Loading...
Indiana Court 2012 Drain Tile Project AcceptanceMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2012 Drain Tile Project - Indiana Court DATE: May 22, 2013 Dubuque kital All- America City II 111! 2012 City Engineer Gus Psihoyos is recommending acceptance of the 2012 Drain Tile Project — Indiana Court, as completed by McDermott Excavating, in the final contract amount of $7,531.71, which is 20% under the original contract amount of $9,072.61. I concur with the recommendation and respectfully request Mayor and City Council approval. duat4A., krt., italy, Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: 2012 Drain Tile Project — Indiana Court DATE: May 20, 2013 Dubuque kitetleg AH- America City 11 1111 2012 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the 2012 Drain Tile Project — Indiana Court. BACKGROUND The 2012 Drain Tile Project — Indiana Court provided for the installation of drain tile at different locations to eliminate icing and algae build up from sump pumps. In accordance with Iowa Code § 384.103 and § 364.12(3)(c), and Iowa Code, Section 26.14, on September 27, 2012 the City solicited informal bids for the 2012 Drain Tile Project — Indiana Court. McDermott Excavating, Inc. of Dubuque, Iowa, submitted the low bid in the amount of $9,072.61. DISCUSSION The 2012 Drain Tile Project — Indiana Court was completed by McDermott Excavating, Inc. of Dubuque, Iowa, in the final contract amount of $7,531.71. This is 20% under the original contract amount of $9,072.61. RECOMMENDATION recommend that the City Council accept the improvements and authorize payment of the contract amount of $7,531.71 to McDermott Excavating for the 2012 Drain Tile Project — Indiana Court. BUDGET IMPACT The cost summary for the 2012 Drain Tile Project — Indiana Court is as follows: The project funding summary is as follows: CIP Award Final Construction Contract $9,072.61 $7,531.71 Contingency 907.26 0.00 Construction Engineering & Inspection 1,496.98 1,000.00 Total Project Cost $11,476.85 $8,531.71 The project funding summary is as follows: CIP Fund Description Fund Amount 7201354 Drain Tile Program $8,531.71 Total Project Funding $8,531.71 ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution accepting the improvements and authorizing payment of the contract amount of $7,531.71 to McDermott Excavating, Inc. for the 2012 Drain Tile Project — Indiana Court. cc: Jenny Larson, Budget Director Deron Muehring, Civil Engineer Denise Ihrig, Civil Engineer Charlie Gau, Engineering Technician Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 PROJECT CLOSE OUT FORM Project Name: CIP Number: Project Contract Amount: Project Completion Date: 2012 DRAIN TILE PROJECT INDIANA CT. 7201354 $9,072.61 7- May -13 Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: McDermott Excavating 14407 Route 20 Dubuque, Iowa 52003 563 - 583 -4633 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE 1 - 296 LF $ 4.31 2 4" Drain tile, Perforated / Includes Excavation 284 LF $ 2.65 3 3/8" Chips, Includes Enginering Fabric 94 Ton $ 20.25 4 Tap Exisitng Intake 2 EA $ 400.00 5 Granular Backfill, (IOWA DOT) Gradation #32 (Man Sand) 15 Ton $ 15.35 6 Graded Stone Base 15 Ton $ 13.40 7 PC Concrete Curb and Gutter, Remove and Construct 10 LF $ 36.60 8 PC Concrete Sidewalk 4 ", Remove and Construct 16 SF $ 6.00 9 PC Concrete Sidewalk /Approach 6 ", Remove and Construct 25 SY $ 55.08 10 Remove Curb Box, Replace Curb _ 2 EA $ 169.00 11 Backfill, Top Soil 50 SY $ 7.45 12 Landscape Restoration 1 LS $ 660.00 13 Traffic Control And Safety Control 1 LS $ 700.00 CHANGE ORDER 288.00 $ 1,241.28 280.00 $ 742.00 44.24 $ 895.86 2.00 $ 800.00 14.53 $ 194.70 3.20 $ 117.12 22.50 $ 1,239.30 2.00 $ 338.00 81.00 $ 603.45 1.00 $ 660.00 1.00 $ 700.00 Sub -Total I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. 7,531.71 Change order Total Total Payment 7,531.71 97.30% 98.59% 47.06% 100.00% 0.00% 96.87% 32.00% 0.00% 90.00% 100.00% 162.00% 100.00% 100.00% Total Contract Work Performed to Date: $ Total Change Order Work Performed to Date: $ Total Contract and Change Order Work Performed to Date: $ Miscellaneous Costs Engineering 7,531.71 7,531.71 1,000.00 TOTAL FINAL PROJECT COSTS: $ 8,531.71 The Undersigned 7!/r C U u ` r contractor for the above improvement, does hereby accept the above 'Total Due Contractor", as full settlement for all claims for said improvement. APPROVED: APPROVED: Michael Van Milligen, City Manager Dubuque, lowa Gus Psihoyos, City Engineer Dubuque, Iowa BY: