Indoor Aquatic Center Joint Committee RecommendationMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Approval of Indoor Aquatic Center Study Firm Recommendation DATE: April 29, 2013 Dubuque kital All- America City II 111! 2012 Nine proposals were received in response to a Request for Proposal for an indoor aquatic center study. A joint committee of the Dubuque Community School District and the City of Dubuque reviewed the proposals and selected four firms to invite for an interview. The Dubuque Community School District /City of Dubuque Joint RFP Review Committee and Leisure Services Manager Marie Ware recommend City Council approval of the selection of Novak Design Group, teamed with Water Technology, Inc., Barker Rinker Seacat Architecture, and Ballard King and Associates, for $69,900 and a not to exceed $8,700 reimburseables, for a total not to exceed of $78,600. The study is budgeted for $100,000, with the Dubuque Community School District and the City of Dubuque each providing one half. The recommendation is scheduled for the May 6th Park and Recreation Commission and City Council meetings, May 7th School Facilities and Support Committee and May 13th School Board meeting. I concur with the recommendation and respectfully request Mayor and City Council approval. brit44 krt., italy, Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Marie Ware, Leisure Services Manager Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Marie Ware, Leisure Services Manager SUBJECT: Approval of Indoor Aquatic Center Study Firm Recommendation DATE: April 26, 2013 INTRODUCTION Dubuque All- America City II 111! 2012 The purpose of this memo is to bring forth the recommendation of the firm to complete an indoor aquatic center study for the City and School District BACKGROUND Ajoint committee of the Dubuque Community School District and City of Dubuque developed a request for proposal (RFP) for an indoor aquatic center study. The RFP was approved by the Park and Recreation Commission, School Facilities and Support Committee, School Board and City Council. The Joint Committee received proposals from nine firms including FEH Associates, Inc., IIW, P.C., Ramaker & Associates, Inc., OPN Architects, RDG Planning & Design, Shive Hattery, Novak Design Group, Williams Architects /Aquatics, and Straka Johnson Architects. Each firm came teamed with other firms for additional expertise. Members of the Joint School /City Committee includes: Laura Carstens - Planning Services Manager, Mary Rose Corrigan - Public Health Specialist, Janna Beau - Recreation Program Supervisor, Nikola Pavelic- Community Engagement Coordinator and Marie Ware- Leisure Services Manager. The school representatives included Karla Weber, Dan Duclos, Bill Burkhart, Brent Cook, Amy Hawkins, Tom Meissner and Kevin Kelleher. The Joint Committee independently scored each of the nine proposals in a scoring matrix developed from the RFP's outlined evaluation criteria. The committee came together and through discussion determined four firms to invite to the interview process. We also determined ten questions each firm was to provide answers to prior to the interview. The Joint Committee took one full day and conducted the four interviews. Prior to that day they were provided the completed questionnaire. Each committee member again had a scoring matrix that was completed after each interview. The scoring matrix used the criteria outlined in the RFP. The four firms interviewed included Straka Johnson Architects, Williams Architects /Aquatics, Shive Hattery and Novak Design Group. DISCUSSION The School /City Joint Committee unanimously recommends Novak Design Group. Novak Design Group teamed with Water Technology, Inc., Barker Rinker Seacat Architecture and Ballard King and Associates. Their recommendation letter is attached. This recommendation is scheduled for the May 6th Park and Recreation Commission and City Council meetings, May 7th School Facilities and Support Committee and May 13th School Board Meeting. PROJECT COST — BUDGET IMPACT Novak Design Group proposal is $69,900 with a not to exceed $8,700 reimburseables for a total not to exceed $78,600. The study is budgeted for $100,000 with the School and City each providing one half. RECOMMENDATION I along with the interview committee respectfully recommend approval of Novak Design Group for the Indoor Aquatic Center Study. MLW:et copy Mary Rose Corrigan, Health Services Manager Laura Carstens, Planning Services Manager Nikola Pavelic, Community Engagement Coordinator Dan Kroger, Recreation Division Manager Janna Beau, Recreation Program Supervisor Kevin Kelleher, Executive Director of Finance & Business Services, Dubuque Community School District. 2 THE CITY OF Dubuque Community Schools DUB ` i E �` Masterpiece on the Mississippi To inspire and challenge May 1, 2013 Dear City Council and Board of Education Members, Over the past number of months, we have convened as members of the City of Dubuque /Dubuque Community School District Pool Committee to explore the possible need for a community aquatic center and develop a process to conduct a feasibility study. Listed below is a brief timeline of what the committee accomplished. During the fall of 2012 and winter of 2013, the committee met multiple times to develop criteria to include in the Request for Proposal (RFP). On approximately January 24, 2013, the RFP was sent to local architects as well as put on the City and District websites. The responses were due on March 8 2013. On March 20, 2013, members of the committee met to review and evaluate nine responses to the City Council /School Board RFP to conduct the feasibility study of a new indoor aquatic center. Based on that initial review of submissions, four consultants were selected to participate in interviews with the committee: Shive - Hattery Architecture - Engineering; Williams Architects /Aquatics; Novak Design Group PLC; and Straka Johnson Architects. The interviews took place on April 11, 2013, and included 90 minutes for each consultant including set -up time, presentations, and time for questions. Following the interviews, the committee engaged in very productive discussion about the strengths and weaknesses of each firm. While each group had strong knowledge in design, architecture, and construction of pools, one stood out for its skill and experience in conducting the feasibility study. Based on our work, the committee is pleased to unanimously recommend selection of Novak Design Group PLC as the firm to conduct the feasibility study. Novak will be using the following support firms to assist them in this study; Water Technology Inc.; Barker, Rinker, Seacat Architecture; and Ballard King and Associates. There are many reasons for this recommendation, including the following: Novak Design Group has a comprehensive team in place to address the main points of the study and they had the greatest depth and experience in overall scope. It was clear that the team possessed strong chemistry and has worked together on similar projects. The team has decades of experience working together. The company has significant site selection experience. The team has demonstrated the ability to overcome obstacles based on their work on previous feasibility studies. Novak had the strongest public engagement process — one that includes community members at all age groups on committees and leadership groups. Novak is committed to keeping the public involved throughout the whole of the project. - The team's presentation exhibited clear excitement for the possibility of what Dubuque could accomplish. Novak provided the strongest information on community engagement and site analysis. - The team focused significant time on the feasibility study section of the RFP (which is currently the most important portion of work), outlined a process and gave innovative reflection on local goals. Overall, we are confident that Novak Design Group PLC will conduct a feasibility study that will engage our community and give an accurate look at the need and possibility of creating an indoor aquatic center for our schools and community. On behalf of the City of Dubuque On behalf of the Dubuque Community School District Marie Ware Kevin Kelleher ....tvicaz&) I Lit- `�L 4--`t- -. Laura Carstens Amy Hawkins II/ i : .:_. ...eigii P . A .4.k 171(44:6 Mary Ro. = Corrigan Karla Weber .' i 1 14,1( c r J. n a Beau Bill Burkhart S Dan Kroger / Masterpiece on the Mississippi Talwesidridner Dubuque Community School District 2300 Chaney Road Dubuque, IA 52001.3095 Response to: Request for Proposal for Indoor Aquatic Center Study Submitted by: Novak Design Group PLC 3801 River Ridge Drive NE Cedar Rapids, Iowa 52402 In association with: Water Technology, Inc, Barker Rinker Seacat, and Ballard King " Associates NOVAK DESIGN GROUP wri WATIM IFCH4;.00, A, bk INSJ 76. DECRY OF C 1 DUB Masterpiece on the Mississippi ,r.i CONTENTS LETTER OF TRANSMITTAL 5 INTRODUCTION STATEMENT 7 PROFILE OF CONSULTANT 9 BACKGROUND AND ORGANIZATION 13 TEAMWORK 15 EXPERIENCE 19 TEAM MEMBERS 27 SCOPE OF SERVICES\ PROPOSED PROJECT SCHEDULE 33 REFERENCES 41 LITIGATION 43 NOVAK DESIGN GROUP WTI WA IA A Dubuque Community School District Indoor Aquatic Study i IA ►p w ► lie ►��►a wr "" a; ,,I;•i. Kevin Kelleher, executive Director of finance and Business Services Dubuque Community School District 2300 Chaney Road Dubuque, IA 52001 -3095 Re: Indoor Aquatic Center Study THECITY OF DUB Masterpkceon the Mississippi lb Wad MITI Dear Kevin Kelleher and Members of the Selection Committee: Novak Design Group is pleased to present our proposal for professional services. We have assembled a proven team of professionals who have the necessary talent and experience to collaborate with Dubuque Community School District and the City of Dubuque. We are excited about and look forward to working together to complete a feasibility study for an Aquatic Center for the Dubuque Community. Our vast knowledge of recreational and competitive aquatic centers is unsurpassed. We are a diverse group of design professionals each providing necessary expertise for specific aspects of the aquatic center. Our goal is to make the Dubuque Aquatic Center the standard that other communities wish to duplicate. Our Team • Novak Design Group Project Management & Building Concept Design • Water Technology Inc Aquatic Consultant • Barker Rinker Seacat Recreational Consultant • Ballard King and Associates Recreation & Feasibility Consultant Our Study will include: • Needs Analysis • Community Engagement and Use • Site Analysis • Facility Sharing between School and City • Conceptual Facility Planning • Cost of Operation and Maintenance • Financial Impact Analysis • Track, Fitness Weight Training Areas Other Considerations included in Study: • Myrlha verses Concrete Pools • Air quality Athlete /Spectator Comfort • Lighting - Competition and Recreation • Material Durability We • Water Temperature Competition /Recreational • Scheduling Facility Use for School and City • Number of Lanes and facility cost comparison are confident in our ability to provide a comprehensive study which will clearly identify an Aquatic Center design which fits the needs of both the Dubuque School District and the Dubuque Community. We look forward to the opportunity to present our credentials to you and the members of the Selection Committee. Principal & Project Manager: Gary M. Landhauser, AIA Novak Design Group PLC o. 319. 393.9334 x 2 3801 River Ridge Drive NE m. 319. 551 -6798 Cedar Rapids, Iowa 52402 f. 319.393 -9331 Signed Gary M. Lan hauser, AIA WTI • bk Dubuque Community School District c Indoor Aquatic Study it A successful swimming and diving team is not made up of one person, nor is it all freestylers, etc. a successful team is made up of a diverse group of individuals that together offer their own unique strengths. Similarly, the cooperative team of Novak Design Group, Water Technology, Inc., Barker Rinker Seacat, and Ballard King and Associates, each bring a unique skill set to the Dubuque Community School District Study. 1 + 1 = 3. The sum is greater than the parts. National + Local is a winning combination for the Dubuque Community School District and the City of Dubuque. All members are nationally experienced natatorium design experts, Our team also has the local expertise of Novak Design Group PLC. This distinction is illustrated below and will have a huge impact on your overall project success. Additionally, all firms have a proven successful history of teaming together to provide the owner with a win-win solution to problem - solving. Nov Iota ak Design Group PLC i I, award winning, collabora architectural and interior design firm. Most recently, Novak Design group lead the design for the Linn. Mar Aquatic Center in Marion, Iowa, where construction is currently underway, and expected to open in Fall 2013, Water Technology, Inc. (WTI} is the nation's largest and foremost aquatics design firms with an unmatched competition and recreational project client list. WTI is located approximately two hours away, just east of Madison in Beaver Dam. WTI's solution 5a live NOVAK DESIGN GROUP driven planning and design philosophy emphasizes that the most successful and effective plans result from active community participation. WTI believes that it is important to work as a team throughout the process to address important issues, identify assets to be enhanced and challenges to overcome, Throughout the process, planners engage citizens and key interest groups using various unique and highly interactive techniques. WTI most recently collaborated with Novak Design for the aquatic design of the Linn-Mar Aquatic Center. Some additional regional projects include the aquatic engineering and design of the 2008 Olympic Trials Pool in Omaha, feasibility study and design of Luther College Aquatic Center, and aquatic design at the Grand Harbor Resort & Waterpark in Dubuque. Barker Rinker Seacat Architecture (BRS) principals have designed more than 200 natatorium projects across the nation. BRS is a highly specialized and nationally recognized natatorium and recreation facility architectural design firm and is arguably the most experienced firm on a national scale as it relates to this unique project type. Take a good look at the project lists of all the competing firms and compare them to BRS and you'll see a big difference in natatorium expertise. Ballard King and Associates (B'K) brings a high level of familiarity with aquatic projects involving both municipal and school partners. Not only has B "K been involved with multiple consulting projects of this variety, as recently as February 2013. In WTI THE CITY OF DUB Masterpiece on the Mississippi I. 0 symergy (sin- er•jeej noun 1. the interaction of elements that when combined produce a total effect that is greater than the sum of the individual elements, contributions, etc.; synergism. addition its Principal and Senior Associate have operated aquatic facilities that involved a significant municipallschool partnership. This familiarity with the project type along with leisure and competitive aquatics assist in the independent third party analysis that B'K brings to every project. Your trusted advisor. The Novak DesignlBRSIWTIIFK team will assist the Dubuque Community School District and the City of Dubuque all the way through the process - programming and designing the Center, selecting the right materials and equipment, when to hire key staff, train them and assist with the Grand Opening Celebration, Ourteam hasdesigned more natatorium projects than any other in the nation. Additionally, BRSIWTIIB "K have collaborated on over 71 recrealionallaquatic projects nationwide, aiding clients to the see the full potential of their project. Lean on our experience. Dubuque Commanhy School District Indoor Aquatic Study THE CITY OF i DUB Mosley( ere on the Mississippi iw..+mi. Novak Design Group PLC will be the prime, local architect, as one of the leading architectural firms in Eastern Iowa. Novak Design Group PLC has 26 years of experience providing full architectural, master planning and interior design services for both public and private sectors. The extremely diverse portfolio of work includes: world class corporate office buildings, resort architecture including hotels and condominiums, retail and hospitality, college buildings, schools, libraries, private residences, churches, recreation facilities, polioe stations, city halls, and numerous other civic buildings. The practice is strongly rooted in the community, Its employees invest numerous volunteer hours serving on commissions and committees throughout the region. The firm's dedication to passion and creativity over volume anc size ha sustained its relevance and set it apart from other firms in the area. Novak Design Group PLC's work has been published and received numerous awards for design excellence in: • Iowa Architect, ie. (Des Moines, Iowa magazine) • Eastern Iowa Home • The Iowan • Woman Today • Dwell Magazine The firm's fundamental beliefs are as follows: Each project is unique and deserves unique attention without prejudice or preconceived notions. • Every project must aggressively integrate energy efficiencies. Every building is essentially an addition to the natural or built environment and must be a good neighbor. Great design matters. Great design is timeless, Gary M. Landhauser is a principal at Novak Design Group PLC and will be responsible for the Project Management of the Dubuque Community School District Indoor Aquatic Center Study. Gary's strengths, which will enhance the development of your project, include: • Leadership • Organizational skills • Technical experience • Diverse construction experience. Gary joined Novak Design Group, PLC in 1989 and has served as project architect for many of the firm's major projects. W TI 1 bk k Dubuque Community School District Indoor Aquatic Study Water Technology, Inc. (WTI) will be the Aquatic Consultant for the Dubuque Indoor Aquatic study. • WTI's creative energy and passion embraces the philosophy that aquatic recreation completes communities and makes them a better place to live. WTI has evaluated, designed and engineered literally hundreds of aquatic facilities throughout North America since 1983. WTI designs are forward- looking, and support dynamo community programs. Another key ingredient to a project's success is our historical database that helps us provide client's accurate cost estimates and a realistic timeline. • Creativity is an important aspect of our swimming pool designs and programming. • We strive to stay on the cutting edge of new trends by attending industry trade shows, conferences, seminars and talking with users to see what they want. • WTI's designs are not simply creative and innovative - they are also functional. Experience Water Technology, Inc's aquatic design and engineering portfolio includes the following venues: • Municipal Indoor and Outdoor Pools • Community Center Pools • Family Aquatic Centers • YMCA and YWCA Pools • Competitive Venues • University and School Pools WTI Difference THE CITY OF DUB Masterpiece on the Mississippi • Community Developments • Resort and Hotel Pools • Therapy and Wellness Pools • Water Playgrounds, Waterparks • Specialized Aquatic Features and Elements, Cross - project experience between municipallschoolkommerical aquatic facilities provides WTI unique insight into a sustainable, and sucessful facility. Air Quality at Pool Surface • Water Quality for Prolonged Use • Fast Pool - Turbulence Mitigation • High Performace Gutter System • Enviorment and Natural Lighting • Design for all uses (RecreationalANellnessl Athletic) • Comfort for spectators • Design for efficient opperations Douglass Whiteaker, is the President and Principal-in-Charge of Water Technology, Inc., and has extensive knowledge and experience in the aquatic industry. Doug will help the team to understand unique project demographics and public needs which ultimately results in team ownership of the project, producing the ultimate in project excellence. He excels in managing integrated project delivery teams, and his hands - on management abilities energize effective collaboration, Ultimately, his goal is to ensure that the needs and expectations of the City of Dubuque and School District are exceeded, NOVAK DESIGN GROUP wrr Dubuque Community School District Indoor Aquatic Siudy 10 Barker Rinker Seacat (BRS) joins Novak Design Group PLC bringing a 37 -year history in community activity centers - the focus of its practice. • BRS's knowledge and experience has received national reputation in the design and planning of Natatorium projects — more than any other firm in the US. • Assisted school districts and more than 180 communities across the country in the programming and design of their aquatic facilities, • BRS's leadership role during the public process engages all stakeholders to help you create your community facility. • Understand the key issue for a successful design process and outcome is building consensus among stakeholders quickly and making timely decisions, • BRS will develop a detailed work plan based on the key objectives for your community, which is the first step to a successful project. • BRS has the tools to help you prioritize programming and phasing. • BRS advocates balancing service objectives with revenue considerations, integrating this throughout the work plan for your facility. Ballard * King and Associates (B °K) brings 21 years of experience in conducting feasibility studies. • B'K was established in 1992 by Ken Ballard and Jeff King in response to the need for market driven and reality based planning for recreation facilities, Utilizing their extensive experience in developing and operating comprehensive recreation facilities in the public sector, Ken and Jeff have integrated a hands on approach to recreation facility planning. • B'K has completed well over 250 feasibility and planning studies for recreation facilities in the last twelve years and has more than 100 facilities up and running across the United States. The vast majority of their projects are public facility studies and they are considered to be one of the foremost authorities on recreation facility planning in the United Slates. • Ability to provide a variety of pre and post- design services for clients who are considering construction of a recreation facility. • In -depth firsthand knowledge and experience with the economics, feasibility, staffing and management of recreation facilities with a variety of components. THE CITY OF DUB Masterpiece on the Mississippi ii- psme., Salvation Army Rey and Joan Nroc Corps Communily Center • Salem Oregon WT/ Dubuque Community School District Indoor Aquatic Study 11 r "; Novak Design Group PLC Professional Limited Liability NOVAK DESIGN GROUP WTI .Alfa Company 3801 River Ridge Drive NE Cedar Rapids, Iowa 52402 Established in 1986 Services: Architecture • Interior Design • Master Planning • Programming • Rendering • Model•Building Water Technology, Inc. Sub Corp. S 100 Park Avenue Beaver Dam, Wisconsin 53916 Established in 1983 Services: • Facility Evaluation and Renovations • Aquatic Programming and Budgeting • Master Planning • Conceptual Design • Natatorium Consulting • Mechanical Design • Construction Administration • Commissioning and Startup Barker Rinker Seacat 3457 Ringsby Ct Denver, Colorado 80216 Established in 1975 Services: • Feasibility studies • Strategic planning • Master planning • Programming • Public process • Architectural design • Interior design • Construction administration • Project management • Owner's representation 1 b� Masterpiece on the Mississippi •...�.. Ballard' King and Associates 2743 E. Ravenhill Circle Highlands Ranch, Colorado 80126 Established in 1992 Services: Recreation Center Needs Assessment • Feasibility Studies • Market Studies • Economic Impact Projections • Staffing Levels • RFP Review Community Input • Public Surveys • Citizen Input Sessions • Focus Groups • Campaign Strategy for Bond Issues Programming • Componenf Recommendation • Program Space Narratives • Equipment Needs • Site Analysis • Design Issues and Concepts • Financial Analysis and Budgeting • Maintenance Costs • Design Requirements • Operations Planning • Design and Layout Review Operations Issues • Fees and Charges • Sponsorship Packages • Marketing Plans & Strategies • Corporate involvement • Audits Funding Analysis • Operating Cost & Revenues • Capital Funding Sources • Project Partnering Dubuque Comm oily School District Indoor Aquatic Study 13 DUB Masterpiece on the Mississippi E included: News Media — We believe it is important to meet with the news media to inform them of the project process encourage as much visibility as possible. Newsletters — Publish periodic newsletters about the project. Explain the mission and the goals and activities to accomplish, Ask for feedback and announce schedules of public meetings. Web Page — Contribute to a web page where the public can view the progress of the project and can respondlcomment through e-mail, a dedicated blog thread or twitter. Telephone Hot Line — Open a "Hot Line" where people can call and ask for information or give their input into the project, Develop an Issue Matrix — With the District and City; we develop a matrix of issues and groups/ organizations to identify potential conflicts, This is a technique that identifies concerns, possible conflicts and issues early. Once identified, a strategy to address these issues can be developed, Engage all Stakeholders — Al the outset of a project, we encourage meetings with all interested parties or stakeholders who might affect the project including regulatory and other government agencies, user groups, adjacent property owners, business organizations, impacted businesses and others we may identify with you, Public Open Houses — Presentations or work sessions are designed to achieve a variety of objectives from informational only to highly engaged participation. We recommend several active public forums for your project, These are planned to solicit input and response from the general public. Some successful ideas for these meetings include: + Hold events in highly trafficked areas - a shopping center, a city hall, etc. Advertise the events through newsletters, PSA's on radio and TV, through flyers in utility bills, local newspaper, at public buildings. Ask City and District to distribute through their feedback network. • Provide babysitting and snacks. • Employ games such as the "Program Card Game" to prioritize program elements and site THE CITY OF I Imagine an swimmer stepping up on to the swim blocks at a meet or a diver perfoming a dive without having practiced? Or, what if there was no crowd to cheer on the althetes? Athletes know in order to be the first to hit the touch pad, or to score a perfect 10 takes practice. In addition, studies show when there is a large support group in the bleachers athletes perform better. This is similar to the acceptance of a new facility among a community. Our team knows that comprehensive community education and consensus building campaign is imperative to the success of a project, Many projects are abandoned when they fail to gain the support of the communing or governing body. Our team has reviewed both the City's Vision and Mission Statement, and the Dubuque Community School District Strategic Plan, and will work with both entities to identify the aquatic and recreation needs of each. Public Process Experience We will work with the City of Dubuque and Community School District from the onset to determine how much community involvement is required, including the following: Augment the Planning Committee composed of City, District, Public and other potential partners that are connected to the community and have the enthusiasm and energy to make sure the project is a priority for the community. • Develop a Mission Statement for the Aquatics Center that all citizens and stakeholder groups can adopt as their own and against which all project goals can be measured. Ensure that the community feels a part of the process and has ownership in the project. Recommend refinements to the process to maximize stakeholder input and support. Assist and lead, where appropriate, advisory group and focus group meeting discussions. • Lead community wide open houses and workshops, Develop an operational business plan simultaneously with the design. • Provide marketinglinformational materials. Some of the strategies and devices we have used in the past to assure community -wide involvement have WTI • bit + Dubuque Community School District Indoor Aquatic Study 15 THE CRY OF DUB L E Masterpiece on the Mississippi n�4.. Articulate a specific timeline organized around key events or Workshops Clarify specific objectives and participants for each Workshop Clarify work activities and Deliverables for each Work Period between Workshops Estimate work hours associated with each activity Workshops selection, Make sure that everyone, including children, participates in voting. Presentation Materials — We develop presentation tools such as boards, charts, power point presentations and models (both for public presentation and display). The information and graphics we provide electronically can be used for fund raising events, brochures, grant proposals and other similar activities. Key Issues for Success The key issues for a successful design process and outcome for a community project are building consensus quickly and making timely decisions. Typical impediments to moving forward are control of the budget, meeting jurisdictional requirements, reaching agreement with all of the stakeholders and incomplete business planning. We start associating construction and operational costs with program elements from the very beginning of discussions. Site issues such as zoning changes, utility access. drainage, sustainability and environmental concerns must be identified early. Additionally, if partnerships We believe in the Workshop Process as a tool to help focus project activities and participants. Workshops are highly planned events to move the project through key milestones, The process allows the Project Team to: Maximize participation of team members and stakeholders are to be seriously considered, intergovernmental agreements need to be discussed. There needs to be a commitment to the project and a clear understanding of shared costs and benefits. The Work Plan The first step in any community planning process is to develop a detailed Work Plan for your project based an knowledge we've gained from the City and District and significant experience with similar aquatic center projects throughout the US. We have included in our proposal a preliminary draft of a Work Plan in the Scope of Services section for your review. The key objectives of this document are to: WTI 1 Consider choices in a context of the best current information Maintain a creative energy to look for the big opportunities in your project Phasing Strategies Having a clear vision of potential facility additions can clarify the "big picture" for all and optimize other opportunities on the project site. It is important for the Novak DesignlWTIIBRSIFK team to consider these phases and plan for their implementation accordingly, Operational Costs Our team advocates balancing your service objectives with revenue considerations. We believe a successful aquatic center offers "something for all ", yet should to be planned to minimize subsidy requirements, Making patron utilization projections a visible part of the early planning process can help decision making. Jeff King and Darin Barr of B'K will lead this critical portion of the planning process. B'K specializes in developing Dubuque Community School District Indoor Aquatic Study 16 r detailed and accurate operations and maintenance pro - formas for community recreation and aquatics facilities. We have integrated business planning services throughout our work plan, Some of the focus areas include: partnerships, market analysis, operational feasibility analysis of program elements and an operational pro -forma listing detailed budgets for expense and revenue projections, staffing, operating hours and scheduling, attendance estimates, fee structures and maintenance plans, Sustainable Design In the process of creating projects for our clients, the Novak DesignANTI113RS1Bt team is committed to developing our skills as teachers and advocates. We believe the increasing demand that public buildings be exemplary of the best ideas in sustainable thinking calls for a thoughtful process to inform and guide decision making. Public facilities receive a wide variety of stakeholder input and agency review that can create tricky territory for decision makers as they seek to balance the needs of all. We feel the architect should be pro - active in raising awareness, providing choices and helping facilitate "best value" decisions unique to each community. This approach supports our firm's mission of Designing Inspired Community Architecture. We aspire to promote a process of sustainable design that embraces conservation, wellness, quality of life and leaching, Conservation includes the traditional s of resource and fiscal conservation but also erving and strengthening community through building re -use and sensitive urban design. Wellness looks at creating places whose activities and environmental qualities make us healthier. Quality of Life can be enhanced by paying special attention to how public spaces can support community connections and interactions. Finally, we think public buildings can teach sustainable thinking to the many people who use them that can be applied to their home or office environments. Technology Our team also offers, as an optional service, to create exterior character 1 elevations and 3D perspective sketches if desired by the City and District. Primary in our methodology is the use of three - dimensional modeling software throughout the conceptual design arer pre; NOVAK DES!GN GROUP THECRYOF DUB lE Masterpiece on the Mississippi M1,.wd+. process. From the early stages of our process we are able to engage the project team and public in virtual explorations of the project in Google SketchUp or Revil. In our workshops we have the ability to explore ideas for site and building options in real-time — viewing the project from all angles and perspectives which enables the project team to make decisions with greater understanding and confidence. The refined concept design model can then be used as a dynamic way to help educate the public about the project. Site Analysis During the site selection process, our team will use an objective site evaluation methodology that analyzes and compares different potential sites for new construction. Our site evaluation methodology establishes a weighting factor for each selection criteria, and then evaluates each potential site in terms of its ability to meet the proposed project's site requirements. Potential site to be evaluated include the following: District-owned school site, District - owned non - school site, City -owned site, and privately - owned site. Site selection criteria include general site characteristics, site proximity, location impact, initial cost criteria, long range cost criteria, as well as factors unique to Dubuque. Using these criteria and an objective evaluation methodology will provide a rational means for comparing the pros and cons of different potential sites, and provide a means for selecting, justifying, and defending the best possible site for the new facility. The proposed location is one of the most important public acceptance issues for community recreation projects. It has been our experience that an approach that includes obtaining input on potential sites from a variety of sources and proactive solicitation of public input are equally important to the quantifiable and tangible aspects of site selection. WTI bit Dubuque Community School District 17 Indoor Aquatic Study 1 301 AUUFIICI CENTER THE CM( OF DUB Masterpiece on the Mississippi LINN•MAR COMMUNITY SCHOOL DISTRICT AQUATIC CENTER, MARION, IOWA Services: Novak Design Group: Programming and Concept Design, Schematic Design, Design Development, Construction Documents, Bidding & Negotiations, Construction Administration, Color selection- Finishes and Furnishing for the Aquatic Center Building and Site Development. WTI: Programming and needs assesment, concept design, schematic design, design development construction documents for pool and mechanical room. Brief Description of Project: Working closely with Linn Mar Community School District and the Marion Community to understand their aquatic goals, Novak Design Group and Water Technology Inc. designed a facility that would best meet their aquatic needs today and into the future. This state -of -the -art facility will offer a stretch 25 meter pool with bulk head which can be moved to accommodate 25 yard and 25 meter swimming and 1 meter diving competitions, water polo, lessons and other aquatic activities. Linn-Mar Aquatic Center utilizes Myrtha Pool Technology, Using Myrtha Pool Technology, the pool is able to be assembled more quickly than traditional cast in place concrete. This allows for all building construction and finishes to be completed above the pool before the pool is installed, Linn Mar's Aquatic Center will open for Fall 2013 swimming and diving season. Project Budget: $11,700,000 Team Members: Novak Design Group: James A Novak (Principal -in- Charge), Gary M Landhauser (Project Manager) WTI: Douglas Whiteaker (Principal -in- Charge), Dan Lamers (Project Manager), Adam Pfister (Project Desiger) Col munity Engagement Pro cess Novak Design Group and WTI met with the swim team, coaches, and key public indivivals to understand the communities aquatic needs. Exempletory leadership and communication by management also allowed for a seamless trasition from planning thru schematic design. 46! ti W T1 bk k Dubuque Community School District Indoor Aquatic Study 19 �Arp. . ....fNW1u A W w �.• M!� M YIi ��• W ▪ Ma ..Ywn��.. �rY. M. a. r ▪ MM' MO MI NI. fYi w►•Y••. Mr rr rr •IAf rM •wM WM sus � M/M W +Y MM elm Ms 61. • •.'+d W • •' • • w•. witt ISM tug WS WO WM alie I .w. .'w. CAW 1 r. w . 't rows SW Mt THE CITY OF DUB Masterpiece on the Mississippi 1,..w604., VETERAN'S MEMORIAL AQUATIC CENTER, ADAMS 12 FIVE STAR SCHOOL, THORNTON, CO Services: • BRS; Architectural Design • WTI: Aquatic Design, Mechanical Engineering Brief Description of Project: Adams 12 Five Star School District envisioned a regional aquatic venue to support the high schools and surrounding middle schools in the district. In late 2007, we were hired by the school district and the city of Thornton to design a state -of-the -art competitive aquatic center for athletes, students and staff from all five high schools, as well as residents of the community and nearby areas. The 43,570 -s.f, center includes a competitive 50 -meter pool with moveable bulkheads and spectator seating for 800. The pool can be configured into twenty -two 25 -yard cross - course practice lanes; 50- meter, 25 -meter or 25 -yard race lanes in the center between the bulkheads; or a diving and warm -up configuration. Energy - efficient features include solar hot-water heating for the pool, high - performance windows, a daylil two-story lobby, continuous skylight in the natatorium, and advanced mechanical and electrical systems. Project Budget: $16,5 million Team Members: • BRS; Steve Blackburn (Principal -in- Charge) • WTI: Douglass Whiteaker (Principal -in- Charge Aquatics) Community Engagement Process: The project was a partnership between the City of Thornton and the Adams 12 Five Star School District. Before forming the partnership with the City of Thornton, the school district reached out to five cities it serves in order to find a location for the project. The City of Thornton offered $2.3 million of infrastructure to support the project, making it the ideal city in which to site the project. Challenge /Lessons Learned: The Veteran's Memorial Aquatic Center is part of a larger master plan that also includes the North Thornton reation Center and outdoor aquatic park as part of a second phase. It was necessary to plan out the full in order to maximize the full potential of the site. Itec site in000r natatorium and pool mechanical rooms are inherently complex spaces because of the potentially harmful effects of the higher humidity and chemicals present in these areas. As a result, natatoriums are one of the more challenging spaces to design and build properly to ensure comfort of staff and patrons, longevity of materials and sustainability of operations. To ensure the construction team was cognizant of the design intent, critical construction detailing and construction sequencing, BRS held a Natatorium Pre - Construction Meeting prior to construction of the pool building envelope. The General Contractor and all key Sub - Contractors attended the meeting. Significant items of discussion included: continuous vapor retarder at all walls and roofs; vapor retarder details at all openings, penetrations, skylights, etc.; required surface preparation and final coating of all exposed steel; and unique construction sequencing required. NOVAK DESIGN GROUP WTI • if Dubuque Community School Disthd Indoor Aquatic Study 21 ,1,11 1 !! rge), Ken Ballard (Principal in Charge), Darin Barr (Senior Associate) cipal in Charge) Masterpiece on the Mississippi A—, THE SALVATION ARMY RAY AND JOAN KROC CORPS COMMUNITY CENTER, COEUR D'ALENE, IDAHO Services: • BRS: Architectural Design • B•K: Public Input Process, Market Analysis (demographics, participation statistics and alternative service providers), Program Recommendations, Operations Analysis, Third Party Review of Plans, Milestone Schedule, FFE List Development • WTI: Aquatic programming, design, and mechanical engineering Brief Description of Project: The 120,000 -st center is a campus of activities for every age group. The worship, community and education space includes a 400•seat chapel and multipurpose event space for banquets, meetings, weddings and community events. The facility boasts a one-stop activity center with a sports training and recreation area for those who want to work out; aquatics area with lap and leisure water; and family life and personal development area with family lounge, teen room and short -term childcare area. The aquatics include a Myrtha leisure pool with multiple program zones; one for recreation and program uses, a current flow channel with internal activities zone, a walerslide, two whirlpools with one indoors and the other an outdoor, Separate from the leisure pool, the 10 -lane, Myrlha competition pool offers a variety of program areas with the capability of operating at different temperatures for different programming Aquatic facility users include: • Lake City High School • Coeur d'Alene High School • Post Falls High School • CAST Swim Team (140 members) Project Budget: $30 million Team Members • BRS: Chuck Musgrave, AIA, Principal in Charge; Steve Blackburn, Peer Review IA, Jeff King (Principal it WTI; Douglass Whiteaker 1 Gna (Prin Community Engagement Process: In the early part of the development of the facility B "K was involved with the public input process, development of market analysis, program recommendations and operations analysis, As the facilities acquired funding B "K became involved with continual updates to the operational budgets, providing milestone schedules with regards to operations, developing detailed FFE lists for the facilities to confirm overall project budgets and assisting in the development of a milestone schedule to assist with opening the facility successfully. ChallengelLessons learned: The biggest challenge was that The Salvation Army continued to add staffing position and items into the budget causing the overall "balance" of the budget to shift. This can be correlated directly back to The Salvation Army's lack of exposure to projects and facilities with this type of operational challenges. WTI 1 Dubuque Community School District Indoor Aquatic Study 23 OPTION A H i'I -I'd 1 11 1 1 1 1- i11~ I I1Ih- 111,I1IIII- - �11111I 1I— I 1111 11 I I I I (11111 1 !- VIII 11— 1I11� II t I 1 OPTION B nHccm OF DUB Masterpiece on Ike Mississippi ..• + OAK HILL HIGH SCHOOL NATATORIUM FEASIBILITY STUDY, CINCINNATI, OH Services: ▪ B'K: Public Input Process, Market Analysis (demographics, participation statistics and alternative service providers), Program Recommendations, Operations Analysis ▪ WTI: Programming and Aquatic Design Brief Description of Project: Oak Hill High School is located in the greater Cincinnati area and has a long and rich competitive swimming history. The purpose of this study was to investigate the development of an aquatic venue that would serve the competitive needs of the high school and club swim programs along with the aquatic needs of the general public. Team Members: ▪ WTI: Douglass Whiteaker (Principal -in- Charge) B "K: Jeff King (Principal-in-Charge), Darin Barr (Assisted in data analysis and present for meetings when requested) Community Engagement Process: Stakeholder meetings Focus groups Public meetings ChallengelLessons Learned: The biggest challenge in this project was 2 fold. One there was the issue with developing a stand along aquatic facility that was going to be as revenue neutral as possible while still serving the needs of the school district and the general public. Two was the issue surrounding funding and the fact that for this facility to become a reality it was going to require a significant capital fundraising campaign. NOVAK DEVON GROUP W T 1 h� Dubuque Community School District Indoor Aquatic Study 25 4401 4, THE CITY OF Novak Design Group: Gary M. Landhauser, AIA (Principal and Project Manager) Office location: Cedar Rapids, IA Time commitment to the project: 60 Hrs. Credentials: Principal at Novak Design Group & Ocean Architects since 1989. AIA member since 1990, NCARB certified as of 2000. Over 37 years of architectural experience including: • Extensive project management • Team leadership • Project design • Construction document preparation Client interaction • Promotion • Coordination of architectural and engineering disciplines • Construction administration and inspections • Development and review of specifications • Shop drawings review cost estimating Partial Project List: • Basile Hall, Mount Mercy College • Cedar Rapids, IA • Coe College, Stewart Hall Renovation - Cedar Rapids, IA Cornell College,Memer & Pfeiffer Halls Renovations - Mt. Vernon, IA • Master Plan - Linn County , IA Linn-Mar Aquatic Center, Linn - Mar Community School District - Marion, IA • Marion Elderly Housing Complex - Marion, IA • Oak Hill Jackson Brickstones - Cedar Rapids, IA Our Savior Lutheran Church - Novak Design Group: James A. Novak, AIA (Principal) Office location: Cedar Rapids, IA Time commitment to the project: 20 Hrs. Credentials: Founder and managing director of Novak Design Group & Ocean Architects. AIA member since 1979, NCARB certified as of 1979. Key function in directing and managing activities of the firm: Master planning Project design • Planning Managing marketing functions • Client relations • Promotion • Interior design W Tl Partial Project List: • Basile Hall, Mount Mercy College - Cedar Rapids, IA • Coe College, Admissions Building - Cedar Rapids, IA Grundy Center Public Library - Grundy Center, IA • McCabe Hall, Coe College - Cedar Rapids, IA • McLeod USA - Cedar Rapids, IA • Johnson County Justice Center Space Study - Johnson County, IA • Linn County Administration Facilities Master Plan Linn County, IA • Linn -Mar Aquatic Center, Linn - Mar Community School District • Marion, IA • Xavier Catholic High School Cedar Rapids, IA • YMCA Central & Stoney Point Cedar Rapids, IA • bit Masterpiece on the Mississippi A:.. Beltendorf, IA • Sixth Judicial District - Department of Correctional Services Cedar Rapids, IA • St. Joseph the Worker Catholic Church - Dubuque, IA Dubuque Community School District Indoor Aquatic Study 27 Barker Rinker Seacat: Chuck Musgrave, AIA (Principal) Office location: Denver, Colorado Time commitment to the project: 97 Hrs. Individual professional expertiselcredentials: Chuck Musgrave, a principal and the chief financial officer of Barker Rinker Seacat Architecture, has 35 years of architectural experience as an outstanding problem solver and leader. Chuck's skills and expertise are in small - community, mountain - community and nonprofit recreation facilities. Chuck takes a hands -on approach to managing a project and is a frequent speaker and author for recreation associations across the country. Barker Rinker Seacat: Steve Blackburn, AIA, LEED AP (Principal) Office location: Denver, Colorado Time commitment to the ject:9 Hrs ividual professional Cxpertiselcredentials: Steve is a BRS principal and LEED® Accredited Professional. He has extensive experience in the recreation center feasibility and design field. For the past 27 years, he has dedicated himself to the programming and design of recreation and wellness facilities in more than 110 communities and 60 colleges and universities throughout the United Stales. Fifty of Steve's projects have been published in leading trade and design journals, and his work pre Ind NOVAK DESIGN GROUP WTI Recent Project Experience • The Salvation Army Ray & Joan Kroc Corps Community Center Coeur d'Alene, Idaho • Shawnee YMCA Addition & Renovation Study & Full Service Oklahoma • Sahuarita YMCA Community Recreation Programming Arizona • Wilderness Trace Family YMCA Planning Harrodsburg, Kentucky • Alamosa Aquatic Feasibility Study Colorado • Flagstaff Aquaplex Feasibility Study & Full Service Arizona • Gunnison Community Aquatic Center Addition Colorado • Las Cruces Multipurpose Recreation & Aquatics Center New Mexico • Heather Gardens Adult Community Recreation Center Masterpiece or the Mississippi nn w Aurora, Colorado • Shalom Park Wellness Center Aurora, Colorado • Kernersville Community Recreation Center Study North Carolina • Rutland Community Recreation Center Study Vermont • Tri City Recreation Center Study Wyoming • Mid Valley Recreation Center Study Basalt, Colorado • Montrose Recreation Center Study Colorado • Morenci Community Center Arizona • Gypsum Recreation Center Colorado • Cottonwood Recreation Center Feasibility Study & Full Service Arizona has earned 30 design excellence awards. Steve has authored numerous articles and is a regular speaker at recreation and athletic industry conventions on recreation sports programming, strategic planning and design. Recent Project Experience • Adams 12 Five Star School District Veterans Memorial Aquatic Center Thornton, Colorado • Livonia Community Recreation Center Michigan • The Salvation Army Ray & Joan Kroc Corps Community Centers Salem, Oregon; Coeur d'Alene, Idaho; Augusta, Georgia; Phoenix, Arizona; Quincy, Illinois; Green Bay, Wisconsin; Staten Island, New York; Suisun City, California • Bentonville Community Center Arkansas • The Natatorium Community Recreation & Wellness Center Cuyahoga Falls, Ohio Olathe Community Center Kansas Northeast Community Center Study Kansas City, Missouri Hobbs Aquatic /Recreation Feasibility Study New Mexico Souihlake Multipurpose Community Facility Feasibility Study Texas • Grapevine Community Activity Center Renovation /Expansion Feasibility Study and Business Plan Texas • Huffhines Recreation Center Richardson, Texas Dubuque Community School District 28 Indoor Aquatic Study Water Technology, Inc.: Douglass Whiteaker (Principal• in•Charge: Aquatics) Office location: Beaver Dam, WI Time commitment to the project: 102 Hrs. Individual professional expertiselcredentials: Doug's goal is to ensure that the needs and expectations of the client are met and exceeded, His engaging personality helps to facilitate a two -way sharing process with our clients and helps the team to understand unique neighborhood demographics, public needs and ultimately results in team ownership of the project and produces the best aquatic facility to meet the public's needs. Recent Project Experience Adams 12 Five Star Schools - Thornton, CO • Bentonville Community Center • Bentonville, AR • Central High School Cheyenne, WY • Coeur d'Alene, Idaho - Kroc Center - Coeur d'Alene, ID • Luther College — Decorah, IA • Linn -Mar High School — Marion IA • Glenbrook South High School - Glenview, IL • Macon State College - Macon, GA • Marywood University - Scranton, PA • Ohio Wesleyan University - Delaware, OH Water Technology, Inc.: Adam Pfister (Aquatic Designer) Office location: Beaver Dam, WI Time commitment to the project: 50 Hrs. Individual professional expertiselcredentials: Working within in the parameters given, Adam orchestrates a symphony of aquatic elements and features throughout each facility, Adam's experience in Landscape Architecture includes environmental, urban, commercial and residential design; he also has experience in image editing. Prior to designing a facility, Adam's investigative research includes working with project management and the client to understand the demographics of the area in conjunction with the WTI "(ACM OF r DUB i� E Masterpiece an the Mississippi F•rwlwW • Olympic Swim Trial Pools - Omaha, NE • Salem, OR • Salvation Army Kroc Center- Salem, OR Shenendehowa Central School District - Clifton, NY Shepherd University - Shepherdslown, WV Snohomish School District No. 201 - Snohomish, WA Woodrow Wilson Aquatic Center • Washington, DC, DC needs, wants and state codes: Recent Project Experience • Adams 12 Five Star Schools - Thornton, CO • Brookings High School - Brookings, SD • Cherry Creek Denver, CO • College of DuPage•Glen Ellyn, IL - Glen Ellyn, IL • Gwendolyn Brooks College Preparatory Academy • Chicago, IL • Kennesaw State University - Kennesaw, GA • Luther College Aquatic Center - Decorah, IA • Linn-Mar High School — Marion IA Marywood University - Scranton, PA • • Mundelein High School Mundelein, IL • Niles North High School - Skokie, IL • Northwestern University Norris Aquatic Center Evanston, IL Dubuque Community School District Z9 Indoor Aquatic Study Ballard' King and Associates Jeff King (Feasibility) Office location, Time commitment to the project: Highland Ranch, CO Individual professional expertiselcredentials: 45 Hrs Jeff is a founding partner of B'K and has over 30 years experience in recreation facility operation and planning. A good number of those year involve either direct responsibility of operating aquatic venues or overseeing the full - time staff responsible for their operation. Jeff has provided consulting services to more than 200 communities who have benefited from his extensive background in recreation center planning and management. Jeff's expertise comes from a vast array of experience and projects. As the former Recreation Director for the City of St. Peters, MO he was responsible for start -up and operations of REC -PLEX, a 140,000 square foot recreation center, A unique characteristic of REC -PLEX was the 50M pool which hosted all of the aquatic competitions for the 1994 Olympic festival. Additionally REC -PLEX served as the "home° pool for 7 different high school swim teams and one collegiate swim team. Prior to this he was the Facility Manager for the Edora Pool Ice Center (EPIC) in Foil Collins, CO. Ballard " King and Associates Darin Barr (Feasibility) Office location Highland Ranch, CO Time commitment to the project: 23 Hrs Ind exp vidual professional ertiselcredentials: Darin joined B "K in 2007 and has over 10 years experience in recreation facility operation and planning. In the four different organizations he worked for prior to joining Bt he had either direct responsibility for or provided oversight of their aquatic operations. In his 5 years with B'K, Darin has touch almost every project the company has been involved with providing necessary data analysis, attending meetings and assisting with the various public input processes involved NOUak DESIGN GMQUh with each project Prior to joining B'K, Darin worked as the Senior Associate Director and Aquatic Manager at the University of Missouri - Columbia. While there he was responsible for opening their new aquatic facilities which encompassed 6 bodies of water and 1,6 million gallons. In addition to opening that facility he was responsible for implementing program for the student body and general public and worked with university, high school and club swimming and diving programs to develop a comprehensive event schedule, In addition to his years of working in recreation and aquatics he swam competitively from age 8 through college. THE CRY OF Du Masterpiece on the Mississippi &wide, Operational Experience Recreation Director, St, Peters REC -PLEX, St, Peters, MO Indoor 50M x 25Y competition pool: movable floor movable bulkhead 1, 3, 5, 7,10M dive tower 2, 1M springboards and 2, 3M springboards bubble system Colorado Time System Separate indoor leisure pool Spectator seating for 1,500 Facility Manager, Edora Pool Ice Center (EPIC), Fort Collins, CO Indoor 50M pool Operational Experience Aquatic Manager & Senior Associate Director, University of Missouri, Columbia, MO Indoor 50M x 25Y competition pool that included: movable floor 2 movable bulkheads Colorado Time System Indoor 65ft. x 25Y dive tank 1, 3, 5, 7,10M dive tower 2, 1M springboards and 2, 3M springboards bubble system Colorado Time System Recreation Superintendent, SI. Peters REC -PLEX, St. Peters, MO Dubuque Community School District Indoor Aquatic Sludy 30 THE CITY OF DUB Masteryiece on the Mississippi lanthtaf Hierarchy of Project Management • Novak Design Group ■ Gary Landhauser, AIA • James Novak, AIA • Chuck Musgrave, AIA • Steve Blackbum, AIA, LEED AP • Doug Whiteaker • Adam Pfister • Jeff King • Darin Barr How we handle working long•distance. Efficient and effective communication is critical to a successful project. For this reason, we employ a number of software tools to assist in reaching as broad an audience as possible, Large electronic files can be easily transferred with our Newforma Project Center, an enhanced FTP site where project files and emails can be accessed. Our team also employs the use of GoTo Meeting software which allows interactive conference calls between parties in multiple locations (e.g. the District and the City in Dubuque, Novak Design in Cedar Rapids, BRS in Denver, Ballard "King in Denver, and Water Technology in Beaver Dam, Wisconsin.) These conference calls are enhanced by allowing the Owner to see in real time documents and designs on their computer screen, NOVAK DESIGN GROUP W T1 NA1EFI �rc�vai oo� Dubuque Community School District 31 Indoor Aquatic Study 1 I► rrr! 1 0' + ��rr►►I rir�►ridt 1,1'��1 i Tit Fry � ,, h' � ,� 'll 161 Icy i � � � v 1d�7;T11 ma My� MMMMY,rw• �nrrYlw� n�y�� ,��� Ir p =._ woos . ��r -+�'- 1111 1,� /'� 1 t. THECm OF DUB Masterpiece on the Mississippi A�"M. PROGRAMMING, PUBLIC INPUT AND PRE-DESIGN PHASE Activity Scope Description (Tasks & Products) Participants 0.1 District Selects Design 1 Consulting Team April 1, 2013 Notification of selection District & City Staff Commence contract negotiations NDG WTI BRS Review proposed work plan scope Confirm public input process requirements Request documentation for site Review City of Dubuque Development Code Amendments Review Dubuque Community District Consultant Guidelines Contact user groups, partners and community and set up times for meetings 0.2 Project Preparation Review previous project information Review public input process requirements Create presentation materials for Workshop 1 Draft work plan National Slide tour components Program Card game 1.0 Pre•Design Kick Off Meeting/ Workshop 1 • Data Gathering Mid April 2013 District & City Staff Two Day Event Dubuque Community/ City of Dubuque NDG WTI BRS • Introduce team and discuss review process • Team structure (Point of contact, committees, user groups, consul- tants, etc,) • Dubuque Community School District and City of Dubuque roles and responsibilties Discuss project vision, goals and objectives Identify project constraints and parameters Review Work Plan, refinement and coordination Discuss need to have user focus group and public meetings Discuss Dubuque Community District Aquatic Center Program Discuss Dubuque Community Recreation Center Program National slide tour of similar aquatic and recreation centers to give committee a visual picture of the potential program components WTI Dubuque Community School District Indoor Aquatic Study 33 TNECITYOF DUB Masterpiece on the Mississippi news. 'NOVA DSO 'ORQl1f'4 WTl Dubuque Community School District 34 Indoor Aquatic Study • Play BRS "Program Card Game" for program building components as a data collecting device, build a wish list and to build consensus among diverse parties (game to include sizing and space allocation requirements for each program component area to meet current and future demands within the community) • Site Discussion • Discuss and review potential sites • Ownership, existing use, adjacencies • Topography, size; configuration, vegetation and ecology Utilities, infrastructure, access and circulation • Tour potential sites & collect available site data • Prepare criteria and site analysis for site selection (up to three sites) Focus Group 1 Stakeholder Meetings • Introduce Project Team and discuss Site /Program Process • Present work -to -date with staff and committees • Discuss preliminary program and concepts of cost recovery objec- tives • Present National slide tour of similar recreation centers to give com- mittee a visual picture of the potential program components • Collect citizens' comments on Site and Program Alternatives Partner Meetings • Introduce Project Team and discuss Review Process • Present work -to -date with staff and committees • Discuss: • Partner opportunities • Project Program • Concepts of cost recovery objectives • Site issues • Collect comments CommunitylStakeholders Workshop 1 • Introduce Project Team and discuss SitelProgram Process • Present work -to -date with staff and committees • Present project mission statement and goals • Participatory activities for project input to include: • National slide tour of similar recreation centers to give committee a visual picture of the potential program components 'NOVA DSO 'ORQl1f'4 WTl Dubuque Community School District 34 Indoor Aquatic Study a, THECRY OF DUB Masterpiece on the Mississippi 24..fr.n. WTI Dubuque Community School District Indoor Aquatic Study 35 • Play BRS Program Prioritization Exercise for procram building com- ponents as a data collecting device, build a wish list io build consensus among diverse parties (game to include sizing and space allocation requirements for each program component area to meet current and future demands within the community) 1.1 Work Period #1a - Mission /Goals, Survey, Conceptual Program, Data Collection, Market Analysis Early May 2013 Duration: 2 Weeks Dubuque Community/ City of Dubuque District & City Staff • Finalize collection site information: maps, soils, utilities (all existing data available) • Provide any previous program information • Staffing and admission fee information needed by Ballard King • Current project budget information NDG Team NDG WTI BRS B "K • Develop preliminary program alternatives based upon work to date • Create a list of proposed program spaces and area (SF) require- ments • Prepare site analysis for site selection • Investigate top site in greater detail • Prepare site plan alternatives exploring: • Vehicular and pedestrian circulation • Environmental criteria (sun, light, topography, drainage...) • Utilities, service access, maintenance issues • Prepare preliminary building program based on input to date • Prepare floor plan /Aquatics space diagram for each selected site exploring: • Program relationships and adjacencies • Internal circulation, efficiencies, mechanical and support spaces • Aquatic Options • Prepare Project Budget Model Matrix alternatives based on sug- gested program to include: • Develop preliminary capital cost for each program space • Suggested fixture, furniture and equipment budget • Site & utility improvement/ restoration budget • Fees and development budget • Contingencies WTI Dubuque Community School District Indoor Aquatic Study 35 DUB THE CITY OF Masterpiece on the Mississippi Nod 'NONAK DES14N' OR.1V WTI Dubuque Community School District Indoor Aquatic Study 36 • Future phases • Alternates • Ballard King to prepare preliminary market analysis. Project Team Up -Date (Go -to- meeting conference to review progress) 2 hour event • Review Site analysis District & City Staff • Review Floor Plan alternatives NDG WTI BRS B *K • Select Site • Review Project Budget Model • Review Market Analysis issues Deliverables: • Recommended Building, Pool and Site Program • Conceptual Site Plan(s) • Project Budget Model(s) Work Period lb - Project Team Conceptual Design, Market Analysis & Program Mid May 2013 • Review work to date, surveys, programs, plans and all previous data NDG WTI BRS B *K Duration 2 weeks • Consolidate previous programming and aquatic center planning ideas • Prepare preliminary building program based on input to date • Prepare two floor plantAquatics space diagrams for selected site exploring: • Program relationships and adjacencies • Internal circulation, efficiencies, mechanical and support spaces • Aquatic Options • Update Project Budget Model Matrix based on suggested program to include: • Ballard King to finalize market analysis. • Prepare for next team workshop and public meeting 1.2 Project Team Workshop 2 - Site 6 Building Plan Alternatives Early June 2013 Project Committee Orientation Meeting District & City Staff 2 Day Event • Discuss deliverables listed below NDG WTI BRS • Review preliminary building program • Review floor plan space diagrams and suggest recommended modifications for further study to arrive at recommended floor plan 'NONAK DES14N' OR.1V WTI Dubuque Community School District Indoor Aquatic Study 36 1 • }, y't'lil I � 0.61, /,;k16 esh II • THE CRY OF DUB Masterpiece on the Mississippi r,.~ 37 ' Review Project Budget Model against goals ' Review Architectural Character slide show ' Review agenda for Community Meeting 1 Partner Meetings • Review preliminary building program ' Review floor plan space diagrams and suggest recommended modifications for further study to arrive at recommended floor plan ' Review site evaluation, ranking and select final site ' Discuss: • Partner opportunities ' Collect comments Deliverables: Draft Mission and Goals Statement ' Preliminary building program ' Floor Plan Space Diagram Alternatives • Project Budget Model Matrix ' Meeting Minutes ' Agenda for Community Meeting 2 ' Slide presentation of building character potential. Images of com- parable buildings giving a wide range of ideas for what your Center may look like. Community /Stakeholders Workshop 2 ' Introduce Project Team and discuss Conceptual Plan Process • Present work-to-date with staff and committees • Review Architectural Character slide show ' Discuss preliminary program and concepts of cost recovery objectives • Collect citizens' comments on Site Selection and Floor Plan Space Diagram Alternatives Work Period 2a - Concept Development ! Detailed Project Budget I Operational Proforma Analysis Early June ' Organize information garnered from Community Meeting 1 and review with staff and committee NDG WTI BRS Duration 2 weeks ' Prepare recommended site plan(s) with building footprint options • Update Project Budget Model to alternative plan's) ' Prepare two floor plan alternatives exploring: • Program relationships and adjacencies for each floor • Internal circulation, efficiencies, mechanical and support spaces ' Prepare two approaches to exterior elevations and sectional possi- bilities with three dimensional animated computer model to include: ' Massing and roof characteristics W %% bk Dubuque Community School District Indoor Aquatic Study NOVaY, RESIGN MO �;- __.� 37 I mcsi. , .... Pi THE CaOF DUB Masterpiece on the Mississippi x WTI • bk k Dubuque Community School District Indoor Aquatic Study 38 • Building sections showing interiors of key spaces and vertical rela- tionships (two story spaces, atriums, large volumes...) • Window fenestrations • Exterior materials • Site, parking & access Project Team Up -Date (Go -to meeting conference to review progress) Mid June , Review Site Plan District & City Staff 2 hour event • Review Floor Plan alternatives - select preferrec option for further development NDG WTI BRS B`K • Review two exterior elevation approaches • Review updated Project Budget Model Deliverables: • Recommended Building and Site Program • Conceptual Site Plan(s) • Conceptual Floor Plans Project Budget Model(s) 2.0 Work Period 2b • Prepare Draft Final Feasibility Summary Report Mid June . Update all work products based on input received in Tele- Confer- ence Meeting NDG WTI BRS B*K Duration 2 weeks . Prepare Draft Final Graphics Package showing plans, elevations, sections, and exterior perspective views • Prepare Draft final "Summary of Feasibility" to include: • Project Program of Spaces Project Budget Model • Reduced Plan, Elevation, and Perspective Drawings • Operational Proforma Analysis Updated to Current Plans • Prepare PowerPoint Presentation of draft final "Summary of Feasibil- ity' • Prepare Draft Final of operational plan including • prepare an operational structure including program and facility use plan for year one, staffing models, management strategies, and mainte- nance staffing levels for the proposed facility • develop assumptions which will include: • Organizational chart for full /part time staffing, including custodial and building maintenance based on the mission of the facility and service philosophy, hours of operation • Identification of contractual service needs Rental uses philosophy WTI • bk k Dubuque Community School District Indoor Aquatic Study 38 THE CRY OF DUB Masterpiece on the Mississippi h v WTI Dubuque Community School District 39 Indoor Aquatic Study • Identification of existing expenses that would naturally be transferred to the new recreation center ( Note: These projections are based on an understanding of the goals of the project, service area demographics, and market conditions, as well as the operating, penditures and income and agreed upon assumptions, cannot be guaranteed,) service and fee philosophies. Estimates for ex- will be based on the best information available but are impacted by many variables and Workshop 3 • Final Presentation End of June Project Committee Orientation Meeting • Present Draft Final NDG WTI BRS B *K One Day Trip “Summary of Feasibility' • Presentation with PowerPoint showing all graphics City Council Presentation • Present Draft Final "Summary of Feasibility" • Presentation with PowerPoint showing all graphics Deliverables: • Two copies of the reduced drawings inserted delivered to Owner • One copy of Final Presentation • Graphics, animations tal format suitable for by the District and report delivered on Compact Disc in digi- publications, marketing, or inclusion in web pages • All graphics to be mounted on 24" x 36" display boards. One (1) sets delivered to Owner 4.0 Work Period #3 Prepare Pre•Design Documents End of June NDG 1 BRS l NDG WTI BRS B *K UVTI 4 • Prepare conceptual site plan Duration: Weeks • Prepare conceptual floor plans Ballard King • Regional Market Analysis i Develop Operational Proforma to include: Completion • Operations including staffing, contractual services, commodities and operating capital End of July • Development of fee schedules, anticipated participation levels, pro- gramming, memberships, and other revenue sources. v WTI Dubuque Community School District 39 Indoor Aquatic Study VW?: W 1 .......... I il11111l�►�i'ai��►�i1��iii Qemaa Priori f 1 • I, N ‘ '1 h - Al rr I r • +i re r !N' MEM= THE CITY OF DUB Masterpiece on the Mississippi ,»M+ Novak Design Group, Barker Rinker Seacal, Water Technology, Inc,, and Ballad King & Associates, encourage you to call our references; as they are a true testament to our work and experience as individual firms as well as our work as a TEAM. Dr, Katie Mulholland Superintendent Linn -Mar Community School District 2990 North 10th Street Marion, Iowa 52302 T, 319.447 -3000 E. kamullholland @linnmar.k12,ia.us (Project Team: Novak Design GrouplWater Technology, Inc.) Henri Vos, Project Manager 720.972.61751 henri.vos @adams12,org Adams 12 Five Star School District Veterans Memorial Aquatics Center Thornton, Colorado (Project Team: Barker Rinker SeacatlWater Technology, Inc.) Jason A. Chadock Athletics Facility Cooridnator Adams 12 Five Star Schools 1500 E. 128th Ave Thornton, Colorado 80241.2602 T. (720) 972.4208 F. (720) 972 -5939 E. jason.a.chadock @adams12.org (Project Team: Barker Rinker SeacatlWater Technology, Inc.) Major Ben Markham Kroc Center Associate Officer The Salvation Army Ray and Joan Kroc Corps Community Center, Coeur d'Alene, Idaho T. (208) 667.1665 E. ben.markham @usw.salvationarmy.org (Project Team: Barker Rinker SeacatlWater Technology, Inc,lBallard'King and Associates) NOVAK DESIGN GROUP WTI -_` Ron DeWilde, Director of Operations The Salvation Army The Salvation Army Ray and Joan Kroc Corps Community Center, Salem, Oregon T. (503) 566.5762 E. ron.dewilde @usw.salvationarmy.org (Project Team: Barker Rinker SeacatlWater Technology, Inc,lBallard "King and Associates) bit Dubuque Community School District Indoor Aquatic Study 41 MO I= 1.111111.1= We're for you, NOVAK. DESIGN 01104 a 02042013 Mr. Jim Novak Novak Design Group PLC 3801 River Ridge Drive N,E, Cedar Rapids, IA 52402 THEM? OF DUB E Masterpiece on the Mississippi Holmes Murphy & Assodates F41 50014 Aye Ste, 300 Cedar Rapids, IA TF; 800.300.0325 HOLMES MURPHY, Dubuque Community School District; Dubuque Aquatic Center Study Jim, Per your request our records do not indicate any past or pending litigation that has been brought against the Novak Design Group PLC. Sincerely, Nick Maletta Account Executive Holmes Murphy & Associates N Maletta @holmesmu rphy,com (319) 896.7709 (800) 300.0325 Enclosed; WTI Dubuque Community School District 43 Indoor Aquatic Study Thank you for consideration of the Novak Design Group/Water Technology, Inc/ Barker Rinker Seacat/Ballard « King and Associates Project Team for the Dubuque Community School District Request for Proposal for Indoor Aquatic Center Study NOVAK DESIGN GROUP WTI BARKER.RINKER SEACAT ARCHITECTURE b� IttLIANU *KING 1'•lii111111111 NOVAK DESIGN GROUP 3801 River Ride Drive NE Cedar Rapids, bwa 52402 T 319.393.9334 F 319.393.9331 www/novakdesigngroupeom April 5, 2013 Marie Ware Leisure Services Manager - City of Dubuque zzoo Bunker Hill Rd. Dubuque, IA 52001 RE: Questionnaire Response for Aquatic Center Study Dear Ms. Ware, As requested Novak Design Group in partnership with Water Technology, Inc., Barker Rinker Seacat Architecture and Ballard King and Associates via this letter are providing responses to the questionnaire sent to us for the Indoor Aquatic Center Study. f. Provide a chart of which team members have worked together on past projects, including the projects featured fn theproposal. • See attached "Exhibit B" of Past Projects. 2. Create a matrix of similar projects completed, contract cost with actual cost at conclusion of project, including the projects featured fn the proposal. • See attached "Exhibit C" of Similar Projects. 3. Explain your engagement model for this project. • Our work plan defines Public Engagement in the Process Work Plan is "fxh ibft A" in Agreement for Arch itectu raf 5 ervices aftach ed. Our experience over the years has shown that beautiful and well crafted feasibility studies are the keystone to our most successfully built projects. Whether the goal is a modest or complex community /School recreation facility we have found that planning the set- up of the process from "Mission and Vision" through to the "Realities of Construction" to arrive at a well loved facility that can be efficiently operated and maintained through the years. We believe it's all in the set up. Orchestrating a process through the feasibility steps ultimately involves not only the Owners and operators but hears the passions, needs, and wants of the users of the facilities. Public process is critical to facilities like yours and we employ a variety of fun and inclusive approaches that encourage input from all parties. The process we have mapped here for the Dubuque Indoor Aquatic Center begins a journey to explore the full array of opportunities that exist including programming activities that connect indoors and out, designing a wonderful facility supporting your visions, evaluating operational efficiencies and long term fulfillment of your dreams. Through the entire process sustainable approaches are intrinsic to the project realization. These facilities will very much be in the public eye with high expectations for environmental awareness and responsible use of public funds. As the stewards of our most valued places we need to make the right decisions early on including not only capital improvements but also long term energy and operational savings. Our feasibilities studies therefore include a wealth of information guiding the process to ultimate implementation and beyond. We prepare beautifully rendered graphics, concise narrative, and detailed operational evaluations that you will find to be highly professional and very readable. In additions to the final feasibility study report you will have access to all graphics and product in electronic format for inclusion into all of your current and future marketing materials including web page design, brochures, fund raising presentations and other media tools. We promise our final products to be a living guide for the realization of your plans. 4. Provide your expectations of the City of Dubuque and Dubuque Community School District personnel and resources related to the project. • Our team requests that the City of Dubuque and Dubuque Community School District: o Identify Point of Contact for Aquatic Study. o Be represented at Pre - Design Kick off Meeting /Workshop, Focus and Stakeholder Meetings, Community /Stakeholders Workshops, Project Team updates and Final Presentation. o Encourage interested Parties to be involved. o Facilitate Public, Stakeholders and Partner Meetings and Announcements. o Provide Space for meetings with appropriate Audio / Video capabilities. o Provide site information. 5. Provide a detailed budget related to your proposal. This should break your budget down to create a greater understanding of your budget proposal. • Fee Breakdown Estimate by Scope Element See attached Dubuque Indoor Aquatic Center Study - Work Plan * *, for full scope description, team member involvement and fee per scope element. ** Work Plan is "Exhibit A" in Agreement for Architectural Services attached. Project Preparation, Input Process, Draft Work Plan $ 2,400. Pre - Design - Data Gathering $ 12,200. Conceptual Program, Site & Market Analysis $ 5,450. Project Team Up -Date -1 $ 1,200. Conceptual Design, Market Analysis & Program $ 6,800. Site & Building Plan Alternatives, Community Workshop $ 12,200. Concept Development, Detailed Budget, Operations Proforma Analysis $ 9,050. Project Team Up -Date - 2 $ 1,200. Draft Final Feasibility Summary Report $ 5,700. Final Presentation $ 8,900. Preparation of Pre - Design Documents $ 4,800. Total Fee (Not To Exceed) $ 69,900. • Hourly Rates - All Firms These hourly rates will be used for billing of scope elements Principals $ 150. Staff $ 100. • Fee Payment Schedule: Invoice 1 - Conclusion of Project Team Update 1 $ 21,250.* Invoice 2 - Conclusion of Project Team Update 2 $ 29,250.* Invoice 3 - Conclusion of Pre - Design Documents $ 19,400.* Total Fee: $ 69,900.* *Plus Reimbursable Expenses 6. Provide details about reimbursables for the project including specifics regarding reimbursables. (Example, if reimbursable budget is projected at $2,000, how much is copying, mileage, postage, et cetera.) • Reimbursable Expenses: Consultant Travel - Air Fare and Lodging $ 7,800. Printing - Presentation Documents $ goo. Total Reimbursable Expenses $ 8,700. 7. If you included additional services in your proposal, please explain those services and their value as additional services versus being included in the proposal. If no additional services proposed, ignore this question. • Our team's proposal is comprehensive, is conformant to the RFP, and does not require any additional services to meet the project requirements. 8. If possible, establish a not to exceed price. • Our team's proposed fee outlined in item 5 above , $69,900, is a Not to Exceed Fee. 9. Share your track record with change orders and the amount of change orders in at least two similar projects to this proposal. • Our team has experience with over 5o previously completed studies and no additional fee was requested for any of those studies. We pride ourselves on delivering a final product for our Client as outlined in our work plan and have present a fee which allows us to do so. 10. Provide a detailed contract outlining your scope of services proposed. • See attached draft Contract outlining scope of services provided. As stated in our initial proposal letter, as a team, we are confident in our ability to provide a comprehensive study which will clearly identify an Aquatic Center design which fits the needs of both the Dubuque Community School District and the Dubuque Community. We look forward presenting our credentials to the members of the Selection Committee on April 5th at 12:45 PM. Best Regards, Gary M. Landhauser AIA Partner- Novak Design Group, PLC AGREEMENT FOR ARCHITEC TURA L SERVICES THIS AGREEMENT FOR ARCHITECTURAL SERVICES ( "Agreement ") is made as of April 1, 2013 by and between Novak Design Group, PLC - TEAM ( "Architect ") and Dubuque Community School District and the City of Dubuque ( "Owner "). Recitals A. Architect is performing architectural services for the Owner for a project to be located in Dubuque, Iowa and generally including professional services in connection with the development of a Indoor Aquatic Center Study ( "Project "). B. Under the terms of this agreement between the Architect and the Owner, the Architect is authorized or permitted to engage one or more consultants to provide services to the Architect on the Project, including without limitation the services to be provided to the Architect by their sub - consultants Barker Rinker Seacat (BRS), Water Technology Inc. (WTI), Ballard King Associates (BKA) under this Agreement. Agreement C. Owner wishes to retain Architect and Architect wishes to provide the services to Owner described in this Agreement and on the terms and conditions described in this Agreement. NOW, THEREFORE, Architect and Owner hereby agree as follows: 1. Services by Architect. Architect shall provide the services ( "Services ") to the Owner for the Project as more particularly described on Exhibit A — Work Plan dated March 8, 2013. Architect shall begin providing the Services as of April 1, 2013 or the date the Owner signs this agreement and shall deliver the Services to the Owner by July 31, 2013 or 120 days after the Owner signs this agreement. Owner shall timely deliver or provide all materials and other information necessary to or requested by Architect to allow Architect to complete the delivery of the Services by the Architect in a timely manner. Owner acknowledges and agrees that any delay or failure by Owner to delivery or provide any materials or other information necessary to or requested by Architect may delay the Architect in providing the Services or increase Architect's costs hereunder. In such event, Architect shall provide written notice to Owner of such delay or such increase in costs as soon as Architect can reasonably ascertain such delay or increase in costs. Owner shall be deemed to have accepted such revised delivery schedule or compensation to Architect and this Agreement shall be deemed to be so modified, unless Owner objects in writing within fifteen (15) days from the date of such notice by the Architect to the Owner. In the event that the Owner does object to the Architect's notice, then the parties shall work in good faith to resolve any disagreements, and if the parties cannot resolve such disagreements, then either party may terminate this Agreement. 2. Services in Addition. If Services in addition to those outlined in the attached Work Plan are requested by the Owner, the Architect shall identify the additional fee to provide such services. The Owner will notify the Architect in writing that the fee for additional services is approved prior to the Architect performing the work. Compensation for Additional Services will be as follows: a. Additional Services - hourly rates: • Principals $150. per hour • Staff $100. per hour b. Additional Expenses • Trips $1,000. per trip (airfare, meals lodging) 1 NOVAK DESIGN GROUP 3. Compensation to Architect. Architect shall be compensated for providing the Services in an amount not to exceed Sixty Nine Thousand Nine Hundred dollars ($69,900), plus expenses for travel, lodging, meals and printing estimated at Eight Thousand Seven Hundred dollars ($8,700). Architect shall bill Owner at conclusion of Project Team Update 1 - $21,250, the Conclusion of Project Team Update 2 - $29,250 and Conclusion of Pre - Design Documents - $19,400 for services provided by Architect to the Owner and all reimbursable expenses as provided in Section 5. 4. Payment to Architect: Promptly upon receipt of any billing from Architect, the Owner shall, as provided in the Agreement, pay to Architect the amount of invoice for Architect's Services. All amounts payable to Architect under this Section 4 which are not paid on or before the Payment Date shall bear interest at the rate of twelve percent (12 %) per annum from the Payment Date to the date payment is received by Architect. Without affecting any other right or remedy under this Agreement or at law, in the event that payment of the amount due is not made within thirty (30) days of the Payment Date, Architect shall have the right to cease all activity under this Agreement until payment in full is received. Any estimated completion dates for the completion or delivery of the Services shall be extended by the period during which the Architect shall have ceased activity, plus the reasonable additional time necessary to restart providing the Services following such interruption in service. Without effecting any other right or remedy under this Agreement or at law, Architect may advise Owner, directly, if any payment due to Architect is not paid within forty -five (45) days of the Payment Date. 5. Reimbursable Expenses. Expenses have been included in Section 3: "Compensation to Architect ". Expenses exceeding the estimated amount in Section 3 or if Owner proceeds with "Services in Addition" to "Exhibit A ", Owner shall reimburse Architect a sum equal to project - related expenses for all expenses incurred by Architect with respect to the Services at the actual cost of such expenses, including without limitation, printing and document reproduction, postage, overnight delivery or courier services, photographs, slides and transparencies, travel expenses and long distance telephone and facsimile expenses. All "Service in Addition" reimbursable expenses shall be billed by Architect to Owner in the monthly billing following the month in which the expense is incurred. The reimbursable expense estimate submitted has been created based upon current information available to the architect. The architect hereby requests that, in the event that air fares or other expenses change during the study period, the Owner reimburse the consultants for the modified project - related expenses. The architect will notify the Owner of such changes in a timely manner. 6. Desianated Representatives. Owner hereby designates _ . as Owner's representatives ( "Owner's Representative ") for all matters for Owner under this Agreement and with respect to the Services to be performed by Architect for Owner. Owner's Representative shall be available to Architect at all reasonable times for consultation with Architect and Architect's Representative (as hereinafter defined). Architect may conclusively rely on the decisions made by Owner's Representative, including those which modify this Agreement after approval. Architect may, but shall not be required to, confirm to Owner in writing any decision made by Owner's Representative, but in all events Owner shall be responsible for being advised by Owner's Representative of all actions undertaken and decisions made by Owner's Representative. Architect hereby designates Gary M. Landhauser AIA as Architect's Representative ( "Architect's Representative ") for all matters for Architect under this Agreement and with respect to the Services to be performed by Architect for Owner. Architect's Representative shall be available to Owner at all reasonable times for consultation with Owner's Representative. Owner may conclusively rely on the decisions made by Architect's Representative, including those which modify this Agreement. Either party may change its Representative under this Agreement by giving notice to the other party as provided in this Agreement. Dubuque Community Schools and the City of Dubuque will represent _ and Novak Design Group, PLC will be represented by Gary M. Landhauser AIA. 2 NOVAK DESIGN GROUP 7. Independent Contractor. Owner acknowledges and agrees that Architect and its authorized representatives are independent contractors to Owner. Architect is neither an employee of nor a joint venturer or partner with the Owner. 8. Ownership and Use of Services. All plans, documents, drawings, models, specifications, reports and other tangible materials (collectively, "Documents ") submitted by Architect to Owner as part of the Services are and shall remain the property of the Architect and the Owner, without regard as to whether the Project is finally executed or completed. Owner may not use the Documents for any other project or any extensions or modifications of the Project without the express written consent of the Architect. Owner shall not modify, alter or change any of the Documents without the express written consent of the Architect. Architect hereby consents to extensions or modifications provided the owner waives any claim against the Architect which arises as a result of the extensions or modifications. 9. Termination. Either party to this Agreement may terminate this Agreement on not less than twenty (20) days written notice to the other; provided, however, Owner shall be obligated for payment to Architect for all Services rendered by Architect to Owner prior to the date of such termination and shall pay such amount to Architect within ten (10) days of receipt of a final billing from Architect. 10. Notices. All notices, demands, requests, exercises and other communications required or permitted to be given by either party under this Agreement shall be in writing and: a. shall be sent by personal delivery, in which case notice shall be deemed delivered on the date of receipt by the other party; or b. shall be sent by telecopy or similar means if a copy of the writing is also sent by United States Certified Mail, pursuant to subparagraph (d) below, in which case notice shall be deemed delivered on the date and at the time of transmittal by telecopy or other similar means, provided that a transmission report is generated that reflects the accurate transmission date and time of the writing; or c. shall be sent by a nationally recognized overnight courier, in which event notice shall be deemed delivered one (1) business day after deposit with that courier; or d. shall be sent by United States Certified Mail, return receipt requested, in which case notice shall be deemed delivered three (3) business days after deposit, postage prepaid, in the United States Mail. All such notices shall be addressed as follows: If to Owner Dubuque Community School District and the City of Dubuque Attn: Fax: Email: If to Architect: Novak Design Group, PLC 3801 River Ridge Drive NE Cedar Rapids, IA 52402 Attn: Gary M. Landhauser AIA Fax: 319 - 393 -9334 Email: glandhauser @novakdesigngroup.com The foregoing addresses may be changed by giving notice in the manner set forth in this Section. 3 NOVAK DESIGN GROUP 11. Attorneys Fees. If any legal action or any other proceeding, including arbitration or an action for declaratory relief, is brought for the enforcement of this Agreement or because of an alleged dispute, breach, default or misrepresentation in connection with this Agreement, the prevailing party shall be entitled to recover reasonable attorneys fees and costs of suit, in addition to any other relief to which the party may be entitled. 12. Successors. This Agreement shall bind and inure to the benefit of the respective heirs, personal representatives, successors and assigns of the parties to this Agreement. 13. Waivers. No waiver of any breach or default of any term or provision of this Agreement shall be deemed a waiver of any other term or provision of this Agreement, and no waiver shall be valid unless in writing and executed by the waiving party. 14. Construction of Agreement. Section headings in this Agreement are solely for the convenience of the parties and are not a part of and shall not be used to interpret this Agreement. This Agreement shall not be construed as if it had been prepared by one of the parties, but rather as if both parties have prepared it. Unless otherwise indicated, all references to Sections are to this Agreement. All exhibits to this Agreement are hereby incorporated by reference. 15. Third -Party Rights. Any controversy or claim arising from or relating to this Agreement or the breach hereof will be settled by binding arbitration administered by the American Arbitration Association in accordance with its Commercial Arbitration Rules in effect to the extent not inconsistent with this Agreement, and judgment on the award rendered by the arbitrator may be entered in any court having jurisdiction. Such proceedings will be conducted in the Denver offices of the American Arbitration Association. The arbitration shall be before one neutral arbitrator to be selected in accordance with the Commercial Rules of the American Arbitration Association then in effect and shall proceed under the Expedited Procedures of those rules, irrespective of the amount in dispute. Any provisional remedy that would be available from a court of law shall be available from the arbitrator to the parties to this Agreement pending arbitration. Notwithstanding the foregoing, either party may seek from a court of competent jurisdiction any interim or provisional relief that is necessary to protect the rights or property of that party, pending the parties' selection of the arbitrator. Notwithstanding such arbitration rules, the arbitrator shall have the authority only to award any remedy or relief that a court of Colorado could order or grant including, without limitation, specific performance of any obligation created under this Agreement, the awarding of punitive damages, the issuance of an injunction, or the imposition of sanctions. The arbitrator shall have the discretion to order a pre- hearing exchange of information by the parties, including, without limitation, the production of requested documents and the exchange of summaries of testimony of proposed witnesses. Each of the parties shall be entitled to take no more than two (2) depositions and the arbitrator shall have the power to issue subpoenas to compel witnesses' attendance at depositions. Each party shall also be entitled to obtain from the other party the production of documents within twenty (20) days following service of a request specifying, with reasonable particularity, the categories of documents sought. All discovery must be completed no later than fifteen (15) days before the date of the arbitration hearing and the arbitrator shall promptly resolve all discovery disputes by telephonic conference call. Any arbitration award must be rendered within thirty (30) days following the completion of the arbitration hearing. The arbitration award shall be in writing and shall specify the factual and legal bases for the award. 16. Integration, This Agreement contains the entire agreement between the parties, and expressly supersedes all previous or contemporaneous agreements, understandings, representations, or statements between the parties respecting the engagement by Owner of Architect, the provision of the Services by Architect to Owner or the other matters set forth herein. 4 NOVAK DESIGN GROUP 17. Amendment. Except as expressly set forth herein, this Agreement may not be amended or altered except by a written instrument executed by all the parties hereto. 18. Partial Invalidity. Any provision of this Agreement that is unenforceable or invalid or the inclusion of which would adversely affect the validity, legality or enforceability of the Agreement shall be of no effect, but all the remaining provisions of this Agreement shall remain in full force and effect. 19. Governing Law. The validity, meaning and effect of this Agreement shall be determined in accordance with Iowa laws. Dated: Owner Dubuque Community School District and the City of Dubuque. By: Title: Dated: Architect: Novak Design Group, PLC By: Gary M. Landhauser AIA Title: Principal 5 NOVAK DESIGN GROUP Dubuque Indoor Aquatic Center Study DUBUQUE COMMUNITY SCHOOL DISTRICT AND THE CITY OF DUBUQUE WORK PLAN March 8, 2013 PROGRAMMING, PUBLIC INPUT AND PRE - DESIGN PHASE Activity Scope Description (Tasks & Products) Participants 0.1 April 1, 2013 0.2 District Selects Design / Consulting Team District & City Staff NDG WTI BRS Fee: $2,400 • Notification of selection • Commence contract negotiations • Review proposed work plan scope • Confirm public input process requirements • Request documentation for site • Review City of Dubuque Development Code Amendments • Review Dubuque Community District Consultant Guidelines • Contact user groups, partners and community and set up times for meetings Project Preparation • Review previous project information • Review public input process requirements • Create presentation materials for Workshop 1 • Draft work plan • National Slide tour components • Program Card game 1.0 Mid April 2013 Two Day Event Pre - Design Kick Off Meeting/ Workshop 1 - Data Gathering District & City Staff NDG WTI BRS Fee: $12,200 Dubuque Community/ City of Dubuque • Introduce team and discuss review process • Team structure (Point of contact, committees, user groups, consultants, etc.) • Dubuque Community School District and City of Dubuque roles and responsibilties • Discuss project vision, goals and objectives • Identify project constraints and parameters • Review Work Plan, refinement and coordination • Discuss need to have user focus group and public meetings • Discuss Dubuque Community District Aquatic Center Program • Discuss Dubuque Community Recreation Center Program • National slide tour of similar aquatic and recreation centers to give committee a visual picture of the potential program components • Play BRS "Program Card Game" for program building components as a data collecting device, build a wish list and to build consensus among diverse parties (game to include sizing and space allocation requirements for each program component area to meet current and future demands within the community) • Site Discussion • Discuss and review potential sites • Ownership, existing use, adjacencies • Topography, size, configuration, vegetation and ecology • Utilities, infrastructure, access and circulation • Tour potential sites & collect available site data • Prepare criteria and site analysis for site selection (up to three sites) Focus Group / Stakeholder Meetings • Introduce Project Team and discuss Site /Program Process • Present work -to -date with staff and committees • Discuss preliminary program and concepts of cost recovery objectives • Present National slide tour of similar recreation centers to give committee a visual picture of the • Collect citizens' comments on Site and Program Alternatives Partner Meetings • Introduce Project Team and discuss Review Process • Present work - to-date with staff and commiftees • Discuss: • Partner opportunities • Project Program • Concepts of cost recovery objectives • Site issues • Collect comments Community /Stakeholders Workshop 1 • Introduce Project Team and discuss Site /Program Process • Present work - to-date with staff and commiftees • Present project mission statement and goals • Participatory activities for project input to include: • National slide tour of similar recreation centers to give committee a visual picture of the potential • Play BRS Program Prioritization Exercise for program building components as a data collecting PROGRAMMING, PUBLIC INPUT AND PRE - DESIGN PHASE Activity Scope Description (Tasks & Products) Participants 1.1 Early May 2013 Duration: 2 weeks Work Period #1a - Mission/Goals, Survey, Conceptual Program, Data Collection, Market Analysis District & City Staff NDG WTI BRS BKA Fee: $5,450 Dubuque Community/ City of Dubuque • Finalize collection site information: maps, soils, utilities (all existing data available) • Provide any previous program information • Staffing and admission fee information needed by Ballard King • Current project budget information NDG Team • Develop preliminary program alternatives based upon work to date • Create a list of proposed program spaces and area (SF) requirements • Prepare site analysis for site selection • Investigate top site in greater detail • Prepare site plan alternatives exploring: • Vehicular and pedestrian circulation • Environmental criteria (sun, light, topography, drainage...) • Utilities, service access, maintenance issues • Prepare preliminary building program based on input to date • Prepare floor plan /Aquatics space diagram for each selected site exploring: • Program relationships and adjacencies • Internal circulation, efficiencies, mechanical and support spaces • Aquatic Options • Prepare Project Budget Model Matrix alternatives based on suggested program to include: • Develop preliminary capital cost for each program space • Suggested fixture, furniture and equipment budget • Site & utility improvement / restoration budget • Fees and development budget • Contingencies • Future phases • Alternates • Ballard King to prepare preliminary market analysis. 2 hour event Project Team Up -Date (Go -to- meeting conference to review progress) District & City Staff NDG WTI BRS BKA Fee: $1,200 • Review Site analysis • Review Floor Plan alternatives • Select Site • Review Project Budget Model • Review Market Analysis issues Deliverables: • Recommended Building, Pool and Site Program • Conceptual Site Plan(s) • Project Budget Model(s) Mid May 2013 Duration 2 weeks Work Period 113 - Project Team Conceptual Design, Market Analysis & Program NDG WTI BRS BKA Fee: $6800 • Review work to date, surveys, programs, plans and all previous data • Consolidate previous programming and aquatic center planning ideas • Prepare preliminary building program based on input to date • Prepare two floor plan /Aquatics space diagrams for selected site exploring: • Program relationships and adjacencies • Internal circulation, efficiencies, mechanical and support spaces • Aquatic Options • Update Project Budget Model Matrix based on suggested program to include: • Ballard King to finalize market analysis. • Prepare for next team workshop and public meeting PROGRAMMING, PUBLIC INPUT AND PRE - DESIGN PHASE Activity Scope Description (Tasks & Products) Participants 1.2 Early June 2013 2 Day Event i Project Team Workshop 2 - Site & Building Plan Alternatives District & City Staff NDG WTI BRS Fee. $12,200 Project Committee Orientation Meeting • Discuss deliverables listed below • Review preliminary building program • Review floor plan space diagrams and suggest recommended modifications for further study to arrive at recommended floor plan • Review Project Budget Model against goals • Review Architectural Character slide show • Review agenda for Community Meeting 1 Partner Meetings • Review preliminary building program • Review floor plan space diagrams and suggest recommended modifications for further study to arrive at recommended floor plan • Review site evaluation, ranking and select final site • Discuss: • Partner opportunities • Collect comments Deliverables: • Draft Mission and Goals Statement • Preliminary building program • Floor Plan Space Diagram Alternatives • Project Budget Model Matrix • Meeting Minutes • Agenda for Community Meeting 2 • Slide presentation of building character potential. Images of comparable buildings giving a wide range of ideas for what your Center may look like. CommunitvlStakeholders Workshop 2 • Introduce Project Team and discuss Conceptual Plan Process • Present work -to -date with staff and committees • Review Architectural Character slide show • Discuss preliminary program and concepts of cost recovery objectives • Collect citizens' comments on Site Selection and Floor Plan Space Diagram Alternatives Early June Duration 2 weeks Work Period 2a - Concept Development / Detailed Project Budget / Operational Proforma Analysis NDG WTI BRS Fee: $9,050 • Organize information garnered from Community Meeting 1 and review with staff and committee • Prepare recommended site plan(s) with building footprint options • Update Project Budget Model to alternative plan's) • Prepare two floor plan alternatives exploring: • Program relationships and adjacencies for each floor • Internal circulation, efficiencies, mechanical and support spaces • Prepare two approaches to exterior elevations and sectional possibilities with three dimensional animated computer model to include: • Massing and roof characteristics • Building sections showing interiors of key spaces and vertical relationships (two story spaces, • Window fenestrations • Exterior materials • Site, parking & access Mid June 2 hour event Project Team Up -Date (Go -to meeting conference to review progress) District & City Staff NDG WTI BRS BKA Fee: $1,200 • Review Site Plan • Review Floor Plan alternatives - select preferred option for further development • Review two exterior elevation approaches • Review updated Project Budget Model Deliverables: • Recommended Building and Site Program • Conceptual Site Plan(s) • Conceptual Floor Plans • Project Budget Model(s) PROGRAMMING, PUBLIC INPUT AND PRE - DESIGN PHASE Activity Scope Description (Tasks & Products) Participants 2.0 Mid June Duration 2 weeks Work Period 2b - Prepare Draft Final Feasibility Summary Report NDG WTI BRS BKA Fee: $5,700 • Update all work products based on input received in Tele- Conference Meeting • Prepare Draft Final Graphics Package showing plans, elevations, sections, and exterior perspective • Prepare Draft final "Summary of Feasibility' to include: • Project Program of Spaces • Project Budget Model • Reduced Plan, Elevation, and Perspective Drawings • Operational Proforma Analysis Updated to Current Plans • Prepare PowerPoint Presentation of draft final "Summary of Feasibility" • Prepare Draft Final of operational plan including • prepare an operational structure including program and facility use plan for year one, staffing models, • develop assumptions which will include: • Organizational chart for full /part time staffing, including custodial and building maintenance based on • Identification of contractual service needs • Rental uses philosophy • Identification of existing expenses that would naturally be transferred to the new recreation center ( Note: These projections are based on an understanding of the goals of the project, service area demographics, and market conditions, as well as the operating, service and fee philosophies. Estimates for expenditures and income will be based on the best information available and agreed upon assumptions, but are impacted by many variables and cannot be guaranteed.) End of June One Day Trip Workshop 3 - Final Presentation Project Committee Orientation Meeting • Present Draft Final "Summary of Feasibility" • Presentation with PowerPoint showing all graphics City Council Presentation • Present Draft Final "Summary of Feasibility" • Presentation with PowerPoint showing all graphics Deliverables: • Two copies of the reduced drawings inserted delivered to Owner • One copy of Final Presentation • Graphics, animations and report delivered on Compact Disc in digital format suitable for publications, • All graphics to be mounted on 24" x 36" display boards. One (1) sets delivered to Owner NDG WTI BRS BKA Fee: $8,900 4.0 End of June Duration: 4 Weeks Completion End ofJuly Work Period #3 Prepare Pre - Design Documents NDG WTI BRS BKA Fee: $4800 . NDG / BRS / WTI • Prepare conceptual site plan • Prepare conceptual floor plans Ballard King • Regional Market Analysis • Develop Operational Proforma to include: • Operations including staffing, contractual services, commodities and operating capital • Development of fee schedules, anticipated participation levels, programming, memberships, and Total Fee: $69,900 Chart of Past Projects Team Members have worked together on: Barker Rinker Seacat (BRS), Water Technology Inc. (WTI), Ballard King Associates (BKA) and Novak Design Group PLC (NOG). Featured Projects Completion BRS WTI BKA NDG Linn -Mar Community School District Aquatic Center, Marion, Iowa Fall 2013 X X Veterans Memorial Aquatic Center, Adams 12 Five Star School District, Thornton, Colorado 2010 X Salvation Amy Ray &Joan Kroc Corps Community Center, Coeur d'Alene, Idaho 2009 X X Oak Hill High School Natatorium Feasibility Study, Cincinnati, Oho 2010 X X Additional Projects Blue Springs Community Center /Natatorium, Missouri 2013 X X X Salvation Army Ray &Joan Kroc Corps Community Center, Phoenix, Arizona 2012 X X X Midland Aquatic Facilities Study, Midland, Michigan 2012 X X Sam m am ish Community Center Study, Washington 2012 X X X Salvation Army Ray &Joan Kroc Corps Community Center, Augusta, Georgia 2011 X X X Salvation Army Ray &Joan Kroc Corps Community Center, Quincy, Illinois 2011 X X X Lynnwood Recreation Center, Lynnwood, Washington 2011 X X Cottonwood Recreation Center, Arizona 2010 X X X Salvation Army Ray &Joan Kroc Corps Community Center, Salem, Oregon 2009 X X X Recreation Center at Boyce Mayview Park, Upper St. Clair, Pennsylvania 2009 X X Erie Recreation Center, Colorado 2008 X X X Flagstaff Aquaplex, Arizona 2008 X X X Kent Community Aquatics Center Study, Washington 2008 X X Rifle Health and Wellness Center, Colorado 2008 X X Roanoke Recreation Center Study, Virginia 2008 X X X Pasadena Aquatic Center Feasibility Study, Pasadena, Texas 2008 X X Golden Recreation Center Expansion, Colorado 2007 X X Hillsboro Recreation Center Study, Oregon 2007 X X X Salvation Amy Ray &Joan Kroc Corps Community Center, Morgantown, West Virginia Concept 2007 X X X Shalom Park Recreation Center Study, Aurora, Colorado 2007 X X X Meeker Recreation Center, Colorado 2007 X X X Salvation Amy Ray &Joan Kroc Corps Community Center, Staten Island, New York Concept 2006 X X X Kernersville Recreation Center Study, North Carolina 2006 X X Oro Valley Recreation and Aquatics Center Study, Arizona 2006 X X Rutland RRRC, Vermont 2006 X X Salvation Army Ray &Joan Kroc Corps Community Center, Aurora, Colorado Study 2006 X X X Salvation Amy Ray &Joan Kroc Corps Community Center, Detroit, Michigan Study /Concept 2006 X X X Waunakee Village Center, Wisconsin 2006 X X Thompson River Recreation Center Study, Colorado 2005 X X Aberdeen Aquatic Center, Aberdeen, South Dakota 2005 X X Cortez Recreation Center, Colorado 2004 X X X Eastern Rio Blanco Recreation Master Plan, Colorado 2004 X X Buchanan Recreation Center, Colorado 2003 X X X Fraser Valley Community Center Study, Colorado 2003 X X Mt. Pleasant Recreation Center Feasibility Study, Michigan 2003 X X X Perinton Community /Aquatic Center, Fairport, New York 2003 X X Medina Recreation Center /High School, Medina, Ohio 2003 X X Westerville Recreation Center, Ohio 2002 X X X Longmont Recreation Center, Colorado 2002 X X X Vandalia Recreation Center, Ohio 2001 X X X River Winds at West Deptford, New Jersey 2001 X X X Wheat Ridge Recreation Center, Colorado 2000 X X X Provo Recreation Center Study, Utah 2000 X X Salvation Amy Ray &Joan Kroc Corps Community Center, Honolulu, Hawaii Peer Review X X X BARKER RINKER SEACAT ARCHITECTURE W T/ w...,, .•11,,40,,,,,, • NOVAK DESIGN GROUP Matrix of Similar Projects Completed, Contract Cost with Actual Cost at Conclusion, Including Projects featured in Proposal: Barker Rinker Seacat (BRS), Water Technology Inc. (WTI), Ballard King Associates (BKA) and Novak Design Group, PLC (NDG). Featured Projects Completion Contract Cost (in millions) Actual Cost (in millions) Linn -Mar Community School District Aquatic Center, Marion, Iowa (25 M competition pool with 1 M diving) Fall 2013 (est) $11.7 Under Construction Veterans Memorial Aquatic Center, Adams 12 Five Star School District, Thornton, Colorado (50 M pool with diving) 2010 $15.3 $15.9 Salvation Army Ray &Joan Kroc Corps Community Center, Coeur d'Alene, Idaho (10 lane, 25vd competitive pool) 2009 $31.3 $33.4 Oak Hill High School Natatorium Feasibility Study, Cincinnati, Ohio 2010 N/A N/A Additional Projects Long Bridge Park and Aquatic Recreation Center, Arlington, Virginia (50 -meter competition pool) 2015 (est) $42.9 -Ph 1 Currently in Design Blue Springs Community Center /Natatorium Study, Missouri 2013 N/A N/A Bentonville Community Center, Arkansas 2013 (est) $14 Under construction Salvation Army Ray &Joan Kroc Corps Community Center, Phoenix, Arizona 2012 $31.7 $33.7 Sammamish Community Center Study, Washington 2012 N/A N/A Salvation Army Ray &Joan Kroc Corps Community Center, Augusta, Georgia 2011 $22.9 $24.4 Salvation Army Ray &Joan Kroc Corps Community Center, Quincy, Illinois 2011 N/A $24.5 Cottonwood Recreation Center, Arizona 2010 $14.6 $15.5 Gunnison Aquatic Center Addition, Colorado (6-lane competitive lap pool with 3 -meter diving) 2010 $6.8 $7 Salvation Army Ray &Joan Kroc Corps Community Center, Salem, Oregon (10 lane, 25 yd competitive poop 2009 $32 $33.2 Erie Community Center, Colorado 2008 $15.6 $15.6 Flagstaff Aquaplex, Arizona 2008 $13.7 $13.8 Kent Community Aquatics Center Study, Washington 2008 NIA N/A Roanoke Recreation Center Study, Virginia 2008 N/A Hillsboro Recreation Center Study, Oregon 2007 N/A BARKER RINKER SEACAT ARCHITECTURE W T/ W.I. . ..f...n. n.. NOVAK DESIGN GROUP THE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Approve Request for Proposal for Indoor Aquatic Center Study DATE: January 14, 2013 Dubuque kital All- America City II 111! 2012 The City Council received a request from the Dubuque Community School District School Board in June of 2012. Their request was to discuss the possible creation of a new, stand -alone aquatic center. The Council at their most recent goal setting session adopted a policy agenda for 2012 - 2014 that included indoor aquatic center evaluation, direction and school partnership as a high priority. Leisure Services Manager Marie Water recommends City Council approval of a Request for proposal for an Indoor Aquatic Center Study. The Request for Proposal has the Dubuque Community School District as the lead organization, but the document is clear that the study is a partnership of the City and School District. The study would be paid for in a 50/50 split between the City and the Dubuque Community School District. While it is uncertain at this time the cost for these services, the Fiscal Year 2014 budget recommendation will include $50,000 for 50% of a $100,000 contract. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Marie L. Ware, Leisure Services Manager January 4, 2013 Dubuque Community School District 2300 Chaney Road Dubuque, IA 52001 -3095 Phone: 563/552-3000 Fax: 563/552-3026 Superintendent, Stan Rheingans Executive Director of Finance and Business Services, Kevin Kelleher Manager of Buildings and Grounds, Bill Burkhart REQUEST FOR PROPOSAL (RFP) for INDOOR AQUATIC CENTER STUDY The Dubuque Community School District (District) is currently contemplating an indoor aquatic center project to replace the existing indoor aquatic facility at Hempstead High School. The current pool is a District -owned pool that allows rental use by the City of Dubuque (City) for public recreation programs. The District is partnering with the City to evaluate the possible creation of a new, stand -alone indoor aquatic center to better serve the needs of the District and the community. The District is soliciting requests for proposals from qualified consultants to provide a Study to assist the District and the City in determining whether to proceed with plans to construct an indoor aquatic center and, if so, under what circumstances. This Study includes, but is not limited to, conceptual facility planning, financial impact analysis, community engagement, site analysis, and needs analysis. This Study will involve outreach to potential partners and the community. Interested and qualified firms are invited to submit a proposal to provide professional services for the project, as noted below. The selected consultant will be required to meet the insurance requirements of both the District and City. The District's insurance requirements are listed in Schedule 1 and the City's insurance requirements are listed in Schedule 2. Any questions regarding the project or this RFP should be directed to Mr. Bill Burkhart, Manager of Building and Grounds, Dubuque Community School District at 563/552 -3175 and /or email bburkhart(d dbgschools.or_q prior to submission. COMMUNITY BACKGROUND The city of Dubuque is located on the Mississippi River in northeastern Iowa, adjacent to Illinois and Wisconsin. As Iowa's oldest city, Dubuque is a community well known for its historic and architectural beauty. The city is over 30 square miles in area, with a population of nearly 60,000 persons. The community has a stable and diversified manufacturing base and a growing service sector. Dubuque is the major retail, medical, education and employment center for the tri -state area. Tourism continues to be a major economic force in the community. Page 1 January 4, 2013 The Dubuque Community School District is governed by an elected Board of Education and managed by a Superintendent. The District has a current enrollment of 10,500 students in grades pre K - 12. The District's mission is to develop world -class learners and citizens of character in a safe and inclusive learning community. The District's website is http: / /www.dubuque.k12.ia.us. The District Strategic Plan is available online at http:// www. dubuque. k12. ia.us /strategicplan /index.html. The City of Dubuque is governed by an elected Mayor and City Council and managed by a City Manager. The City funds a full range of municipal services. City government works in collaboration with the private and non - profit sectors to promote economic development and sustainability. Sustainability and downtown, neighborhood, and riverfront planning and revitalization are long- standing priorities of the City Council. The City's web site is www.cityofdubuque.orq. The City Council's Goals and Priorities are available online at http://www.citvofdubugue.org/councilgoals. SUMMARY OF PROPOSED PROJECT District committees and consultants have recently completed a study of the existing Hempstead High School (Hempstead) indoor aquatic facility. The original facility was constructed in 1971 and no significant modifications have occurred since original construction. The results of the study completed by Burbach Aquatics, Inc. have revealed several deficiencies in the current pool at Hempstead. The study looked at three major elements including pool vessel /decking, pool water recirculation /disinfectant system, and space needs. A cost estimate of $1.4 million would be required to repair these deficiencies. Upon completion of suggested repairs, the pool would not meet current competition standards and would be considered as recreational use only. The District Board of Education and the Dubuque City Council have jointly identified the need to evaluate the possible creation of a new, stand -alone indoor aquatic center to better serve the needs of the District and the community. A joint planning committee of District and City staff was created to address the following: • Undertake a needs assessment/feasibility study — What are the needs of the District, the City and the community? Are there similar needs? How do we work to uniquely meet the needs of others? • What are the needs of the City's Leisure Services Department and Hempstead and Senior High Schools? Are there ways to expand District programming? • Create a list of must have /like to have. Look at needs versus wants. • How does the project fit into what everyone wants to accomplish? Is the facility adequate for all needs? How can we enhance what we offer? • Who are other possible partners? What can they contribute? • What is the range of costs? Can all this be done from a financial side? Gather the sense of scale. • How much land is needed? Might show a range of locations. • How does it work in other communities? What are ways to structure? What are best practices? • Opportunities for the community to give input and get buy in because we will need community support. Page 2 January 4, 2013 A joint committee of the District and the City has identified the desired features of a multi- purpose indoor aquatic center. The joint planning committee has identified the following desired outcomes for an indoor aquatic center: Requirements: • Pool with multi - purpose capabilities o Minimum of 25 yards x 50 meters o 14 -foot diving well with a minimum of two (2) one -meter boards o Capabilities for a 25 -yard, 8 -lane competition pool with depth of 8 to 14' o Zero depth entry • ADA compliant and state /federal /local code compliant • Access to swim lessons for all ages and abilities • Timing system • Sound system • Multi- purpose training /meeting area • Spectator seating area(s) • Locker rooms • Adequate deck space to host multiple teams • Concession area • Lobby /gathering area including ticket window /access entry point • Outdoor signage • Storage space • Chemical storage room • Media area /control room • Sustainable building Options: • School curriculum that allows every elementary student to learn to swim • Aquatic fun area (for lessons and /or fun use) • Whirlpool therapy pool • Underwater sound system • Weight room and conditioning area • Walking /running track • Three -meter diving boards • Two pools with the ability to control water temperatures • Ability to expand and modify the facility • Incorporate visual arts into the design The District and the City have not yet determined if, or to what extent, either entity supports the development of an indoor aquatic center. This Study is intended to assist the District and the City in reaching that decision, and will explore this through the project scope shown later in this document. Page 3 January 4, 2013 RFP RESPONSE PROCESS Consultants desiring to provide professional services to the District must be able to: 1. Successfully team with the District and the City, two elected governing and taxing bodies that jointly are funding this Study, as well as potential community partners. 2. Provide the necessary experience to work with the District, the City, as well as potential community partners to complete a Study for an indoor aquatic center, in conjunction with consideration of current and proposed curricula and educational delivery as well as extra - curricular, competitive, and recreational swim opportunities, as outlined in the scope of services. RFP SUBMISSION PROCESS 1. Interested consultants must submit twelve (12) copies of a written proposal and also an electronic pdf version. Proposals must be delivered in printed format with the exclusion of the one required pdf version. The pdf version must be submitted on a flash drive along with the written copies of the proposal. No faxed or e-mail proposals will be accepted. 2. Proposals must be delivered, in a sealed envelope or box with the words "INDOOR AQUATIC CENTER STUDY" clearly marked on the outside thereof, to: Kevin Kelleher, Executive Director of Finance and Business Services Dubuque Community School District 2300 Chaney Road Dubuque, IA 52001 -3095 3. Proposals are due to the District before 2:00 p.m. CST, March 8, 2013. a. Proposals will be reviewed by the District and the City. After the proposals are evaluated, the District and the City will determine the consultants to be interviewed. b. The District and the City may choose to contact officials from other jurisdictions regarding a consultant, its prior work experience, and its ability to successfully complete the scope of services. c. The District and the City may request clarification or additional information from a specific consultant in order to assist in the District's and the City's evaluation of a proposal. d. Finally, the District and the City may require changes in the scope of services as deemed necessary by the District and the City, before execution of a contract. 4. Each consultant assumes full responsibility for delivery and deposit of the completed proposal package before the deadline. The District and the City are not responsible for any loss or delay with respect to delivery of the proposals. The District and the City reserve the right to reject any and all proposals and to negotiate changes with any consultant. The District and the City are not liable for any cost incurred by any consultant prior to the execution of an agreement or contract. Nor shall the District or the City be liable for any costs incurred by the consultant that are not specified in any contract. Page 4 January 4, 2013 EVALUATION CRITERIA & PROCESS The objective is to select the consultant most qualified to provide the services outlined in this request. Initial screening will be done without knowing the consultant's proposed fee for services. Evaluations will be based on the criteria listed below. Responsiveness, Quality, and Completeness of Proposal • Everything is included that was required by the RFP • The proposal fits with the District Strategic Plan and the City Council's Goals and Priorities • The quality of written material and presentation, relevant experience, answers to questions, and overall organization Experience/Qualifications/Creativity • Experience completing aquatic center studies • Experience working with municipalities and school districts • Experience working with multiple partners • Experience with developing and implementing community engagement processes • Ability to successfully complete the scope of services on time and within budget • Ability to successfully work with District and City staff • References • The selected team has proven capability to deliver strong and innovative solutions that respond to key issues (demonstrate capabilities in proposals) • Aquatic center planning • Aquatic facility capital and operating cost estimating expertise • Site evaluation capabilities and experience including any required transportation and traffic impact expertise • Knowledge of similar aquatic facilities' partnerships, costs, and performance characteristics Qualifications of Key Individuals • Project manager's expertise, experience, and unique qualifications • Other personnel committed to this project and their unique qualifications Scope of Services • Consultant understands what it will take to successfully achieve the goals and objectives of the requested services • Consultant proposed revisions and /or changes to the scope of services that would better serve the community Communication • Consultant's ability to conduct public outreach meetings and solicit input • Consultant's ability to communicate ideas, reports, and vision(s) in a clear and concise format • Success of the project will rely on input from the community and from potential partners and the process used to incorporate feedback Page 5 January 4, 2013 Litigation • List and explain any past claims and /or lawsuits, and the reason for the claim and /or lawsuit • List and explain any pending claims and /or lawsuits, and the reason for the claim and /or lawsuit Proposed Fees and Compensation • Reasonability of scope of services to fees proposed RFP RESPONSE SUBMITTAL DETAILS All proposals submitted must be: • Limited to twenty -five (25) pages o The 25 -page limit does not include front and back covers (optional), transmittal letter, references, and fees and compensation o Fees and compensation must be submitted in a separate envelope • Bulleted items or outline format are required; essay format is not acceptable • Presented in 8 % x 11 inch format • All recyclable materials • Arial font, minimum 11 point font • In the same order as described below • No binders or bindings • The original proposal will include original signatures, in ink, by authorized personnel, on all documents that require an authorized signature • Do not include marketing materials Add any specific additional information about the consultant that will benefit the District and the City in the selection process. Failure to provide the required mandatory information may result in a consultant not being considered. Submitted proposals will not be returned. ORDER OF SUBMITTAL DOCUMENTS To simplify the review process and obtain the maximum comparability, the proposal must include the following information, at a minimum, and be organized in the following manner. Letter of Transmittal: Provide a one page letter of transmittal briefly stating the consultant's interest in this project, outlining the consultant's understanding of the work, and the name, address, telephone, cell and fax numbers, and email address of the project manager and signed by the project manager. Introduction Statement: Provide a one page introduction statement that explains the consultant's expertise, previous experience, and unique qualifications for this project. Profile of Consultant: Provide general information about the consultant and its area of expertise in regards to this RFP, including the qualifications of the project manager and other key personnel to be assigned to the project. Page 6 January 4, 2013 Background and Organization - Identify name, address, history and organization of the consultant, including an overview of the services the consultant provides in -house and the number of years the consultant has provided the requested services. Describe any other relevant professional services offered by the consultant and how these services may be able to benefit the District and the City. Teamwork - Describe the process recommended to create a team relationship among those involved with the project, including the District, the City, the public, and other potential partners. Experience - Describe recent professional experience with detailed but brief descriptions of representative projects, including project budgets, team members, community engagement process, and other applicable information, including work with public sector clients, and a minimum of three (3) most recent aquatic studies. Team Members - Identify key team members that will be assigned to the project, including their office location, specific roles and responsibilities, time commitment to the project, and individual professional expertise /credentials, especially relating to experience with similar studies. • List project manager for the team • A listing of team personnel who will actually be assigned to perform the work on this project, and a breakdown and description of tasks assigned per project team member. Describe the hierarchy of project management • For consultants located outside the region, address how the consultant will remain responsive to short notice requests and meetings • Identify similar projects that team members have worked on together Sub - consultant(s) personnel experience • Names and addresses of any outside consultant(s) or associate(s) proposed to be involved with this project • Include each proposed sub - consultant(s) experience and qualifications as described above for firm's personnel • For sub - consultants located outside the region, address how they will remain responsive to short notice requests and meetings • Identify similar projects that team members have worked on together with the sub - consultants Scope of Services Scope of services should include preparation and presentation of draft and final written reports, including all visual aids for public presentations. Provide a detailed description of how the consultant proposes to approach this project. Include sufficient discussion of proposed methodologies, techniques, and procedures for each work item. Describe the means or strategy by which the consultant would satisfy the following scope of services, and /or an alternative or hybrid strategy recommended by the consultant. Page 7 January 4, 2013 The proposed scope of services will fully address: • Conceptual Facility Planning • Financial Impact Analysis • Community Engagement • Site Analysis • Needs Analysis Proposed Project Schedule Completion of Study is targeted for August 31, 2013. Provide a project schedule outlining the time period and estimated completion date of the proposed scope of work. This should include a schedule for and description of all deliverable products throughout the period. Describe the method to assure that the time schedule will be met. Identify the person responsible for assuring schedule compliance. Products should be delivered in hardcopy and electronic formats compatible with the District's and the City's computer software and hardware. References Provide at least three (3) references of clients for whom the consultant has completed similar projects within the past five years, with full name, title, address, email, phone, and fax numbers. Litigation Provide litigation information, if applicable. Fees and Compensation Provide a proposed cost plus expenses budget for completion of the proposed scope of services with cost breakdowns by scope element. Clearly define reimbursable costs such as travel, printing, etc. Provide hourly and overhead rates for personnel, including for additional services. Include proposed fee payment schedule. Quotation of fees and compensation shall remain firm for a period of at least 90 days from the submission deadline. Please separate the proposed fees and compensation from the other portion of the RFP submittal. Initial screening will be done without knowing the consultant's proposed fee for services. PROJECT SCOPE 1. Conceptual Facility Planning: Any future design planning will be based on conceptual facility planning developed from the programming needs and goals. The conceptual facility planning should demonstrate how the pool will be used and what space and configuration options are recommended. Conceptual facility planning will incorporate (where applicable) feedback received from the community engagement process. Research and document existing aquatics facilities in the community, including facility location, size, components, rate structure, and operational cost recovery. Create sample pool use schedule(s) for school district athletics and programs, City programs, and local and regional aquatic groups. Page 8 January 4, 2013 The Study will test all programmatic features to ensure that they meet the needs of the community. Each conceptual plan will include detailed capital and operational cost estimates to provide a rational business case that meets the needs of District students and Dubuque residents. Conceptual facility planning will incorporate (where applicable) feedback received from the community meeting(s). 2. Financial Impact Analysis: The capital, operating, and maintenance cost impact of key program components will be studied as part of the financial impact analysis to compare the merits of each component to the overall facility. The assessment will develop a priority of the program components, based on how the facility will be utilized, its potential rate structure, and the cost and impact(s) of each component. This step will need to identify the critical components of the aquatic center and be organized to identify: • Potential programming recommendations (site and building) to be included for analysis • How key programmatic elements effect the facility's cost recovery (through an 'element vs. associated cost' matrix) • Funding and potential partnership analysis • Impacts on existing pool and aquatic facilities in the community • Schedule /timeline showing when major milestones for tasks and subtasks will be completed Analyze multiple operational models and program components including best practices. Develop a long -range operational plan to ensure the long -term economic viability of the facility, including annual costs of operation and maintenance and annual revenues. Develop capital cost models for required items and potential outcomes. 3. Community Engagement: A community engagement process is part of the scope of work. The District and the City will assist in the organization; however, the overall coordination and documentation will fall within the contracted scope of work. The consultant will be required to prepare and present the draft and final reports, including visual aids, to the District's Facilities /Support Services Committee and to the District Board of Education, as well as to the City of Dubuque's Parks & Recreation Commission and to the Dubuque City Council. Describe the plan for community engagement. The community engagement plan needs to measure support and commitment, identify community desires for the overall concept of the facility, engage community partners in the process, and identify other funding opportunities. The proposed community engagement plan should: • Assign staff and define role • Provide for communication with all members of the community • Incorporate diverse methods for presenting information and receiving feedback 4. Site Analysis: Provide assessments for up to six (6) potential sites, which may or may not include the following: District -owned school site, District -owned non - school site, City -owned site, and privately -owned site. Page 9 January 4, 2013 Analyze each site to determine its suitability for an indoor aquatic center. Identify key criteria to assess the benefits and drawbacks to each site, and develop methodologies to compare and contrast the individual merits of each. A section will be included in the final report detailing the types of analysis conducted, results, and any limitations or concerns related to each of the sites. The report will identify one or more preferred sites. 5. Needs Analysis: Conduct a needs analysis to determine the need for a multi - purpose indoor aquatic complex for all ages, ranges of health, levels of experience, and recreational and athletic interests. • Determine needs of the District and the City • Research of similar aquatic facilities, including partnerships, costs, and performance characteristics • Contact other possible partners to identify their needs and their operating and capital contributions • Identify the potential users and user groups • Identify how stakeholders and potential user groups are represented and their time /space needs are addressed • Determine broad -based community support for an indoor aquatic center • Analyze the programming needs of the stakeholders and the community • Include appropriate fee schedules for potential users and user groups Page 10 January 4, 2013 Schedule 1 DUBUQUE COMMUNITY SCHOOL DISTRICT MINIMUM INSURANCE REQUIREMENTS 1. All insurance policies required hereunder shall be written with an insurer authorized to do business in the State of Iowa. Insures shall have an A.M. Best rating no less than "A - ", (Excellent). 2. All insurance policies required hereunder shall be endorsed to provide the Dubuque Community School District written notification of at least thirty (30) days prior to cancellation or non - renewal, ten (10) days notification for nonpayment of premium. 3. Contractor shall furnish Certificates of Insurance to the Dubuque Community School District indicating the insurance requirements set forth in this agreement have been met. Such certificates shall include copies of any policy forms and endorsements that are equivalent to those specifically required. Contractor shall be responsible to ensure all its subcontractors and sub - subcontractors performing work or services meet the insurance requirements for their respective trade. 4. Each Certificate of Insurance shall be submitted to the Dubuque Community School District Manager of Buildings & Grounds. 5. At its discretion and on a case by case basis, the Dubuque Community School District reserves the right to increase or decrease limits, and add or waive insurance coverage and requirements. 6. Failure to provide evidence of minimum limits and coverage or procure required insurance shall not be deemed a waiver of these requirements by the Dubuque Community School District. Failure to obtain or maintain the insurance requirements shall be considered a material breach of this agreement. 7. The Dubuque Community School will have in place Builders Risk insurance on new building projects that exceed $10,000 in value, including coverage for materials temporarily stored off site and in transit. Builders Risk insurance will include the interest of the Contractor and its subcontractors, except for any deductible, not to exceed $10,000. Contractor and its subcontractor shall be responsible for insuring its own equipment and property. Page 11 January 4, 2013 Schedule 1 DUBUQUE COMMUNITY SCHOOL DISTRICT INSURANCE REQUIREMENTS: GENERAL CONTRACTORS COMMERCIAL GENERAL LIABILITY: General Aggregate Limit $2,000,000 Products - Completed Operation Aggregate Limit $2,000,000 Personal and Advertising Injury Limit $1,000,000 Each Occurrence Limit $1,000,000 Fire Damage Limit (any one occurrence) $ 100,000 Medical Payments $ 5,000 Commercial General Liability policy shall be written on an occurrence form using ISO occurrence form CG 00 01 or equivalent form. Policy shall include the following endorsements: 1. ISO endorsement CG 20 10 or equivalent endorsement naming the Dubuque Community School District, its board members, employees and agents as an additional insured. 2. ISO endorsement CG 20 37 or equivalent endorsement naming the Dubuque Community School District, its board members, employees and agents as an additional insured for completed operations. This endorsement shall be maintained for a minimum of two years after completion of the project. 3. Endorsement indicating additional insured status for the Dubuque Community School District, its board members, employees and agents is primary and non - contributory. 4. ISO endorsement CG 25 03 or equivalent endorsement, Designated Construction Project(s) General Aggregate Limit. 5. ISO endorsement CG 24 04 or equivalent endorsement, Waiver of Transfer of Rights of Recovery Against Others to Us, naming the Dubuque Community School District. 6. Governmental Immunities Endorsement (see attached specimen). Page 12 January 4, 2013 Schedule 1 DUBUQUE COMMUNITY SCHOOL DISTRICT BUSINESS AUTOMOBILE LIABILITY: Combined single limit of Or $1,000,000 Bodily Injury (per person) $500,000 Bodily Injury (per accident) $500,000 Property Damage $500,000 Business auto liability shall be written on ISO form CA 00 01 or equivalent form. 1. Policy shall include Symbol 1 (Any Auto). 2. Include ISO endorsement CA 04 44 or equivalent endorsement, Waiver of Transfer of Rights of Recovery Against Others to Us, naming the Dubuque Community School District. 3. Include ISO endorsement CA 99 48, Pollution Liability — Broadened Coverage for Covered Autos, or equivalent endorsement if the contractor has vehicles that transport fuel onto Dubuque Community School District property. WORKERS COMPENSATION & EMPLOYERS LIABILITY: 1. Workers Compensation — Statutory — State of Iowa 2. Employers Liability Bodily Injury Limit Each Accident $500,000 Bodily Injury Disease — Policy Limit $500,000 Bodily Injury Disease — Limit Each Employee $500,000 Workers Compensation shall include the following endorsements: WC 0003 13, Waiver of Our Right to Recover from Others, in favor of the Dubuque Community School District. UMBRELLA OR EXCESS LIABILITY: Limit Each Occurrence Aggregate Limit $5,000,000 $5,000,000 Umbrella or Excess liability policy shall provide excess coverage and be at least as broad in coverage as the following required policies and endorsements: Commercial General Liability, Business Auto and Employer's Liability. Page 13 January 4, 2013 Schedule 1 DUBUQUE COMMUNITY SCHOOL DISTRICT GOVERNMENTAL IMMUNITIES ENDORSEMENT 1. Nonwaiver of Governmental Immunity. The insurance carrier expressly agrees and states that the purchase of this policy and the including of Dubuque Community School District as an Additional Insured does not waive any of the defenses of governmental immunity available to the Dubuque Community School District under Code of Iowa Section 670.4 as it now exists and as it may be amended from time to time. 2. Claims Coverage. The insurance carrier further agrees that this policy of insurance shall cover only those claims not subject to the defense of governmental immunity under the Code of Iowa Section 670.4 as it now exists and as it may be amended from time to time. Those claims not subject to Code of Iowa Section 670.4 shall be covered by the terms and conditions of this insurance policy. 3. Assertion of Governmental Immunity. The Dubuque Community School District shall be responsible for asserting any defense of governmental immunity, and may do so at any time and shall do so upon the timely written request of the insurance carrier. 4. Non - Denial of Coverage. The insurance carrier shall not deny coverage under this policy and the insurance carrier shall not deny any of the rights and benefits accruing to the Dubuque Community School District under this policy for reasons of governmental immunity unless and until a court of competent jurisdiction has ruled in favor of the defense(s) of governmental immunity asserted by the Dubuque Community School District. No Other Change in Policy. The above preservation of governmental immunities shall not otherwise change or alter the coverage available under the policy. SPECIMEN Page 14 January 4, 2013 Schedule 2 CITY OF DUBUQUE INSURANCE REQUIREMENTS FOR PROFESSIONAL SERVICES Insurance Schedule C 1. shall furnish a signed Certificate of Insurance to the City of Dubuque, Iowa for the coverage required in Exhibit I prior to commencing work and at the end of the project if the term of work is longer than 60 days. Providers presenting annual certificates shall present a Certificate at the end of each project with the final billing. Each Certificate shall be prepared on the most current ACORD form approved by the Iowa Department of Insurance or an equivalent. 2. All policies of insurance required hereunder shall be with a carrier authorized to do business in Iowa and all carriers shall have a rating of A or better in the current A.M. Best's Rating Guide. 3. Each Certificate shall be furnished to the contracting department of the City of Dubuque. 4. Failure to provide minimum coverage shall not be deemed a waiver of these requirements by the City of Dubuque. Failure to obtain or maintain the required insurance shall be considered a material breach of this agreement. 5. Subcontractors and sub subcontractor performing work or service shall provide a Certificate of Insurance in accord with Exhibit I. 6. All required endorsements to various policies shall be attached to Certificate of insurance. 7. Whenever a specific ISO form is listed, an equivalent form may be substituted subject to the provider identifying and listing in writing all deviations and exclusions that differ from the ISO form. 8. Provider shall be required to carry the minimum coverage /limits, or greater if required by law or other legal agreement, in Exhibit I. Page 15 January 4, 2013 Schedule 2 CITY OF DUBUQUE INSURANCE REQUIREMENTS FOR PROFESSIONAL SERVICES Insurance Schedule C (continued) Exhibit I A) COMMERCIAL GENERAL LIABILITY General Aggregate Limit $2,000,000 Products- Completed Operations Aggregate Limit $1,000,000 Personal and Advertising Injury Limit $1,000,000 Each Occurrence $1,000,000 Fire Damage Limit (any one occurrence) $ 50,000 Medical Payments $ 5,000 a) Coverage shall be written on an occurrence, not claims made, form. All deviations from the standard ISO commercial general liability form CG 0001, or Business owners form BP 0002, shall be clearly identified. b) Include ISO endorsement form CG 25 04 "Designated Location(s) General Aggregate Limit" or CG 25 03 "Designated Construction Project (s) General Aggregate Limit" as appropriate. c) Include endorsement indicating that coverage is primary and non - contributory. d) Include endorsement to preserve Governmental Immunity. (Sample attached). e) Include additional insured endorsement for: The City of Dubuque, including all its elected and appointed officials, all its employees and volunteers, all its boards, commissions and /or authorities and their board members, employees and volunteers. using ISO form CG 2026. B) AUTOMOBILE LIABILITY $1,000,000 (Combined Single Limit) C) WORKERS' COMPENSATION & EMPLOYERS LIABILITY Coverage A Coverage B Statutory—State of Iowa Employers Liability Each Accident $100,000 Each Employee- Disease $100,000 Policy Limit - Disease $500,000 a) Policy shall include an endorsement providing a waiver of subrogation to the City of Dubuque. b) Coverage B limits shall be greater if required by Umbrella Carrier. D) UMBRELLA LIABILITY $1,000,000 E) PROFESSIONAL LIABILITY $1,000,000 Page 16 January 4, 2013 Schedule 2 CITY OF DUBUQUE INSURANCE REQUIREMENTS FOR PROFESSIONAL SERVICES PRESERVATION OF GOVERNMENTAL IMMUNITIES ENDORSEMENT 1. Nonwaiver of Governmental Immunity. The insurance carrier expressly agrees and states that the purchase of this policy and the including of the City of Dubuque, Iowa as an Additional Insured does not waive any of the defenses of governmental immunity available to the City of Dubuque, Iowa under Code of Iowa Section 670.4 as it is now exists and as it may be amended from time to time. 2. Claims Coverage. The insurance carrier further agrees that this policy of insurance shall cover only those claims not subject to the defense of governmental immunity under the Code of Iowa Section 670.4 as it now exists and as it may be amended from time to time. Those claims not subject to Code of Iowa Section 670.4 shall be covered by the terms and conditions of this insurance policy. 3. Assertion of Government Immunity. The City of Dubuque, Iowa shall be responsible for asserting any defense of governmental immunity, and may do so at any time and shall do so upon the timely written request of the insurance carrier. 4. Non - Denial of Coverage. The insurance carrier shall not deny coverage under this policy and the insurance carrier shall not deny any of the rights and benefits accruing to the City of Dubuque, Iowa under this policy for reasons of governmental immunity unless and until a court of competent jurisdiction has ruled in favor of the defense(s) of governmental immunity asserted by the City of Dubuque, Iowa. No Other Change in Policy. The above preservation of governmental immunities shall not otherwise change or alter the coverage available under the policy. SPECIMEN Page 17 Dubuque Cominuniiy Schools 7b inspire and challenge June 8, 2012 Mayor Roy D. Buol and City Council City of Dubuque 50 West 13th Street Dubuque, IA 52001 Dear Mayor Buol and Council Members: RC:i E{ \'ED 12 JUN 12 P11 2: 10 City Cie k s L Dubuque, IA 1/4/ s.1 2300 Chaney Road Dubuque, IA 52001 -3095 Phone (563) 552 -3000 Fax (563) 552 -3026 www.dbqschools.org As part of the master planning process for the Dubuque Community Schools, the district has started to explore options for the aging pool facility at Hempstead High School. Early estimates show that it would cost approximately $2 million to repair and facelift the pool. Even with these enhancements, significant challenges would continue to exist at the current site. The diving well, while grandfathered in for use, slopes in a way that is not acceptable under guidelines for new facilities because of possible safety concerns and the depth of the lanes also poses a safety threat. From a sustainability perspective, the aging of the pool has caused a slow leak that is near impossible to address in the current facility. We believe that moving forward with work at the current site is akin to putting a Band -Aid on the pool. It would not fully address the shortfalls that exist and would be doing a disservice to the students of the district and the taxpayers who support it. On the flip side, we believe this presents us with a wonderful opportunity to bring the idea of collaboration between the district, the city and other partners to life in a meaningful way. We would like to invite representatives from the city council and city staff, as you see fit, to meet with representatives from the school board and district administration to discuss the possible creation of a new, stand- alone aquatic center. At the meeting, we wish to discuss what the framework might be for beginning broader conversations with potential private partners in the community who may find great interest in this endeavor as well. Acting Superintendent Stan Rheingans will be in touch to follow -up on this request. A new facility, which has been discussed for years throughout the community, could be a flagship venue to serve the students of the district and the greater Dubuque -area community. We believe now is an ideal time to begin these talks. As you know, there has been much talk in the past about how the district and city can collaborate in ways that make Dubuque an even stronger, more vibrant community. We believe this is one way to bring action to our words. Thank you in advance for your willingness to begin discussions — we look forward to many fruitful conversations in the days ahead. Sincerely, tan Rheingan Acting Superintendent Craig S. Beytien President, Board of Education