5 Points Traffic Reconstruction ProjectTHE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 5 Points Traffic Signal Reconstruction Project C I P 1021920 DATE: February 26, 2013 Dubuque kital All- America City II 111! 2012 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 5 Points Traffic Signal Reconstruction Project, as completed by Portzen Construction, in the final contract amount of $163,368.41. This is 9.3% over the original contract amount of $149,432.00 due to the installation of a new traffic signal base and signal at the southeast corner of Jackson and 20th Street. With the addition of the traffic signal, additional sidewalk and curb and gutter had to be replaced. I concur with the recommendation and respectfully request Mayor and City Council approval. kr,„709,,, Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: 5 Points Traffic Signal Reconstruction Project CIP 1021920 DATE: February 25, 2013 INTRODUCTION Dubuque ketd AU- mnatcacfly 11111 2012 The enclosed resolution provides for the acceptance of the construction contract for the 5 Points Traffic Signal Reconstruction Project. BACKGROUND The 5 Points Traffic Signal Reconstruction Project provided for the reconstruction of traffic signals at the intersection of Rhomberg Avenue and 20th and Elm Streets. Improvements included: pedestrian buttons for the crosswalks; a dedicated left turn for the westbound traffic on Rhomberg Avenue to Elm Street; and the reconstruction of curb ramps to bring the intersection to ADA standards. This newly - rebuilt signal is tied into the City -wide traffic management operations center at City Hall. DISCUSSION The 5 Points Traffic Signal Reconstruction Project was completed by Portzen Construction, Inc. of Dubuque, Iowa, in the final contract amount of $163,368.41. This is 9.3 % over the original contract amount of $149,432.00. The extra cost is due to the installation of a new traffic signal base and signal at the South East corner of Jackson and 20th street. With the addition of the traffic signal additional sidewalk and curb and gutter had to be replaced. This was an ideal time to update this corner since a fiber vault was being placed at this intersection and portion of the sidewalk had to be removed. RECOMMENDATION I recommend that the City Council accept the improvements and authorize payment of the contract amount of $163,368.41.00 to Portzen Construction, Inc. for the 5 Points Traffic Signal Reconstruction Project. BUDGET IMPACT The estimate of probable cost for 5 Points Traffic Signal Reconstruction Project is as follows: The project funding summary is as follows: CIP Award Final Construction Contract $149,432.00 $163,368.41 Contingency 14,417.30 0.00 Construction Engineering & Inspection 21,625.00 19,644.21 Total Project Cost $185,474.30 $183,012.62 The project funding summary is as follows: CIP Fund Description Fund Amount 1021920 5 Points Intersection Rhomberg — 20th - Elm $92,500.00 3001274 Traffic Signal Controller Replacement 4000.00 3001011 Signal Program 36,000.00 3001816 Traffic Signal Fiber Optic Network 1650.00 3501608 Street Lighting Downtown 4862.62 3001017 Fiber Optic Conduit Projects 24,000.00 2501017 Fiber Optic Conduit Projects 20,000.00 Total Project Funding $183,012.62 ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution accepting the improvements and authorizing payment of the contract amount of $163,368.41 to Portzen Construction, Inc. for the 5 Points Traffic Signal Reconstruction Rebid Project. Prepared by David Ness, Civil Engineer II cc: Jenny Larson, Budget Director Don Vogt, Public Works Director RESOLUTION NO. 67 -13 ACCEPTING THE 5 POINTS TRAFFIC SIGNAL RECONSTRUCTION PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 5 Points Traffic Signal Reconstruction Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the 5 Points Intersection Rhomberg — 20th - Elm capital improvement appropriation for the contract amount of $163,368.41 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 4th day of March Attest: Kevi ' . Firnstahl, C rThity Clerk , 2013. Kevi h, Mayor Pro Tem CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 5 POINTS TRAFFIC SIGNAL RECONSTRUCTION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 5 Points Traffic Signal Reconstruction Project, and that said Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $183,012.62. Dated this 26 441 day of e6r'a, , 2013. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on th ' day of Kevin S Fi ns ahl, CMC City Clerk , 2013. $ 161,631.41 I $ 1,737.00I THE CITY Op DUB tau Masterpiece on the Mississippi PARTIAL PAYMENT NO Council Final City of Dubuque - Engineering Division Partial Payment Form PROJECT NAME: 5 - POINTS TRAFFIC SIGNAL RECONSTRUCTION CONTRACTOR: Portzen Construction BID ITEM DESCRIPTION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 28 27 28 29 30 b IMPROVEMENTS MOBILIZATION & MISCELLANEOUS UNIT LS PLAN QUANTITY DATE: February 11, 2013 CONTRACT AMOUNT: $149,432.00 CONTRACT UNIT COST REMOVE PAVEMENT OR DRIVEWAY SY REMOVAL OF SIDEWALK SY REMOVAL EXISTING HANDOLE BASE STONE SIDEWALK, P.0 CONCRETE 41N. QUANTITY TO DATE gEnT AMOUNT EARNED TO DATE COMP. $ 6,000.00 1.00 $ 6,000.00 100.0% 103 $ 12.00 112.88 $ 1,354.56 109.6% 119 $ 9.00 212.96 $ 1,918.64 179.0% EA $ 350.00 1.00 5 350.00 100.0% TON so $ 20.00 99.51 5 1,990.20 110.6% SY 97 $ 36.00 152.56 $ 5,492.16 157.3% SY 34 $ 80.00 60.48 $ 3,828.80 177.9% LF 82 $ 20.00 $ - 0.0% SY 38 $ 85.00 118.82 $ 10,099.70 330.1% TON 17 $ 125.00 11.91 $ 1,488.75 70.1% SF 84 $ 45.00 84.00 S 3,780.00 100.0% STA 17 $ 80.00 18.02 $ 1,281.60 94.2% EA 2 $ 110.00 2.00 $ 220.00 100.0% STA 8.2 $ 80.00 7.98 $ 636.80 128.4% $ 5,000.00 1.00 $ 5,000.00 100.0% EA $ 1,050.00 3.00 $ 3,150.00 300.0% EA 3 $ 3,200.00 3.00 $ 9,600.00 100.0% EA $ 6,800.00 1.00 $ 6,800.00 100.0% EA 79 $ 105.00 31.00 $ 3,255.00 163.2% EA $ 1,700.00 1.00 $ 1,700.00 100.0% LS $ 4,100.00 1.00 $ 4,100.00 100.0% LS $ 53,000.00 1.00 $ 53,000.00 100.0% LF 185 $ 17.00 298.46 $ 5,073.82 161.3% LF 78 $ 25.00 43.52 $ 1,088.00 55.8% LF 851 $ 28.00 857.50 $ 24,010.00 90.3% LF 92 $ 10.00 248.65 $ 2,486.50 270.3% LF 72 $ 16.00 117.43 5 1,878.88 163.1% SIDEWALK, P.C. CONCRETE, 61N CURB & GUTTER P.C. CONCRETE 8' PCC PAVEMENT WITH INTEGRAL CURB AND GUTTER HMA 300k SURFACE COURSE. 12' (PG64 -22) PAVEMENT DETECTABLE WARNING - CURB RAMP PAINTED PAVEMENT MARKING, WATERBORNE OR SOLVENT -BASED PAINTED PAVEMENT MARKING SYMBOL PAVEMENT MARKING REMOVAL TRAFFIC CONTROL LS 24' ROUND HANDHOLE FIBER VAULT, SQUARE PROVIDE FIBER HUB FOUNDATION AND INSTALL FIBER HUB CABINET CORE DRILL FIBER VAULT OR HANDHOLE PRECAST HANDHOLE WITH LID MARKED 'TRAFFIC SIGNALS' REMOVAL OF TRAFFIC SIGNALIZATION TRAFFIC SIGNALIZATION CONDUIT, HOPE, PUSHED 2' CONDUIT, HOPE, PUSHED 4' CONDUIT, HDPE, 4' WITH 4 -1' INNER DUCT CONDUITS, PUSHED CONDUIT, RIGID PVC, TRENCHED 2' CONDUIT, RIGID PVC, TRENCHED 4' SUBDRAIN, PLASTIC PIP, 4' CONNECT SUBDRAIN TO EXISITNG INTAKE ADJUST EXISTING MANHOLE LF Too $ 10.00 EA $ 400.00 EA $ 750.00 $ 3.00 $ TOTAL AMOUNT EARNED TO DATE: 0.0% 2,250.00 300.0% CHANGE ORDER - EXTRA WORK ITEMS 1 REMOVE & DISPOSE OF OLD INTAKE 2 REMOVE SIGN FOUNDATIONS 3 REMOVE OLD ROCK FOUNDATION 4 PATCH CLAY STORM SEWER WITH COLLAR 5 INSTALLATION OF TESCO FOUNDATION LS LS LS LS LS $ 175.00 1 $ 309.00 1 $ 698.00 1 $ 115.00 1 $ 440.00 1 TOTAL AMOUNT EARNED TO DATE: TOTAL AMOUNT EARNED TO DATE: 175.00 309.00 698.00 115.00 440.00 $ 163,368.41 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the orrect amount of all work required to complete the above improvement APPROVED: APPROVED: Michael Van Milligen, City Manager City of Dubuq : , lo Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, contractor for the above improvement, does hereby accept the above "Total Due Contractor ", as full settlement for all claims for said improvement. CONTRACTOR; BY: (AG TITLE: TQ'c's_k, Mar 554' DATE: a ((� j`�