRUCTION PROJECT
Whereas, the City Council has proposed a Resolution of Necessity for the
Bonson Road Reconstruction Project has given notice of the public hearing
thereon as required by law; and
Whereas, the public hearing has been held, all persons offering objections
have been heard and consideration given to all objections and is pending before
this Council; and
Whereas, this is the time and place set as provided for the taking of action
on the proposed Resolution of Necessity.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF DUBUQUE, IOWA:
That the proposed Resolution of Necessity described above is hereby:
xx
Adopted, without amendment, and all objections filed or made having
been duly considered are overruled.
Adopted as amended by the Schedule of Assessments attached hereto as
Exhibit A, and made a part hereof by reference. All objections filed or
made having been duly considered are overruled.
Deferred for later consideration to a City Council meeting to be held on the
day of , 2006, next at 6:30 p.m. in the Public Library
Auditorium, with jurisdiction retained for further consideration and action at
the adjourned meeting.
Abandoned.
Passed, adopted and approved this 3rd day of April, 2006.
Roy D. Buol, Mayor
Attest:
Jeanne F. Schneider, City Clerk
RESOLUTION NO.
ORDERING BIDS
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
That the Bonson Road Reconstruction Project is hereby ordered to be
advertised for bids for construction.
BE IT FURTHER RESOLVED that the amount of the security to
accompany each bid shall be in an amount which shall conform to the provisions
of the Notice to Bidders hereby approved as a part of the plans and
specifications heretofore adopted.
That the City Clerk is hereby directed to advertise for bids for the
construction of the improvements herein provided, to be published in a
newspaper having general circulation in the City of Dubuque, Iowa, which notice
shall not be less than four days nor more than forty-five days prior to the receipt
of said bids at 2:00 p.m. on the 11th day of April, 2006. Bids shall be opened and
read by the City Clerk at said time and will be submitted to the Council for final
action at 6:30 p.m. on the 17th day of April, 2006.
Passed, adopted and approved this _ day of
,2006.
Roy D. Buol, Mayor
Attest:
Jeanne F. Schneider, CMC, City Clerk
, .
D~~~E
~<k~
MEMORANDUM
February 28, 2006
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Bonson Road Reconstruction Project
CIP 3001813: Fiscal Year 2007 Street Construction Program
City Engineer Gus Psihoyos recommends initiation of the bidding process for the
Bonson Road Reconstruction Project, and further recommends that a public hearing be
set for April 3, 2006.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
j11J{ ~~ /lJL
Michael C. Van Milligen
MCVM/jh
Attachment
cc: Barry Lindahl, Corporation Counsel
Cindy Steinhauser, Assistant City Manager
Gus Psihoyos, City Engineer
D~~%duE
~~~
MEMORANDUM
February 28, 2006
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
SUBJECT: Bonson Road Reconstruction Project
CIP 3001813: Fiscal Year 2007 Street Construction Program
INTRODUCTION
The enclosed resolutions authorize the public bidding procedure for the Bonson Road
Reconstruction Project.
BACKGROUND
The existing Bonson Road is asphaltic pavement with curb and gutter on the west side
of the road.
DISCUSSION
The Bonson Road Reconstruction Project will provide for the reconstruction of
underground utilities, roadway sub-base and the construction of a new 31-wide concrete
roadway. The project will include new curbing and sidewalk on both sides of the street.
The road will be widened from its existing 24 feet to 31 feet.
The project also provides for the reconstruction of two (2) sanitary sewer manholes.
There are no individual sanitary sewer services on this street. The project will also
include the construction of approximately 690 lineal feet of new storm sewer and catch
basins to improve the storm water conveyance in the area and the installation of fiber
optics telecommunications conduit infrastructure. The project will incorporate upgrades
to the existing water system that include: the complete reconstruction of approximately
1,325 lineal feet of new watermain, mainline valves and fire hydrants. There are no
individual water services on this street.
City staff met with the City Forester on this project to discuss the condition and impact
to the existing City trees within the project corridor. There are approximately fifty (50)
trees in this corridor, which a majority of them are small diameter voluntary cedar trees.
However, it is proposed that twenty (20) of the voluntary trees will be removed due to
the proposed construction operations.
Due to the desire to protect existing trees and the steep grade on the side yards, three
(3) segmental block retaining walls will be installed along the east side of this project.
PROJECT COORDINATION
In an effort to inform the impacted residents along Bonson Road, the Engineering
Department staff conducted two (2) public informational meetings-one in 2005 and
another this year. The open forum meetings allowed staff to discuss the scope of the
project, construction schedule, special assessment procedures, availability of financial
assistance, as well as to answer any other questions relating to the project. The public
informational meetings proved to offer mutual benefit to both staff and residents that
attended.
The plans have been reviewed by Building Services and Human Rights to ensure it
complies with the building code and ADA (American Disabilities Act) requirements.
PROJECT SCHEDULE
The schedule for the project is as follows:
Initiate Public Bidding Process
Advertisement for Bid Proposals
Mail Special Assessment Notice to Property Owners
Publish Notice to Property Owners 1 st Publication:
2nd Publication:
Notice of Public Hearing on Plans & Specs, Assessments
Pre-Bid Construction Conference
Public Hearing, Plans & Specs, Spec. Assessments
Receipt of Bid Proposals
Award of Construction Contract
Project Completion Date
RECOMMENDATION
March 6, 2006
March 10, 2006
March 10, 2006
March 10, 2006
March 17, 2006
March 24, 2006
March 29, 2006
April 3, 2006
April 11, 2006
April 17, 2006
September 1, 2006
I recommend that the City Council give preliminary approval to the construction plans
and specifications, approve the Resolution of Necessity, approve the Preliminary
Assessment Schedule, establish April 3, 2006 as the date of the public hearing, and
hereby authorize the City Clerk to advertise for bid proposals for the Bonson Road
Reconstruction Project.
BUDGET IMPACT
The estimate of probable cost for the Bonson Road Reconstruction Project is
summarized as follows:
Construction Contract
Contingency (10%)
Construction Engineering & Inspection (15%)
Total Project Cost
Estimate
$515,180.00
51,518.00
85,004.70
$651.702.70
The project funding summary is as follows:
CIP No. Fund Description
3001813 FY 2007 Street Construction Program
Special Assessment - Street Improvement, Residential Properties
Special Assessment - Street Improvement, Commercial Properties
7401405 FY 2007 Watermain Replacement Program
7101638 Street Program Related Sanitary Sewer Improvements
1021017 FY2007 Fiber Optic Conduit - Paving Projects
Total Project Funding
Fund Amount
$406,966.00
76,780.67
9,536.91
98,031.18
3,795.00
56,592.94
$651.702.70
The Bonson Road Reconstruction Project will be funded through the annual capital
improvement project appropriation of City funds as noted above in the amount of
$565,385.12. The project, as outlined, will require Special Assessments in the amount
of $86,317.58 and expenditure from the Annual Street Construction Program (Funded
through Local Option Sales Tax) in the amount of $406,966.00.
PROPERTY ASSESSMENTS
Low- to moderate-income property owners subject to street assessment will be eligible
for financial assistance ranging from 20 to 100 percent of the street assessment for the
owner-occupied resident property depending on family size and income level. This
financial assistance program is made available through the One Percent Local Option
Sales Tax.
ACTION TO BE TAKEN
The City Council is requested to give preliminary approval to the Resolution of
Necessity, to approve the preliminary assessment schedule, to establish the date of the
public hearing, and. to authorize the City Clerk to advertise for proposals through the
adoption of the enclosed resolutions for the Bonson Road Reconstruction Project.
Prepared by Jon Dienst, PE
cc: Dawn Lang, Budget Director
Bob Green, Water Plant Manager
Don Vogt, Public Works Director
Bob Schiesl, Assistant City Engineer
Deron Muehring, Civil Engineer
Greg Doeden, Civil Engineer
RESOLUTION NO.
PRELIMINARY APPROVAL OF PLANS AND SPECIFICATIONS
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
That the proposed plans, specifications, form of contract and estimated cost for
the Bonson Road Reconstruction Project in the estimated amount of $651,702.70 are
hereby approved and ordered filed in the office of the City Clerk for public inspection.
Passed, adopted and approved this
day of
,2006.
Roy D. Buol, Mayor
Attest:
Jeanne F. Schneider, CMC, City Clerk
RESOLUTION NO.
FIXING DATE OF HEARING ON PLANS AND SPECIFICATIONS
Whereas, the City Council of the City of Dubuque, Iowa has given its preliminary
approval on the proposed plans, specifications, and form of contract and placed same
on file in the office of the City Clerk for public inspection of the Bonson Road
Reconstruction Project.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
That a public hearing will be held on the 3rd day of April, 2006, at 6:30 p.m. in the
Public Library Auditorium at which time interested persons may appear and be heard for
or against the proposed plans and specifications, form of contract and cost of said
improvement, and the City Clerk be and is hereby directed to cause a notice of time and
place of such hearing to be published in a newspaper having general circulation in the
City of Dubuque, Iowa, which notice shall be not less than four days nor more than
twenty days prior to the day fixed for its consideration. At the hearing, any interested
person may appear and file objections to the proposed plans, specifications, contract, or
estimated cost of the improvement.
Passed, adopted and approved this
day of
,2006.
Roy D. Buol, Mayor
Attest:
Jeanne F. Schneider, CMC, City Clerk
NOTICE OF HEARING ON PLANS AND SPECIFICATIONS
Notice of public hearing on the proposed plans and specifications, proposed form
of contract and estimate of probable cost for the Bonson Road Reconstruction Project:
Proiect Description: The Bonson Road Reconstruction Project will provide for
the reconstruction of underground utilities, roadway sub-base, and the construction of
approximately 4,300 S.Y. of new 31-foot wide concrete roadway between Asbury Road
and Meggan Street, with pedestrian sidewalks along both sides of Bonson Road. The
project will include reconstruction of approximately 1,325 lineal feet of new watermain,
mainline valves and fire hydrants. The project also provides for the construction of
approximately 690 lineal feet of new storm sewer as well as catch basins, fiber optics,
and a telecommunications conduit infrastructure.
NOTICE IS HEREBY GIVEN: The City Council of Dubuque, Iowa will hold a
public hearing on the proposed plans, specifications, form of contract and estimate of
cost for the Bonson Road Reconstruction Project in accordance with the provisions of
Chapter 384, City Code of Iowa, at 6:30 p.m., on the 3rd day of April, 2006, in the Public
Library Auditorium, 360 West 11 th Street, in Dubuque, Iowa. Said proposed plans,
specifications, form of contract and estimate of cost are now on file in the office of the
City Clerk. At said hearing any interested person may appear and file objections thereto
or to the cost of the improvements.
Any visual or hearing-impaired persons needing special assistance or persons
with special accessibility needs should contact the City Clerk's office at (563) 589-4120
or TOO at (563) 690-6678 at least 48 hours prior to the meeting.
Published by order of the City Council given on the
,2006.
day of
Jeanne F. Schneider, CMC, City Clerk
RESOLUTION NO.
RESOLUTION OF NECESSITY
Whereas, proposed plans have been duly prepared and approved by the City
Council of the City of Dubuque and are now on file in the office of City Clerk showing
among other things the plans, specifications, form of contract, estimated cost and
preliminary plat and schedule showing the amount proposed to be assessed against
each lot and the valuation of each lot as filed by the City Council, for the Bonson Road
Reconstruction Project.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
That the City Council deems it advisable and necessary for the public welfare to
make the herein mentioned improvements, and unless property owners at the time of
the final consideration of this proposed resolution have on file with the City Clerk
objections to the Resolution of Necessity, they shall be deemed to have waived all
objections pertaining to the regularity of the proceeding and the legality of using the
special assessment procedure.
Said improvements shall be constructed and done in accordance with the plans
and specifications which have been approved by the City Council and now on file with
the City Clerk. That the cost and expense of making such improvement will be
assessed partially or totally against privately owned property lying with the assessment
limits, and in an amount not to exceed that provided by law, and in proportion to the
special benefits conferred.
The portion of the cost which shall be borne by the City will be paid from the
Fiscal Year 2007 Street Construction Program, Watermain Replacement Program,
Street Program Related Sanitary Sewer Improvements, Fiber Optic Conduit - Paving
Projects, and special assessment bonds may be issued in anticipation of deferred
payments of special assessments when a contract has been performed and accepted,
and the proceeds thereof used to pay the contractor.
The above resolution was introduced, approved and ordered placed on file with
the City Clerk this day of , 2006.
Approved and placed on file for final action.
Roy D. Buol, Mayor
Attest:
Jeanne F. Schneider, CMC, City Clerk
RESOLUTION NO.
FIXING DATE OF HEARING ON RESOLUTION OF NECESSITY
Whereas, the City Council of the City of Dubuque, Iowa, has given its preliminary
approval on the proposed plans, specifications and form of contract and placed same
on file in the office of the City Clerk for public inspection for the Bonson Road
Reconstruction Project; and
Whereas, the proposed Resolution of Necessity for said improvement has been
introduced and is now on file in the City Clerk's office for public inspection.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
That on the 3rd day of April, 2006, a public hearing will be held at 6:30 p.m. in the
Public Library Auditorium in the City of Dubuque at which time the owners of property
subject to assessment for the proposed improvement or any other person having an
interest in the matter may appear and be heard for or against the making of the
improvement, the boundaries of the district, the cost, the assessment against any lot, or
the final adoption of a Resolution of Necessity and the City Clerk be and is hereby
authorized and directed to cause a notice of time and place of such hearing to be
published in a newspaper having general circulation in the City of Dubuque, Iowa, which
notice shall be published once each week for two consecutive weeks, the first
publication of which shall be not less than ten days prior to the day fixed for its
consideration. Unless property owners at the time of the final consideration of this
proposed resolution have on file with the City Clerk objections to the Resolution of
Necessity they shall be deemed to have waived all objections thereto.
Passed, adopted and approved this
day of
,2006.
Roy D. Buol, Mayor
Attest:
Jeanne F. Schneider, CMC, City Clerk
NOTICE TO PROPERTY OWNERS
Notice is given that there is now on file for public inspection in the office of the
City Clerk of Dubuque, Iowa, a proposed Resolution of Necessity, an estimate of cost,
and a plat and schedule showing the amounts proposed to be assessed against each
lot and the valuation of each lot within a district approved by the City Council of
Dubuque, Iowa, for an improvement of the type(s) and in the location(s) as follows:
The Bonson Road Reconstruction Project will provide for the reconstruction of
underground utilities, roadway sub-base, and the construction of approximately 4,300
S.Y. of new 31-foot wide concrete roadway between Asbury Road and Meggan Street,
with pedestrian sidewalks along both sides of Bonson Road. The project will include
reconstruction of approximately 1,325 lineal feet of new watermain, mainline valves and
fire hydrants. The project also provides for the construction of approximately 690 lineal
feet of new storm sewer as well as catch basins, fiber optics, and a telecommunications
conduit infrastructure.
That the proposed district to be benefited and subject to assessment for the cost
of such improvements is described as follows:
Bonson Road
All property included within the areas described so as to include one-half of the
privately-owned property between each such street to be improved and the next
street, whether such privately-owned property abuts upon the street to be
improved or not. In no case shall property situation more than 300 feet from the
street to be improved be assessed.
The City Council will meet at 6:30 p.m. on the 3rd day of April, 2006, at the Public
Library Auditorium, 360 West 11th Street, at which time the owners of property subject to
assessment for the proposed improvement or any other person having an interest in the
matter may appear and be heard for or against the making of the improvement, the
boundaries of the district, the cost, the assessment against any lot, or the final adoption
of a Resolution of Necessity. A property owner will be deemed to have waived all
objections unless at the time of hearing he has filed objections with the City Clerk.
Any visual- or hearing-impaired persons needing special assistance or persons
with special accessibility needs should contact the City Clerk's office at (563) 589-4120
or TOO (563) 690-6678 at least 48 hours prior to the meeting.
Published by order of the City Council given on the
,2006.
day of
Jeanne F. Schneider, CMC, City Clerk
RESOLUTION NO.
RESOLUTION APPROVING PRELIMINARY SCHEDULE OF ASSESSMENTS
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
That the attached sheet(s), Page 1 to Page 1 inclusive, are hereby determined to
be the schedule of proposed assessments for the Bonson Road Reconstruction Project
and the valuations set out herein are hereby approved.
Passed, approved and adopted this
day of
,2006.
Roy D. Buol, Mayor
Attest:
Jeanne F. Schneider, CMC, City Clerk
CITY OF DUBUQUE, IOWA
BONSON ROAD RECONSTRUCTION PROJECT
PRELIMINARY SCHEDUll!: OF VALUATION AND PROPOSED ASSESSMENTS
OATE:FEBRUARYZ8,Z006
hefebyf,ud
shown oppollite eech 101
Valualion
"''''
&a5S&5sedagalnsl&llCh~1
p'OpOsedlo
heamo
l0gell1efwi
The tollowing schedule Is hereby determined 10 show each tol proposed 10 be aGseued for the Improvemenl5howI
8lI the true valualions of such lolsby Ihe Cily Counc;1 01 the Cily of Dubuqu&
lOlAl.IlET
""ESSMl!:Nl
Main5ma,VelmaK lot 17 Block 1 SUllsel Part Sub. 10-21-227-003 $105,586.74 53,786,74 $3,786,74 53.786,74
lindllrean,DavidJ,&Chi..lineM LOI 18 Block 1 $unsel Park Sub 10-21.227-001 598,374.83 $3,774.83 $3.774,83 53,77483
BrailDach,Larry&Shannon Lol17Block3SullaelParkSub 10--16-482_011 $113.266,40 53,86640 $3.866,40 53,866,40
Comeiius.Mic/laeIP.&JoniK LOI 16610ck 3SunselPar1l Sub 10--16-482_012 595.053.02 $1,153.02 $1.15302 51.153,02
Kupferschmidl,EdwardK&Lynn LOI 15 Block 3 Sunalll Parll Sub 10-16.482-013 590.916.93 5468.93 $468,93 $468,93
Plab.Jo....phA,&li.aG LOI 14 Block 3 SunselPario; Sub 10--16-482-014 5101,229,54 522954 $229,54 $229.54
MCDermon,GariJ Lol 13 Block. 3 Sunslll Parll Sub 10-16_482_015 $100,769,13 $121.13 $121,13 $121,13
Burrow.. DonaldE. & Joyca A LOI 18 Block 3 Sun5e1 Park Sub 10-16-482.001 $105.05812 $4,01012 $4,010,12 $4.010,12
B&yaf.JamesE.&PatficiaK LOT 19 BLK 3 SUNSET PARK SUB 10-16-482--002 $123.52099 $1,120.99 $1,120,99 $1,12099
KANE, MtCHAEL J & BARBARA A LOT20BLK3SUNSETPARKSUB 10-16-482--003 $100.122,53 $422.53 $422,53 $422,53
HUTZELL. KELLY J & LAURA A LOT21 BLK 3 SUNSETPAA.K SUB 10-16-482--004 $911.321,32 $221.32 $221.32 $22132
BRUGGEMAN. MARIA 0 LOT 22 BLK 3 SUNSET PARK SUB 10-16-482-<l05 5105,363,24 $6324 $63.24 $63,24
Joo.s.OafleneM, Tfust LollClBlockSSunselPerl<Sub 10-16-481-010 $111.765,78 $4,066.78 $4,066,76 $4,Cl66.78
BECK,JOSEPHW&RITAH LOT 6 BlK 5 SUNSET PARK SUB 10-16-481_Cl11 $99,635.73 $1,057,73 $1,087.73 $1.087.73
OYEN, LARRY E & MICHelLE L LOT 6 BLK 5 SUNSET PARK SUB 10-16-481-012 5100.011.03 $41103 $411.03 5411,03
DOUGHERTY, CLEMENT F & RITA M LOT 1 BLK 5 SUNSET PARI< SUB 10_16_481_013 $104.66758 $219.68 $21968 $219.68
GRtESINGER. JACKIE D & lOT6BLK5SUNSETPARKSUB 10_16_481_014 $95.303.84 $65.84 $5584 $5584
Walksr.WilhamJ,&Ch,isl<ne LOl11 Block. 5 Sunset Park 8<Jb 10-16--481-ClOl 5113.276,04 $3,976.04 $3,97$,04 $3.97604
CHRISTENSEN,KURTE LOT 126LK 5 SUNSET PARK SUB 10-16-481-002 $88.943.99 $1,143.99 51,14399 $1,143,99
BOAL TRUST. HAZEL B, CIOAMERICAN TRU5T & SAVINGS LOT 13 BLK 5 SUNSET PARK SUB 10-16-481--003 594,629,51 5429,51 $429,51 $429.51
WILLIAMS. JAMES DEXTER & LOT 14 BlK 5 SUNSET PARK SUB 10-16--481_004 $84.571,79 $22379 $22379 5223.79
HOFFMAN, DANIEL B & ANN MARIE lOT 15BLK 5 SUNSET PARK SUB 10-16-481-005 $95.415,34 $67.34 $67,34 $67,34
KUbik,Rob&r1D Lot 14 Block 6 Sunsel Park Sub. 10-16-480-011 $109.545,05 $3,645.05 $3.64505 $3,64505
TROWBRIDGE, RALPH W & PEGGY M LOT 13 8LK 6 SUNSET PARK SUB 10-16--480-012 $104.55851 $1,210.51 $1,210,51 $1,211).51
HAUFE. JEFFREY D & SHERRY G LOT 12 BLK 6 SUNSET PARK SUB 10--16--480-013 $107.116729 $467.29 $467,29 $467.29
WISSING. CHARLES E SA. & LORI A LOT 11 BLK 6 SUNSET PARI< SUB 10-16_480-014 $100,828.72 522872 5228,72 5228.72
CARLSON, KIMBERLY M LOT 10 BLI< 6 SUNSET PARI< SUB 10-16-480-015 $99.185.41 $85.41 $65,41 $65.41
Cusla"Harold&R;taRevoc.ableTrusl Lol15Block6SunsetParkSub 10--16-480-001 $92.506.41 $4,180.41 $4.16041 $4,160.41
DUPONT. ERIC M & TAMMY S LOT 16 BLI<6 SUNSET PARK SUB 10--16-480-002 $94,618,94 $1,11694 51.11694 $1.11894
ESSER,MICHAELP LOT 17 BLK6 SUNSET PARK SUB 10-16-480-003 $106,136.08 $436.08 $436,08 543608
THOMPSON. GENE P & KAREN A LOT 18 BLK 6 SUNSET PARK SUB 10-16-460--004 $117.924.20 $224.20 $224.20 $224.20
OCONNELL,JOHNJR&MARYT LOT 19& lOT 2-20 BLK6 SUNSET PARK$UB 10-16-480-005 5112.890,75 $9075 59075 $90.75
Terwillsgsr.NaU...nJ,&Kt-isA Lot 1 COppaf Field Sub 10-16-453_010 $50.05484 57.25484 $7,254,64 $7.254,64
Terwilleger, NathanJ,& K';sA LOT 2 COPPER FIELD SUB 10-16-453-011 $38,258,11 $1.458.11 $1,456.11 $1.456.11
MONO. JOSEPH H & GAtL A LOT 3 COPPER FIELD SUB 10-16-453-012 5102,549,03 $349.03 $349.03 $34903
SCHWARTZ, THOMAS C & VIDA JEAN LOT 17 BUENA VISTA SUB #1 10-16-453-008 $269.59272 5692.72 $6112,72 5692,72
Burtlach,MaI)'Ann.DacJ.ofTrUSI Lot 18bullna Vista Sub #1 10-16-453--009 5283.72649 57.380.49 57,360.49 $7,36049
Mond,JosephH.&GlliIA LoI1BUfiIlSVistaSub,#1 10-16-4$&.001 $378,180,14 $5.460.14 $5,48014 $5.480,14
Wolff,LarI)'C.&RoberleJ Lot 2 BUlllle Vistll SUb,#l 10-16-456-002 $262.08673 $5.688.13 $5,66873 $5,688.73
Deiler,JamllSP LOI 3 Buelle ViSla Sub. #1 10-16-456-003 $292,786,73 $5.668.73 $5,68673 $S,668,73
Dubuque Iowa Congregat'on of Jehovalls LOl4 Bualla Vista Sub. #1 10-21-202-003 Tax Exempl $9,536,91 $9,536.91 $9.53691
W"lER'ERVlce
"SSEliaMENT
SEWERUfEflAI
...senSMI!Nl
PUIlUC
IMPlWYEMENT'
"un'MENT
WATER.....INIOI!l'\CIEHCY
ASll:hME14f AUElISMENT
~-
....SI!IlIlllE14
'lOEWALK
ASII!UMENT
NElP"'VINCl
"UUIlMENT
VALu...nON
"~"'Pf\OVEMEN
PAACEL'
LOfOElClUPllON
OWNERN"'.f
$86,317.
"
,.~
SB',317_58
.9
$86,
RESOLUTION NO.
RESOLUTION WITH RESPECT TO THE ADOPTION OF THE
RESOLUTION OF NECESSITY PROPOSED FOR THE BONSON ROAD
RECONSTRUCTION PROJECT
Whereas, the City Council has proposed a Resolution of Necessity for the
Bonson Road Reconstruction Project has given notice of the public hearing thereon as
required by law; and
Whereas, the public hearing has been held, all persons offering objections have
been heard and consideration given to all objections and is pending before this Council;
and
Whereas, this is the time and place set as provided for the taking of action on the
proposed Resolution of Necessity.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
That the proposed Resolution of Necessity described above is hereby:
Adopted, without amendment, and all objections filed or made having been duly
considered are overruled.
Adopted as amended by the Schedule of Assessments attached hereto as
Exhibit A, and made a part hereof by reference. All objections filed or made
having been duly considered are overruled.
Deferred for later consideration to a City Council meeting to be held on the
day of , 2006, next at 6:30 p.m. in the Public Library Auditorium, with
jurisdiction retained for further consideration and action at the adjourned meeting.
Abandoned.
Passed, adopted and approved this
day of
,2006.
Roy D. Buol, Mayor
Attest:
Jeanne F. Schneider, CMC, City Clerk
RESOLUTION NO.
ORDERING BIDS
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
DUBUQUE, IOWA:
That the Bonson Road Reconstruction Project is hereby ordered to be advertised
for bids for construction.
BE IT FURTHER RESOLVED that the amount of the security to accompany each
bid shall be in an amount which shall conform to the provisions of the Notice to Bidders
hereby approved as a part of the plans and specifications heretofore adopted.
That the City Clerk is hereby directed to advertise for bids for the construction of
the improvements herein provided, to be published in a newspaper having general
circulation in the City of Dubuque, Iowa, which notice shall not be less than four days
nor more than forty-five days prior to the receipt of said bids at 2:00 p.m. on the 11th day
of April, 2006. Bids shall be opened and read by the City Clerk at said time and will be
submitted to the Council for final action at 6:30 p.m. on the 1 ih day of April, 2006.
Passed, adopted and approved this _ day of
,2006.
Roy D. Buol, Mayor
Attest:
Jeanne F. Schneider, CMC, City Clerk