Loading...
Curb Ramp Install Ph II CDBG 2006 accept5r D~~~E ~YN.-~ MEMORANDUM July 10, 2006 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2006 Curb Ramp Installation - CDBG Project, Phase II City Engineer Gus Psihoyos is recommending acceptance of the 2006 Curb Ramp Installation - CDBG Project, Phase II, as completed by Kluck Construction, in the final contract amount of $21 ,464.66, which is a 10% decrease from the original construction contract amount of $23,843.00. I concur with the recommendation and respectfully request Mayor and City Council approval. (it { {{~1 /itl___ Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gus Psi hoyos, City Engineer ,- . , 'i I C.,J fHECITYOF ~ DUB E ~~~ MEMORANDUM June 28, 2006 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer _90 SUBJECT: 2006 Curb Ramp Installation - CDBG Project, Phase II INTRODUCTION The enclosed resolutions provide for the acceptance of the 2006 Curb Ramp Installation - CDBG Project, Phase II. BACKGROUND This project included 11 ramps in the downtown area between 1 yth and 21st Streets and Elm to Jackson Streets. DISCUSSION The 2006 Curb Ramp Installation - CDBG Project, Phase II has been completed by Kluck Construction of Dubuque, Iowa in the amount of $21,464.66, which is 10% decrease from the original construction contract amount of $23,843. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $21,464.66. BUDGET IMPACT The project cost summary for the 2006 Curb Ramp Installation - CDBG Project, Phase II is as follows: Bid Award Final Construction Contract $23,843.00 $21,464.66 Contingency $ 2,416.10 $ 0.00 Engineering $ 3,986.57 $ 3,219.70 Total Project Cost $30,245.67 $24,684.36 This Capital Improvement Project (CIP 2601236 - Wheel Chair Ramps) is funded through the Fiscal Year 2006 Community Development Block Grant Funds. ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolutions accepting the improvement and establishing the final construction cost of the 2006 Curb Ramp Installation - CDBG Project, Phase II. Prepared by Jane Smith, Engineering Assistant cc: Dawn Lang, Budget Director Aggie Tauke, Housing & Comm. Development Jane Smith, Engineering Assistant Jon Dienst, PE RESOLUTION NO. 315-06 ACCEPTING THE 2006 CURB RAMP INSTAllATION - COBG PROJECT, PHASE II Whereas, the contract for the 2006 Curb Ramp Installation - CDBG Project, Phase II (the Project) has been completed and the City Manager has examined the work and filed a certificate stating that the Project has been completed according to the terms of the contract, plans and specifications and that the City Manager recommends that the Project be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Manager is approved and the Project is hereby accepted. Section 2. The City Treasurer is hereby directed to pay to the contractor from the Fiscal Year 2006 Community Development Block Grant Funds for the contract amount of $21,464.66 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 17th day of July, 2006. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 316-06 FINAL ESTIMATE Whereas, the construction contract for the 2006 Curb Ramp Installation - CDBG Project, Phase II has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $24,684.36 and the said amount shall be paid from the Fiscal Year 2006 Community Development Block Grant Funds of the City of Dubuque, Iowa. Passed, approved and adopted this 17th day of July, 2006. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk City of Dubuque FINAL CONTRACT AMOUNT Date: PROJECT NAME: 2006 CURB RAMP INSTALLATION - CDBG PROJECT PHASE II CONTRACT AMOUNT: 03-Jul-06 $23,843.00 CONTRACTOR: KLUCK CONSTRUCTION ITEM QTY. UNIT UNIT COST QTY. AMOUNT EARNED TO DATE TO DATE 1. PCC Curb & Gutter, Remove, Replace, Complete 191.00 L.F. $30.00 125.00 $3,750.00 2. 6" PCC Wall, Complete 528.00 S.F. $9.50 318.00 $3,021.00 3. 4" PCC Concrete Sidewalk, Remove, Replace, Complete 211.00 S.F. $5.00 1211.00 $6,055.00 4. 6" PCC Concrete Sidewalk, Remove, Replace, Complete 1412.00 S.F. $6.00 567.96 $3,407.76 5. Detectable Warnings (2x4) Furnish & Install 17.00 Units $90.00 14.50 $1,305.00 6. Handrailing, Complete 41.00 L.F. $40.00 46.00 $1,840.00 7. Steps 2.00 No. of $200.00 2.00 $400.00 EXTRA 8. Stone & 3'x3' $54.00 9. 18' end rail $540.00 10. Stone & 2' x 3.6' $43.20 11. Drain $148.70 12. Rebar $900.00 TOTAL CONTRACTOR COST $21,464.66 ENGINEERING $3,219.70 TOTAL CONSTRUCTION COST $24,684.36 I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager City of Dubuque, Iowa /---) / ,'10, ~ jYj~-:" Gus Psihoyos, City Engineer The undersigned, , contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: R 0 w:.J6 C DHSf. BY: ;O{tl-~ fJ/,(ol;