Loading...
Bee Branch Phase I, 15th Street Project CompletionTHE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Bee Branch Phase !Completion - 15th Street Project DATE: April 29, 2013 Dubuque kital All- America City II 111! 2012 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Bee Branch Phase !Completion — 15th Street Project, as completed by McDermott Excavating, in the final contract amount of $86,268.17, which is 4.8% below the original contract amount of $90,612.90. I concur with the recommendation and respectfully request Mayor and City Council approval. btitt44 kr,„709,,, Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Bee Branch Phase I Completion — 15th Street Project DATE: April 26, 2013 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for Bee Branch Phase I Completion — 15th Street Project. BACKGROUND The Bee Branch - Phase I Completion — 15th Street Project provided for the completion of Phase I of the Bee Branch Creek Restoration Project. Due to design changes in the channel between the basin and the 16th Street Bridge more properties were acquired along 15th Street changing the scope of the project. This work was done under a separate contract because the acquisitions required more time than the original contract completion date allowed. Dubuque bierd NI- America Cly '1 If 2012 In accordance with Iowa Code § 384.103 and § 364.12(3)(c), and Iowa Code, Section 26.14, on August 28, 2012 the City solicited informal bids for the Bee Branch Phase I Completion — 15th Street Project. McDermott Excavating of Dubuque, Iowa, submitted the low bid in the amount of $90,612.90. The project included: the removal of a portion of Maple Street, removal of a parking lot, water main abandonment, the construction of stormwater intakes, 346 feet of curb and gutter, 1,425 square feet of PCC sidewalk, street patching, finish excavation of slopes and the surrounding area, placement of decorative stones, placement of topsoil, and the seeding of all areas to match the rest of Phase I. DISCUSSION The Bee Branch Phase I Completion — 15th Street Project was completed by McDermott Excavating of Dubuque, Iowa, in the final contract amount of $86,268.17. This is 4.8% below the original contract amount of $90,612.90. RECOMMENDATION I recommend that the City Council accept the improvements and authorize payment of the contract amount of $86,268.17 to McDermott Excavating for the Bee Branch Phase 1 Completion — 15th Street Project. BUDGET IMPACT The cost summary for the Bee Branch Phase !Completion — 15th Street Project is as follows: The project funding summary is as follows: CIP Award Final Construction Contract $90,612.90 $86,268.17 Contingency & Engineering 24,012.42 0.00 Total Project Cost $114,625.32 $86,268.17 The project funding summary is as follows: CIP Fund Description Fund Amount 7201654 Bee Branch Creek Restoration $86,268.17 Total Project Funding $86,268.17 ACTION TO BE TAKEN 1 respectfully request that the City Council adopt the attached resolution accepting the improvements and authorizing payment of the contract amount of $86,268.17 to McDermott Excavating for the Bee Branch Phase I Completion — 15th Street Project. cc: Jenny Larson, Budget Director Deron Muehring, Civil Engineer Tom Freund, Engineering Technician RESOLUTION NO, 132 -13 ACCEPTING THE BEE BRANCH PHASE I COMPLETION — 15TH STREET PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Bee Branch Phase I Completion — 15th Street Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Bee Branch Restoration Project capital improvement appropriation for the contract amount of $86,268.17 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Attest: Passed, approved and adopted this 6th day of K= in S. Firnsta I, CM City Clerk May , 2013. Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE BEE BRANCH PHASE I COMPLETION — 15TH STREET PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Bee Branch Phase I Completion — 15th Street Project, and that said Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $86,268.17. Dated thiso‘/- day of ,.�%. 2013. Gus Psihoyos, City Engin Filed in the office of the City Clerk on thee%99' day of , 2013. Ke in S. Firnstahl, CMC y Clerk er Masterpiece on the Mississippi CONTRACTOR'S PAYMENT FORM Project Name: CIP Number: Project Contract Amount: Project Completion Date: BEE BRANCH - PHASE I COMPLETION - 15TH STREET CONTRACT ITEM QUANTITY UNIT UNIT PRICE CIP: 7201654 $90,612.90 28- Sep -12 Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: McDermott Excavating CONTRACT ITEM QUANTITY UNIT UNIT PRICE 14407 US 20 West CURRENT PAYMENT QUANTITY TOTAL Dubuque, Iowa 52003 ' 563 -583 -4633 Traffic Control and Project Safety Miscellaneous Pavement Removals / Tree & Stump Removals Abandon Existing Intakes Unclassified Excavation Water Main, Remove 8" Tee, Complete Intake 101 -B, Complete Limestone Backfill 3/4" Base 30" Curb & Gutter, Remove & Replace HMA Street Patch 4" PCC Sidewalk Curb Ramp, Truncated Domes Amended Topsoil Seeded Turf Seeded Short Grass Prairie 2 Ton Random Limestone Block (Salvaged on Site) Medium Revetment w /Geotextile CONTRACT PAYMENT NO. 2 - RETAINAGE CURRENT PAY PERIOD: 12- Oct -12 City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589 -4270 11- Apr -13 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PREVIOUS PAYMENT QUANTITY TOTAL CURRENT PAYMENT QUANTITY TOTAL TOTAL TO DATE QUANTITY TOTAL PERCENT COMPLETE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Traffic Control and Project Safety Miscellaneous Pavement Removals / Tree & Stump Removals Abandon Existing Intakes Unclassified Excavation Water Main, Remove 8" Tee, Complete Intake 101 -B, Complete Limestone Backfill 3/4" Base 30" Curb & Gutter, Remove & Replace HMA Street Patch 4" PCC Sidewalk Curb Ramp, Truncated Domes Amended Topsoil Seeded Turf Seeded Short Grass Prairie 2 Ton Random Limestone Block (Salvaged on Site) Medium Revetment w /Geotextile 1 1 2 1 1 2.5 30 195 375 100 1500 8 1030 3700 1250 40 60 LS LS Ea LS LS Ea Tons Tons LF Tons SF Ea CY SY SY Ea Tons $ 3,900.00 1.00 $ 3,900.00 $ - 1.00 $ 3,900.00 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 195.60% 71.77% 92.27% 102.74% 95.00% 100.00% 88.16% 88.98% 86.24% 100.00% $ 4,265.00 1.00 $ 4,265.00 $ - 1.00 $ 4,265.00 $ 300.00 2.00 $ 600.00 $ - 2.00 $ 600.00 $ 7,735.00 1.00 $ 7,735.00 $ - 1.00 $ 7,735.00 $ 2,200.00 1.00 $ 2,200.00 $ - 1.00 $ 2,200.00 $ 1,917.00 2.50 $ 4,792.50 $ - 2.50 $ 4,792.50 $ 9.00 58.68 $ 528.12 $ - 58.68 $ 528.12 $ 13.00 139.96 $ 1,819.48 $ - 139.96 $ 1,819.48 $ 19.50 346.00 $ 6,747.00 $ - 346.00 $ 6,747.00 $ 107.00 102.74 $ 10,993.18 $ - 102.74 $ 10,993.18 $ 4.65 1425.05 $ 6,626.48 $ - 1425.05 $ 6,626.48 $ 152.00 8.00 $ 1,216.00 $ - 8.00 $ 1,216.00 $ 23.73 908.03 $ 21,547.55 $ - 908.03 $ 21,547.55 $ 2.05 3292.17 $ 6,748.95 $ - 3292.17 $ 6,748.95 $ 2.58 1078.00 $ 2,781.24 $ - 1078.00 $ 2,781.24 $ 37.75 40.00 $ 1,510.00 $ - 40.00 $ 1,510.00 $ 22.50 $ - $ - $ - $ 84,010.50 $ $ 84,010.50 92.71% EXTRA WORK PC Curb, Straight, No gutter 6" PCC Sidewalk John Deere 160 Excavator Tandem Dump Truck Labor AC Sawing LowBoy / Mobilization 18.00 LF 75.00 SF 4.00 Hr 5.00 Hr 3.50 Hr 169.00 LF 1.50 Hr $19.44 $4.60 $125.00 $75.00 $45.00 $2.25 $100.00 $349.92 $345.00 $500.00 $375.00 $157.50 $380.25 $150.00 TOTAL EXTRA WORK $2,257.67 Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589 -4270 PROJECT CLOSE OUT FORM Project Name: CIP Number: Project Contract Amount: Project Completion Date: 3EE BRANCH - PHASE I COMPLETION - 15TH STREE CIP: 7201654 $90,612.90 28- Sep -12 Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: McDermott Excavating 14407 US 20 West Dubuque, Iowa 52003 563- 583 -4633 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE 1 Traffic Control and Project Safety 1 LS $ 3,900.00 1.00 $ 3,900.00 100.00% 2 Miscellaneous Pavement Removals I Tree & Stump Removals 1 LS $ 4,265.00 1.00 $ 4,265.00 100.00% 3 Abandon Existing Intakes 2 Ea $ 300.00 2.00 $ 600.00 100.00% 4 Unclassified Excavation 1 LS $ 7,735.00 1.00 $ 7,735.00 100.00% 5 Water Main, Remove 8" Tee, Complete 1 LS $ 2,200.00 1.00 $ 2,200.00 100.00% 6 Intake 101 -B, Complete 2.5 Ea $ 1,917.00 2.50 $ 4,792.50 100.00% 7 Limestone Backfill 30 Tons $ 9.00 58.68 $ 528.12 195.60% 8 3/4" Base 195 Tons $ 13.00 139.96 $ 1,819.48 71.77% 9 30" Curb & Gutter, Remove & Replace 375 LF $ 19.50 346.00 $ 6,747.00 92.27% 10 HMA Street Patch 100 Tons $ 107.00 102.74 $ 10,993.18 102.74% 11 4" PCC Sidewalk 1500 SF $ 4.65 1425.05 $ 6,626.48 95.00% 12 Curb Ramp, Truncated Domes 8 Ea $ 152.00 8.00 $ 1,216.00 100.00% 13 Amended Topsoil - 1030 CY $ 23.73 908.03 $ 21,547.55 88.16% 14 Seeded Turf 3700 SY $ 2.05 3292.17 $ 6,748.95 88.98% 15 Seeded Short Grass Prairie 1250 SY $ 2.58 1078.00 $ 2,781.24 86.24% 16 2 Ton Random Limestone Block (Salvaged on Site) 40 Ea $ 37.75 40.00 $ 1,510.00 100.00% 17 Medium Revetment w /Geotextile 60 Tons $ 22.50 $ - 0.00% $ 84,010.50 EXTRA WORK PC Curb, Straight, No gutter 18.00 LF $19.44 18.00 $ 349.92 100.00% 6" PCC Sidewalk 75.00 SF $4.60 75.00 $ 345.00 100.00% John Deere 160 Excavator 4.00 Hr $125.00 4.00 $ 500.00 100.00% Tandem Dump Truck 5.00 Hr $75.00 5.00 $ 375.00 100.00% Labor 3.50 Hr $45.00 3.50 $ 157.50 100.00% AC Sawing 169.00 LF $2.25 169.00 $ 380.25 100.00% LowBoy / Mobilization 1.50 Hr $100.00 1.50 $ 150.00 100.00% Payment Totals $ 2,257.67 Total Contract Work Performed to Date: $ 84,010.50 Total Change Order Work Performed to Date: $ 2,257.67 Total Contract and Change Order Work Performed to Date: $ 86,268.17 Miscellaneous Costs Engineering I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milli Dubuque, Iowa n, City Manager Gus Psihoyos, City Engineer Dubuque, Iowa TOTAL FINAL PROJECT COSTS: $ 86,268.17 The Undersigned contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. APPROVED: