US 151-61 Capacity Improvements Project AcceptanceTHE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: US 151 -61 Capacity Improvements (Iowa DOT Project No. STP -A- 061 - 8(128)-- 22 -31) (CIPs 300 -2028) DATE: February 28, 2013 Dubuque kital All- America City II 111! 2012 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the US 151 -61 Capacity Improvements Project, as completed by Tschiggfrie Excavating, in the final contract amount of $1,041,371.35, which is a 7.99% increase from the original contract amount of $964,338.65. The increase is due to changes that the Iowa Department of Transportation required in preparation for the US 52/61/151 Paving Catfish Creek Bridge DOT (83) project that will be started this year. This included widening the roadway at the intersection of US 151- 61 and US 52 to accommodate turning movements when US 151 -61 will be temporarily converted from 4 to 2 lanes. With these changes, longer mastarms were needed in order to position the signal heads in the correct location. The changes were covered by the Primary Roads Fund; therefore no City funds were needed for these changes but added to the overall project cost. Another major change was how Twin Valley Drive was reconstructed. Initially, Twin Valley Drive would be closed for roughly 2 weeks, but after talking to business owners they wanted an access at this location for their customers. Because of this change, it required the contractor to reconstruct Twin Valley Drive in three stages and required additional traffic control at this intersection. I concur with the recommendation and respectfully request Mayor and City Council approval. kr,„/09,,, Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer 2 Masterpiece on the Mississippi Dubuque a14mericacib 2012 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: US 151 -61 Capacity Improvements (Iowa DOT Project No. STP -A- 061 - 8(128)-- 22 -31) (CIPs 300 -2028) DATE: February 26, 2013 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the US 151 -61 Capacity Improvements Project, Iowa DOT Project No. STP-A- 061 - 8(128) -- 22 -31. BACKGROUND The US 151 -61 Capacity Improvements Project provided for the following improvements at the US 151 -61 and US 52, US 151 -61 and Maquoketa Drive and the right turn lane at US 151 -61 and Lake Eleanor Road intersections: US 151 -61 at US 52 • Reconstructed entire signal. • New control cabinet on the northeast side of intersection (by Hardee's). • Built signals with future geometric improvements including dedicated protected -only left -, through- and right -turn movements for the side streets. This eliminated the current split phasing. • New microwave vehicle detection for all approaches. US 151 -61 at Maquoketa Drive • Reconstructed entire signal. • New control cabinet on the northeast side. • New microwave vehicle detection for all approaches. 1 Lake Eleanor Road • Added southbound right -turn lane. Additional ITS Improvements • Fiber optic communications between the two signals (approximately 2,500 feet). This communications line allows the signal to be interconnected. • Traffic sensors midway between signals to monitor movements and to accumulate traffic counts. • Cameras at each intersection for monitoring of signal operation. • Connected these two signals to the traffic operations center so that the City could remotely monitor and adjust the signals from City Hall. DISCUSSION The US 151 -61 Capacity Improvements Project, Iowa DOT Project No. STP- A -061- 8(128)-22-31, was completed by Tschiggfrie Excavating of Dubuque, Iowa in the final contract amount of $1,041,371.35, which is a 7.99% increase from the original contract amount of $964,338.65. The increase is due to changes that the IDOT required in preparation for the US 52/61/151 Paving Catfish Creek Bridge DOT (83) project that will be started this year. This included widening the roadway at the intersection of US 151- 61 and US 52 to accommodate turning movements when US 151 -61 will be temporarily converted from 4 to 2 lanes. With these changes longer mastarms were needed in order to position the signal heads in the correct location, the changes were covered by the Primary Roads Fund; therefore no city funds were needed for these changes but added to the overall project cost. Another major change was how Twin Valley Drive was reconstructed. Initially, Twin Valley Drive would be closed for roughly 2 weeks, but after talking to business owners they wanted an access at this location for their customers. Because of this change it required the contractor to reconstruct Twin Valley Drive in three stages and required additional traffic control at this intersection. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $1,041,371.35 for US 151 -61 Capacity Improvements Project, Iowa DOT Project No. STP -A- 061 - 8(128)- 22 -31. 2 BUDGET IMPACT The cost for US 151 -61 Capacity Improvements Project is as follows: The project funding summary is as follows: CIP Award Final Construction Contract $964,338.65 $1,041,371.35 Contingency 112,200.00 0.00 Engineering Consultant Services 74,000.00 106,200.00 Construction Engineering & Inspection 100,000.00 97,673.03 Total Project Cost $1,250,538.65 $1.245.244.38 The project funding summary is as follows: CIP Fund Description Fund Amount 3002028 US 151 -61 Capacity Improvements $350,362.43 3002028 ICAAP 400,000.00 3002028 DMATS SRP Funding 255,000.00 3002028 U -STEP Funding 179,042.61 3002028 3R Funding 46,420.71 3002028 Primary Road Funds (Catfish Creek Bridge) 14,418.63 Total Project Funding $1,245,244.38 ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution accepting the improvements and authorizing payment of the contract amount of $1,041,371.35 to Tschiggfrie Excavating for the US 151 -61 Capacity Improvements Project. Prepared by David Ness, Civil Engineer II cc: Jenny Larson, Budget Director Don Vogt, Public Works Director 3 RESOLUTION NO. 69 -13 ACCEPTING THE US 151 -61 CAPACITY IMPROVEMENTS PROJECT, IOWA DOT PROJECT NO. STP -A- 061 - 8(128) -22 -31 AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the US 151 -61 Capacity Improvements Project has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from ICAAP, DMATS STP Funding, U -Step Funding, 3R funding and US 151 -61 Capacity Improvements for the contract amount of $1,041,371.35 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Attest: Kevin Passed, approved and adopted this 4th day of March r '_ f :. irnstahl, C 'ity Clerk , 2013 Kevin J. Lynch, Mayor Pro Tem CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE US 151 -61 CAPACITY IMPROVEMENTS PROJECT, IOWA DOT PROJECT NO. STP- A -061- 8(128)-22-31 The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the US 151 -61 Capacity Improvements Project - Iowa DOT Project No. STP -A- 061 - 8(128)- 22 -31, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $1,245,244.38. `F� r Dated this c 1 O day of "k-11 , 2013. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on th i day of 2013. Kev' Firnstahl, CMC City Clerk 80.00 1 CONTRACTOR'S PAYMENT FORM CONTRACT PAYMENT NO. OWNER: IMO City of Dubuque PROJECT: US 61/151 Capacity Improvements IIW PROJECT NO: 10221 -05 IDOT Protect No.: STP- A -061- 8(128) -22-31 WORKING DAYS: LATE START DATE: ACTUAL START DATE: 64 July 25,2011 August 15, 2011 PREPARED BY: IIW, P.C. PAGE 1/5 CONTRACTOR: ADDRESS: Phone: AMOUNT OF CONTRACT Original: $964,338.65 Revised: $1,025,088.19 DETAILED ESTIMATE OF CONTRACT WORK COMPLETED TO DATE Tschiggfrle Excavating P.O. Box 3280 Dubuque, IA 52004-3280 1563557.7450 Fax: 1563557 -7585 DATES OF PAYMENT From: To: November 13, 2012 Completion THIS PERIOD TOTAL TO DATE / DIVISION REF. NO. ITEM CODE CONTRACT ITEM DESCRIPTION CONTRACT ITEM PREVIOUS PERIOD DIVISION 1 DIVISION 2 DIVISION 1 DIVISION 2 TOTAL TO DATE PERCENT QUANTITY UNIT UNIT COST QTY Div1 QTY Div2 QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT 0010 2102- 0425070 SPECIAL BACKFILL 295.8 TON $14.95 249.97 0 $0.00 249.97 $3,737.05 - 249.97 $3,737.05 85% 0020 2102- 2710070 EXCAVATION, CLASS 10, ROADWAY AND BORROW ' 2003.06 CY $11.10 1756.06 247 0 $0.00 0 80.00 1756.06 $19,492.27 247 $2,741.70 2003.06 $22,233.97 100% 0030 2102 - 2712015 EXCAVATION, CLASS 12, BOULDERS OR ROCK FRAGMENTS 6 CY $66.00 0 0 $0.00 0 $0.00 0 $0.00 0% 0040 2105- 8425015 TOPSOIL, STRIP, SALVAGE AND SPREAD 590 CY $7.70 520 70 0 $0.00 0 80.00 520 $4,004.00 70 $539.00 590 $4,543.00 100% 0050 2107- 075000 COMPACTION WITH MOISTURE AND DENSITY CONTROL 738 CY $2.35 705 33 0 $0.00 0 $0.00 705 $1,656.75 33 $77.55 738 $1,734.30 100% 0060 2115- 0100000 MODIFIED SUBBASE 1251.97 CY $26.90 1118.07 133.9 0 $0.00 0 80.00 1118.07 $30,076.08 133.9 $3,601.91 1251.97 $33,677.99 100% 0070 2121 - 7425010 GRANULAR SHOULDERS, TYPE A 258.3 TON $13.60 200.51 61.44 0 $0.00 0 $0.00 200.51 $2,726.94 61A4 $835.58 261.95 $3,562.52 101% 0080 2123 - 7450000 SHOULDER CONSTRUCTION, EARTH 21.3 STA $111.00 18.1 3.2 0 $0.00 0 80.00 18.1 $2,009.10 3.2 $355.20 21.3 $2,364.30 100% 0090 2301 - 1033090 STANDARD OR SLIP FORM PCC PAVEMENT, CLASS C, CLASS 3 DURABILITY, 9 IN. ' 1655.15 SY $50.10 1655.15 0 $0.00 1655.15 $82,923.02 1655.15 $82,923.02 100% 0100 2301- 1033100 STANDARD OR SLIP FORM PCC PAVEMENT, CLASS C, CLASS 3 DURABILITY, 10 IN. ' 1110.52 SY $55.75 1106.52 4 0 $0.00 0 $0.00 1106.52 $61,688.49 4 $223.00 1110.52 $61,911.49 100% 0110 2303- 0042500 HMA MIXTURE (3,000,000 ESAL), INTERMEDIATE COURSE, 1/2 IN. MIX 630 TON $79.85 499.63 178.06 0 $0.00 0.02 $1.60 - 499.63 $39,895.46 178.08 814,219.69: 677.71 $54,115.15 108% 0120 2303-0043504 HMA MIXTURE (3,000,000 ESAL), SURFACE COURSE, 1/2 IN. MIX, FRICTION L-4 116.7 TON $88.75 96.61 34.95 0 80.00 0 $0.00 96.61 $8,574.14 34.95 $3,101.81 131.56 $11,675.95 113% 0130 2303- 0246428 ASPHALT BINDER, PG 64 -28 44.8 TON $673.00 34.95 12.81 0 $0.00 0 $0.00 34.95 $23,521.35 12.81 $8,621.13 47.76 $32,142.48 107% 0140 2402- 0425040 FLOODED BACKFILL DELETED 134 CY $32.15 0 0 $0.00 0 $0.00 0 $0.00 0% 0150 2402 - 2720000 EXCAVATION, CLASS 20 166.8 CY $22.15 166.8 0 $0.00 166.8 $3,694.62 166.8 $3,694.62 100% 0160 2402 - 2720100 EXCAVATION, CLASS 20, FOR ROADWAY PIPE CULVERT • 97.14 CY $11.10 97.14 - 0 80.00 97.14 $1,078.25 - 97.14 $1,078.25 100% 0170 2416 -0100015 APRONS, CONCRETE, 15 IN. DIA. 1 EACH $691.00 1 0 $0.00 1 $691.00 1 $691.00 100% 0180 2416 - 0100024 APRONS, CONCRETE, 24 IN. DIA. 1 EACH $929.00 1 0 80.00 1 $929.00 1 $929.00 100% 0190 2416 - 1180024 CULVERT, CONCRETE ROADWAY PIPE, 24 IN. DIA. 12 LF $77.85 20 - 0 $0.00 20 $1,557.00 20 $1,557.00 167% 0200 2416 - 1541036 REMOVE AND REINSTALL RIGID PIPE CULVERT LESS THAN OR EQUAL TO 36 IN. 16 LF $62.45 14 0 $0.00 14 $874.30 14 $874.30 88% 0210 2502 - 8212034 SUBDRAIN, LONGITUDINAL, (SHOULDER) 4 IN. DIA. 2217 LF $7.60 1975 325 0 $0.00 0 $0.00 1975 $15,010.00 325 $2,470.00 2300 $17,480.00 104% 0220 2502 - 8212104 SUBDRAIN, PLASTIC PIPE, 4 IN. 357 LF $10.50 389 0 80.00 389 $4,084.50 389 $4,084.50 109% 0230 2502- 8220196 SUBDRAIN OUTLET, RF -19E 7 EACH $154.00 0 1 0 $0.00 0 $0.00 0 $0.00 1 $154.00 1 $154.00 14% 0240 2502- 8220197 SUBDRAIN OUTLET(RF -19F) 7 EACH $164.00 18 0 $0.00 18 $2,952.00 - 18 $2,952.00 257% 0250 2503- 0114215 STORM SEWER GRAVITY MAIN, TRENCHED, REINFORCED CONCRETE PIPE (RCP), 2000D (CLASS III) 151N. 102 LF $64.40 96 0 $0.00 96 $6,182.40 96 $6,182.40 94% • Quantity Changed By Change Order SUBTOTAL WORK COMPLETED - Page 1 80.00 81.60 $317,357.72 $36,940.57 80.00 $354,298.29 1 CONTRACT PAY(iIENT NO. IIW PROJECT NO: 10221-05 IDOT Project No.: STP -A- 061. 8(128).•22.31 CONTRACT WORK COMPLETED - CONTINUED THIS PERIOD PAGE 2/5 REF. NO. ITEM CODE CONTRACT ITEM DESCRIPTION CONTRACT ITEM PREVIOUS PERIOD DIVISION 1 DIVISION 2 DIVISION 4 DIVISION 1 DIVISION 2 DIVISION 4 TOTAL TO DATE QUANTITY UNIT UNIT COST QTY Div1 QTY Div2 QTY Div4 QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT PERCENT 0260 2503 - 0200036 REMOVE STORM SEWER PIPE LESS THAN OR EQUAL TO 36 IN. 42 LF $31.20 49 - 0 $0.00 49 $1,528.80 49 $1,528.80 117% 0270 2507 - 3250005 ENGINEERING FABRIC 38 SY $4.50 0 0 $0.00 0 $0.00 0 $0.00 0% 0280 2507 - 8029000 EROSION STONE 20 TON $21.15 0 0 $0.00 0 $0.00 0 $0.00 0% 0290 2510- 6745850 REMOVAL OF PAVEMENT • 2010.34 SY $11.70 1964.94 45.4 - 0 $0.00 0 80.00 - - 1964.94 $22,989.80 45.4 $531.18 2010.34 $23,520.98 100% 0300 2511 - 7526004 SIDEWALK, PCC, 4 IN 37.48 SY 840.15 37.48 - - 0 $0.00 - - - 37.48 $1,504.82 - - 37.48 $1,504.82 100% 0310 2518- 6910000 SAFETY CLOSURE 3 EACH $220.00 2 0 $0.00 2 $440.00 2 $440.00 67% 0320 2523 - 0000310 HANDHOLES AND JUNCTION BOXES 10 EACH $176.00 11 - - - 0 $0.00 11 $1,936.00 - - 11 $1,936.00 110% 0330 2524- 6765010 REMOVE AND REINSTALL SIGN AS PER PLAN 8 EACH $110.00 8 0 0 $0.00 0 $0.00 - 8 $880.00 0 $0.00 8 $880.00 100% 0340 2524 - 9275100 WOOD POSTS FOR TYPE A OR B SIGNS, 4 IN. X4 IN. 94 LF $9.90 0 -. 0 $0.00 -- 0 $0.00 - - - 0 $0.00 0% 0350 2524- 9275222 WOOD POSTS FOR TYPE A OR B SIGNS, 4 IN. X 6 IN. 114 LF $12.10 0 0 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0% 0360 2524 - 9325001 TYPE A SIGNS, SHEET ALUMINUM 52.51 SF $26.40 50 1175 - 0 $0.00 0 $0.00 - 50 $1,320.00 13.75 $363.00 - 6175 $1,68100 121% 0370 2525 - 0000100 TRAFFIC SIGNALIZATION 1 LUMP $381,550.00 1 0 $0.00 - 1 $381,550.00 1 $381,550.00 100% 0380 2525- 0000120 REMOVAL OF TRAFFIC SIGNALIZATION 1 LUMP $18,450.00 1 0 $0.00 - 1 $18,450.00 - 1 $18,450.00 100% 0390 2526 - 8285000 CONSTRUCTION SURVEY DELETED 1 LUMP $9,900.00 0 0 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0% 0400 2527- 9263109 PAINTED PAVEMENT MARKING, WATERBORNE OR SOLVENT BASED 91.54 STA $66.00 78.19 5.22 69.39 0 $0.00 0 $0.00 0 $0.00 78.19 $5,160.54 5.22 $344.52 69.39 $4,579.74 152.8 $10,084.80 167% 0410 2527- 9263137 PAINTED SYMBOLS AND LEGENDS, WATERBORNE OR SOLVENT BASED 9 EACH $82.50 12 13 0 $0.00 0 $0.00 12 $990.00 - 13 $1,072.50 25 $2,062.50 278% 0420 2527- 9263180 PAVEMENT MARKINGS REMOVED 33.8 STA $46.20 12.6 1.2 1 0 $0.00 0 $0.00 0 $0.00 12.6 $582.12 1.2 $55.44 1 $46.20 14.8 $683.76 44% 0430 2528 - 8445110 TRAFFIC CONTROL 1 LUMP $21,340.00 0.8 0.2 0 $0.00 0 $0.00 0.8 $17,072.00 0.2 $4,268.00 1 $21,340.00 100% 0440 2528 - 8445113 FLAGGERS 5 EACH $295.00 2 0 80.00 $0.00 2 $590.00 2 $590.00 40% 0450 2533 - 4980005 MOBILIZATION 1 LUMP $21,300.00 0.9 0.1 0 $0.00 0 $0.00 0.9 $19,170.00 0.1 $2,130.00 1 $21,300.00 100% 0460 2599- 9999005 CORE DRILL HOLES INTO HANDHOLE OR VAULT 49 EACH $51.10 56 0 $0.00 56 $2,861.60 56 $2,861.60 114% 0470 2599 - 9999005 FIBER VAULT, 3 FT. ROUND 3 EACH $325.00 3 0 $0.00 3 $975.00 3 $975.00 100% 0480 2599- 9999005 FIBER VAULT, 4 FT. ROUND 1 EACH $247.00 1 0 $0.00 1 $247.00 1 $247.00 100% 0490 2599 - 9999005 FIBER VAULT, SQUARE 3 EACH $296.00 5 0 $0.00 5 $1,480.00 5 $1,480.00 167% 0500 2599 - 9999005 INTAKE SPECIAL, SINGLE AS PER PLAN DELETED 1 EACH $4,280.00 0 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0% 0510 2599 - 9999005 WAVETRONICS HD MICROWAVE SENSOR, COMPLET 1 EACH $17,640.00 1 0 $0.00 1 $17,640.00 1 $17,640.00 100% 0520 2599- 9999009 CONDUIT, INNERDUCT, TRENCHED, 4 IN. W/ 4 -1 IN CONDUITS 2243 LF $25.35 2226 0 $0.00 2226 $56,429.10 2226 $56,429.10 99% 0530 2599 - 9999009 CONDUIT, RIGID PVC, BORED 2 IN. 170 LF $13.65 183 0 $0.00 183 $2,497.95 183 $2,497.95 108% 0540 2599- 9999009 CONDUIT, RIGID PVC, BORED 4 IN. 773 LF $20.90 763 0 $0.00 763 $15,946.70 763 $15,946.70 99% ` Quantity Changed By Change Order SUBTOTAL WORK COMPLETED - Page 2 $0.00 $0.00 Moo 1 $572,241.43 $7,692.14 $5,698.44 $585,632.01 CONTRACT PA r4AENT NO. EIELS IIW PROJECT NO: 10221 -05 IDOT Protect No.: STP -A -061. 8(126) - -2231 CONTRACT WORK COMPLETED - CONTINUED THIS PERIOD TOTAL TO DATE / DIVISION PAGE 3/5 REF. NO. ITEM CODE CONTRACT ITEM DESCRIPTION CONTRACT ITEM PREVIOUS PERIOD DIVISION 1 DIVISION 2 DIVISION 3 / 4 DIVISION 1 DIVISION 2 DIVISION 3 / 4 TOTAL TO DATE PERCENT QUANTITY UNIT UNIT COST QTY Div1 QTY Div2 QTY Div 3 / 4 QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT 0550 2599- 9999009 CONDUIT, RIGID PVC, TRENCHED, 1 1/4 IN. 25 LF $19.40 0 0 $0.00 1 2102- 2710070 0 $0.00 CY $11.10 0 $0.00 0% 0560 2599 - 9999009 CONDUIT, RIGID PVC, TRENCHED, 2 IN. 253 LF $20.95 343 - 0 $0.00 $555.00 100% - 2107- 0875000 343 $7,185.85 CY $2.35 343 $7,185.85 136% 0570 2599- 9999009 CONDUIT, RIGID PVC, TRENCHED, 4 IN. 197 LF $22.20 319 - 0 $0.00 $108.10 100% - 2115- 0100000 319 $7,081.80 CY $26.90 319 $7,081.80 162% 0580 2599 - 9999009 FIBER CABLE; 48 SM & 24 MM 3935 LF $2.45 3935 - 0 $0.00 $976.47 100% 1 2121- 7425010 3935 $9,640.75 - $13.60 - - - 3935 $9,640.75 100% 0590 2599- 9999009 SAWCUTTING PAVEMENT 958 LF $4.05 811 296 34.45 0 $0.00 0 $0.00 1 2301- 1033090 811 $3,284.55 296 $1,198.80 1107 84,483.35 116% 0600 2601- 2634100 MULCHING 0.6 ACRE $700.00 0.5 0.1 93A 0 $0.00 0 $0.00 1 2301- 1033100 0.5 $350.00 0.1 $70.00 0.6 $420.00 100% 0610 2601 - 2636044 SEEDING AND FERTILIZING (URBAN) 0.6 ACRE $2,200.00 0.5 0.1 46.6 0 $0.00 0 $0.00 1 2402 - 2720000 0.5 $1,100.00 0.1 $220.00 0.6 $1,320.00 100% 0620 2602 - 0000020 SILT FENCE 66 LF $3.30 121 68 - 0 $0.00 0 $0.00 1 - 121 $399.30 68 $224.40 189 $623.70 286% 0630 2602 - 0000030 SILT FENCE FOR DITCH CHECKS 112 LF , $3.30 213 1 0 $0.00 $3,310.00 100% 2 2102- 2710070 213 $702.90 CY $11.10 - -- 213 $702.90 190% 0640 2602- 0000060 REMOVAL OF SILT FENCE 66 LF $1.10 121 68 - 0 $0.00 0 $0.00 2 2115- 0100000 121 $133.10 68 $74.80 - -- 189 $207.90 286% 0650 2602 -0000070 REMOVAL OF SILT FENCE FOR DITCH CHECKS 112 LF $1.10 213 - - 0 $0.00 - -- 2 2301- 1033090 213 $234.30 - $50.10 - -- 213 $234.30 190% 0660 2602 - 0000090 CLEAN -OUT OF SILT FENCE 40 LF $0.55 0 0 0 $0.00 0 $0.00 2 2301 - 1033100 0 $0.00 0 $0.00 - -- - -- 0 $0.00 0% 0670 2602 - 0000100 CLEAN -OUT OF SILT FENCE FOR DITCH CHECKS 50 LF $0.55 0 0 $0.00 - -- 2 2402- 0425040 7013 (0140) Flooded Backfill 0 $0.00 $32.15 - -- t 0 $0.00 0% DETAILED ESTIMATE OF CHANGE ORDER WORK COMPLETED TO DATE $0.00 $0.00 $0.00 $30,112.55 $1,788.00 $0.00 THIS PERIOD TOTAL TO DATE / DIVISION $31,900.55 CH. ORD. NO. CHANGE ORDER ITEM DESCRIPTION CHANGE ORDER ITEM PREVIOUS PERIOD DIVISION 1 DIVISION 2 DIVISION 3 / 4 DIVISION 1 DIVISION 2 DIVISION 3 / 4 TOTAL TO DATE QUANTITY UNIT UNIT COST QTY Div 1 QTY Div 2 QTY Div 3 / 4 QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY I AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT PERCENT Change Order 1 = All Division 3 Work 1 2102- 2710070 7001 (0020) Excavation, CI 10 Roadway & Borrow 50 CY $11.10 50 0 $0.00 - 50 $555.00 50 $555.00 100% 1 2107- 0875000 7002 (0050) Compaction w /Moisture and Density Control 46 CY $2.35 46 0 $0.00 46 $108.10 46 $108.10 100% 1 2115- 0100000 7003 (0060) Modified Subbase 36.3 CY $26.90 36.3 0 $0.00 36.3 $976.47 36.3 $976.47 100% 1 2121- 7425010 7004 (0070) Granular Shoulders, Type A 30.2 TON $13.60 34.45 0 $0.00 34.45 $468.52 34.45 $468.52 114% 1 2301- 1033090 7005 (0090) Standard or Slip Form PCC Pavement, CI C, CI 3 Durability, 9 In. 93.4 SY $50.10 93.4 0 $0.00 93A $4,679.34 93.4 $4 679.34 100% 1 2301- 1033100 7006 (0100) Standard or Slip Form PCC Pavement, CI C, CI 3 Durability, 10 In. 46.6 SY $55.75 46.6 0 $0.00 46.6 $2,597.95 46.6 $2 597.95 100% 1 2402 - 2720000 7007 (015) Excavation, Class 20 30.3 CY $22.15 30.3 0 $0.00 30.3 $671.15 30.3 $671.15 100% 1 2525 - 0000100 7008 (0370) Traffic Signalization 1 LS $3,310.00 1 0 $0.00 1 $3,310.00 1 $3,310.00 100% 2 2102- 2710070 7009 (0020) Excavation CI 10, Roadway & Borrow 46.06 CY $11.10 - -- - -- - -- - -- - -- _ -- - -- - -- 2 2115- 0100000 7010 (0060) Modified Subbase " 68.17 CY $26.90 - -- - -- - -- - -- - -- - -- - -- 2 2301- 1033090 7011 (0090) Standard or Slip Form PCC Pvmt, CIC, CI 3 Durability, 9 In. " 67.65 SY $50.10 - -- - -- - -- - - -- - -- - -- - -- - -- 2 2301 - 1033100 7012 (0100) Standard or Slip Form PCC Pavement, CIC, CI 3 Durability, 10 In. '• 40.22 SY $55.75 - -- - -- - -- - -- - -- - -- - -- - -- -- - -- - -- - -- 2 2402- 0425040 7013 (0140) Flooded Backfill -134 CY $32.15 - -- - -- - -- - - -- - -- - -- -- - -- 2 2402 - 2720000 7014 (0150) Excavation, Cl. 20 62.8 CY $22.15 - -- - -- -- - -- - -- - -- - -- - -- 2 2402- 2720100 7015 (0160) Excavation, CI. 20 for Roadway Pipe Culvert " 17.14 CY $11.10 - -- - -- - -- - -- - -- - -- - -- .` Quantity Added Into Bid Items Above ($853.60)) $1.601 $0.001 CONTRACT PAYMENT NO. 9 FINAL IIW PROJECT NO: 10221 -05 IDOT Protect No.: STP -A- 061 - 8(128) - -22-31 DETAILED ESTIMATE OF CHANGE ORDER WORK COMPLETED TO DATE - CONTINUED PAGE 4/5 uanhly Added Into Bld Items Above TOTAL CHANGE ORDER WORK TOTAL CONTRACT AND CHANGE ORDER WORK PERFORMED Less: Amount Retained Per Contract 3% Value of Stored Materials (See Attached List) Less: Stored Materials Amount Retained Per Contract 3% Net Amount Eamed to Date Less: Previous Amount Paid BALANCE DUE TO CONTRACTOR THIS PAYMENT TSCHIGGFRIE EXCAVATING, INC. ($853.60) Moo So.00 J. $19,645.03 1 $939,356.731 $0.00 I $46,420.71 1 f $55,593.91 1 $69,540.50 I $1,041,371.351 $0.00 $0.00 $0.00 $1,041,371.35 $1,010,956.65 I 830,414.70] THIS PERIOD TOTAL TO DATE / DIVISION DIVISION 1 DIVISION 2 DIVISION 1 DIVISION 2 DIVISION 3 / 4 TOTAL TO DATE PERCENT QTY 1 AMOUNT QTY 1 AMOUNT QTY 1 AMOUNT QTY 1 AMOUNT QTY 1 AMOUNT 2 2510 - 6745850 7016 (0290) Removal of Pavement 114.34 SY $11.70 - -- -- - - - -- - -- - -- -- - -- - -- -- - -- - -- -- - -- 2 2525 -0000100 7017 (0370) Traffic Signalization 1 LS 415,885.60 1 I 0 $0.00 - 1 ($15,885.60) 1 ($15,885.60) 100% 2 2526- 8285000 7018 (0390) Construction Survey 1 LS $9,900.00 - -- - -- - -- - -- - -- - -- -- - -- -- - -- - -- - -- 2 25994999005 7019 (0500) Intake Special, Single APP " -1 EA $4,280.00 -- - -- - -- - -_ - -- - -- -- 4 2511- 7526004 7020 (0300) Sidewalk, PCC, 4 Inch 4.62 SY $40.15 - -- - -- - -- -- - -_ - -- - -- -_ 4 2525 -0000100 7021 (0370) Traffic Signalization 1 LS $13,364.35 1 0 $0.00 1 $13,364.35 1 $13,364.35 100% 1 2599 - 9999010 8001- Temporary Pavement Added Costs 1 LS $1,052.10 1 0 $0.00 - 1 $1,052.10 1 $1,052.10 100% 2 2528 - 9290004 8002 - Changeable Message Signs, Portable 4 CDAY $75.00 6 0 $0.00 - - 6 $450.00 . - 6 $450.00 150% 2 2599 4999005 8003 -Lane Closure Installation 4 EACH $187.50 7 0 $0.00 7 $1,312.50 7 $1,312.50 175% 2 2599 - 9999005 8004 - Intake Single, As Per Plan 1 EACH $3,186.00 1 - 0 $0.00 1 $3,186.00 1 $3,186.00 100% 2 21024710080 8005 - Excavation Class 10, Unstable Material 25.9 CY $22.20 25.9 0 $0.00 25.9 $574.98 25.9 $574.98 100% 3 2599 - 9999010 8006 -Twin Valley Dr. Staging Extra Costs 1 LS $24,717.76 - 1 - 0 $0.00 1 $24,717.76 1 $24,717.76 100% 3 2599 - 9999010 8007 -Temp. Gran. Pavement Maintenance 1 LS $182.50 1 0 $0.00 1 $182.50 1 $182.50 100% 3 2599 - 9999005 8008 - Connect Conduit 2 EACH $200.00 2 0 $0.00 - 2 j $400.00 2 $400.00 100% 3 2599 4999010 8009 - Premium Pay for Overnight Traffic Signal Installation 1 LS $581.28 1 0 $0.00 - - 1 $581.28 1 $581.28 100% 4 2599 - 9999009 8010 - Conduit, Pushed, 4 Inch w/ 4 -1" Conduits 442 LF $25.40 482 0 $0.00 482 $12,242.80 482 $12,242.80 109% 4 2599 - 9999005 8011 -CD Baskets 48 EACH $5.70 48 0 $0.00 - 48 $273.60 48 $273.60 100% 4 21254225050 8012 - Reshaping Ditches 2.4 STA $600.00 2.4 0 $0.00 - _ 2.4 $1,440.00 2.4 $1 440.00 100% 4 2601 - 2640350 8013 - Special Ditch Control, Wood Excelsior Mat 66 SQ $50.00 66 0 $0.00 66 $3,300.00 66 $3,300.00 100% 4 5 2527- 9263190 2599 - 9999010 8014 - Symbols and Legends Removed 4 1 EACH $60.00 $9,595.30 4 0 $0.00 4 $240.00 4 $240.00 100% 8015- Advance Extended Range Sensor LS 1 - 0 $0.00 1 $9,595.30 1 $9,595.30 100% 6 6200- 5000081 8016 -(Price Adjust) Non - complying Traffic Control 1 LS - 8853.60 0 1 4853.60 1 4853.60 1 (8853.60) 100% uanhly Added Into Bld Items Above TOTAL CHANGE ORDER WORK TOTAL CONTRACT AND CHANGE ORDER WORK PERFORMED Less: Amount Retained Per Contract 3% Value of Stored Materials (See Attached List) Less: Stored Materials Amount Retained Per Contract 3% Net Amount Eamed to Date Less: Previous Amount Paid BALANCE DUE TO CONTRACTOR THIS PAYMENT TSCHIGGFRIE EXCAVATING, INC. ($853.60) Moo So.00 J. $19,645.03 1 $939,356.731 $0.00 I $46,420.71 1 f $55,593.91 1 $69,540.50 I $1,041,371.351 $0.00 $0.00 $0.00 $1,041,371.35 $1,010,956.65 I 830,414.70] CONTRACT PAYMENT NO. ECM IIW PROJECT NO: 10221-05 IDOT Project No.: STP -A- 061. 8(128) - -22-31 DETAILED ESTIMATE OF CHANGE ORDER WORK COMPLETED TO DATE - CONTINUED PAGE 5/5 CERTIFICATION OF CONTRACTOR: The undersigned contractor certifies that to the best of his knowledge, information and belief the work covered by thls Contract Payment has been completed In accordance with the Contract Documents for this project; that thls Contract Payment Is a true and correct statement of the amount of the work completed to the date of this Contract Payment and that the amounts paid to the contractor will be utilized by him to pay for labor, materials, equipment and subcontracts Involved In the performance of this contract CONTRACTOR' TSCHIGGFRIE E f'VATING, INC. BY: TITLE: C DATE: RECOMMENDATION OF ENGINEER: In accordance with the Contract Documents for this project, the undersigned Engineer recommends payment to the Contractor of the balance due this payment as shown. IIW ENGINEERS & SURVEYOR_S, P.C. BY: ;(.C�.. \- /I[�[y}[,� TITLE: Project Manager DATE: A� 0 Q ''3 Ife P. Neebel, P. APPROVAL OF OWN : CITY OF DUBUQUE BY: TITLE: / / �j�- (� ((/r ( C"3—Zr---- AMOUNT PAID DATE: 4 7t� cj7 7a Z — Z0-15 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: APPROVED: Michael Van Milli en, City Manager City of ue, Iowa Gus Psihoyos, City Engineer City of Dubuque, Iowa