TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Acceptance of Public Improvements in Westbrook Subdivision No. 2
DATE: February 11, 2013
City Engineer Gus Psihoyos is recommending acceptance of the public improvements
that the developer, Callahan Construction, Inc., has recently completed in Westbrook
Subdivision No. 2, with the exception of the stormwater detention facilities.
Maintenance of said improvements shall be the responsibility of the contractor, Callahan
Construction, Inc., for a period of two years from the date of acceptance. The
stormwater detention facilities may be accepted after 80% of the lots in the entire
Westbrook Subdivision No. 2 are developed and adequate erosion control measures
are installed on the remaining 20% of the lots.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
brit44 itgy,
Michael C. Van Milligen
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Teri Goodmann, Assistant City Manager
Gus Psihoyos, City Engineer
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manage
FROM: Gus Psihoyos, City Engineer
SUBJECT: Acceptance of Public Improvements in Westbrook Subdivision No. 2
DATE: February 8, 2013
INTRODUCTION
Dubuque
All- America
11111!
2012
The enclosed material provides for City Council acceptance of the public improvements
on North Westbrook Drive, South Westbrook Drive and Trails Edge Drive, which the
developer, Callahan Construction, Inc., has recently completed in Westbrook
Subdivision No. 2.
BACKGROUND
As a condition of subdivision plat approval through Resolution No. 123 -11, the
developer of Westbrook Subdivision No. 2, was required to install certain public
improvements including street paving with curb, storm sewers, sanitary sewer main,
storm water detention facilities, watermain and street lighting, and to dedicate the
improvements to the City upon completion. The developer of Westbrook Subdivision
No. 2, has recently completed the improvements and has formally requested the City's
acceptance of the public improvements which have been installed.
DISCUSSION
The Subdivision Ordinance requires that upon completion of all the required public
improvements, the subdivider shall notify the City in writing of the completion of the
improvements, requesting that the City either approve or reject the acceptance of the
improvements, together with a statement of reasons for any rejection.
Callahan Construction, Inc., has requested City's acceptance of the improvements in
Westbrook Subdivision No. 2. Upon inspection by the City, it has been determined that
all of the public improvements required by Resolution No. 123 -11 have been completed,
with the exception of the storm water detention facilities, in accordance with plans
approved by the City Council and in conformance with City specifications. The storm
water detention facilities are substantially complete but need some minor grading and
erosion control work completed, along with seeding and mulching of disturbed areas in
the basin.
RECOMMENDATION
I would therefore recommend that the City Council accept the public improvements in
Westbrook Subdivision No. 2 with the exception of the stormwater detention facilities.
Maintenance of said public improvements shall be the responsibility of the contractor,
Callahan Construction, Inc., for a period of two years from the date of acceptance by the
City Council. The stormwater detention facilities may be accepted after 80 percent of
the lots in the entire Westbrook Subdivision No. 2 are developed and adequate erosion
control measures are installed on the remaining 20 percent of the lots.
ACTION TO BE TAKEN
The City Council is requested to adopt the attached resolution accepting the public
improvements, with the exception of stormwater detention facilities, in Westbrook
Subdivision No. 2.
Prepared by Ronald J. Turner, P.L.S.
cc: Bob Green, Water Department Manager
Don Vogt, Public Works Director
Ronald J. Turner, P.L.S.
Deron Muehring, Civil Engineer
2
RESOLUTION NO. 45 -13
ACCEPTING PUBLIC IMPROVEMENTS IN WESTBROOK SUBDIVISION NO.2
Whereas, pursuant to Resolution 123 -11, certain public improvements
including street paving, storm sewer, storm water detention facilities, sanitary
sewer, watermain, and street lighting were installed by the developer of
Westbrook Subdivision No. 2; and
Whereas, the improvements, except for storm water detention facilities,
have been completed and the City Manager has examined the work and has filed
a certificate stating that the same has been completed in accordance with the
plans approved by the City Council and in conformance with City specifications,
and has recommended that the improvements be accepted by the City Council.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF DUBUQUE, IOWA:
Section 1. That the recommendation of the City Manager be approved
and that said public improvements in Westbrook Subdivision No. 2, except the
storm water detention facilities, be and the same is hereby accepted.
Section 2. That maintenance of said improvements shall be the
responsibility of the owner, Callahan Construction for a period of two (2) years
from the date of this resolution.
2013.
Attest:
Passed, adopted and approved this 18th day of February
S. Firnstah , Cit
Roy D. Buol, Mayor
THE CITY OF
DUB
Masterpiece on the Mississippi
Westbrook Subdivision No. 2
Accent Public Imirovements
DAGIS
DUBUQUE AREA C.aGRAPHIC INFCaMATION
DISCLAIMER: This Information was compiled
sing the Dubuque Area Geographic Information System
(DAGIS), which Includes data created by both the City of
Dubuque and Dubuque County . It Is understood that, while
the CIty of Dubuque and participating agencies utilized the
most current and accurate Information available, DAGIS and
It's suppliers do not warrant the accuracy or currency of the
Information or data contained herein. The City and participating
agencies shall not be held liable for any direct, Indirect, Incidental,
usequential, punitive, or special damages, whether foreseeable or
nforeseeable, arising out of the authorized or unauthorized use of
this data or the Inability to use this data or out of any breach of
warranty whatsoever.
200100 0
1 inch = 600 feet
200 400 600 800 Feet
N
W E
S
Map Prepared by:
City of Dubuque
Engineering Division
50 West 13th Street
Dubuque, Iowa 52001
Phone: (563) 589 -4270
Fax: (563) 589 -4205