SEP Green Alley Permeable Pavers Project Award (Loras, Arlington, Prairie, Dell Streets)THE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager Dubuque kital All- America City II 111! 2012 SUBJECT: SEP Green Alley Permeable Pavers Project between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street (CIP 7102044, 7102411, 7101638, 7202044) DATE: March 26, 2013 Sealed bids were received for the SEP Green Alley Permeable Pavers Project between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street. City Engineer Gus Psihoyos recommends award of the contract to the low bidder, Portzen Construction, Inc., in the amount of $174,840, which is 2.07% under the estimate of probable cost. I concur with the recommendation and respectfully request Mayor and City Council approval. kr,„709,,, Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: March 25, 2013 RE: Dubuque knerd AI4 tcacny 2012 SEP Green Alley Permeable Pavers Project between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street (CIP 7102044, 7102411, 7101638, 7202044) INTRODUCTION The enclosed resolution authorizes the award of the construction contract for the SEP Green Alley Permeable Pavers Project - Between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street. DISCUSSION This project will involve the reconstruction of the alley between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street. The Project will involve reconstructing one alley that includes: - Removal of the existing alley pavement - Excavation of the subgrade to allow the placement of clean washed stone for a storage medium - Installation of a concrete border for the interlocking concrete pavers - Installation of HMA headers and HMA pavement for a portion of the alley - Reconstruction of the pavement surface with interlocking concrete pavers - Replacement of the brick sanitary manholes in the alley with precast concrete manholes - Replacement of the 8" sanitary sewer main and related private services The alley will be constructed using HMA pavement on the steep section of the alley. The installation of interlocking concrete pavers in this area would be of little benefit, since water would pass over the pavers. The section with mild slopes will have pavers in the center to infiltrate the water. This infiltration will improve water quality and reduce runoff. The Engineering Department has reviewed the Dell Street profile to see if any adjustments can be made for the steepness of the grade. Staff has determined changes cannot be made due to the presence of existing structures. This project will reconstruct the alley into a green alley. After this project is complete all of the SEP green alleys will have been constructed. As provided in Paragraph 43 of the Consent Decree, any public statement, oral or written, in print, film, or other media, made by the City making reference to the SEP under the Consent Decree must include the following language: "This project is undertaken in connection with the settlement of an enforcement action, United States and State of Iowa v. City of Dubuque, Iowa, taken on behalf of the U.S. Environmental Protection Agency and the State of Iowa under the Clean Water Act." BID RESULTS Sealed bids were received on the project on March 21, 2013. Portzen Construction, Inc. of Dubuque, Iowa, submitted the low bid in the amount of $174,840.00. This amount is 2.07% under the estimate of probable cost. A summary of the bid proposals received is as follows: Contractor Name Total Bid Portzen Construction Inc. $174,840.00 Tschiggfrie Excavating Co. $244,645.60 McDermott Excavating $259,041.83 Connolly Construction Inc. $298,589.82 RECOMMENDATION I recommend that the contract for the SEP Green Alley Permeable Pavers Project between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street be awarded to Portzen Construction, Inc. in the amount of $174,840.00. BUDGET IMPACT The estimate of probable cost for the SEP Green Alley Permeable Pavers Project — Between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street is as follows: Estimate Award Construction Contract $178,702.00 $174,840.00 2 Contingency 17,870.20 17,870.20 Construction Engineering & Inspection 19,657.22 19,657.22 Total Project Cost $216,229.42 $212,367.42 The project funding summary is as follows: Fund CIP No. Fund Description Amount 7102411 Green Alley SEP Project $ 70,000.00 7102044 Green Alley Sanitary 69,000.00 7101638 Street Program Related Sanitary 37,367.42 7202044 Green Alley Storm 36,000.00 Total Project Funding $212,367.42 REQUESTED ACTION I recommend that the City Council adopt the attached resolution awarding the SEP Green Alley Permeable Pavers Project — Between Loras Boulevard and Arlington Streets from Prairie Street to Dell Street to Portzen, Construction, Inc. in the amount of $174,840.00. Prepared by Jon Dienst, PE cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Deron Muehring, Civil Engineer II Denise Ihrig, Environmental Engineer 3 RESOLUTION NO. 100 -13 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE SEP GREEN ALLEY PERMEABLE PAVERS PROJECT BETWEEN LORAS BOULEVARD AND ARLINGTON STREETS FROM PRAIRIE STREET TO DELL STREET Whereas, sealed proposals have been submitted by contractors for the SEP Green Alley Permeable Pavers Project between Loras Boulevard and Arlington Streets .from Prairie Street to Dell Street (the Project) pursuant to Resolution No. 77 -13 and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 8th day of March, 2013, and Whereas, said sealed proposals were opened and read on the 21st day of March, 2013 and it has been determined that Portzen Construction, Inc. of Dubuque, Iowa with a bid proposal in the amount of $174,840.00, is the responsive, responsible bidder for the Project, and Whereas, it has been determined that it is in the best interest of the City of Dubuque to enter into an improvement contract with Portzen Construction, Inc. for said Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Portzen Construction, Inc. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 1st day of April , 2013. Attest: Kevin : Firnstahl, CM '5.r� y Clerk Roy D. Buol, Mayor CITY OF DUBUQUE - ENGINEERING DIVISION - BID TABULATION SHEET BID TABULATION FOR: Prairie St. to Dell St. (Arlington & Loras) SEP ALLEY PROJEC BID DATE: March 21, 2013 BIDDER: Portzen Construction Inc. BID ITEM DESCRIPTION BASE BID: UNIT ESTIMATE QUANTITY ESTIMATE UNIT COST ESTIMATE COST UNIT COST TOTAL COST EXCAVATION & STONE 1 Remove Pavement ( Regardless of Material Type) SY 1,000 $ 4.50 $ 4,500.00 $2.50 $2,500.00 2 Remove Existing Manhole Each 6 $ 600.00 $ 3,600.00 $350.00 $2,100.00 3 Excavation, Unclassified CY 330 $ 11.00 $ 3,630.00 $18.00 $5,940.00 4 Excavation, Investigation for Bedrock (Pot Holing) Each 1 $ 400.00 $ 400.00 $500.00 $500.00 5 Excavation,(For HPDE Liner Placement Along Retaining Wall) CY 120 $ 11.00 $ 1,320.00 $12.00 $1,440.00 6 Rock Excavation, (if needed) CY 10 $ 100.00 $ 1,000.00 $50.00 $500.00 7 Select Backfill Ton 2,000 $ 14.00 $ 28,000.00 $7.20 $14,400.00 8 Bedding and Void Opening Aggregates (ASTM #8 Washed stone) Ton 20 $ 20.00 $ 400.00 $21.00 $420.00 9 Porous Aggregate (ASTM #57 washed stone) Ton 280 $ 21.00 $ 5,880.00 $19.00 $5,320.00 10 Porous Aggregate (ASTM #2 washed stone) Ton 460 $ 28.00 $ 12,880.00 $25.00 $11,500.00 11 Backfill, Topsoil SY 160 $ 7.00 $ 1,120.00 $6.00 $960.00 12 Existing Curb & Gutter Removal (as indicated /approved by City Engineer LF 110 $ 7.00 $ 770.00 $3.50 $385.00 13 Subbase Granular Material (6" Thick) Ton 290 $ 17.00 $ 4,930.00 $13.00 $3,770.00 PAVEMENT 14 PCC Concrete Collar - Standard Concrete SY 133 $ 60.00 $ 7,980.00 $55.00 $7,315.00 15 Permeable Concrete Block Pavers SF 1092 $ 6.00 $ 6,552.00 $5.00 $5,460.00 16 PCC Concrete Pavement (7 "), Remove & Install SY 84 $ 35.00 $ 2,940.00 $50.00 $4,200.00 17 HMA 300k Headers & Streets, 112" (PG 64 -22) Ton 220 $ 110.00 $ 24,200.00 $95.00 $20,900.00 18 HMA 300k Driveways, 1/2" (PG 64 -22) Ton 25 $ 110.00 $ 2,750.00 $104.00 $2,600.00 19 PC Concrete Sidewalk, 4 ", Remove & Construct SF 70 $ 6.00 $ 420.00 $5.50 $385.00 20 PC Concrete Sidewalk, 6 ", Remove & Construct SF 150 $ 7.00 $ 1,050.00 $6.00 $900.00 21 PC Concrete Curb, 2.5', Construct LF 110 $ 20.00 $ 2,200.00 $25.00 $2,750.00 22 Geotechnical Fabric SY 540 $ 3.00 $ 1,620.00 $2.50 $1,350.00 23 PC Concrete Access Ramp, Detectable Each 2 $ 100.00 $ 200.00 $250.00 $500.00 SANITARY SEWER 24 8" SDR -26, PVC Pipe w./Bedding LF 560 $ 50.00 $ 28,000.00 25 48" Diameter Manhole Base Each 4 $ 1,000.00 $ 4,000.00 26 48" Diameter Manhole Sidewall VF 40 $ 150.00 $ 6,000.00 $50.00 $1,000.00 $125.00 $28,000.00 $4,000.00 $5,000.00 27 4" PVC Lateral w/Bedding LF 120 $ 25.00 $ 3,000.00 28 6" PVC Lateral w/Bedding LF 20 $ 30.00 $ 600.00 29 8" x 4" PVC Wye Each 11 $ 200.00 $ 2,200.00 30 8" x 6" PVC Wye Each 1 $ 240.00 $ 240.00 31 Manhole Frame & Cover (includes internal chimmey seals) Each 4 $ 500.00 $ 2,000.00 32 Fixture Adjustment, Valves & Manholes Each 2 $ 175.00 $ 350.00 $35.00 $40.00 $125.00 $150.00 $750.00 $300.00 $4,200.00 $800.00 $1,375.00 $150.00 $3,000.00 $600.00 MISCELLANEOUS 33 Sawcut, (Regardkess of Pavement Type) LF 200 $ 3.00 $ 600.00 34 HPDE Liner Weir (approximately 11 ea (8' x 4')) SY 40 $ 30.00 $ 1,200.00 35 HPDE Liner Along Retaing Wall SY 140 $ 30.00 $ 4,200.00 36 Sod SY 160 $ 10.00 $ 1,600.00 37 Dust Control Surface Treatment MGAL 13.00 $ 15.00 $ 195.00 38 Erosion Control Plan - Operating Procedures LS 1.00 $ 1,000.00 $ 1,000.00 39 Traffic Control & Safety Control LS 1.00 $ 1,000.00 $ 1,000.00 40 Mobilization LS 1.00 $ 4,000.00 $ 4,000.00 Bid Sub -Total Contingency (10 %) Construction Engineering & Inspection (15 %) Total Construction Estimate: $ 178,527.00 $17,852.70 $29,456.96 $ 225,836.66 $4.00 $26.00 $14.00 $11.00 $20.00 $2,500.00 $1,500.00 $21,800.00 Bid Sub Total $800.00 $1,040.00 $1,960.00 $1,760.00 $260.00 $2,500.00 $1,500.00 $21,800.00 $174,840.00 $ 174,840.00 % Under /Over -2.07% CITY OF DUBUQUE - ENGINEERING DIVISION - BID TABULATION SHEET BID TABULATION FOR: Prairie St. to Dell St. (Arlington & Loras) SEP ALLEY PROJEC BID DATE: March 21, 2013 BID ITEM DESCRIPTION BASE BID: UNIT ESTIMATE QUANTITY ESTIMATE UNIT COST BIDDER: Tschiggfrie Excavating Co. ESTIMATE COST UNIT COST TOTAL COST EXCAVATION & STONE 1 Remove Pavement ( Regardless of Material Type) SY 1,000 $ 4.50 $ 4,500.00 $8.55 $8,550.00 2 Remove Existing Manhole Each 6 $ 600.00 $ 3,600.00 $465.00 $2,790.00 3 Excavation, Unclassified CY 330 $ 11.00 $ 3,630.00 $11.65 $3,844.50 4 Excavation, Investigation for Bedrock (Pot Holing) Each 1 $ 400.00 $ 400.00 $916.00 $916.00 5 Excavation,(For HPDE Liner Placement Along Retaining Wall) CY 120 $ 11.00 $ 1,320.00 $30.35 $3,642.00 6 Rock Excavation, (if needed) CY 10 $ 100.00 $ 1,000.00 $42.00 $420.00 7 Select Backfill Ton 2,000 $ 14.00 $ 28,000.00 $16.30 $32,600.00 8 Bedding and Void Opening Aggregates (ASTM #8 Washed stone) Ton 20 $ 20.00 $ 400.00 $20.15 $403.00 9 Porous Aggregate (ASTM #57 washed stone) Ton 280 $ 21.00 $ 5,880.00 $23.75 $6,650.00 10 Porous Aggregate (ASTM #2 washed stone) Ton 460 $ 28.00 $ 12,880.00 $27.15 $12,489.00 11 Backfill, Topsoil SY 160 $ 7.00 $ 1,120.00 $6.00 $960.00 12 Existing Curb & Gutter Removal (as indicated /approved by City Engineer LF 110 $ 7.00 $ 770.00 $4.20 $462.00 13 Subbase Granular Material (6" Thick) Ton 290 $ 17.00 $ 4,930.00 $20.45 $5,930.50 PAVEMENT 14 PCC Concrete Collar - Standard Concrete SY 133 $ 60.00 $ 7,980.00 $52.00 $6,916.00 15 Permeable Concrete Block Pavers SF 1092 $ 6.00 $ 6,552.00 $4.55 $4,968.60 16 PCC Concrete Pavement (7 "), Remove & Install SY 84 $ 35.00 $ 2,940.00 $51.00 $4,284.00 17 HMA 300k Headers & Streets, 112" (PG 64 -22) Ton 220 $ 110.00 $ 24,200.00 $110.00 $24,200.00 18 HMA 300k Driveways, 1/2" (PG 64 -22) Ton 25 $ 110.00 $ 2,750.00 $133.00 $3,325.00 19 PC Concrete Sidewalk, 4 ", Remove & Construct SF 70 $ 6.00 $ 420.00 $9.90 $693.00 20 PC Concrete Sidewalk, 6 ", Remove & Construct SF 150 $ 7.00 $ 1,050.00 $10.00 $1,500.00 21 PC Concrete Curb, 2.5', Construct LF 110 $ 20.00 $ 2,200.00 $28.00 $3,080.00 22 Geotechnical Fabric SY 540 $ 3.00 $ 1,620.00 $3.65 $1,971.00 23 PC Concrete Access Ramp, Detectable Each 2 $ 100.00 $ 200.00 $308.00 $616.00 SANITARY SEWER 24 8" SDR -26, PVC Pipe w./Bedding LF 560 $ 50.00 $ 28,000.00 $72.35 $40,516.00 25 48" Diameter Manhole Base Each 4 $ 1,000.00 $ 4,000.00 $786.00 $3,144.00 26 48" Diameter Manhole Sidewall VF 40 $ 150.00 $ 6,000.00 $253.00 $10,120.00 27 4" PVC Lateral w/Bedding LF 120 $ 25.00 $ 3,000.00 $46.75 $5,610.00 28 6" PVC Lateral w/Bedding LF 20 $ 30.00 $ 600.00 $47.70 $954.00 29 8" x 4" PVC Wye Each 11 $ 200.00 $ 2,200.00 $337.00 $3,707.00 30 8" x 6" PVC Wye Each 1 $ 240.00 $ 240.00 $385.00 $385.00 31 Manhole Frame & Cover (includes internal chimmey seals) Each 4 $ 500.00 $ 2,000.00 $797.00 $3,188.00 32 Fixture Adjustment, Valves & Manholes Each 2 $ 175.00 $ 350.00 $410.00 $820.00 MISCELLANEOUS 33 Sawcut, (Regardkess of Pavement Type) LF 200 $ 3.00 $ 600.00 $4.15 $830.00 34 HPDE Liner Weir (approximately 11 ea (8' x 4')) SY 40 $ 30.00 $ 1,200.00 $22.00 $880.00 35 HPDE Liner Along Retaing Wall SY 140 $ 30.00 $ 4,200.00 $15.80 $2,212.00 36 Sod SY 160 $ 10.00 $ 1,600.00 $9.90 $1,584.00 37 Dust Control Surface Treatment MGAL 13.00 $ 15.00 $ 195.00 $77.00 $1,001.00 38 Erosion Control Plan - Operating Procedures LS 1.00 $ 1,000.00 $ 1,000.00 $1,866.00 $1,866.00 39 Traffic Control & Safety Control LS 1.00 $ 1,000.00 $ 1,000.00 $1,400.00 $1,400.00 40 Mobilization LS 1.00 $ 4,000.00 $ 4,000.00 $35,218.00 $35,218.00 Bid Sub -Total Contingency (10 %) Construction Engineering & Inspection (15 %) Total Construction Estimate: $ 178,527.00 $17,852.70 $29,456.96 $ 225,836.66 Bid Sub -Total $244,645.60 $ 244,645.60 % Under /Over 37.04% CITY OF DUBUQUE - ENGINEERING DIVISION - BID TABULATION SHEET BID TABULATION FOR: Prairie St. to Dell St. (Arlington & Loras) SEP ALLEY PROJEC BID DATE: March 21, 2013 BID ITEM DESCRIPTION BASE BID: UNIT ESTIMATE QUANTITY ESTIMATE UNIT COST BIDDER: McDermott Excavating ESTIMATE COST UNIT COST TOTAL COST EXCAVATION & STONE 1 Remove Pavement ( Regardless of Material Type) SY 1,000 $ 4.50 $ 4,500.00 $7.75 $7,750.00 2 Remove Existing Manhole Each 6 $ 600.00 $ 3,600.00 $900.00 $5,400.00 3 Excavation, Unclassified CY 330 $ 11.00 $ 3,630.00 $13.50 $4,455.00 4 Excavation, Investigation for Bedrock (Pot Holing) Each 1 $ 400.00 $ 400.00 $1,000.00 $1,000.00 5 Excavation,(For HPDE Liner Placement Along Retaining Wall) CY 120 $ 11.00 $ 1,320.00 $36.00 $4,320.00 6 Rock Excavation, (if needed) CY 10 $ 100.00 $ 1,000.00 $90.00 $900.00 7 Select Backfill Ton 2,000 $ 14.00 $ 28,000.00 $18.00 $36,000.00 8 Bedding and Void Opening Aggregates (ASTM #8 Washed stone) Ton 20 $ 20.00 $ 400.00 $23.50 $470.00 9 Porous Aggregate (ASTM #57 washed stone) Ton 280 $ 21.00 $ 5,880.00 $25.00 $7,000.00 10 Porous Aggregate (ASTM #2 washed stone) Ton 460 $ 28.00 $ 12,880.00 $28.50 $13,110.00 11 Backfill, Topsoil SY 160 $ 7.00 $ 1,120.00 $5.00 $800.00 12 Existing Curb & Gutter Removal (as indicated /approved by City Engineer LF 110 $ 7.00 $ 770.00 $6.00 $660.00 13 Subbase Granular Material (6" Thick) Ton 290 $ 17.00 $ 4,930.00 $22.25 $6,452.50 PAVEMENT 14 PCC Concrete Collar - Standard Concrete SY 133 $ 60.00 $ 7,980.00 $52.73 $7,013.09 15 Permeable Concrete Block Pavers SF 1092 $ 6.00 $ 6,552.00 $4.97 $5,427.24 16 PCC Concrete Pavement (7 "), Remove & Install SY 84 $ 35.00 $ 2,940.00 $52.50 $4,410.00 17 HMA 300k Headers & Streets, 112" (PG 64 -22) Ton 220 $ 110.00 $ 24,200.00 $115.00 $25,300.00 18 HMA 300k Driveways, 112" (PG 64 -22) Ton 25 $ 110.00 $ 2,750.00 $115.00 $2,875.00 19 PC Concrete Sidewalk, 4 ", Remove & Construct SF 70 $ 6.00 $ 420.00 $11.00 $770.00 20 PC Concrete Sidewalk, 6 ", Remove & Construct SF 150 $ 7.00 $ 1,050.00 $12.60 $1,890.00 21 PC Concrete Curb, 2.5', Construct LF 110 $ 20.00 $ 2,200.00 $24.00 $2,640.00 22 Geotechnical Fabric SY 540 $ 3.00 $ 1,620.00 $3.25 $1,755.00 23 PC Concrete Access Ramp, Detectable Each 2 $ 100.00 $ 200.00 $500.00 $1,000.00 SANITARY SEWER 24 8" SDR -26, PVC Pipe w./Bedding LF 560 $ 50.00 $ 28,000.00 $87.75 $49,140.00 25 48" Diameter Manhole Base Each 4 $ 1,000.00 $ 4,000.00 $750.00 $3,000.00 26 48" Diameter Manhole Sidewall VF 40 $ 150.00 $ 6,000.00 $228.00 $9,120.00 27 4" PVC Lateral w/Bedding LF 120 $ 25.00 $ 3,000.00 $67.00 $8,040.00 28 6" PVC Lateral w/Bedding LF 20 $ 30.00 $ 600.00 $70.00 $1,400.00 29 8" x 4" PVC Wye Each 11 $ 200.00 $ 2,200.00 $310.00 $3,410.00 30 8" x 6" PVC Wye Each 1 $ 240.00 $ 240.00 $340.00 $340.00 31 Manhole Frame & Cover (includes internal chimmey seals) Each 4 $ 500.00 $ 2,000.00 $750.00 $3,000.00 32 Fixture Adjustment, Valves & Manholes Each 2 $ 175.00 $ 350.00 $600.00 $1,200.00 MISCELLANEOUS 33 Sawcut, (Regardkess of Pavement Type) LF 200 $ 3.00 $ 600.00 $4.00 $800.00 34 HPDE Liner Weir (approximately 11 ea (8' x 4')) SY 40 $ 30.00 $ 1,200.00 $39.00 $1,560.00 35 HPDE Liner Along Retaing Wall SY 140 $ 30.00 $ 4,200.00 $20.00 $2,800.00 36 Sod SY 160 $ 10.00 $ 1,600.00 $11.25 $1,800.00 37 Dust Control Surface Treatment MGAL 13.00 $ 15.00 $ 195.00 $68.00 $884.00 38 Erosion Control Plan - Operating Procedures LS 1.00 $ 1,000.00 $ 1,000.00 $2,400.00 $2,400.00 39 Traffic Control & Safety Control LS 1.00 $ 1,000.00 $ 1,000.00 $2,000.00 $2,000.00 40 Mobilization LS 1.00 $ 4,000.00 $ 4,000.00 $26,750.00 $26,750.00 Bid Sub -Total Contingency (10 %) Construction Engineering & Inspection (15 %) Total Construction Estimate: $ 178,527.00 $17,852.70 $29,456.96 $ 225,836.66 Bid Sub -Total $259,041.83 $ 259,041.83 % Under /Over 45.10% CITY OF DUBUQUE - ENGINEERING DIVISION - BID TABULATION SHEET BID TABULATION FOR: Prairie St. to Dell St. (Arlington & Loras) SEP ALLEY PROJEC BID DATE: March 21, 2013 BID ITEM DESCRIPTION BASE BID: UNIT ESTIMATE QUANTITY ESTIMATE UNIT COST BIDDER: Connolly Construction Inc. ESTIMATE COST UNIT COST TOTAL COST EXCAVATION & STONE 1 Remove Pavement ( Regardless of Material Type) SY 1,000 $ 4.50 $ 4,500.00 $11.75 $11,750.00 2 Remove Existing Manhole Each 6 $ 600.00 $ 3,600.00 $1,595.00 $9,570.00 3 Excavation, Unclassified CY 330 $ 11.00 $ 3,630.00 $34.05 $11,236.50 4 Excavation, Investigation for Bedrock (Pot Holing) Each 1 $ 400.00 $ 400.00 $1,730.00 $1,730.00 5 Excavation,(For HPDE Liner Placement Along Retaining Wall) CY 120 $ 11.00 $ 1,320.00 $55.50 $6,660.00 6 Rock Excavation, (if needed) CY 10 $ 100.00 $ 1,000.00 $89.00 $890.00 7 Select Backfill Ton 2,000 $ 14.00 $ 28,000.00 $13.85 $27,700.00 8 Bedding and Void Opening Aggregates (ASTM #8 Washed stone) Ton 20 $ 20.00 $ 400.00 $28.45 $569.00 9 Porous Aggregate (ASTM #57 washed stone) Ton 280 $ 21.00 $ 5,880.00 $33.80 $9,464.00 10 Porous Aggregate (ASTM #2 washed stone) Ton 460 $ 28.00 $ 12,880.00 $44.50 $20,470.00 11 Backfill, Topsoil SY 160 $ 7.00 $ 1,120.00 $35.50 $5,680.00 12 Existing Curb & Gutter Removal (as indicated /approved by City Engineer LF 110 $ 7.00 $ 770.00 $10.15 $1,116.50 13 Subbase Granular Material (6" Thick) Ton 290 $ 17.00 $ 4,930.00 $22.90 $6,641.00 PAVEMENT 14 PCC Concrete Collar - Standard Concrete SY 133 $ 60.00 $ 7,980.00 $58.04 $7,719.32 15 Permeable Concrete Block Pavers SF 1092 $ 6.00 $ 6,552.00 $9.00 $9,828.00 16 PCC Concrete Pavement (7 "), Remove & Install SY 84 $ 35.00 $ 2,940.00 $75.00 $6,300.00 17 HMA 300k Headers & Streets, 112" (PG 64 -22) Ton 220 $ 110.00 $ 24,200.00 $110.50 $24,310.00 18 HMA 300k Driveways, 112" (PG 64 -22) Ton 25 $ 110.00 $ 2,750.00 $119.50 $2,987.50 19 PC Concrete Sidewalk, 4 ", Remove & Construct SF 70 $ 6.00 $ 420.00 $15.00 $1,050.00 20 PC Concrete Sidewalk, 6 ", Remove & Construct SF 150 $ 7.00 $ 1,050.00 $23.50 $3,525.00 21 PC Concrete Curb, 2.5', Construct LF 110 $ 20.00 $ 2,200.00 $27.00 $2,970.00 22 Geotechnical Fabric SY 540 $ 3.00 $ 1,620.00 $8.00 $4,320.00 23 PC Concrete Access Ramp, Detectable Each 2 $ 100.00 $ 200.00 $119.00 $238.00 SANITARY SEWER 24 8" SDR -26, PVC Pipe w./Bedding LF 560 $ 50.00 $ 28,000.00 $110.00 $61,600.00 25 48" Diameter Manhole Base Each 4 $ 1,000.00 $ 4,000.00 $635.00 $2,540.00 26 48" Diameter Manhole Sidewall VF 40 $ 150.00 $ 6,000.00 $180.00 $7,200.00 27 4" PVC Lateral w/Bedding LF 120 $ 25.00 $ 3,000.00 $36.00 $4,320.00 28 6" PVC Lateral w/Bedding LF 20 $ 30.00 $ 600.00 $35.00 $700.00 29 8" x 4" PVC Wye Each 11 $ 200.00 $ 2,200.00 $380.00 $4,180.00 30 8" x 6" PVC Wye Each 1 $ 240.00 $ 240.00 $410.00 $410.00 31 Manhole Frame & Cover (includes internal chimmey seals) Each 4 $ 500.00 $ 2,000.00 $940.00 $3,760.00 32 Fixture Adjustment, Valves & Manholes Each 2 $ 175.00 $ 350.00 $590.00 $1,180.00 MISCELLANEOUS 33 Sawcut, (Regardkess of Pavement Type) LF 200 $ 3.00 $ 600.00 $4.60 $920.00 34 HPDE Liner Weir (approximately 11 ea (8' x 4')) SY 40 $ 30.00 $ 1,200.00 $57.00 $2,280.00 35 HPDE Liner Along Retaing Wall SY 140 $ 30.00 $ 4,200.00 $41.00 $5,740.00 36 Sod SY 160 $ 10.00 $ 1,600.00 $16.20 $2,592.00 37 Dust Control Surface Treatment MGAL 13.00 $ 15.00 $ 195.00 $166.00 $2,158.00 38 Erosion Control Plan - Operating Procedures LS 1.00 $ 1,000.00 $ 1,000.00 $2,775.00 $2,775.00 39 Traffic Control & Safety Control LS 1.00 $ 1,000.00 $ 1,000.00 $2,060.00 $2,060.00 40 Mobilization LS 1.00 $ 4,000.00 $ 4,000.00 $17,450.00 $17,450.00 Bid Sub -Total Contingency (10 %) Construction Engineering & Inspection (15 %) Total Construction Estimate: $ 178,527.00 $17,852.70 $29,456.96 $ 225,836.66 Bid Sub -Total $298,589.82 $ 298,589.82 % Under /Over 67.25% nril fib NO '?` 1" Jaen LORAS BLVD 7 -, r-; T TT :MI r111 mrffin _felt it1-1 *am era NOTES. 1. ANY AREAS DISTURBED OUTSIDE OF THE CONSTRUCTION LIMITS WILL BE THE CONTRACTORS RESPONSIBILITY. 2. PLACE EXPANSION JOINT MATERIAL AT JOINT BETWEEN CONCRETE COLLAR AND DRIVEWAY CONCRETE PAD. 1. HMA (ASPHALT) PAVEMENT 2. CONCRETE COLLAR AND PERMEABLE PAVERS PAVEMENT 0 10' 20' 40' SCALE 1" = 20' FEET DESIGN TEAM: JWD - MJK CITY OF DUBUQUE - ENGINEERING DEPT I DUBUQUE COUNTY I PROJECT NUMBER: 7102411 SEP Alley Project (17th to 18th) - HMA / Pemeable Pavers Plan SHEET: 15 of 32 I REV.