Loading...
SEP Green Alley Permeable Pavers Project (Loras, Arlington, Prairie, Dell) InitiationMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager Dubuque kital All- America City II 111! 2012 SUBJECT: SEP Green Alley Permeable Pavers Project between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street (CIP 7102044, 7102411, 7101638, 7202044) DATE: February 26, 2013 City Engineer Gus Psihoyos recommends initiation of the public bidding procedure for the SEP Green Alley Permeable Pavers Project between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street, and further recommends that a public hearing be set for March 18, 2013. I concur with the recommendation and respectfully request Mayor and City Council approval. kr,„ 7)4, Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: February 25, 2013 RE: Dubuque Al-America Ci ly 11 1 1 r 2012 SEP Green Alley Permeable Pavers Project between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street (CIP 7102044, 7102411, 7101638, 7202044) INTRODUCTION The enclosed resolutions authorize the public bidding procedure for the SEP Green Alley Permeable Pavers Project — Between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street. BACKGROUND Section X of Case 2:11 -cv- 01001 -EJM, United States of America and the State of Iowa v. the City of Dubuque, IA (N.D. Iowa), Civil Action Number 2008V00041, DOJ Case Number 90 -5 -1 -1 -09339 requires the City of Dubuque (City) to implement a Supplemental Engineering Project (SEP), which has the objective of securing significant environmental or public health protection and improvements. Under the SEP, the City has agreed to reconstruct four (4) alleys using permeable interlocking pavers. The four (4) alleys must be completed by December 31, 2014. In July of 2011 a work plan was submitted to the EPA that included the alley between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street. Construction of permeable paver alleys will reduce the volume and peak flow of runoff to the Mississippi River while also reducing the pollutant load associated with stormwater runoff. DISCUSSION This project will involve the reconstruction of the alley between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street. The Project will involve reconstructing one alley that includes: — Removal of the existing alley pavement — Excavation of the subgrade to allow the placement of clean washed stone for a storage medium — Installation of a concrete border for the brick pavers — Installation of HMA headers and HMA pavement for a portion of the alley — Reconstruction of the pavement surface with interlocking concrete pavers — Replacement of the brick sanitary manholes in the alley with precast concrete manholes — Replacement of the 8" sanitary sewer main and related private services This project will reconstruct the alley into a green alley. After this project is complete all of the SEP green alleys will have been constructed. As provided in Paragraph 43 of the Consent Decree, any public statement, oral or written, in print, film, or other media, made by the City making reference to the SEP under the Consent Decree must include the following language: "This project is undertaken in connection with the settlement of an enforcement action, United States and State of Iowa v. City of Dubuque, Iowa, taken on behalf of the U.S. Environmental Protection Agency and the State of Iowa under the Clean Water Act." PROJECT SCHEDULE The schedule for the project is as follows: Initiate Public Bidding Process Publish Notice to Bidders, Advertise for Bids Publish Public Hearing Notice on Plans & Specs Public Hearing on Plans & Specs Receipt of Bid Proposals (Bid- Letting) Award Construction Contract Project Completion Date RECOMMENDATION March 4, 2013 March 8, 2013 March 8, 2013 March 18, 2013 March 21, 2013 April 1, 2013 June 28, 2013 I recommend that the City Council give preliminary approval to the construction plans and specifications and approve the Resolution of Necessity, establish March 18, 2013, as the date of the public hearing, and hereby authorize the City Clerk to advertise for bid proposals for the SEP Green Alley Permeable Pavers Project — Between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street. BUDGET IMPACT The estimate of probable cost for the SEP Green Alley Permeable Pavers Project — Between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street is as follows: 2 Estimate Construction Contract $ 178,702.00 Contingency 17,870.20 Construction Engineering & Inspection 19,657.22 Total Project Cost $216,229.42 The estimated project category costs are as follows: Cost Summary /Description Amount Alley Construction Improvements $ 115,878.07 Sanitary Sewer Improvements 99,419.65 Storm Sewer Improvements 931.70 Total Project Cost $ 216,229.42 The project funding summary is as follows: Fund CIP No. Fund Description Amount 7102411 Green Alley SEP Project $ 70,000.00 7102044 Green Alley Sanitary 69,000.00 7101638 Street Program Related Sanitary 41,229.42 7202044 Green Alley Storm 36,000.00 Total Project Funding $216,229.42 REQUESTED ACTION The City Council is requested to establish the date of the public hearing, and authorize the City Clerk to advertise for bid proposals through the adoption of the enclosed resolutions for the SEP Green Alley Permeable Pavers Project — Between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street. Prepared by Jon Dienst, PE cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Deron Muehring, Civil Engineer II Denise Ihrig, Environmental Engineer 3 RESOLUTION NO. 77-13 SEP GREEN ALLEY PERMEABLE PAVER PROJECT (Between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street.) PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND ORDERING THE ADVERTISEMENT FOR BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The proposed plans, specifications, form of contract and estimated cost for the SEP Green Alley Permeable Pavers Project — Between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street in the estimated amount $216,229.42, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. A public hearing will be held on the 18th day of March, 2013, at 6:30 p.m. in the Historic Federal Building Council Chambers at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. The SEP Green Alley Permeable Pavers Project — Loras Boulevard and Arlington Streets from Prairie Street to Dell Street is hereby ordered to be advertised for bids for construction. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. The City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the attached Notice to Bidders to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four but not more than forty -five days before the date for filing bids before 2:00 p.m. on the 21st day of March, 2013. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at 6:30 p.m. on the 1st day of April, 2013, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Attest: Passed, adopted and approved this 4th day of March W10'11 Kevin . irnstahl, CMC, y Clerk , 2013. Kevin/ J`Lync, Mayor Pro Tern NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE: SEP GREEN ALLEY PERMEABLE PAVERS PROJECT (BETWEEN Loras Boulevard and Arlington Streets from Prairie Street to Dell Street) NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the SEP Green Alley Permeable Pavers Project — Between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 18th day of March, 2013, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: Reconstruction of the alley between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street. - Removal of the existing alley pavement - Excavation of the subgrade to allow the placement of clean washed stone for a storage medium Installation of a concrete border for the brick pavers Installation of HMA headers and HMA pavement for a portion of the alley - Reconstruction of the pavement surface with interlocking concrete pavers - Replacement of the brick sanitary manholes in the alley with precast concrete manholes - Replacement of the 8" sanitary sewer main and related private services Any visual or hearing- impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589 -4120 or TDD at (563) 690 -6678 at least 48 hours prior to the meeting. "This project is undertaken in connection with the settlement of an enforcement action, United States and State of Iowa v. City of Dubuque, Iowa taken on behalf of the U.S. Environmental Protection Agency and the State of Iowa under the Clean Water Act." Published by order of the City Council given on the day of 2013. Kevin S. Firnstahl, CMC, City Clerk NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT SEP GREEN ALLEY PERMEABLE PAVERS PROJECT (Between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street) Time and Place for Filing Sealed Proposals. Sealed bids for the work comprising each improvement as stated below must be filed before 2:00 p.m. on the 21st day of March, 2013, in the Office of the City Clerk, City Hall - First Floor, 50 West 13th Street, Dubuque, Iowa. Time and Place Sealed Proposals Will be Opened and Considered. Sealed proposals will be opened and bids tabulated at 2:00 p.m. on 21st day of March, 2013, at City Hall - Conference Room C, 50 West 13th Street, Dubuque, Iowa, for consideration by the City Council (Council) at its meeting on the 1st day of April, 2013. The City of Dubuque, Iowa, reserves the right to reject any and all bids. Time for Commencement and Completion of Work. Work on each improvement shall be commenced within 10 days after the Notice to Proceed has been issued and shall be fully completed by 28th day of June, 2013. Bid Security. Each bidder shall accompany its bid with a bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bid security shall be in the amount of ten percent (10 %) of the amount of the contract and shall be in the form of a cashier's check or certified check drawn on a state - chartered or federally chartered bank, or a certified share draft drawn on a state - chartered or federally chartered credit union, or the governmental entity may provide for a bidder's bond with corporate surety satisfactory to the governmental entity. The bid bond shall contain no conditions excepted as provided in this section. Contract Documents. Copies of the construction documents may be obtained at the Engineering Department, City Hall — Second Floor, 50 West 13th Street, Dubuque, Iowa 52001. No plan deposit is required. Preference for Iowa Products and Labor. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. Sales Tax. The bidder should not include sales tax in its bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. General Nature of Public Improvement. SEP Green Alley Permeable Pavers Project — Between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street CIPs 7102044, 7102411, 7101638, 7202044 Reconstruction of the alley between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street — Removal of the existing alley pavement — Excavation of the subgrade to allow the placement of clean washed stone for a storage medium Installation of a concrete border for the brick pavers Installation of HMA headers and HMA pavement for a portion of the alley Reconstruction of the pavement surface with interlocking concrete pavers Replacement of the brick sanitary manholes in the alley with precast concrete manholes — Replacement of the 8" sanitary sewer main and related private services "This project is undertaken in connection with the settlement of an enforcement action, United States and State of Iowa v. City of Dubuque, Iowa taken on behalf of the U.S. Environmental Protection Agency and the State of Iowa under the Clean Water Act." Published in the Telegraph Herald, 8th day of March 2013