City Engineer Gus Psihoyos is recommending acceptance of the construction contract
for the Bee Branch Phase !Completion — 15th Street Project, as completed by
McDermott Excavating, in the final contract amount of $86,268.17, which is 4.8% below
the original contract amount of $90,612.90.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
btitt44 kr,„709,,,
Michael C. Van Milligen
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Teri Goodmann, Assistant City Manager
Gus Psihoyos, City Engineer
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
SUBJECT: Bee Branch Phase I Completion — 15th Street Project
DATE: April 26, 2013
INTRODUCTION
The enclosed resolution provides for the acceptance of the construction contract for Bee
Branch Phase I Completion — 15th Street Project.
BACKGROUND
The Bee Branch - Phase I Completion — 15th Street Project provided for the completion
of Phase I of the Bee Branch Creek Restoration Project. Due to design changes in the
channel between the basin and the 16th Street Bridge more properties were acquired
along 15th Street changing the scope of the project. This work was done under a
separate contract because the acquisitions required more time than the original contract
completion date allowed.
Dubuque
bierd
NI- America Cly
'1 If
2012
In accordance with Iowa Code § 384.103 and § 364.12(3)(c), and Iowa Code, Section
26.14, on August 28, 2012 the City solicited informal bids for the Bee Branch Phase I
Completion — 15th Street Project. McDermott Excavating of Dubuque, Iowa, submitted
the low bid in the amount of $90,612.90.
The project included: the removal of a portion of Maple Street, removal of a parking lot,
water main abandonment, the construction of stormwater intakes, 346 feet of curb and
gutter, 1,425 square feet of PCC sidewalk, street patching, finish excavation of slopes
and the surrounding area, placement of decorative stones, placement of topsoil, and the
seeding of all areas to match the rest of Phase I.
DISCUSSION
The Bee Branch Phase I Completion — 15th Street Project was completed by McDermott
Excavating of Dubuque, Iowa, in the final contract amount of $86,268.17. This is 4.8%
below the original contract amount of $90,612.90.
RECOMMENDATION
I recommend that the City Council accept the improvements and authorize payment of
the contract amount of $86,268.17 to McDermott Excavating for the Bee Branch Phase 1
Completion — 15th Street Project.
BUDGET IMPACT
The cost summary for the Bee Branch Phase !Completion — 15th Street Project is as
follows:
The project funding summary is as follows:
CIP
Award
Final
Construction Contract
$90,612.90
$86,268.17
Contingency & Engineering
24,012.42
0.00
Total Project Cost
$114,625.32
$86,268.17
The project funding summary is as follows:
CIP
Fund Description
Fund Amount
7201654
Bee Branch Creek Restoration
$86,268.17
Total Project Funding
$86,268.17
ACTION TO BE TAKEN
1 respectfully request that the City Council adopt the attached resolution accepting the
improvements and authorizing payment of the contract amount of $86,268.17 to
McDermott Excavating for the Bee Branch Phase I Completion — 15th Street Project.
cc: Jenny Larson, Budget Director
Deron Muehring, Civil Engineer
Tom Freund, Engineering Technician
RESOLUTION NO, 132 -13
ACCEPTING THE BEE BRANCH PHASE I COMPLETION — 15TH STREET PROJECT
AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE
CONTRACTOR
Whereas, the Public Improvement Contract for the Bee Branch Phase I
Completion — 15th Street Project (the Project) has been completed and the City
Engineer has examined the work and filed a certificate stating that the Project has been
completed according to the terms of the Public Improvement Contract and that the City
Engineer recommends that the Project be accepted; and
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved and the Project
is hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor from
the Bee Branch Restoration Project capital improvement appropriation for the contract
amount of $86,268.17 less any retained percentage provided for therein as provided in
Iowa Code chapter 573, and to pay such retainage only in accordance with the
provisions of Iowa Code chapter 573.
Attest:
Passed, approved and adopted this 6th day of
K= in S. Firnsta I, CM City Clerk
May , 2013.
Roy D. Buol, Mayor
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE BEE BRANCH
PHASE I COMPLETION — 15TH STREET PROJECT
The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that
he has inspected the Bee Branch Phase I Completion — 15th Street Project, and that
said Project has been performed in compliance with the terms of the Public
Improvement Contract, and that the total cost of the completed work is $86,268.17.
Dated thiso‘/- day of ,.�%. 2013.
Gus Psihoyos, City Engin
Filed in the office of the City Clerk on thee%99' day of , 2013.
Ke in S. Firnstahl, CMC y Clerk
er
Masterpiece on the Mississippi
CONTRACTOR'S PAYMENT FORM
Project Name:
CIP Number:
Project Contract Amount:
Project Completion Date:
BEE BRANCH - PHASE I COMPLETION - 15TH STREET
CONTRACT ITEM
QUANTITY UNIT UNIT PRICE
CIP: 7201654
$90,612.90
28- Sep -12
Contractor Name:
Contractor Address:
City, State, Zip:
Contractor Telephone:
McDermott Excavating
CONTRACT ITEM
QUANTITY UNIT UNIT PRICE
14407 US 20 West
CURRENT PAYMENT
QUANTITY TOTAL
Dubuque, Iowa 52003
'
563 -583 -4633
Traffic Control and Project Safety
Miscellaneous Pavement Removals / Tree & Stump Removals
Abandon Existing Intakes
Unclassified Excavation
Water Main, Remove 8" Tee, Complete
Intake 101 -B, Complete
Limestone Backfill
3/4" Base
30" Curb & Gutter, Remove & Replace
HMA Street Patch
4" PCC Sidewalk
Curb Ramp, Truncated Domes
Amended Topsoil
Seeded Turf
Seeded Short Grass Prairie
2 Ton Random Limestone Block (Salvaged on Site)
Medium Revetment w /Geotextile
CONTRACT PAYMENT NO. 2 - RETAINAGE
CURRENT PAY PERIOD: 12- Oct -12
City of Dubuque
Engineering
50. W. 13th Street
Dubuque, IA 52001
(563) 589 -4270
11- Apr -13
ITEM
NO.
CONTRACT ITEM
DESCRIPTION
CONTRACT ITEM
QUANTITY UNIT UNIT PRICE
PREVIOUS PAYMENT
QUANTITY TOTAL
CURRENT PAYMENT
QUANTITY TOTAL
TOTAL TO DATE
QUANTITY TOTAL
PERCENT
COMPLETE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Traffic Control and Project Safety
Miscellaneous Pavement Removals / Tree & Stump Removals
Abandon Existing Intakes
Unclassified Excavation
Water Main, Remove 8" Tee, Complete
Intake 101 -B, Complete
Limestone Backfill
3/4" Base
30" Curb & Gutter, Remove & Replace
HMA Street Patch
4" PCC Sidewalk
Curb Ramp, Truncated Domes
Amended Topsoil
Seeded Turf
Seeded Short Grass Prairie
2 Ton Random Limestone Block (Salvaged on Site)
Medium Revetment w /Geotextile
1
1
2
1
1
2.5
30
195
375
100
1500
8
1030
3700
1250
40
60
LS
LS
Ea
LS
LS
Ea
Tons
Tons
LF
Tons
SF
Ea
CY
SY
SY
Ea
Tons
$ 3,900.00
1.00 $ 3,900.00
$ -
1.00
$ 3,900.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
195.60%
71.77%
92.27%
102.74%
95.00%
100.00%
88.16%
88.98%
86.24%
100.00%
$ 4,265.00
1.00 $ 4,265.00
$ -
1.00
$ 4,265.00
$ 300.00
2.00 $ 600.00
$ -
2.00
$ 600.00
$ 7,735.00
1.00 $ 7,735.00
$ -
1.00
$ 7,735.00
$ 2,200.00
1.00 $ 2,200.00
$ -
1.00
$ 2,200.00
$ 1,917.00
2.50 $ 4,792.50
$ -
2.50
$ 4,792.50
$ 9.00
58.68 $ 528.12
$ -
58.68
$ 528.12
$ 13.00
139.96 $ 1,819.48
$ -
139.96
$ 1,819.48
$ 19.50
346.00 $ 6,747.00
$ -
346.00
$ 6,747.00
$ 107.00
102.74 $ 10,993.18
$ -
102.74
$ 10,993.18
$ 4.65
1425.05 $ 6,626.48
$ -
1425.05
$ 6,626.48
$ 152.00
8.00 $ 1,216.00
$ -
8.00
$ 1,216.00
$ 23.73
908.03 $ 21,547.55
$ -
908.03
$ 21,547.55
$ 2.05
3292.17 $ 6,748.95
$ -
3292.17
$ 6,748.95
$ 2.58
1078.00 $ 2,781.24
$ -
1078.00
$ 2,781.24
$ 37.75
40.00 $ 1,510.00
$ -
40.00
$ 1,510.00
$ 22.50
$ -
$ -
$ -
$ 84,010.50 $
$ 84,010.50
92.71%
EXTRA WORK
PC Curb, Straight, No gutter
6" PCC Sidewalk
John Deere 160 Excavator
Tandem Dump Truck
Labor
AC Sawing
LowBoy / Mobilization
18.00 LF
75.00 SF
4.00 Hr
5.00 Hr
3.50 Hr
169.00 LF
1.50 Hr
$19.44
$4.60
$125.00
$75.00
$45.00
$2.25
$100.00
$349.92
$345.00
$500.00
$375.00
$157.50
$380.25
$150.00
TOTAL EXTRA WORK
$2,257.67
Masterpiece on the Mississippi
City of Dubuque
Engineering
50. W. 13th Street
Dubuque, IA 52001
(563) 589 -4270
PROJECT CLOSE OUT FORM
Project Name:
CIP Number:
Project Contract Amount:
Project Completion Date:
3EE BRANCH - PHASE I COMPLETION - 15TH STREE
CIP: 7201654
$90,612.90
28- Sep -12
Contractor Name:
Contractor Address:
City, State, Zip:
Contractor Telephone:
McDermott Excavating
14407 US 20 West
Dubuque, Iowa 52003
563- 583 -4633
ITEM
NO.
CONTRACT ITEM
DESCRIPTION
CONTRACT ITEM
QUANTITY UNIT UNIT PRICE
PROJECT TOTAL
QUANTITY TOTAL
PERCENT
COMPLETE
1 Traffic Control and Project Safety
1
LS
$ 3,900.00
1.00
$ 3,900.00
100.00%
2 Miscellaneous Pavement Removals I Tree & Stump Removals
1
LS
$ 4,265.00
1.00
$ 4,265.00
100.00%
3 Abandon Existing Intakes
2
Ea
$ 300.00
2.00
$ 600.00
100.00%
4 Unclassified Excavation
1
LS
$ 7,735.00
1.00
$ 7,735.00
100.00%
5 Water Main, Remove 8" Tee, Complete
1
LS
$ 2,200.00
1.00
$ 2,200.00
100.00%
6 Intake 101 -B, Complete
2.5
Ea
$ 1,917.00
2.50
$ 4,792.50
100.00%
7 Limestone Backfill
30
Tons
$ 9.00
58.68
$ 528.12
195.60%
8 3/4" Base
195
Tons
$ 13.00
139.96
$ 1,819.48
71.77%
9 30" Curb & Gutter, Remove & Replace
375
LF
$ 19.50
346.00
$ 6,747.00
92.27%
10 HMA Street Patch
100
Tons
$ 107.00
102.74
$ 10,993.18
102.74%
11 4" PCC Sidewalk
1500
SF
$ 4.65
1425.05
$ 6,626.48
95.00%
12 Curb Ramp, Truncated Domes
8
Ea
$ 152.00
8.00
$ 1,216.00
100.00%
13 Amended Topsoil -
1030
CY
$ 23.73
908.03
$ 21,547.55
88.16%
14 Seeded Turf
3700
SY
$ 2.05
3292.17
$ 6,748.95
88.98%
15 Seeded Short Grass Prairie
1250
SY
$ 2.58
1078.00
$ 2,781.24
86.24%
16 2 Ton Random Limestone Block (Salvaged on Site)
40
Ea
$ 37.75
40.00
$ 1,510.00
100.00%
17 Medium Revetment w /Geotextile
60
Tons
$ 22.50
$ -
0.00%
$ 84,010.50
EXTRA WORK
PC Curb, Straight, No gutter 18.00
LF
$19.44 18.00
$ 349.92
100.00%
6" PCC Sidewalk 75.00
SF
$4.60 75.00
$ 345.00
100.00%
John Deere 160 Excavator 4.00
Hr
$125.00 4.00
$ 500.00
100.00%
Tandem Dump Truck 5.00
Hr
$75.00 5.00
$ 375.00
100.00%
Labor 3.50
Hr
$45.00 3.50
$ 157.50
100.00%
AC Sawing 169.00
LF
$2.25 169.00
$ 380.25
100.00%
LowBoy / Mobilization 1.50
Hr
$100.00 1.50
$ 150.00
100.00%
Payment Totals
$ 2,257.67
Total Contract Work Performed to Date: $ 84,010.50
Total Change Order Work Performed to Date: $ 2,257.67
Total Contract and Change Order Work Performed to Date: $ 86,268.17
Miscellaneous Costs
Engineering
I hereby certify that the above statement shows, in detail, the correct
amount of all work required to complete the above improvement.
APPROVED:
Michael Van Milli
Dubuque, Iowa
n, City Manager
Gus Psihoyos, City Engineer
Dubuque, Iowa
TOTAL FINAL PROJECT COSTS: $ 86,268.17
The Undersigned contractor for the above
improvement, does hereby accept the above "Total Due Contractor", as
full settlement for all claims for said improvement.
APPROVED: