Loading...
Water & Resource Recovery Center FY 14 Budget Presentationrce Recovery Center Department Manager Administrative Assistant Assistant Manager Eight Operators 3 Laboratory Technicians 0.16 Intern Maintenance Foreman 2 Mechanics & 1 Electrician Laboratory Services — W &RRC, Water, Landfill, Health Department & Commun r Fy201 W &RR Operations — Average Day Res. /Com. Ind. % Ind. r Flow 8.983 mgd 8.083 mgd 0.90 mgd 10 % B.O.D. 20,615 lbs. 12781 lbs 7833 lbs 38% T.S.S. 18,891 lbs. 16246 lbs 2645 lbs 14% • W &RRC Performance FY 201 :3 mgd. (annual 3.3 Billion) • Removed 95% of B.O.D. (Biological Oxygen Demand) • Removed 94% of T.S.S. (Total Suspended Solids) • Generated 11.4 Dry Tons of Bio- Solids Daily • Yearly Total of 4,171 Dry Tons • 3,134 to Incineration and 1,037 tons to Landfill r ncinerator Failure —April 2012 ing - July 2011 my looding Continued to Impact Construction Schedule in FY12 /FY13 Incinerator Failure in April 2012 had significant impact on Operations for the Remainder of FY12 and into FY13 wal $ mi ion in construction $ 5.1 million for engineering & Construction services $ 5 million for contingency $ 3.3 million for design Total project of $64 million • Up To $2.7 million for Co- Generation w wal Ci o Du•uque Initiated Project in 2005 and a Facility plan was submitted to IDNR in 2008 USEPA /IDNR — July 2011 the City signed with USEPA a Consent Decree which among other things requires that the W &RRC be completed as specified in the Facility Plan submitted Hydraulic Peak Loading BOD Load (lbs/day) Solids Load (lbs/day) 20,615 18,891 Existing Capacity 34.3 24,400 24,600 Design Conditions Percent Increase 19.2% 51% 19.5% f W &RR Renewal — Capacity Increases Ci o Du•uque will be poised for growth in population and industrial uses Along with this increased capacity Dubuque will have a highly energy efficient operation R W &RRC Construction Loan Repayment es Fy12 12% Fy13 13% a Fy14 14% a Fy15 2% a Fy16 0% • Major Budget Highlights • '•• •f Progress Red • in le ' rical Energy Costs Natural Gas Reductions Major Maintenance Cost Reductions . Incinerator Maintenance and Fuel Purchase Elimination Lower Polymer Usage Bio- Solids Application Co- Generation Combined Heat and Power et • • lectrical Energy FY1 Acual FY12 Actual FY13 Budget FY14 Budget $579,205 $469,024 $355,790 $374,006 FY14 Old Plant $600,000+ 600 - 500 - 400 - 300 - 200- 100 0 Incinerator Fuel Purchase Reductions FY1 c ual $286,238 FY12 Actual $317,504 FY13 Budget $66,500 FY14 Proposed $0.00 • FY14 Incinerator Still Online at Current Prices $450,000 450 - 400 - 350 - 300 - 250 - 200 - 150 - 100 - 50 - 0 r to sage Reductions FY1 c ual $50,961 FY12 Actual $15,559 FY13 Budget $50,000 FY14 Proposed $25,000 • p� -Increase — 17% 4 °o-percen rate increase to SRF Repayment Impact for typical family using 6,000 gallons per month would be from $27.34 in FY13 to $31.99 in FY14 an increase of $4.65 R Rate Comparison (based on usage of 800 cubic feet or 6000 gallons per month) Rates fy14 (proposed) $37.89 ( +9 %) Des Moin. $36.88 ( +9 %) Iowa City $36.08 Sioux City $34.72 Dubuque $31.99 ( +17 %) Davenport $27.15 ( +5 %) Ames $26.35 Cedar Rapids $26.42 ( +3.4 %) Waterloo $22.40 Council Bluffs $17.21 Average (without Dubuque) $29.46 e Rate Comparison (based on usage of 800 cubic feet or 6000 gallons per month) Dubuque's Rate a $31.99 is $5.90 Lower than the Highest Rate at $37.89 Dubuque's Rate is $2.53 higher than the Average at $29.46 (Average without Dubuque) • 4 Projects Repair /Replacement of Sewer Force Main for the Bradley & Perry Street Sanitary Sewer. sJaldwes pue SJa ;aw MOId ;uenIJul MaN duel Afl O; duel Pe ;uoa au!JOlya panuoa s ;alul 6u4ed!SS!a J01eJ0/6Jau3 MaN slot ;uoa X01 apeJbdn : ;uawd!nb3 uo! ;eu • 438a esneN ;uawd!nb3 aupolya anoWON sJaMO18 uo! ;eJad 86eJo ;S SVM pue SJa!;!SSela ;!JO `SU00J3S MaN SJasnjj!a uo! ;eJad MaN oa enoweN) anon J!aM BwPd MaN �ayuelp leu!j Jayne - eu!d puod ysV V u!. L a6pnig Pale, loV a6enlg -0 p!nb!1 sdwnd gym pue Ja!;!Jela 6u!uaaog su!seg IPO ueL a6elolg gym g u!el a6pnig palen!loV puod ysV PB !Ja ;eMaa pue Spuod qsv anoWON p u!e a6pnig palen!loV uo!lelS dwnd SV?J anlon.gg ,all!IdS SSW] ;uaWd!nb3 a3eldeN s)Iuel uo! ;ez!Ienb3 Mold )lead !IpuBH P!IOS Jayuelp 6�ewud .N !n8 Ua;U!ein uodelS wnd alseM Weld -ul uo! ;!ppd qe� pue uo! ;enoueN u!plm8 IoJ; sia ;sabla 3!qo SSOJ 6°d ;oeFoJd 10 MOIAO Headwork's Rebuild -Bar Screens and Grit System — Online Summer 2012 -40Pelbww Rebuild Primary Clarifiers and add Fourth rifler Completed Fall 2012 Standb Powar Online Fall 2012 e -- has full standby power capability along with all the major pumping stations. Portable generators are available for use at the smaller stations. This allows for continuity of service in the event of power outages. Centrifuges On -Line February 2013 CENTRIFUGE SYSTEMS Laboratory Addition — Summer 2012 Administration Building — Spring 2013 4511 e ergy Monitoring With New SCADA alit C ffi Digester No.4 Mixer No. MDC -70 -10 Hand Ion FWD Speed 60 % 'REV Hand Speed Speed Req'd 70% 70.0% Power Factor 0.54 Current Power 2.47kW I o Auto (" VFD Fault °Run FWD ()Motor Overtemp ()Run REV • Luba Oil Low °FWD Required ()Coll to Run Foil FWDD ()REV Required ()Call to Run Fail REV O Today Sunday Saturday Friday Thursday Cumulative Runtime Last Cumul. Starts Reset Power Runtime Starts Consumption hrs nsWH 1.6 0 3.8 24.0 2 56.6 24.0 2 24.0 2 24.0 2 469.5 41 1. 29.2013 Reset ti)Cumulative Values Digester No.4 Mixers Digester No.4 Mixer No. 1 MDC -70 -11 Handd�Fill� FWD Speed 60% REV Hand Speed Speed Req'd 70 % 70.0 % ° Auto ("Run FWD ORun REV ()FWD Required Q REV Required Today Sunday Saturday Friday Thursday Cumulative Runtime Last Cumul. Starts Reset J ',FWG rUfr !REV Power Factor Current Ern 0.43 Power 2.09 k W Q VFD Fault ()Motor Overtemp 9 Luba Oil Low ()Coll to Run Fail FWDi_I ()Call to i,Run Fail REV ! I Power Starts Consumption (V) (kWH) 0 3.7 2 55.2 2 2 2 Runtime (hrs) 1.6 24.0 24.0 24.0 24.0 469.5 41 1. 29.2013 . # Rest emulative Values apereraraecJ,Ararm. Digester No.4 Mxer No. 12 MDC -70 -12 Hand nn FWD Speed 60% REV Hand Speed 70 % Speed Req'd 70.0 % Q Auto •Run FWD ()Run REV FWr. rin Power Factor 0.55 Current B.OA Power 2.42 k W Q VFD Fault Q Motor Overtemp • Luba Oil Low •FWD Required •Call to Run Fail FWD ()REV Required •Coll to Run Foil REV JI Power Runtime Starts Consumption (hrs) (#3 (kWH) Today 1.6 0 3.8 Sunday 24.0 2 57.3 Saturday 24.0 2 Friday 24.0 2 Thursday 24.0 2 Cumulative Runtime Last Cumul. Starts Reset 469.2 44 1. 29.2013 Reset emulative Values MCC=JS V OC 1 Abe-51 A 1 179 95.7 °F -70 -3 95. 6 °F -70 -3 eight -06 FTC 131.5 °F -70 -20 131.3 °F No. 1 SCADA Energy Monitoring I • I'. &R • TS 45 Fall 9 Rm M PB *at Foil :Net 'cult eNet Fault -01 Fuel 5 -0 I Fall 5-02 i Fail UfIP • Fall Utility r Fall (� Intrusion I-WO Aeration Plant / Overview Chemicals Screening 6 Pri. Glorifiers Grit Removal , {Scum 6 Sludge Final Gifiers RAS 6 Scum -t! Pumping Service West Utility w :Iffy West Transformer Power OK° Comm Foil. B -45 -01 316 kW RAD -45 -01 6 -4! 7711.1n GB t Provisional q 2000/3 V FB -20 -01 FB -70 -01 FE MCC -20 MCC -70 MCC -75 East Generator Room Hazardous Material • Emergency Pushbutton (CS- 45 -09) West Generator Room Hazardous Material u Emergency Pushbutton (CS- 45 -08) Chemical Room Hazardous Material O Emergency Pushbutton (CS- 45 -06) 02/18/2013 06 .35 38 02/16/2013 08:3..12 02/18/2013 06.33:10 In -Plant Waste Effluent =-7 Excess Flow Sludge Processing DEW6 Electrical Distribution and Paralleling Switchgeor RAD -45 -02 Srifchgeor 5E5 -45 -01 Voltage Phoze A -B Voltage Phase B -C Voltage Phase A -C Current Phase A Current Phase B Er! Errs Current Phase C iiiielLL is SYi'LLL'iil MB -45 -01 MB -45 -02 485 Volts 488 Volts 486 Volts 490 Volts 492 Volts 490 Volts kW Power Factor kVAR Total kW 316 kW -0.84 242 kW -0.89 123.0kVAR 558.0kW EF -45 -02 EF -45 -03 5 -02 ° Run La Fuel 0 Tank Leak Peak Shave Mode Active Bose Load Nri Mode Active r1 SCADA Alarm ;.PS Summary Generator h- -\ Remote Permissives "-" j, Lift Station: East Utility Eort Unlit Transformer y 45 -02 MB -45 -02 242 kW 5 -01: 5000A, 480V, 3h 200KAIC °Power OK 4/Comm Fail -(' Alarm 6 -- Dialer — 4 -20mA Ranges 0 5 -01 FB -10 -01 FB -62 -01 Future FB -55 -01 Provisional � Capacitor q 2000 /3 q Bank 1 2000/3 NV( V MCC -10 MOP -62 -01 MCC -55 tee . q.retor SCCAS Morn. overaeor SCCISAWn. •Pereter - - MCC Paweri foil Alarms MCC.1 MCC-35 Fall Total C SES Alarm (� CC Alarm J Plant El. Generator Setpoints Y Setpoints STOPS :�' Control i,�. Alan.. be ID. SPAIN C OXYGEN PLOW STATUS COILED 1 PDIMAfY HOT WATIQ PUMP AVID STATUS Srvw *Substantia Completion-FaIl 2013 e •urce Recovery Center Wate Resource Recovery Center "Aqua est Vita" Water is Life "Along With" "Things Required for Life" "Brought Back for Use" "The Place Where it Happens" The Water & Resource Recovery Center W &RRC tr e W &RRC Staff Adminis rative & Laboratory Personnel Operations Maintenance W &RRC - From Disposing of Waste to Extra cti n • Resources in Incineration. Burned To Bio- Solids for Beneficial Use Previous words like `waste, pollution, dispose' "There is no waste until it is wasted"