SUBJECT: 30 Inch Force Main Relocation Project from 7th Street to 12th Street
around the former Public Works Garage Site and the Alliant Energy Site
DATE: May 10, 2013
City Engineer Gus Psihoyos recommends City Council rescission of Resolution No.
139 -13, resulting in the cancellation of the public bidding process for Phase 1 of the 30
Inch Force Main Relocation Project from 9til Street to 11th Street. The project will be re-
initiated at a future City Council meeting once the plans and specifications have been
updated to reflect the Statewide Urban Design and Specification (SUDAS). City staff
will take the necessary steps in response to some environmental contamination that
exists in the area and then initiate this project again.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
brit44
Michael C. Van Milligen
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Teri Goodmann, Assistant City Manager
Gus Psihoyos, City Engineer
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
SUBJECT: 30 Inch Force Main Relocation Project from 7th Street to 12th Street around
the former Public Works Garage Site and the Alliant Energy Site
Dubuque
inftlig
AU- America City
1 I I I IF
2012
DATE: May 20, 2013
INTRODUCTION
The enclosed resolution provides for City Council consideration the rescission of
Resolution No. 139 -13 resulting in the cancellation of the public bidding process for
Phase I of the 30 inch Force Main Relocation Project from 9th Street to 11th Street .
BACKGROUND
The public bidding process for Phase I of the 30 inch Force Main Relocation Project
from 9th Street to 11th Street was approved and initiated at the May 6, 2013 City Council
Meeting. The Public Hearing is currently scheduled for Monday, May 20, 2013 during
the regular meeting of the City Council. The bid letting is currently scheduled for May
23, 2013.
DISCUSSION
The Engineering Department is recommending the cancellation of the public bidding
process for Phase I of the 30 inch Force Main Relocation Project from 9th Street to 11th
Street through the rescission of Resolution No. 139 -13 which gave preliminary approval
of the proposed plans, specifications, form of contract, estimated cost, set the date for
the Public Hearing and ordered the advertisement for bids for Phase I of the 30 inch
Force Main Relocation Project from 9th Street to 11th Street.
Prior to the first initiation of the public bidding process, in March, test results from soil
samples did not indicate anything significant. Ground water samples were also taken,
however the testing period was of longer duration and the results were not available
until after the project was initiated and notice to bidders had been published. After the
Notice to Bidders publication it was brought to our attention that there were
environmental issues with the groundwater in the construction area. Engineering staff
and the consultant, IIW, P.C., needed some time to evaluate the results and determine
the best way to move forward on the project. The initiation was rescinded so further
research could be conducted to determine the best way to proceed. The engineering
department met with IIW, P.C. and consulted with an OSHA expert. Results of the
collaborative efforts, along with a soil and groundwater management plan were written
into the project specification to inform prospective bidders and city staff of the hazards
that may be encountered on this project. One of the requirements that was added is
for all contractors planning to bid on the project to obtain the 40 hour HAZWOPER
training certification prior to bidding. The requirement for the HAZWOPER training was
also applied to some Engineering department staff that will or may be involved with the
project during construction. The Staff training has been completed.
The project was planned to utilize the 1996 City of Dubuque Standard Specifications
(current) along with the current standard form of contract and other ancillary standard
forms and project specific documents. A thorough legal review of the current General
Conditions and form of contract, as it related to the hazardous materials, could not be
completed prior to Council initiating the project on May 6, 2013 and was planned to be
completed by May 9, 2013, so that plans would be available for contractors on the
following day. Engineering and Legal staff met and determined that many changes
were needed to the 1996 City of Dubuque Standard Specification, General Conditions,
to address the complexities of this project and that it would not be completed in time to
be available to contractors for bidding.
Engineering, Finance and Legal staff have been working diligently, over the last six
months, to review the Statewide Urban Design and Specification (SUDAS) and develop
supplemental specifications so that the Council Priority of adopting SUDAS can be
implemented. Legal staff has also been working on updating the standard form of
contract and other contract documents to correlate with SUDAS. This process is nearly
complete and will be completed and ready for implementation on several upcoming
projects. Staff determined that it would be more productive to spend the time needed
to finish up with SUDAS and implement it as the project specification rather than
revising the current City of Dubuque specifications which we will no longer be using.
Utilizing the new specifications and contract documents will better address the
complexities of this project.
RECOMMENDATION
I recommend that the City Council approve the attached resolution to rescind Resolution
No. 139 -13 which would cancel the public bidding process for Phase I of the 30 inch
Force Main Relocation Project from 9th Street to 11th Street through the. The project
will have to be re- initiated at a future City Council meeting once the plans and
specifications have been updated to reflect the SUDAS specification.
Prepared by Todd Irwin
cc: Jenny Larson, Budget Director
Barry Lindahl, Corporate Counsel
Bob Green, Water Department Manager
Jonathan Brown, Water Pollution Control Manager
Ken TeKippe, Finance Director
John Klostermann, Street and Sewer Maintenance Supervisor
2
RESOLUTION NO. 157-13
RESOLUTION RESCINDING RESOLUTION NO. 139 -13, APPROVING
PRELIMINARY PLANS, SPECIFICATIONS, FORM OF CONTRACT AND
ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS,
SPECIFICATIONS, FORM OF CONTRACT AND ESTIMATED COST; AND
ORDERING THE ADVERTISEMENT OF BIDS FOR PHASE I OF THE 30 INCH
FORCE MAIN RELOCATION PROJECT FROM 9TH STREET TO 11TH STREET
Whereas, the City Council of the city of Dubuque, Iowa at its meeting on May 6,
2013 approved by resolution the proposed plans, specifications, form of contract and
estimated cost for Phase I of the 30 inch Force Main Relocation Project from 9th Street
to 11th Street; and
Whereas, the project was planned to utilize the 1996 City of Dubuque Standard
Specifications (current) along with the current standard form of contract and other
ancillary standard forms and project specific documents. A thorough legal review of the
current General Conditions and form of contract, as it related to the hazardous materials
determined that many changes were needed to the 1996 City of Dubuque Standard
Specification, General Conditions, to address the complexities of this project and that it
would not be completed in time to be available to contractors for bidding.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IA:
Section 1. Resolution No. 139 -13 approving the proposed plans, specifications,
form of contract and estimated cost for Phase I of the 30 inch Force Main Relocation
Project from 9th Street to 11th Street, in the estimated amount $1,185,437.50 is hereby
rescinded.
Section 2. The public hearing set for the 20th day of May 2013, at 6:30 p.m. in the
Historic Federal Building Council Chambers for interested persons to appear and be
heard for or against the proposed plans and specifications, form of contract and
estimated cost of said Project is hereby cancelled.
Passed, approved and adopted this 20th day of May, 2013
Attest:
Trish L. Gleason, Assistant City Clerk
Roy D. Buol, Mayor
CITY OF DUBUQUE,
IOWA
FFICIAL NOTICE
NOTICE IS HEREBY
GIVEN that the City
Council of the City of
Dubuque, Iowa will
hold a public hearing
on the proposed plans,
specifications, form of
contract and estimated
cost for the 30 -Inch
Force Main Relocation
Project - Phase 1 from
9th Street to llth
Street, in accordance
with the provisions of
Chapter 26, Code of Io-
wa, at 6:30 p.m., on the
20th day of May, 2013,
in the Historic Federal
Building Council Cham-
bers (second floor),
350 West 6th Street,
Dubuque, Iowa. Said
proposed plans, speci-
fications, form of con-
tract and estimated
cost are now on file in
the office of the City
Clerk. At said hearing
any interested person
may appear and ; file
objections thereto.
The scope of the Proj-
ect is as follows:
The 30 -Inch Sanitary
Sewer Force Main Re-
location - Phase 1 9th
Street to llth Street
project includes 1,150
LF of 30 -inch DIP force
main, 163 LF of 42 -inch
bored and jacked steel
casing, 775 LF of 8 -inch
water main along with
fittings and miscellane-
ous water main com-
ponents. Pavement re-
placement on the proj-
ect includes 490 tons of
6 -inch thick hot mix as-
phalt, 990 SY of 9 -inch
thick Portland cement
concrete Class C, 145
SY of 11 -inch thick
Portland cement con-
crete Class M, miscel-
laneous sidewalk, curb
and gutter. The project
will also include 'a
multi -stage traffic con-
trol plan. A 40 -hour
Hazwoper Certification
Training Course is re-
quired before work
commences by person-
nel working under the
project area.
Any visual or hearing
impaired persons
needing special assis-
tance or persons with
special accessibility
needs should contact
the City Clerk's office
at (563) 589 -4120 or
TDD at (563) 690 -6678
at least 48 hours prior
to the meeting.
Published by order of
the City Council given
on the 6th day of May
2013.
Kevin S. Firnstahl,
CMC, City Clerk
NOTICE TO BIDDERS
PIJ6l:IC
IMPROVEMENT
PRC9ECT
30 -INCH SANITARY
SEWER FORCE MAIN
RELOCATION -
PHASE I
9TH STREET TO 12TH
STREET
Time and Place for
Filing Sealed Propos-
als.Sealed bids for the
work cornprising each
improvement as stated
below must be filed be-
fore 2:00 p.m. on the
23rd day of May, 2013,
in the Office of the City
Clerk, City Hall - First
Floor, 50 : West 13th
Street, Dubuque, Iowa.
Time and Place
Sealed Proposals
Will be Opened and
Considered. Sealed
proposals will ' be
opened and bids tabu-
lated at 2:00 p.m. on
May 23, 2013, at City
Hall - Conference Room
B, 50 West 13th Street,
Dubuque, Iowa, for
consideration -s by the
City Council (Council)
at its meeting on lune
3, 2013. The City of Du-
buque, Iowa, reserves
the right to reject any
and all bids.
Time for Com-
mencement and
Completion of Work.
Work shall ` be com-
menced within 10 days
after the Notice to Pro-
ceed has been issued
and shall be fully com-
pleted by September
27, 2013.
Mandatory Pre -Bid
Conference. A manda-
tory pre-bid confer-
ence will be held at
10:00 a.m. on May 15,
2013, in the City Coun-
cil Chambers, Historic
Federal Building, 350
West 6th Street, Dubu-
que, Iowa.
Bid Security, Each
bidder shall accompa-
ny its bid with a bid se-
curity as security that
the successful bidder
will enter into a con-
tract for the, work bid
upon and will furnish
after the award of con-
tract a corporate sure-
ty bond, acceptable to
the governmental enti-
ty, for the faithful per-
formance of the con-
tract, in an amount
equal to one hundred
percent of the amount
of the contract. The bid
security shall be in the
amount of ten percent
(10%) of the amount of
the contract and shall
be in the form of ` a
cas hier's` check or cer-
tified check drawn on a
state- chartered or fed-
erally chartered bank,
or a certified share
draft drawn on a state-
chartered or federally
chartered credit union,
or the governmental
entity may provide for
a bidder's bond with
corporate surety satis-
factory to the govern-
mental entity. The bid
bond shall contain no
conditions excepted as
provided in this -sec-
tion.
Contract Docu-
ments. Copies of the
plans and specifica-
tions prepared by IIW,
P.C., `may be obtained
from Tri -State Blue-
print, 696 Central Ave-
nue, Dubuque, Iowa
52001, phone 563 -556-
3030. No plan deposit is
required.
Preference for Iowa
Products and Labor,
By virtue of statutory
authority, preference
will be given to prod-
ucts and provisions
grown and coal pro -
duced within the State
of Iowa, and to 'Iowa
domestic labor, to the
extent -' lawfully ` '' re-
quired under lowa:stat-
utes.
Sales Tax. The bidder
should not include
sales tax in its bid. A
sales tax exemption
certificate will be avail -
able for all material
purchased for incorpo-
ration in the project.
General Nature of
Public Improvement.
The 30- Inch "Sanitary
Sewer Force Main Re-
location Phase :1 9th
Street to llth Street
project '' consists of
three stages along with
a corresponding multi
stage traffic control
plan. The project in-
cludes 1,150 LF of 30-
inch DIP force main,
163 LF of 42 -inch bored
and jacked steel cas-
ing, 775 LF of 8 -inch
water main along with
fittings and miscellane-
ous water main com-
ponents. Pavement re-
placement on the proj-
ect includes 490 tons of
6 -inch thick hot mix as-
phalt, 990 SY of 9 -inch
thick Portland cement
concrete Class C, 145
SY of 11 -inch thick.
Portland cement" -con-
crete' Class M, - miscel-
laneous sidewalk, and
curb and gutter. A 40
hour Hazwoper Certifi-
cation Training Course
is required to be com-
pleted for all personnel
involved with
e x c a v a t i n g ,
dewatering, and haul-
ing operations, prior to
bidding. A list of certi-
fied personnel and
their position will need
to be provided as a
condition of award.
it 5/10
STATE OF IOWA {SS:
DUBUQUE COUNTY
CERTIFICATION OF PUBLICATION
I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa
corporation, publisher of the Telegraph Herald,a newspaper of general circulation
published in the City of Dubuque, County of Dubuque and State of Iowa; hereby
certify that the attached notice was published in said newspaper on the following
dates: May 10, 2013, and for which the charge is $74.99.
Subscribed to before me, a Not). Public in and for Dubuque County, Iowa,
this fe, day of
, 207;5' .
Notary Public in and for Dubuque County, Iowa.
j MARY K.WES)n .<.,
Co miSuiv7o NQ .6