Loading...
Hwy 151/61 South Grandvidew Avenue Overpass Water Main Relocation Project AwardMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Award of Contract for the Hwy. 151/61 South Grandview Avenue Overpass Water Main Relocation Project CIP #740 -1405, Fund Balance - $337,696.44 DATE: May 20, 2013 Dubuque kital All- America City II 111! 2012 Sealed bids were received for the Hwy. 151/61 South Grandview Avenue Overpass Water Main Relocation Project. Water Department Manager Bob Green recommends award of the contract to the low bidder, Tschiggfrie Excavating Co., in the amount of $372,678.35, which is 2.5% below the engineer's estimate of $382,410.00. I concur with the recommendation and respectfully request Mayor and City Council approval. kr,„ 7)4, Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Bob Green, Water Department Manager Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Bob Green, Water Department Manager Dubuque ktratd All - America City '1 111! 2012 SUBJECT: Award of contract for the Hwy. 151/61 South Grandview Avenue Overpass Water Main Relocation Project CIP #740 -1405, Fund Balance - $337,696.44 DATE: May 17, 2013 INTRODUCTION The purpose of this memorandum and attached resolution is to recommend awarding Tschiggfrie Excavating Co. of Dubuque, IA the construction contract for the Hwy. 151/61 South Grandview Avenue Overpass Water Main Relocation Project. DISCUSSION The relocation of the water pipe is required as part of the Iowa Department of Transportation Highway 52/61/151 Reconstruction Project that is to begin April 1, 2013. This project includes the following work: — Numerous Connections to Existing Water Main, — Installation of Vertical Pipe Concrete Structure — Approx. 500 L.F. 16 -inch D.I. Water Main (open cut) — Approx. 330 L.F. 12 -inch D.I. Water Main (open cut) — Approx. 180 L.F. 16 -inch D.I. Water Main in 26 -inch Jack) — Related Water Main Accessories — Related Restoration Steel Casing (Bore and Three (3) contractors bid on the construction RFP for this project. The firms that submitted proposals are as follows: COMPANY LOCATION BID AMOUNT 1. Tschiggfrie Excavating Co. Dubuque, IA $372,678.35 2. Top Grade Excavating, Inc. Farley, IA $376,340.00 3. Portzen Construction, Inc. Dubuque, IA $498,746.50 The engineer's estimate for construction costs for this project was $382,410.00. The low bid of $372,678.35 is $9,731.65 (2.5 %) below the engineer's estimate. Page 1 of 3 BUDGET IMPACT The estimate of probable cost for Hwy. 151/61 South Grandview Avenue Overpass Water Main Relocation Project is as follows: Estimated Construction Cost $ 372,678.35 Contingency (15 %) $ 55,901.75 Engineering Design & Inspection Fees $ 21,900.00 Bidding $ 5,500.00 Inspection /Staking $ 9,300.00 Total Estimated Project Cost $ 465,280.10 The project funding summary is as follows: CIP NO. 740 -1405 FUND DESCRIPTION Hwy. 151/61 South Grandview Avenue Overpass Water Main Relocation Project FUND AMOUNT BUDGETED $ 337,696.44 BUDGET DEFICIT $ 127,583.66 HISTORY CIP 740 -2261 Ramp Utility Relocation These funds were originally allocated to support infrastructure improvements to the city's water distribution system along Central Ave. as part of the new 9th Street Parking Ramp Project and later as part of the Historic Millwork District Project. Over time, as these projects were better defined and were constructed, some of the identified funds were not utilized. FY13 monies budgeted in this account were $631,861.00. To date, these monies have supported a 12 inch water main extension along 5th Street to Ice Harbor Drive located within the Port of Dubuque at an estimated cost of $191,126.40. These funds will also support the proposed 8 inch water main extension along Elm Street from 9th to 11th Street (Intermodal Parking Ramp Project) at an estimated cost of $98,000.00. At this time, there is an estimated fund balance in this account in the amount of $390,734.60. In review of this CIP and its proposed future activities, there will be a surplus fund balance in the estimated amount of $292,734.40. $92,198.50 of the surplus fund has been allocated to the Asbury Tank Reconditioning Project and $106,321.00 has been allocated to the Bunker Hill Pump Station Improvement Project, leaving $94,214.90 available. We are requesting this surplus be approved to support the projected increase cost to the Hwy. 151/61 South Grandview Avenue Overpass Water Main Relocation Project. The remaining $33,368.76 required to support this project would come from postponing the Eagle Point Driveway Overlay project. Page 2 of 3 It is being recommended that this budget deficit be absorbed with the surplus funds currently in the following CIP: CIP NO. FUND DESCRIPTION FUNDS AVAILABLE 740 -2261 Ramp Utility Relocation $ 94,214.90 740 -2309 Eagle Point Driveway Overlay $ 105,000.00 RECOMMENDATION It is with the recommendation of MSA Professional Services, Inc. and staff that I request to award this project to the lowest qualified bidder, Tschiggfrie Excavating Co. of Dubuque, IA, in the amount of $372,678.35. I have attached a copy of the recommendation letter submitted by MSA Professional Services, Inc. for your review. Attachments cc: Jenny Larson, Budget Director Kevin Firnstahl, City Clerk Mike Brekke, Distribution Supervisor File Page 3 of 3 RESOLUTION NO. 175 -13 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR HWY. 151/61 SOUTH GRANDVIEW AVENUE OVERPASS WATER MAIN RELOCATION PROJECT CIP 740 -1405 Whereas, sealed proposals have been submitted by contractors for the Hwy. 151/61 South Grandview Avenue Overpass Water Main Relocation Project (the Project) pursuant to Resolution No. 119-13 and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 19th day of April, 2013. Whereas, said sealed proposals were opened and read on the 16th of May, 2013 and it has been determined that Tschiggfrie Excavating Co. of Dubuque, IA, with a bid amount of $372,678.35, is the lowest responsive, responsible bidder for the Project. Whereas, it has been determined that it is in the best interest of the City of Dubuque to enter into a Public Improvement Contract with for said Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Tschiggfrie Excavating Co. of Dubuque, IA, and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Attest: Passed, approved and adopted this 3rd day of June, 2013. A KevL irnstahl, Ci y Clerk Roy D. oI, Mayor NSA TRANSPORTATION • MUNICIPAL DEVELOPMENT • ENVIRONMENTAL May 17, 2013 Robert Green, Water Department Manager City of Dubuque Water Department 1902 Hawthorne Street Dubuque, IA 52001 Re: Dubuque — Highway 151/61 Water Main Relocation City of Dubuque Water Department Dear Mr Green: Upon review of the bids received on May 16, 2013 for the above - referenced project, it was found that all bids were submitted by qualified Contractors. It is our recommendation that the low responsive bidder listed below be accepted and award made by the Dubuque City Council. Tschiggfrie Excavating Inc. 425 Julien Dubuque Drive Dubuque, IA 52003 Base Bid Amount $372,678.35 Enclosed is a copy of the bid tabulation for your use and file. Please contact our office if you have any questions. Sincerely, MSA Professional Services, Inc. Jacob it. Huck, P.E. Team Leader Enc. Offices in Illinois, Iowa, Minnesota, and Wisconsin 1605 ASSOCIATES DRIVE, SUITE 102 • DUBUQUE, IA 52002 563.582.3973 • 888.869.1214 • FAX: 563.582.4020 www.msa- ps.com P: \490s \492 \00492030 \00492030 Letter of Recommendation docx BID TABULATION PROJECT HIGHWAY 151/61 WATER MAIN RELOCATION OWNER CITY OF DUBUQUE PROJECT NUMBER: 00492030 BID DATE: MAY 16, 2013 For updated bidding information visit us at www.msa- ps.com 1 of 2 00492030 Bid Tab TABULATION TSCHIGGFRIE EXCAVATING TOP GRADE EXCAVATING PORTZEN CONSTRUCTION, INC. ITEM NO. ITEM DESCRIPTION EST. QNTY UNITS UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 1 Mobilization 1 LS $ 5,492.75 $ 5,492.75 $ 14,000.00 $ 14,000.00 $ 40,000.00 $ 40,000.00 2 Traffic Control 1 LS $ 6,500.00 $ 6,500.00 $ 8,000.00 $ 8,000.00 $ 10,000.00 $ 10,000.00 3 Connect to Existing Water Main 4 EA $ 1,554.00 , $ 6,216.00 $ 1,200.00 $ 4,800.00 $ 1,500.00 $ 6,000.00 4 Vertical Pipe Structure & Shoring 1 LS $ 47,961.10 $ 47,961.10 $ 53,000.00 $ 53,000.00 $ 99,000.00 $ 99,000.00 5 Bore Pit & Shoring 2 EA $ 13,569.50 $ 27.139.00 $ 4,500.00 $ 9,000.00 $ 18,000.00 $ 36,000.00 6 6" D.I. Water Main 43 LF $ 44.60 $ 1,917.80 $ 40.00 $ 1,720.00 $ 48.00 $ 2,064.00 7 *" D.I. Water Main 30 LF $ 50.15 $ 1,504.50 $ 50.00 $ 1,500.00 $ 54.00 $ 1,620.00 8 12" D.I. Water Main 340 LF $ 66.05 $ 22,457.00 $ 61.00 $ 20,740.00 $ 67.00 $ 22,780.00 9 16" D.I. Water Mian 690 LF $ 80.35 $ 55.441.50 $ 91.00 $ 62,790.00 $ 85.00 $ 58.650.00 10 26" Casing Pipe, w/Pipe Spacer, Open Cut, Complete 28 LF $ 123.25 $ 3.451.00 $ 150.00 $ 4,200.00 $ 120.00 $ 3.360.00 11 26" Bore Casing Pipe, w/Pipe Spacers & Jacking, Complete 205 LF $ 257.25 $ 52,736.25 $ 235.00 $ 48,175.00 $ 265.00 $ 54,325.00 12 Capping and Abandoning Water Main (Including Flowable Fill) 2 EA $ 1,305.65 $ 2,611.30 $ 600.00 $ 1,200.00 $ 1,800.00 $ 3,600.00 13 6" x 6" Anchoring Tee 2 EA $ 532.00 $ 1,064.00 $ 700.00 $ 1.400.00 $ 450.00 $ 900.00 14 6" 90° Bend 1 EA $ 467.00 $ 467.00 $ 500.00 $ 500.00 $ 400.00 $ 400.00 15 6" RS Gate Valve & Box 6 EA $ 1.068.00 $ 6,408.00 $ 1,300.00 $ 7,800.00 $ 1.050.00 $ 6.300.00 16 6" Megalug® 22 EA $ 98.35 $ 2,163.70 $ 175.00 $ 3,850.00 $ 60.00 $ 1,320.00 17 6" D.I. 22.5° Bend 2 EA $ 443.00 $ 886.00 $ 650.00 $ 1,300.00 $ 375.00 $ 750.00 18 6" Romac Macro" Coupling 5 EA $ 382.65 $ 1,913.25 $ 600.00 $ 3,000.00 $ 400.00 $ 2.000.00 19 Fire Hydrant 1 EA $ 2,731.00 $ 2.731.00 $ 2,400.00 $ 2,400.00 $ 3,000.00 $ 3.000.00 20 8 "x6" D.I. Reducer 1 EA $ 280.00 $ 280.00 $ 400.00 $ 400.00 $ 400.00 $ 400.00 21 8" Megalug® 1 EA $ 142.00 $ 142.00 $ 200.00 $ 200.00 $ 75.00 $ 75.00 22 8" RS Gate Valve & Box 1 EA $ 1,517.00 $ 1,517.00 $ 1,700.00 $ 1.700.00 $ 1,300.00 $ 1,300.00 23 12" Romac Macro"" Coupling 3 EA $ 604.00 $ 1,812_00 $ 1,000.00 $ 3,000.00 $ 550.00 $ 1,650.00 24 12" D.I. Cap 2 EA $ 300.00 $ 600.00 $ 300.00 $ 600.00 $ 525.00 $ 1,050.00 25 12" Megalug® 15 EA $ 196.35 $ 2,945.25 $ 275.00 $ 4,125.00 $ 150.00 $ 2,250.00 26 12" 90° Bend 1 EA $ 734.00 $ 734.00 $ 700.00 4 $ 700.00 $ 800.00 $ 800.00 27 12 "x6" D.I. Reducer 2 EA $ 533.00 $ 1,066.00 $ 500.00 $ 1.000.00 $ 600.00 $ 1,200.00 28 12" D.I. 45° Bend 2 EA $ 659.00 $ 1,318.00 $ 800.00 $ 1,600.00 $ 650.00 $ 1,300.00 29 12" RS Gate Valve & Box 2 EA $ 2,321.00 $ 4,642.00 $ 1,900.00 $ 3,800.00 $ 2,500.00 $ 5,000.00 30 12" Field Lok 350 Gaskets 4 EA $ 257.00 $ 1,028.00 $ 300.00 $ 1,200.00 $ 250.00 $ 1.000.00 31 12" Nitrile Pipe Gaskets 19 EA $ 81.35 $ 1,545.65 $ 125.00 $ 2,375.00 $ 30.00 $ 570.00 32 16" Megalug® 37 EA $ 334.00 $ 12,358.00 $ 400.00 $ 14,800.00 $ 300.00 $ 11,100.00 33 16" Romac MacroTM Coupling 2 EA $ 1,228.00 $ 2,456.00 $ 1,500.00 $ 3,000.00 $ 1,200.00 $ 2,400.00 34 16" D.I. 90° Bend (in vertical pipe structure) 2 EA $ 1,387.00 $ 2,774.00 $ 1,000.00 $ 2,000.00 $ 1,350.00 $ 2,700.00 35 16 "x8" Anchoring Tee 1 EA $ 1.039.00 $ 1.039.00 $ 1.000.00 $ 1,000.00 $ 1,250.00 $ 1,250.00 36 16" Butterfly Valve & Box 6 EA 9 2,332.00 $ 13.992.00 $ 2.100.00 $ 12,600.00 $ 3,000.00 $ 18.000.00 37 16 "x12" D.I. MJ Tee 3 EA $ 835.00 $ 2.505.00 $ 1,000.00 $ 3,000.00 $ 700.00 $ 2.100.00 38 16 "x16" D.I. MJ Tee 1 EA $ 1,718.00 $ 1.718.00 $ 1,900.00 $ 1,900.00 $ 2,000.00 9 2.000.00 39 16" D.I. 45° Bend 6 EA $ 1,293.00 $ 7,758.00 $ 1,400.00 $ 8,400.00 $ 1,600.00 $ 9,600.00 For updated bidding information visit us at www.msa- ps.com 1 of 2 00492030 Bid Tab TABULATION For updated bidding information visit us at www.msa - ps.com 2 of 2 00492030 Bid Tab TABULATION TSCHIGGFRIE EXCAVATING TOP GRADE EXCAVATING PORTZEN CONSTRUCTION, INC. ITEM NO. ITEM DESCRIPTION EST. QNTY UNITS UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 40 16 "x6" D.I. Reducer 2 EA $ 731.00 $ 1,462.00 $ 800.00 $ 1,600.00 $ 1,000.00 $ 2,000.00 41 16" 11.5° Bend 1 EA $ 982.00 $ 982.00 $ 900.00 $ 900.00 $ 1,200.00 $ 1,200.00 42 16" D.I. 22.5° Bend 4 EA $ 982.00 $ 3,928.00 $ 1,000.00 $ 4,000.00 $ 1,200.00 $ 4,800.00 43 16" Field Lok 350Gaskets 6 EA $ 487.00 $ 2.922.00 $ 600.00 $ 3,600.00 $ 550.00 $ 3,300.00 44 16" SS Thrust Rodding (in verticalpipe structure) 1 LS $ 1,082.00 $ 1,082.00 $ 1,200.00 $ 1,200.00 $ 1,200.00 $ 1,200.00 45 4'x8'x2" Pipe Insuation Sheet 4 EA $ 62.65 $ 250.60 $ 100.00 $ 400.00 $ 35.00 $ 140.00 46 ACC patch, (7.5" min. thickness) 195 TONS $ 96.00 $ 18,720.00 $ 90.00 $ 17,550.00 $ 105.00 $ 20,475.00 47 PCC Curb & Gutter, Remove & Replace 140 LF $ 18.15 $ 2,541.00 $ 14.00 $ 1,960.00 $ 32.00 $ 4,480.00 48 Crushed Aggregate Base Course, (6 -inch min. thickness) 150 TONS $ 17.30 $ 2,595.00 $ 14.00 $ 2,100.00 $ 15.00 $ 2,250.00 49 PCC Sidewalk Curb Ramp, (6 -inch min. thickness) 160 SF $ 8.10 $ 1,296.00 $ 6.00 $ 960.00 $ 12.00 $ 1,920.00 50 Detectable Waming Pavers (2'x2') 2 EA $ 255.00 $ 510.00 $ 150.00 $ 300.00 $ 200.00 $ 400.00 51 Select Backfill (limstone screenings) 1,180 TONS $ 9.45 $ 11,151.00 $ 7.00 $ 8,260.00 $ 12.00 $ 14,160.00 52 Concrete Washout Area 1 LS $ 660.00 $ 660.00 $ 500.00 $ 500.00 $ 1,000.00 $ 1,000.00 53 Erosion Control Blanket 2,830 SY $ 3.00 $ 8,490.00 $ 4.00 $ 11,320.00 $ 6.00 $ 16,980.00 54 Vehicle Tracking Pad 1 LS $ 1,292.70 $ 1,292.70 $ 1,000.00 $ 1;000.00 $ 1,500.00 $ 1,500.00 55 Silt Fence 910 LF $ 1.75 $ 1,592.50 $ 1.50 $ 1,365.00 $ 4.00 $ 3,640.00 56 ' Hydroseeding 850 SY $ 2.25 $ 1,912.50 $ 3.00 $ 2,550.00 $ 1.75 $ 1,487.50 TOTAL ITEMS: #1 - #56 $ 372,678.35 $ 376,340.00 $ 498.746.50 For updated bidding information visit us at www.msa - ps.com 2 of 2 00492030 Bid Tab TABULATION