Loading...
Signed Contracts_Strand Associates Change Order #20, Miron Construction for W&RRC Renovation4/7A STRAND ASSOCIATES" May 20, 2013 CHANGE 'ORDER NO. 20 PROJECT: OWNER: CONTRACT: CONTRACTOR: Water Pollution Control Plant Modifications City of Dubuque 1 -2010 Miron Construction Co., Inc. Description of Change 20a Remove 20 -inch deep section of asphalt pavement below concrete pavement north of tunnel at Structure 20 for installation of site piping. 20b Caulk and seal FRP odor control covers at Primary Clarifier No. 2 according to manufacturer's. requirements. 20c Change Milestone 1 contract completion date from October 4, 2012, to January 7, 2013, in accordance with enclosed Work Change Directive (WCD) No. 80. 20d Extend centrate drain cleanouts located under the centrifuges in Centrifuge Room 7513 to the outside of the frames using 45- degree bends for easier accessibility in accordance with enclosed WCD No. 81. 20e Provide Model L0702AAWR solenoid valve as manufactured by Automatic Valve at the conveyor slide gates. Provide revised SCC -75 -01 control logic as shown on the enclosed drawings. Add an In -Auto contact to the Open- Close -Auto selector switch provided with the conveyor gates, Twelve hours of the Contract's SCADA enhancement time will be used to complete this work. Provide in accordance with enclosed WCD No. 81. 20f Provide Aeration Tank C repairs in accordance with enclosed WCD No. 82. Provide 18 linear feet of full -depth epoxy crack injection in the Aeration Tank C top concrete slab. Provide ten additional kits of epoxy to reinforce Aeration Tank B beams. 20g Provide electrical modifications in the Solids Processing Building in accordance with enclosed WCD No. 83. 20h Provide modifications at screen box in accordance with enclosed WCD No. 83. G WT:smc1S`. \MAD \I 100 -- 1 14911154 \0231WrthChmige Orders \CO 20 dour Arcot ia 1 Illinois 1 Incliat la I Kentucky 1 Ohio I Wisconsin Strand Associates, Inc: 9 1 Q West Winai a Olive, Madison, WI 53775 (PI 60F3- 251 -4843 1t) tiUtl .51-8665 ADD $ 485 ADD $ 506 NO $ 0 CHANGE ADD $ 2,623 ADD $ 2,000 ADD $ 6,810 DEDUCT ($1,961) ADD $ 2,089 www.strand.com SIr ,nc1 Associates, lne. City of Dubuque —Miron Construction Co., Inc. Contract 1 -2010, Change Order No. 20 Page 2 May 20, 2013 20i Inside Aeration Tank C, reinstall one existing baffle using ADD $ 1,494 stainless steel hardware and install new stainless steel bolts where bolts are missing to anchor existing baffles. Perform this work on a time and materials basis in accordance with enclosed WCD No. 84. 20j Delete protective coating in Aeration Tank C in accordance DEDUCT ($65,008) with enclosed WCD No. 85. 20k Provide vinyl tilt and base on Unisex Toilet floor in ADD $ 508 Maintenance Building in accordance with enclosed WCD No. 86. 201 In First Floor Room 5502, provide 4 inches of board insulation ADD $ 1,661 in ceiling opening above stairwell. Mechanically fasten a 12 -gauge galvanized sheet metal panel to the concrete ceiling. Oversize the panel as required on each side and caulk airtight. Paint to match ceiling. Provide in accordance with enclosed WCD No. 86. 20m Install EF -20 -01 in Compressor Room 2002, Route duct into ADD $ 4,691 PRI Splitter Room 2004. Provide in accordance with enclosed WCD No. 86. 20n Provide plug valve to isolate Primary Clarifier No. 4 scum pit in ADD $ 2.688 accordance with enclosed WCD No. 87. 20o Restore masonry in Administration Building Room 8111 in ADD $ 681 accordance with enclosed WCD No. 88. 20p Provide handrail, wall - mounted, according to detail ADD $ 1,356 E/99- AS5.03 on both sides of the stairs adjacent to retaining wall No. 2 in accordance with enclosed WCD No. 89. 20q Provide flue extension on RTU -80 -01 and Owner to provide NO $ 0 laboratory tests in accordance with enclosed WCD No. 89. CHANGE 20r Provide butterfly valve as specified in 15510 on 3 -inch PWS in ADD $ 1,805 accordance with enclosed WCD No. 90. 20s Provide handrailing in Administration Building Stairs Room ADD $ 2,430 8112 in accordance with enclosed WCD No. 91. 20t At Final Clarifier No. I. remove and replace grout between the ADD $ 640 sludge collector seal ring and the floor where the existing grout was failing in accordance with enclosed WCD No. 92. G WTsne\s:1MAD\ I I00 - -I 144 \I 154\0231Wrd\Chaogc Orders%CO 20.docx www.strand.com Strond Associates, Inc. City of Dubuque —Miron Construction Co., Inc. Contract 1 -2010. Change Order No. 20 Page 3 May 20, 2013 20u Inside Aeration Tank 13, reinstall one existing baffle using ADD $ 819 stainless steel hardware and install new stainless steel bolts where bolts are missing to anchor existing baffles. Perform this work on a time and materials basis in accordance with enclosed WCD No. 93. 20v Provide Aeration Tank B repairs in accordance with enclosed ADD $ I7.446 WCD No. 94. Provide 224 linear feet of full -depth epoxy crack injection in the Aeration Tank B top concrete slab. Provide 7.5 additional kits of epoxy to reinforce Aeration Tank B beams. 20w Delete protective coating in Aeration Tank B in accordance DEDUCT ($55,495) with enclosed WCD No. 95. 20x Provide dowels where new walls meet existing walls at ADD $ 1,508 Structure 28 in accordance with enclosed WCD No. 96. 20y Provide site lighting modifications in accordance with enclosed ADD $ 1,415 WCD No. 97. 20z Provide hydrogen sulfide monitor in Thickener Room in ADD $ 4,221 accordance with enclosed WCD No. 97. 20aa Provide landscape modifications in accordance with enclosed DEDUCT ($ 6,589) WCD No. 97. 20bb Provide sidewalk adjacent to Maintenance Building in ADD $ 2,574 accordance with enclosed WCD No, 98. 20cc Provide Administration Building locker room modifications in ADD $ 2,623 accordance with enclosed WCD No 98. 20dd Provide aluminum plate along walkway between WAS Storage ADD $ 2,544 Tank No. 1 and WAS Storage Tank No. 2 in accordance with enclosed WCD No. 98. 20ee Provide modifications to plumbing vents in accordance with ADD $ 4,308 enclosed WCD No. 99. 2Off Provide aluminum grating at the top of aeration tank outlet box ADD $ 1,558 in accordance with enclosed WCD No, 99. 20gg Provide neoprene cover to close the opening on the west wall of ADD $ 889 Passageway 7514 in accordance with WCD No. 99, 20hh Provide power to heater and receptacles at the Liquid Oxygen ADD $ 2,152 Storage Tanks in accordance with enclosed WCD No. 99. 201i Provide emergency stop for Flammable Liquid Fuel Storage ADD $ 6,775 System in accordance with enclosed WCD No. 100. GWT:swe \SAMAD\ 1100-1199 \ 1 1 5 4102 31Wid1Chaa ge OrderslCO 20.docx www.strand.ccm Strand Associates, Inc. City of' Dubuque— Miron. Construction Co., Inc. Contract 1 -2010, Change Order No. 20 Page 4 May 20, 2013 20jj Face Brick Allowance specified in Section 04300 Unit Masonry DEDUCT ($17,316) System. 20kk Provide blocking for plaques and monitors in the ADD $ 614 Administration Building Lobby. • 2011 Provide grading adjacent to Structure 60 and 62 in accordance NO $ 0 with enclosed drawing. CHANGE 20mm At existing polymer containment area, remove existing drain to NO $ 0 1 inch below floor elevation and plug as required. Repair with CHANGE nonshrink grout plus surfacing to match existing. 20nn North of west sliding gate, provide intercom station and card ADD $ 4,240 reader on upper mounting stand at gate access control station. Mount intercom and card reader to gate access control station 83 inches above concrete base according to detail J/99- E5.02. Provide in accordance with enclosed WCD No. 101. TOTAL, VALUE OF THIS CHANGE ORDER: DEDUCT ($60,2I6) Contract Price Adjustment Original Contract Price $49,750,000 Previous Change Order Adjustments $ 5,141,619 Adjustment in Contract Price this Change Order ($ 60,216) Current Contract Price including this Change Order $54,831,403 Contract Completion Date Adjustment Original Milestone 1 Contract Completion Date Original Milestone 2 Contract Completion Date Original Substantial Contract Completion Date Original Contract Completion Date Current Milestone 1 Contract Completion Date including all Change Orders Milestone 2 Contract Completion Date including all Change Orders Current Substantial Contract Completion Date including all Change Orders Current Final Contract Completion Date including all Change Orders t i \VT;sme \S : \MADI 1 100• -1 199\ 1 1 54102 31Wrd \Change OrderslCO 20.docx March 1, 2012 July 2, 2012 March 31, 2013 August 31, 2013 January 7, 2013 February 6, 2013 September 3, 2013 February 3, 2014 www.strand.com Strand Associates, Inc. City of Dubuque —Miron Construction Co., Inc. Contract 1 -2010, Change Order No. 20 Page 5 May 20, 2013 This document shall become a supplement to the Contract and all provisions will apply hereto. MMENDED �-�W, '.yam t; RANDALL A...�, =zw WIRTZ :z:.-- 16137ENQER— Strand Associates, ''.',,�� �OWPA2OVED i CONTRACTOR —Miron Co ruction Co., Inc. DAVID G. VOSS JR., PR IDENT APPROVED OWNER —City of Dubuc! CWT:smc1S:\ MAD\ II00-- I19911154 \0231WrdChangc Orders \CO 20.docx —X)/ Date Date 5-473//3 www.strand.com Building Excellence' CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 20a J013 #: 103400 MOD 1/: 0210 -00 DATED: 4/20/12 FAX: 608 -251 -8655 PHONE: 608 - 251 -4843 DESCRIPTION OF MODIFICATION: Cost to remove asphalt from underneath concrete pavement at Structure 20 REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT Tschiggfrie Excavating Miron Management Fee 5.00 % - Subs Subtotal Performance Bond 1.50 % TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: $455.00 $22.75 $477.75 $7.17 $484.92 $485.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost S•I e•�ule Impact Miron Representativ6, !, *� 1_1__ A 4/20/12 o' an -�aniels Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN MIRON CONSTRUCTION CO., IN(:. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 54957 -0509 1471 McMahon Drive Neenah, WI 54956 Phone; 920/969 -7000 Fax: 920/969 -7399 www.mlron- construction. corn --.^� , 1/111 's® 4.y! % if Owner City of Dubuque Computed by ]CD Project Dubuque WPCP Date 20- Apr -12 Project No 103400 Verified by Title Cost Proposal Request Documentation Date �" Page 1 of 1 Revision 0 Modification Quote Number: 210-00 Description of Modification: Remove Asphalt from Underneath Concrete Pavement 20. Items included in this proposal: 210 -01 Item 210 -01 Tschkia rie pavement below concrete pavement North of tunnel of site piping. $ Material - !abet $ 455.00 $ - 1.0 Remove 20" deep section of asphalt at structure 20 for Installation Contract Time 1.0 No Change * ** Note: Removal witnessed and measured by RPR Subtotal: Miron Markup @ 5% Bond & Insurance @ 1.5%: TOTAL - Mod 210 -00: $ - $ - $ 7.17 $ 484.92 $ 455.00 $ 22.75 Building Excellence- CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 20b JOB #:103400 MOD #: 0291 -00 DATED: 1/11/13 FAX: 608 -251 -8655 PHONE: 608 -251 -4843 DESCRIPTION OF MODIFICATION: Cost to modify control covers for Primary Clarifier 2. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT JF Ahern Company $475.00 Miron Management Fee 5.00 % - Subs $23.75 Subtotal $498.75 Performance Bond 1.50 % $7.48 TOTAL AMOUNT OF THIS MODIFICATION: $506.23 CHANGE ORDER AMOUNT REQUESTED: $506.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Sche.ule Impact Miron Representative ' 1 /j /� L Date 1/11/13 Owner Representative aniels Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN MIRON CONSTRUCTION CO., INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 54957 -0509 1471 McMahon Drive Neenah, WI 54956 Phone: 920/969 -7000 Fax: 920/969 -7399 www.miron-constructIon.com iiiii ®ffaaii Owner City of Dubuque Computed by JCD Project Dubuque WPCP Date 11- Jan -13 Project No. 103400 Verified by Title Cost Proposal Request Documentation Date Page l of l Revision 0 Modification Quote Number: Description of Modification: Items included In this proposal: 291 -00 Modify Odor Control Covers for Primary Clarifier 2 291 -01 . Item 291 -01 Shan 1.0 Modify odor control covers for P2 based upon tank being out of round. =MUMS 1.0 No Change Tatai $ 475.00 $ - "s Note: None Subtotal: Miron Markup @ 5% Bond & Insurance to 1.5 %: TOTAL - Mod 291 -00: $ 475.00 $ 23.75 $ 7.48 $ 506.23 Sall STRAND A06QCIATe9. av 20c @ N O I N@ F R H Work Change Directive Directive No.: 80 I Contract: 1 -2010 Owner: City of Dubuque By: GWT Contractor. Miron Construction Co., Inc. Date: 1/23/13 Description of Work Cost Deduction Cost Addition Change Milestone 1 contract completion date from October 4, 2012, to January 7, 2013. $0 Total $0 Remarks: This Work Change Directive shall result in no change to the Milestone 2, Substantial Completion, and Final Completion dates and is not subject to negotiation. Milestone 1 Is being modified in the Contract as noted above in the Description of Work. Change in Contract Price by: ❑ Supplemental Unit Price ❑ Unit Price ❑ Lump Sum Requested by: Strand 1D° e13 (., fah- e„pAi. Recommended by: 1/23/13 (Engineer) Date Accepted by: c''. `")---._ • / — 30— .13 (Con -; o ' Date l�'- Approved by: �i-1� / -- 31 -73 • ner) Date -THIS FORM IS NOT A SUBSTITUTE FOR A PROPERLY PREPARED AND EXECUTED CHANGE ORDER -- Initlal_c\S:VMD11100- 1199 \11541023 \Wrd\Work Change Dlrectives\Directive No 80.Milestone 1,docx S3. STRAND AssOCIATIVANC' 20d, 20e 1.,OIN *Pgfl Work Change Directive Directive No.: 81 1 Contract: 1 -2010 Owner. City of Dubuque By: GWT Contractor. Miron Construction Co.. Inc. Date: 1/10/13 Description of Work Cost Deduction I Cost Addition Extend centrate drain cleanouts located under the centrifuges In Centrifuge Room 7513 to the outside of the frames using 45 degree bends for easier accessibility, Provide Model L0702AAWR solenoid valve as manufactured by Automatic Valve at the conveyor slide gates. Provide revised SCC -75 -01 control logic as shown on the drawing attached to this Work Change Directive. Add an In- Auto contact to the Open -Close -Auto selector switch provided with the conveyor gates. 12 hours of the Contract's SCADA enhancement time will be used to complete this work. $2,623 $2'000 Total $4,623 Remarks: This Work Change Directive shall result in no change to project duration and is not subject to negotiation. Change in Contract Price by: ❑ Unit Price ® Lump Sum • Supplemental Unit Price Requested by: Strand, Owner, Miron 1/10/13 Date _ Recommended by: i '7 r-au , 1 ''/ u 1/10/13 (Engineer) Date Accepted by: —�' /...--/r---1_3 ontractor), Date Approved by: ��m ,y,A/ / 30--q (1 er) ' Date —THIS FORM IS NOT A SUBSTITUTE FOR A PROPERLY PREPARED AND EXECUTED CHANGE ORDER -- InIUaIs%S:\MAO \1100 - 1199111541023 \Wrd\Work Chango DIrectives1Dtrective No 81.Centrale CO.Convevor SV.docx Building Excellence` CHANGE ORDER REQUEST JOB 11:103400 MOD 1t: 0288 -00 DATED: 1/08/13 TO: Mr Glenn W. Tranowski, P.E FAX: 608 - 251 -8655 Strand Associates Inc PHONE: 608 -251 -4843 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Cost associated with centrifuge centrate cleanout, per the response to RFI 684. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT JF Ahern Company $2,461.00 Miron Management Fee 5.00 % - Subs $123.05 Subtotal $2,584.05 Performance Bond 1.50 % $38.76 TOTAL AMOUNT OF THIS MODIFICATION: $2,622.81 CHANGE ORDER AMOUNT REQUESTED: $2,623 00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost hedule Impact Miron Representative .Tj 1� �' I /'�� Date 1/08/13 an Daniel Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN MIRON CONSTRUCTION CO., INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 54957 -0509 1471 McMahon Drive Neenah, WI 54956 Phone: 920/969 -7000 Fax: 920/969 -7399 • - �x Owner Project Project No. Title City of Dubuque Computed by )CD Dubuque WPCP Date 8- )an -13 103400 Verified by Cost Proposal Request Documentation Date Page 1 of 1 Revision 0 Modification Quote Number: 288.00 Description of Modification: RFI -684 Items included in this proposal: 288-01 Item 288 -01 Ahem 1.0 Extend cleanouts under centrifuges Contract Times support frames for ease of access. Total $ 2,461.00 $ - 1.0 No Change * ** Note: None Subtotal: $ 2,461.00 Miron Markup © 5% $ 123.05 Bond & Insurance © 1.5 %: $ 38.76 TOTAL - Mod 288 -00: $ 2,622.81 FIELD OR AS NOTED 1 CONTROL PANEL SCC -75-01 - 1 CG -75 -01 1 - - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 —11 -12 - 13 -14 -15 F -0- 1 CLOSE r -0- 1 OPEN ---.1 AUTO 1 1 FU13202 3 4 N 1 2 - BIOSOLIDS CONVEYOR 3 - GATE AUTO NO. 1 - 5 — BIOSOLIDS CONVEYOR 6 - GATE NO. 1 IN OPENED POSITION 7 - 8 - BIOSOLIDS CONVEYOR 9 - IN GATE CLOSOEDI POSITION 10 — 11- BIOSOLIDS CONVEYOR 12 - GATE NO. 1 OPEN /CLOSE 13 - 14 15 132 -11 16 - ® 17- 18 -- BIOSOLIDS CONVEYOR 19 - GATE NO. 2 IN AUTO 20 - 21- CONVEYOR BIOSOLIDS C 22 - GATE NO. 2 IN OPENED POSITION 23 24- BIOSOLIDS CONVEYOR 25 - GATE CLOSOED POSITION 26 - 27 BIOSOLIDS 2CONVEYOR 28 - GATE OPEN /CLOSE 29 - 30 _ 31 132 -27 32 - 33 - 34 - 35 - 36 - 37 — -t 13202 I-0 --I - -.....-1 I 1 1 : r- 13203 IN 6 ,, „D 0/2/6 I.2/6 -I 1 --¢ i _l 1 1 J 1 I 0 I xoo L o OPENED L -1 k -Cr 13206 1 IN 7 DI 0/2/7 1:2/7 -1 --fr- CLOSED I- H 1- - -I 13209 1 IN 8 DI 0/2/8 [. 2/8 GATE NO. 1 OPEN /CLOSE CR13215 132111 I I . y -0- - - 13212 1 13213 DO 0/12/7 0:12/7 1 ENERGIZE TO OPEN SPRING L — — -0—� g I — — _, V OUT 7 CR13215 -1 N �- I - 16 1 -17 CG -75 -02 -18 -19 - 20 '--21 - 22 - 23 -24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 E —O— 1 CLOS r _o__ 1 OPEN AUTO 1 I FU13218 A 13218 —1) 1 I 1 I —® . r 13219 N 9 DI 0/2/9 I:2/9 -I 1 1 -+ I - 1 1 i —o0X XOO 7 - - -c- L - - OPENED 1 L -11- -c` IN 10 / DI 0/2/1° 1:2/10 - -1 13222 7 - -_0_J CLOSED � --c- L_ I- IN 11 „ ,p� 0 2 11 / / I: 2/11 - 1 13225 1 1 GATE NO. 2 OPEN /CLOSE 1 CR13231 1 "---.1 13227 1 I I ¢- -0- I ENERGIZE TO OPEN -I 13228 1 I I p2/8 <>0/12/8 I SPRING RETURN L — — -O- -,ISO- — — -C`- 13229 OUT 8 CR13231 I - 32 1 - 33 3 4 N - 34 - 35 SAI: Typical for all conveyor gates • - 36 - 37 1 I 1 PROJECT NOTES: TERMINAL NUMBERS FOR CONNECTING TO EQUIPMENT "PROVIDED BY OTHERS" TO BE SUPPLIED AT STARTUP. * — PROVIDED BY OTHERS ** — EXISTING EQUIPMENT * * * - FIELD INSTALLED Wunderlich -Malec E I�e�sI se4,es 5501FePo Road, Mlnnelonka,MN55343 1 Phone(952)933-3222 DOCUMENT Is THE COPYRIGHTED PROPERTY OF NVN )ERLIa�AALEc TN ENGINEERING NG. MD MAY NOT BE REPRCDUGED OR USED FOR OTNER THAN NVNDERUCHHAALEC ENGINEERING AUTHORIZED PURPOSES WITHOUT NAITIEN PERMISSION. ENG. STAMP DUBUQUE, IA WPCP MODIFICATIONS PROD. NO. 1510032 CONTROL PANEL SCC -75-01 /MCC -75A & 75B BIOSOLIDS CONVEYOR GATE CONTROL CG -75 -01 & CG -75-02 CONTROL WIRING PANEL NO. SCC -7501 0 01/02/13 AS INSTALLED, GATE VALVE REVISIONS JWG TMK JWG SHT. NO. 132 REV DATE DESCRIPTION DESIGN DWG. CHK. FILENAMEN 151 0032 SCC 75 1 132 STRAND tviCOVATEti a vii r.ue44 20f Work Change Directive Directive No.. Owner: Cily of Dubuque 82 Contract: 1.2010 By: GAIT Contractor. Miran Construction Co., Inc. Date: 1124113 Description of Work Cost Deduction Cost I Addition j Provide epoxy injection for beam cracks greater than 0,012 inches wide on the Aeration Tank C beams according to FRP reinforcing manufacturer requirements. Contractor shall review areas to receive fiber reinforcement showing cracking with the Engineer and Owner, and shall identify the linear footage of cracks requiring injection in Tank C prior to performing the work. $58.62 per lineal foot $58.62 per lineal foal $0 $575.51/kit slab from the are tight areas the linear work. Provide full depth epoxy crack injection in Aeration Tank C lop concrete similar to Specification Section 07950. Cracks shall be injected inside of the tank. Not all the cracks may need to be treated If they and not showing signs of deterioration. Contractor shall review showing cracking with the Engineer and Owner, and shall identify footage of cracks requiring injection In Tank C prior Apply finish coat of Tyfo S according to manufacturer Aeration Tank C beams receiving externally bonded to performing the recommendations onto FRP reinforcement. If more than 8 kits of epoxy are used to reinforce Aeration Tank C beams, provide additional epoxy kits to comply with FRP reinforcing manufacturer requirements. Total TBD Remarks: This Work Change Directive shall result in no change to project duration, Quantities to be veriFed with Owner and Engineer. The unit price indicated shall'nclude all materials, labor, incidentals, and Contractor's mark -up for subcontractors and bonds. After the work is complete, a calculated lump sum cost will be included in a future change order. It is not acceptable for Fibrwrap to include a additional mobilization cost for work at Aeration Tank C. Change in Contract Price by. Supplemental Unit Price 0 Unit Price 0 Lump Sum Requested by. Ownerl/Miron Various Date • Recommended by: u��ky� h (Engineer) 1124113 Date Accepted by: (C o0 / - 20 --/ j Date Approved by: a err- 1-- 31r /5 Date -THIS FORM IS Nor A SUBSTITUTE FOR A PROPERLY PREPARED AND EXECUTEDCRANGEORDER- Imhals'S mou ioo•.114e111$0023001work Chimp arecOoKirec!rve No 82Reraiime Tank C F.pocy Inlet cion.ar sa SAL MOW Mg 11!“ 011101141011177V almo••••••••••••••• D:(101111 .•.. lb ••" err% a 1211 I III atlipAtti; Lf!.t_ 144 • , Musoal ": • I. :',ti Api.192111aIS II lifilr • • 104 / . • . . .. . .";12 :24: • : 4 ...4‘y Ad% 1 10,•t ..% a 41.• . i ., nu n urn ititti port man 1 in ;:- ;I.' ' ,IV'Qrrie• 7.1trt";' I., wsiMe, i'V..‘ en 604 Worif,S*W1/2, 7+ 4riktiliql.;it.7 Lt.i F.N..111111111=Ve.4* 4),,I6P.Kili t.:IPI4dilitAN 3.tr.1.•' lk , ri,finlimii timiivnitiriviii. '‘. 1r: 'Mos> 0,74ai.}. , ' • .Y.w..7 " fat il t 4 .31-.3. ? ) , , r iti(4);, 1. 1101111111SSiliol■.ows• rip . ipt.1111111.11111[111.Alln" , . I tv'eA- 7f3174 e.„11 whi ••• ' • el 4.11:1 41:T4'" IKIttl.134401101141niiire{40101,Nr6Vr 9;;ImIrial MUSE 4 • oolumeob Oo • t tectraltupaetat 1 IQr /444 C • • 414; la I .7,7r:;; p4:44 7.4.4:1* (0•1 LP@ tt tb4:4'il .• ',a 1 Poupt:r.i ; '.• si;.:7?..141.: 0•14° lanrunc ' • : ma.% st :Heys+ : • • •••• ••• 4" le•te.4 Ay _11I1 " "::7,141? :4 l':144, I 'Mr .7: • 7, • *TT T.ti.W.4,11-4. t/till I 11-t: itit n`.4/.1(3/4/ C liriA111P. &Mon 333411Etl..Den, tin Digo, CA MO 101134004 FIC 151,4441N2 airatpfstyko,* wahrectss :fri‘mortmitopri a ma ern, It 1112111144131111 *Pe 14 • 000 KILWI •aw ;11101N I. rat tit:urn :SY two• . kt.": 4;sa trw of kw/ firSts-laimpti t Building Excellence" CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Cost associated with Aeration tank C repair. JOB #:103400 MOD N, 0292 -01 DATED: (/13/13 FAX: 608- 251 -8655 PHONE: 608- 251-4843 REQUESTED BY; Strand Associates Inc DATE: SUBCONTRACTOR Fibrwrap Construction Services Miron Management Fee 5.00 - Subs Performance Bond 1.50 TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: AMOUNT $6,390.00 $319.50 Subtotal $6,709.50 $100.64 $6,810.14 $6,810.00 Please find back up materials enclosed regarding this modification, Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Miron Representative 4611:', la' an lan>.els Schtle Impact Date 1/13/13 Owner Representative Date THIS PRICE IS VALID FOR 15 DAPS FROM THE DATE SHOWN MIRON CONSTRUCTION CO., INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 54957.0509 1471 McMahon Drive Neenah, WI 54956 Phone: 9201969-7900 Fax: 920/969-7399 www. miron•construction, com �y illii iiiieg%i Owner City of Dubuque Computed by )CD Project Dub aqueWPCP Date 31•)ao-13 Project No, 103400 Verified by ride Cost Proposal Request Dammenlaton Date Pape 1 of 1 Revision 0 Modification Quote Number. 29141 Description ofModlOca'don: WO 082 Items Included In this proposal: 29201, 29202, 29203, 292.04 Item 292.01 Ella 9e 10 EpoxyNJedbn for aeralkn lank C beams (OLP) 00$11nBs 1.0Itflange $ $ EMI • • list $ $ • Item 292 -02 UM 1.0 Epoxy Injection for aeration tare C slab (18111 roared nal 1.0IIo Change $ $ I01al 990O0 Item 292 -03 QM Apply TyfaS finish tat CFRPreinfacment $ $ DIN • ' 1.0 coat onarab Coneact flm01 10 No Chasm Item 29244 1,0 Mitered 101 is of epoxy requred fa usface of aeration tank C beams Catt 191 $ IN S,400A0 - 1,0 No Cane $ ms Note, none Subtotal: $ Kun Madwp 0 Sib $ 6,390.00 719.50 10064 6,810.14 Rand & Ino ance 0 I.9%: $ TOTAL • Mod 192.01: $ gNpINeRRtl Work Change Directive (20g, 20h Directive No,: 83 Contract: 1.2010 Owner City of Dubuque 8y: GWT Contractor Mkon Construction Co., Inc, Date: 211113 Description of Work Cost Deduction Cost Addition Provide electrical modifications In the Solids Processing Building according to Cost Proposal Request No. 103 issued on January 10, 2013, Contractor to tum over to the Owner conduit, switches, and wire which was already purchased but not Installed due to this change. The 8" drain pipe shell be connected to the west side of the diversion channel to the ponds as shown on the drawings attached to this Work Change Directive, Drain pipe shall be Installed to allow all Bow from the drying pad to drain to the screen box. For the screen box in detail 13105- C5.01, delete the a drain and adjust the 6' drain on the east side to match the elevation shown on the attached drawing, Locate the screen box 15' offset of the west edge of the pad, centered on the 2 foot wide opening In the curb edge which connects the diversion channel to the ash drying pad, See drawings attached to this Work Change Directive for additional details. $1,981 $2,089 Total $128 Remarks This Work Change Directive shall result in no change to project duration and is not subject to negotiation. Change in Contract Price bLr. Supplemental Link Price I tfnIt Price I (CI Lump Sum Requested by: StrandlMiro Various Date Recommended by: (Engineer) 7/tbroviiiit; 211113 Date Accepted by, / ( „ .der de if 2 —S-43 Date �� J i Approved by, � (e e D ate -THIS FORM iS NOT SUBSTITUTE FORA PROPERLYPREPARED AND IXECUTED CHANGE ORDER- 1# 01SMIAD11100- f1K411841yi31Waotk Change Dinadve sanative No 83.Co.Gen Room UgNUSaean Dud= No, 103 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: T0: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 January 10, 2013 Miron Construction Co., Inc. Jonathan Daniels, Dawn Florian °, Gerald David Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and/or Time incidental to proposed modifications to the Contract Documents described herein. Please submit a separate quote for each item. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Drawing 7511,12 (Sheet 261) CLARIFICATION: The nine light fixtures along with associated wire and conduit in the Future Biogas Co- Generator Room 7510 (six Type -EE and three Type -DD) shall not be installed. Tum over fixtures to Owner. DELETE the three 3 -way light switches (switch designations a, b, and c) on the north wall of Room 7510 located directly west of Door 7510A. CHANGE the three 4-way light switches (switch designations a, b, and c) on the east wall located directly south of Door 7511A to 3 -way switches in Heat Exchanger Room 7511. InilislsLR, N1AD11100- 119941154\039 /rthCost Proposal RequosWCP9,103.Stnalpre75 Com Room tFigtocs.Jocx Building Excellence' CHANCE ORDER REQUEST ' T0: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 JOB #.103400 MOD #; 0293 AO DATED: 1/22111 FAX: 608 - 251 -8655 PHONE: 608- 251 -4843 RE: Dubuque PCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Cost associated with light fixtures in Co -Gen Room, per CPR 103 dated 1/10/13. REQUESTED BY: Strand Associates Inc SUBCONTRACTOR Faith Technologies, Inc. Subtotal ( Performance Bond TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: DATE: 1/10/13 AMOUNT $1,932.00) $1,932.00) ( $28.98) $1,960.98) $1,961.00) Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Miron Representativ ti - " 'n Danie le Impact Owner Representative Date 1/22/13 Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Copy: File / dmf Jobsite MIRON CONSTRUCTION CO., INC. Building Excellence Corporate °like P.O. Box509 Neenah, WI 54957 -0509 1471 McMahon Drive Neenah, WI 54956 Phone: 9201969.7000 Fax, 9201969.7399 www,mlron•censtruction.com iilliff ran Owner OW ofpubuque Computed by JCD Project Dubwue WPCP Date 22•Jan-13 Project No, 103400 Verified by Title Cost PrKasal Request Documentation Date Page 1 al 1 Revision 0 Modification Quote Number: 293-00 DesOptionofModification: CPR•103 Items Included In this proposal: 103 -01 Item 103.01 Slitl $ "uaP.Iii 2.41 $ (1,932.00) $ 1.0ElocvaIrraJfiations per CPR 103 Contm011m s I.0 No Chime m Nom: None subtotal: $ Bard & Insurarre t® 15%; $ TOTAL -CPR 103-00: $ - $ 11,932 O) (28.98) (1,960.48) STRAND ASSOCIATES SHEET OF PROJECT 7 M MK iirci, o?? tjki„ - R FT 612- (LP 1 I Fri a IF 1 ift a F O I 44 1 low I 1 0 n u bc) t . M ■ a T. 1, lin 1 4 10 My f , L k,,,earr:,,, 0 A a '114:',/tss: 1 MI 1 111 I 1 rii 1 hi I. . - o „,r I nu I STRAND ASSOCIATES SHEET OF PROJECT BY ONE f0/02. MK iirci, o?? tjki„ - R FT 612- (LP OtOZ A1n1` •afa 3H101 UOI21d a3nssi c aNV Z`t VON3COV 3af190NI SDNIMV!!a 35311.1. 4i0t.701u+00 :A8 VMOI `3nonana 3nbnana 10 A113 SNOLLvoL41aO11I .INV1d 1O11.1NO3 NOLLSTIOd 831.VM AW2.1 c }g )CdO )1crA8 530 01.0Z 11214Y :31Y13 L • NV•Id DNIQV11J 311S a391V130 0 EBB N t ti'\\\\ ,„ 1 \1 \1,\ \' 1 11 \ \ „ \\ \\ \1111 \ \1 \ \ \11 t\ \ \\‘‘‘ \ 1 \ \v000\0\10 1t\t \llt \\"\\"\\\W 1\tltl tt 1\`\\ ,\ \ \1 11 \\ \11tH \11'\ \ \1 ',\ \\ \`\\ \ \\11 \ \\ \ \\1 \ \ \1 \\\ .� \ \1At1 11`111 V\\\1N 11 1 t t\ AI t t\ 1 1'\ \ \,111 1 11 \. \\ \1 1 1 \`\ 1 1 \t \1 \i \ 1\ 1 1\ \ \\ \`\ \\ \� \\ \1\il \\‘11\1:\\\\\\ \\ttt\\t\\ \\l1 1\\ `\\\ \ \\ \� \tt11if \\ \`\ \t \ \ \ - \Q \1111tt�ltl \\\ \\ \ \ \\ \ \\ -- -223' t►i'% \ Itil 1111 x 1111 `11111 \ 1111 11 1 } i1 1 i 11 `111\ \1 \\\\\‘\ - 9 } it Ir t i l r It t 111 0°00'1114'14 01 1 1N \ 1 t 1 it +lit Att�t11r11t1� S 1 t i�11)11111111111 ll � \ 4 1 111114111111111 \ \ \ \1 bt 111111111111111111 � r^ 1111./11111111 11 1\/:::::\1\1\1„1:111111 tl,1I1/+ 191:11,I i\11i 111111ll 11111111\.111, \11111tt1ltt` 111111111111 \\t \1U1 \li11` \\ 1 r l 11 1 ■ t 1 1 1 1 1 1 1 1 1 1 1 1 1 \111111111\` 111111\\11"1 1111\\\\\\, 111111 \`Ct \\1 Al \ \ 111111 df \\\ j 1 0, 1 VAV t \, 1 1 \ 1111 \ A0 1 0,10.1 \1 \11 \\11 \\ \\11 111\,\,\ 111 1111\ \ ` \11\1 1 111 \\ 1 \ 1 \ \ \ \1 1 ,, \t1\ \ \\ \111 \1\11\\ t� \1,,'11\ 111\\\1\ \1 \ s' \\ `\ `1 \\\\\\\\ `i 1\ 1 \1\11\ \111 \1 \\ \ t\tx1 \t \1 \\11\11 \111 \\,\\\111 1111\ 11 \, \ \ \ \1\\ 1` \\ \\\111 > >� `, ,\ .1 111\`\,1, \ \\\\t \t \`�\\\ 1 t 1 t 1, 11 \\ \,1111 \\\ \\ \\ \ \1 \ \\ \\\ 1 \ \ r\i\ 11ti i\ > \\tt� \it `\ \\\\" \\\1\\ \\\\ \\\\ \\\ \ \ t \\\\\\\\\\\\\\\ \\\ �\ \ \ \1�,�11tit1�t111\11\1� \\ \ 1 \1111 \\1 Ci l; \\ +111;1 \t\;\\ 1111 1 1\11 \ 11\1 1 \1\i \ ',1`,\11‘11\1„,‘ \ t \1\t \,�0 \tt� \'\� \ \`L \\\ \\ 1 1 ,\N \s1,t\\1\ \\\\\1 \ \\ \\ \t \\1 \ \11 \ \1\ \ \\ 111111\\\ 1111\\ \A\ \;t \ \ \11 \ \�\\ \N\ \A \\ 1A \ \,s 11s‘ ,r \t\\ \ \\, t\\ ;; \\ tt \\ •, \ \1 1 1 1 1 \\ \\\ t \ \ \ \ \ \ \\\1 \ \ \1 \\‘\\\\\1\\\\\\\\\\\\\\ t\,', ; ;`t ; \ , \\ ; ; 1\1\1 `11 \ 1 1 1 \, 1111 i ill 1 \111 \ \\ \ \, \11 t\ \\1111111 1' 11, 1I'NO∎1111 11rr1111A, 1l \1111 1111111 \1 \' 1\h L0' 10—SO 9MIMYSCI 33S -••GC--z — • Jul 16, 2010 - 4:38pm E 0I a 0• 0 0 c a 0 v 0 0 0 rn rn 0 0 z eri Ez • w�I �x �x NO. ALTERNATIVE 1 rt ■ ■ �x \ E 628.00 f � � ASH CELL \ 12' 0 E 623.5* e op. SEE DRAWING PUN 1.09 1 .� 6"D 1 e oPT. — 1. SEE GENERA!. NOTES ON SHEET 05 -411.01. MUM= Ot 2' FR/ HOPE FM FROM BALL FIELD COMPLEX. ® PWO BOTH ENDS or ABANDONED DECANT PIPING. OW. OF 6). ® CONNECT NEW 6' PW TO EXs11N0 6' PW. FIEIA VERIFY LOCATION AND ELEVATION OF EXISTING 8' PW. INSTAL. 11' VALVE IN VALVE BOX ON 6" PW. Q CRY WATER PRESSURE LS APPROXIMATELY 175 P51. File: S: \MAD \1100- --1199 \1154 \008 \Acad \Strand Drawings \05— M1.08.dwg Time: Jul 16, 2010 — 4:39pm JULY 2010 STRAND HNOINI R• SHEET 39 05—M1.08 JOB NO.1154 -008 Building Excellence` CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: JOB 0:103400 MODa:0284.00 DATED: 1022111 FAX: 608-251 -8655 PHONE: 608- 251 -4843 Cost associated with vactor truck debris pad drain, per RFI 672. REQUESTED BY: Strand Associates Inc SUBCONTRACTOR JF Ahern Company Miran Construction Co., Inc Miran Management Fee 5,00 t - Subs Miron Management Fee 15.00 t - Miron Work Performance Bond 1.50 t TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: Subtotal Subtotal DATE: AMOUNT $366.00 1,455.36 1,821.36 $18.30 218,30 2,057.96 $30,87 $2,088.83 $2,089.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Miron Representativ= ��1�11 �� I !:1� 1' ��� Date 1!22/13 an Danie s Owner Representative Date edule Impact THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN MIRON CONSTRUCTION CO., INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 54957.0509 1471 McMahon Drive Neenah, WI 54956 Phone; 92019694000 Fax: 9201969.7399 www.miron•construction.com 11111fifiroll Owner Project Project No, Title City of Dubucue Computed by JCD Dubuque WPCP Dam 21- 1ao•13 103900 Verified by Cost Proposal Request Documentation Date Page 1 of 1 Revision 0 Modification Quote Number: 21400 Description of Modification: RR.612 Items included In 1hls proposal: 26401 Item 284-01 dhoti 1.0 ht7di0ations lo WO box plpbg pet RR 672 response SD 1,0Idd r walls to ash pad dra6age channel per V. 672 response Nadi $ 366.00 $ 200,00 $ 30,00 $ • Litz $ 1,255,36 $ 118,30 $ • (3Wo amblers 1day) 2.0 Direct Markup Uail i a01 1.0 No Change "'Nre' NOR Subtosat MrOnMakuP05% Bond & [nuncio Co l.5%: TOTAL • Nod 284-00: $ Sg &60 $ 18.30 $ 30,87 $ 2,088,8) $ 1,943.66 STRAND ASSOCIATES' Work Change Directive 20i Directive No.: 04 Contract: 1 -2010 Owner, City of Dubuque By: GWT Contractor. Miran Construction Co., Inc. Date: 216113 Description of Work Cost Deduction Cost Addition Inside Aeration Tank C, reinstall one existing baffle using stainless steel hardware and install new stainless steel balls where bolts are missing to anchor existing baffles, Perform this work on a time and materials basis. Total TBD Remarks: This Work Change Directive shall result in no change to project duration, Please review the time sheets with the resident project representative on site daily and provide material invoices for work that will be performed on a time and materials basis. If hours charged for this work exceeds 32, please no* Engineer and Owner prior to proceeding, Change In Contract Price by Q Supplemental Unit Price 0 Unit Price Q Lump Sum Requested by, Owner 215113 Date Recommended by, Lvit C Date (Engineer) Accepted by: C_—� a'-'6 '13 Dale ,E ray. j A�fj 4' Approved by: ll/,2irI��L Dale (0' er) / —THIS FORM IS NOT SUBSTITUTE FOR A PROPERLY PREPARED AND EXECUTED CHANGE ORDER- GwrIbk SN10111p9- 119$1116MZAWnNlrocthe No el Avalon Tani C aoMee d�cz Darling Excellence' CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 JOB 4:103400 MOD 0306.00 DATED: 2/14/13 FAX: 608-251 -8655 PHONE: 608 - 251 -4843 DESCRIPTION OF MODIFICATION: Cost to repair and reinstall existing stainless steel baffles at Structure 40C. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT Miron Construction Co., Inc $1,279.60 Miron Management Fee 15.00 t - Miron work $191.94 Subtotal $1,41.54 $22.07 $1,493.61 Performance Bond 1.50 t TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: $1,494.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above, The contract with the Owner is adjusted as follows: Approved Cast Miron Representati Date 2/14/13 Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN MIRON CONSTRUCTION CO„ INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 54957.0509 1471 McMahon Drive Neenah, WI 54956 Phone :9201969.7000 Fax: a459.7399 www.miron- consbaction.com �/, Niljifici n Owner City ofDubuque Computed by 1CD Project Dubuque WO Date 13fer13 Project No, 103400 Verified by 110e Cost PraoosalReQuestDocumentation Date Page 1of1 Revision 0 Modifindon Quote Number; 3D600 Description of Modification: Rept and Relndall Existing SW1lms Red Baffles %An40•C Items Included In this proposal; 30601 Item 306.01 Mho 1.0 Repair and ReMstal Fxatng Stainless Sled Batiks In Structure feC Material 1St $ 50.00 $ 149.611 $ • f 2 Carpenters P Hours CCsnDact 11m 1,0 'to Change "`Note; None 9kmtal: Ron Markup ®15% Pond &Inane01,5* TOTAL- Mod 30640: $ 50,00 3 1,129,60 $ 150 = 164,44 3 1161 $ 1,493.61 $11� • STRAND ASBOOIATIV Work Change Directive 20j Directive No,: 85 Contract: 1.2010 Owner: • CRY ofDubuaue By: OWr Contractor. Iton_Construction Con Ina, Date: 216113 Description of Work Cost Deduction Coat Addition Delete protective coaling In Aeration Tank C Retorting to attached Cost Proposal Request No, 104 Rem 104-01 Issued on January 14, 2013 except only remove the existing protective coating on the beams as required to install FRP reinforcing. 565,008 Total $05,008 and Is not subject to Remarks; This Work Change Directive shall result in no change to project duration negotiation. Change In Contract Price by: Supplemental Unit Price Q Unit Price ►■ lump Sum Requested by: Owner 1114113 Date Recommended by: 4I4ne4er)C 22113 01 _ ‘--8 Accepted by; Date actor) at�, % Approved by: Z -7 -.13 Date Al 7ner) TMSFORM IS NOT A SUBSTITUTE FORA PROPERLY PREPARED AND EXECUTED CHANCE ORDER- OM;IarfSN1ND1 1108- 110ei115410YJ1w Mak Change Uindealar4ti8wNo85 .41Om Tank CFroNoBveCorog,dax Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1.2010 Page 1 January 14, 2013 No.104 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: T0: Distribution COST PROPOSAL REQUEST Glenn W, Tranowski City of Dubuque WPCP Modifications 1.2010 January 14, 2013 Miron Construction Co., Inc, Jonathan Daniels, Gerald David, Dawn Florian Steve Sampson Brown, Jonathan Brown Glenn Tranowski, Larry Solchenberger Stuart Summer Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and/or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Drawing 40- ASM1,01(Sheet 102) 104.01 Delete the protective coating specified in Section 09881 from the interior of Aeration Tank C. Replace the second sentence of Key Note 6 with the following: "Existing coating shall be preserved except for beams which are to be FRP reinforced. Existing coating shall be completely removed from beams which are to be FRP reinforced." Building Excellence' CHANGE ORDER REQUEST T0: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 JOB 0:103400 MOD N:0205 -01 DATED: V03113 FAX: 608 -251 -8655 PHONE: 608- 251 -4843 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Revised cost to delete protective coating in Aeration Tank C. REQUESTED BY: Strand Associates Inc SUBCONTRACTOR Champion Coatings Inc Fibrwrap Construction Services Performance Bond TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: ( Subtotal ( DATE: AMOUNT $68,000.00) $3,952.62 $64,047.38) ( $960.71) ( $65,008.09) ( $65,008.00) Please find back up materials enclosed regarding this modification, Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Miron Representative Danie s chedile Impact 1� r r 1 Date 2/03/13 Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN MIRON CONSTRUCTION CO., INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 54957 -0509 1479 McMahon Drive Neenah, WI 54955 Phone: 9201969.7000 Fax: 92019694399 www,mfron•construct►on,com r/ rl��/%■ N IlliiiliciinQii Owner OW of Dubuque Computed by KO Project Dubuque WPCP Date 3-Feb -13 Project No, 103900 Verified by Title Cost Proposal Request Documentation Date Page I of 1 Revision 0 Nodifica don Quote Number. 295-00 Description of modification: CUR.109 Items included in this proposal: 104-01 Item 10401 Chardon Coat ngs Tank C o f beams only for FRP reinforcement Ina Mixt tank Cs" $ rr S (60,009:00) S 3,952.62 lA Mete protect a coating In 0.eratbn %MR 1.0 Remove coaling from bottom CC/Egnut To 1.0 Ito Chmgc "" Notei item 104.02 was addressed for lank C in WCD 002 Original coaling removal was by Champion. Only coating removal reached for FWrwrao was removed not coallna for each entire beam. Subtotal: $ Bond d hove (0IA: $ TOTAL • CPR 109.00: $ (69,041.36) (960,10 (65,008,09) �j e STRAND AssocIATA8e Work Change Directive 20k, 201, 20m Directive No.: 86 Contract: 12010 Owner: City of Dubuque By: GWf 4 Contractor, Miron Conslrucllon Co., Inc, Date: 2115113 Description afWark Cost Deduction Cost Addition Provide vinyl the and base an Unisex Toilet floor in Maintenance according to attached Cost Proposal Request No. 107 Issued on 12, 2013. In First Floor Room 6602, provide 4- Inches of board Insulation as spooned Section 07212.2,04 (Behind Preformed Metal Wall Panels) in railing above stairwell. Mechanically fasten a 12 -gauge galvanized sheet panel to the concrete ceiling. Oversize the panel as required each caulk air tight Paint to match ceiling. Install EF•20.01 in Compressor Room 2002. Route duct into PRI Room 2004. Install duct at 8 feet A.F.F. In Room 2004 or as high as with duct below concrete beam. Provide offsets as required to route Room 2004, Building February In opening metal side and Splicer possible duct into $608 $1,661 $4,691 Total $6,860 Remarks: This Work Change Direclive shall result In no change to project duration and Is not subject to negotiation, Change In Contract Price by: 0 Unit Price ® Lump Sum Supplemental Unit Price Requested by: Owner, Strand Various Dale Recommended by: d_94PralfovAs, 2115113 (Engineer) Date \` C- Accepted by: / '"`)1\ ''Ira i3 �,, ,,1� • Doke I0 Approved by: Ii, AJ ic te girl y 1 a.� eo Daie -NS FON IS NOT A SUBSTITUTE FOR A PROPERLY PREPARE AND EXECUTED CHANGE ORDER- Gyryl$:%441)11103- I 194111541.023101tthWork Cha pe011ecin 'esNY/dt+6NaeB.Slf90TiltSI 15 seal, EF•2aAtka Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page l February 12, 2013 No.107 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: T0: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1.2010 February 12, 2013 Miron Construction Co., Inc. Jonathan Daniels, Gerald David, Dawn Florian° Steve Sampson Brown, Jonathan Brown Glenn Tranowski, Larry Solchenberger Stuart Summer Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and/or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Drawing 99- AS6.02 (Sheet 372) - Room Finish Schedule In Room 9006 - Unisex Toilet, change Floor from "F3" to "FS" and Base from "Bl" to "B2 ". Building Excellence' CHANGE ORDER REQUEST T0: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: JOB 0:103400 MOD 9, 0304.00 DAZED: V13/13 FAX: 608 -251 -8655 PHONE: 608- 251 -4843 Cost associated with Maintenance Building toilet room tile floor, per CPR 107 dated 2/12/13. REQUESTED BY: Strand Associates Inc DATE: 2/12/13 AMOUNT SUBCONTRACTOR Hughes Flooring Inc Miron Management Fee 5.00 I - Subs Performance Bond 1.50 % TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: $477.00 $23.85 Subtotal $500.85 $7.51 $508.36 $508.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Miron Representativ S +ule Impact • rill_ � . � an Janie s' Date 2113/13 Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN MIRON CONSTRUCTION CO., INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 54951.0509 1411 McMahon Dave Neenah, WI54954 Phone: 92019694000 Fax: 92019694399 www.miran•construction.eom iiIiIJfI iron Owner CtNofDubuque Computed by 7CD Project Dubuque VIPCP Date 13•Peb•13 Project P Verified Tide Cost Proposal Request Documentation Date Pape 1 of 1 Revision 0 Modification Quote Number: 304.00 Description of Modification: CPR -107 Items included In this proposal: 30401 Item 30401 tights 1,0 Add VCr Flooring & Nnyl Base CJ Room 9006 DIA $ 477.00 $ fdalar iS 1.0 No Charge "•« Note: None Subtoal: hllrar Mariuo 4 510 Bad &Insurance 611.5 "S: TOTAL • CPR 304 -a0: $ 471,00 $ 1385 $ 751 $ 50836 Building Excellence" CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 JOB 11:103400 MODS: 029941 DATED: 2118713 FAX: 608 -251 -8655 PHONE: 608- 251 -4843 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Revised cost associated with Structure 55 existing roof ductwork, per RFI 694. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT JF Ahern Company $1,412.20 Omni Glass & Paint Inc $146.00 Subtotal $1,558.20 Miron Management Fee 5.00 % - Subs $77.91 Subtotal $1,636.11 Performance Bond 1.50 % $24.54 TOTAL AMOUNT OF THIS MODIFICATION: $1,660.65 CHANGE ORDER AMOUNT REQUESTED: $1,661.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Miron Representative Date 2/18/13 Jo an Daniels Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Sc edule Impact MIRON CONSTRUCTION CO., INC. Building Excellence Corporate Office P.O. Box 509 Neenah, W1549574509 1471 McMahon Drive Neenah, WI 54956 Phone: 9201969.7000 Fax: 9201969:399 www,mlron•consfruction.com lltli�IrwN 1 Y�! Owner CtyofDubuque Computed by 3CD Project Dubuque WPO' Date 11•Feb•13 Project Verified le Cast Prolwsal Request Documentaton te Page 1 of 1 Revision 0 Modification Quote Number; 29401 Description of Modification: RR. 601 Items Included In this proposal; 29401, 29402 Item 299.01 tilxrn 1,0 Board hmlatko Pot Rf1694Response 9PJ01 $ $ $ mil Latg 13B 0o s 1,274,20 46 00 $ 109.00 1,0 Cations Per RFI 694 Response Contract 11mi 1.0 No Once ._• rd,': None Subtotal: $ !iron MMwp lfl 5% $ Bond B; Insurance 01,5%: $ TOTAL•Med19941: 18400 9,20 24,54 $ 1,660.65 S 1,374.20 S 6071 Building Excellence' CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 JOB 8:103490 MOD 4' 0303 -00 DATED. 2107113 FAX: 60B- 251 -8655 PHONE: 608 - 251 -4843 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Cost associated with EF -20 -01 relocation costs, per RFI 676. REQUESTED BY: Strand Associates Inc SUBCONTRACTOR JF Ahern Company Miron Construction Co., Inc Miron Management Fee 5.00 % - Subs Miron Management Fee 15.00 - Miron Work Performance Bond 1,50 $ TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: DATE: AMOUNT $3,776.60 $570.76 Subtotal $4,347.36 $188.83 $85.61 Subtotal $4,621.80 $69.33 $4,691.13 z $4,691.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Miron Representative Owner Representative dillneve -",,t ' n lame s ledule Impact Date 2/07/13 Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN MIRON CONSTRUCTION CO., INC. Building Excellence Corporate Office P.D. Box 509 Neenah, WI 54957.0509 1471 McMahon Drive Neenah, WI 54956 Phone:920469.7000 Fax: 920469.7399 www.mimn.nnnstrurlinn.rnm ■//s iiiiiiQi/iiYii Owner (Sty of Dubuque Computed by 1CD Project Dubuque WPCP Date 7-Feb-13 Project No, 103900 Verified by tile Cost Proposal Request Dowmentation Date Page 1 of 1 Revision 0 Modification Quote Number 303.00 0eseripdonorModification: RF1-696 Items included in this proposal: 30301 Item 303.01 them 1.0 Redly EF- 20-01Ixotfon per IIFI696 response dm 1.0 New Carpenter 5 hours) Meiedal 1st 9 1,302,95 $ NOR $ 1500 $ • $ 2,413.65 S 47076 S 70,61 S • equipment Sad (1 2.O DirectMedwp Cone&Rom 1.DNo(Nage "' fide: None Sukewk $ WronNerkup ®594 $ Bard 191newnoe01,5%c $ TOTAL • Mod 308401 1,411,95 j 3,015,02 65.15 $ 123,68 6933 $ 4,691.23 STRAND ASSOCIATES' Work Change Directive 20n Directive No.: 81 Contract 1.2010 Owner: Div of Dubuque . , DY GWT Contractor. Won Construction Co„ Inc. Date: 2120113 Description of Work Cast Reduction Cast Addition Provide plug valve to Isolate Primary Clarifier No. 4 scum pit according to attached Cost Proposal Request No. 108 issued on February 12, 2013, $2,688 Total $2,688 duration is to Remarks: This Work Change Directive shall result In no change to project and not subject negotiation, Change in Contract Price by: Supplemental Unit Price 0 Un8 Price r1 Lump Sum Requested by: Owner 2112113 Dale � Recommended by: �'�Y�^'` 1�4,�� (Enphleer) 2120113 Date Accepted by: C�� ntl:.. / # Ar •2 - ,22.-1 13 Date 3 —/5- 13 Approved by: ,Il i%. l/ poet) Date -THIS FORM I3 HOT A SUBSTITUTE FORA PROPERLY PREPARED AND EXECUTED CHANGE ORDER- MIMS: MAOOI00-119MMS4T231V1IMM Caonpe 0iiaclNes9)Irecdro No 8/PC 4 Sam PR IaoloOonValudir75 dialn rOnpdav Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1.2010 Page 1 February 12, 2013 No.108 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL REQUEST Glenn W. Tranorvski City of Dubuque WPCP Modifications 1.2010 February 12, 2013 Miron Construction Co., Inc. Jonathan Daniels, Gerald David, Dawn Florian° Steve Sampson Brown, Jonathan Brown Glenn Tranowski, Larry Solchenberger Stuart Summer Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and/or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Drawing 00 -06.04 (Sheet 11) and Drawing 20- ASM1.04 (Sheet 75) Provide plug valve between Primary Clarifier No. 4 scum pit and tee upstream of SCMP - 20.04. Turn over pipe spool to Owner. Building Excellence' CHANGE ORDER REQUEST T0: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 SOB 0:103400 MOD II: 0305.00 DATED: 211 5113 FAX: 608- 251 -8655 PHONE: 608- 251 -4843 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Cost associated with PC No 4 scum pit isolation valve, per CPR 108 dated 2/12/13. REQUESTED BY: Strand Associates Inc DATE: 2/12/13 SUBCONTRACTOR AMOUNT JF Ahern Company Miron Management Fee 5.00 % - Subs Performance Bond 1.50 $ TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: $2,522.00 $126.10 Subtotal $2,648.10 $39.72 $2,687.82 $2,688.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost S ule Impact Miron Representative , f ��` Date 2/15/13 Joga n Daniels I Owner Representative ` Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN IRON CONSTRUCTION CO., INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 54957.0509 1471 McMahon Drive Neenah, WI 54956 Phone: 9201969.7000 Far 920/91399 www.mlron.conshuction.com �/ >*UIIift%PO I Owner Dly of Dubuque Computed by LO Project Dubuque WPCP Date 15+6 -13 Project No. 103400 Verified by litio CO5TPmposal Request DCCumentation Date Page o101 fm Revision 0 modification quote Number. 305 -00 Description of Modification: CPR•108 Items Inducted in this proposal: 178 -01 Item 108.01 Aim 1,0 And seg eke per X 188 S $ Mold 4303,00 Litz i 1,219.00 i Carnal= 1,0No°tango ." Nate; None Subtotal: $ Mime Markup t) S% $ !end S Inmate 0IA: i TOTAL• CPR 108.00: $ 1,303.08 65.15 39.7,2 2,587.82 $ 1,219,C0 $ 60.SS STRAND ASSOCIATES' Work Change Directive 20o Directive No.: 88 Contract: 1.2010 Owner: Cilv of Dubuque By: RAW Contractor: Munn ConstnndlDn Co„ Inc, Date: 316113 Descdpllan of Work Cost Deduction Cost Addition Restore masonry in Administration Building Room 8111 on a materials basis, Contractor estimated the work would not require 8 hours, If more hours are required, Contractor shall notify Owner Bnglneer1RPR prior to the work exceeding 8 hours, time and more than and TBD Total TBD Remarks: This Work Change Directive shall result in no change to project duration, Please review the time material Invoices for work that will be sheets with the resident project representative on site dally and provide performed on a time and materials basis, Change in Contract Price by: 0 Supplemental Unit Price 0 Lump Sum I Unit Price Requested by: Owner 311113 Date Recommended by, 3/5113 (En freer) Date ,„ Nh Accepted by: Cr.' 3 ^ c-t3 onl IN i Date Approved by: /1assi 3 ~ir l3 (Owner) Date —RS FORM IS NOT SUBSTITUTE FORA PROPERLY PREPARED AND EXECUTED CHANGE ORDER- cwrhavM011100- 11M11S110131wrd VACNnge DInEINd1D rtY0 No Know E11r Mpsonry Retoni ndocc Building Excellence" CHANGE ORDER REQUEST T0: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 4811:03400 MON:03184 DATED: 4134+11 FAX: 608- 251 -8655 PHONE: 606 -251 -4843 DESCRIPTION OF MODIFICATION: Cost associated with Room 8111 existing masonry. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT S. Moyle Masonry, Inc. $639.00 Miron Management Fee 5.00 - Subs $31.95 Subtotal $670.95 Performance Bond 1.50 t $10.06 TOTAL AMOUNT OF THIS MODIFICATION: $681.01 CHANGE ORDER AMOUNT REQUESTED: $681.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost SoY Jule Impact Miron Representative �rN .na, e Date 4/24/13 Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN !RON CONSTRUCTION CO.. INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 54957 .0509 1471 McMahon Drive Neenah, W154956 Phone: 9201969.7000 Fax; 920!969.7399 Www,miron•conslruction,com I/II1I finifi1 Owner Qty of Dubuque Computed by JCD Project Dubumm WPCP Date 23•Apr•13 Project No. 103900 Verified by Title Cost Proposal Request 0ocumentation Date Page 1 of 1 Revision 0 Monition Quoos number. 0escription of Modlarodom Items Included In tNs proposal; 318-00 WC0088 31801 item 319.01 tlIh 1.0 Repair ono; masonry per WCD 080 1021 $ 639.00 $ • fd0(md]= 1.0 No Clangs "*Note None %Mod: $ Mime Markup § 5% $ Bad Q insurance Q 1St $ TOTAL• Mod 318.01k 639.00 31 95 1006 $ 681,01 ,1 STRAND ASSOCIATES' Work Change Directive 20p, 20q Directive No.: 89 Contract: 1.2010 Owner Chv of Dubuque By: GIN Contractor. Miron Construction Co., Inc, Date: 412113 tion of Work Description Cast Deduction Cost Addition Drawing 05.05,03 (Sheet 31) Provide handrail wall mounted per detail EI99- AS5,03 stairs adjacent to retaining wall #2, This handrail will Administration Building and to retaining wall #2. Drawing 99 -H6.02 (Sheet 384) Provide Mon flue extension on RTU -80.01 manufacturer. Specification Section 11328 - Grit Washers ADD the following to the end of paragraph 3.01.C.1.c: on both sides be mounted as recommended If equipment CONTRACTOR an OWNER - approved of the to the by fails to shall fails to shall fails to shall $1,356 $0 "Laboratory tests shall be performed by OWNER. achieve the specified performance requirements, provide all retesting and associated costs with independent testing laboratory." Specification Section 11352 - Rotary Drum Thickening Replace the first two sentences of paragraph 3,02.H Equipment Mil the following: If equipment CONTRACTOR an OWNER - approved Equipment the following: If equipment CONTRACTOR an OWNER- approved "Laboratory tests shall be performed by OWNER. achieve the specified performance requirements, provide all retesting and associated casts with independent testing laboratory" Specification Section 11361 - Centrifuge Dewatering Replace the first two sentences of paragraph 3.02.H with "Laboratory tests shall be performed by OWNER. achieve the specified performance requirements, provide all retesting and associated costs with independent testing laboratory," GWrab aSNA011100- 11881115410231Wrdnork Change OlrecavesOlantive No89,RTU40.01 Flue,RaNing at Retaining Wall 2Slalrs.docx '�1 �a STRAND ASSOCIATES' Work Change Directive Specification Section 11388 • Blended Systems Replace the last sentence of paragraph Sludge and Centrate Tank 1,63,A.3 with the following: by OWNER. If equipment requirements, CONTRACTOR costs with an OWNER- Mixing falls to shall approved "Laboratory tests shall be performed achieve the specified performance provide all retesting and associated Independent testing laboratory." Total $1,356 Remarks: This Work Change Directive shall result in no change to negotiation. project duration and is not subject to Change in Contract Price by: a Supplemental Unit Price Unit Price Sum ti Lump Requested by: Owner, Engineer, Various Date Contractor I r, —s u dti n Recommended by: 412/13 )13 (Enneer) Date Accepted by: C 4-4 —1.3 (C •.o , Date ��./� /`-�' Approved by: 9-5--7— ,.�7L owner) Date -NS FORM IS NOTA SUBSTITUTE FOR PROPERLY PREPARED AND EXECUTED CHANGE ORDER- OffrIbrIS:%1A1A1100..119911154W231'NrthWork Chang Olredva sthe lveNo0011TI10001rlue .RaingalnelablIgWaltSg9aCxe Building Excellence' CHANGE ORDER REQUEST T0: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003.7996 JOB A:103400 MOD 0: 03090 DATED: YID 13 FAX: 608 -251 -8655 PHONE: 608- 251 -4843 DESCRIPTION OF MODIFICATION: Cost associated with site retaining wall #2 handrail, per RFI 706. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT Breuer Metal Craftsmen, Inc. Miron Construction Co., Inc Miron Management Fee - Miron Work Performance Bond 1.50 TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: $449.00 $712.64 Subtotal $1,161.64 $174.25 Subtotal $1,335.89 $20.04 $1,355.93 $1,356.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost ►� Sc -Jule Impact Miron Representative ��,! I, Date 3/11/13 onaIT'r lance s Owner Representative`. Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN M1RON CONSTRUCTION CO,, INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 54957.0509 1471 McMahan Drive Neenah, WI 54956 Phone: 9201959-7000 Fax: 920/9 m 7399 www.mrron- construc tlon. com II ■�u/� lliiiiiiirail Owner Project Project No. Tide Lily of Dubuque Computed by 1CD Dubuque WPCP Date 10•MINI3 103900 Verified by Cost Proposal Request Caumentalion Date Page 1 of l Revision 0 Modification QuateMahon 30910 Description of Modification: RFl -706 Items included in this proposal: 30341 Item 309.01 Nlron I. OlmlaIhandal per RFl706 response (notation 41414 2.0Suppyhandrail RF1706resionse f F Mil 44100 latdt $ 712.61 $ per asbartTimes 1.O No Change "s Note: None Sablo k $ Moon Markup a0!15 %S Bond &Insurara @ 1.5%: $ TOTAL • Mod 10940: $ 449.00 67,35 20.04 1,355.92 $ 712.64 $ 106.90 Building Excellence CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Revised cost to add flu extension to RTU 80. JOB4:103400 MOD 8:031141 DATED: 3/22113 FAX: 608- 251 -8655 PHONE: 608 -251 -4843 REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT JF Ahern Company $.00 TOTAL AMOUNT OF THIS MODIFICATION: $.00 CHANGE ORDER AMOUNT REQUESTED: $.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost / ,Sch ���le Impact Miron Representative 1��.!�' 9 ' (I , , %I + Date 3/22/13 n Danie s Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Copy: rile / dmf Jobsite 'IRON CONSTRUCTION CO., INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 549570509 1471 McMahon Drive Neenah, W154956 Phone: 92019694000 Fax: 9201969.7399 www.miron- cansauction.com eldif■�g s ireg p Owner City of Dubuque Computed by JCD Project Duhuque WPCP Date n•Mar•13 Project No, 103400 Verified by Date Tltle Cost Proposal Request Documentation Page 1of1 Revkion 0 Modification Quote Number 311 -01 Description ofModNkatlon, IMMO breast Flue Waist Wormer* Test Lab Work Remo indu dad in Oils proposal: 311 -01 Item 311.01 itun 1,0 Add ahead Me edeulon to R111•80 2.0 Owner pro/de lab swims la plenum tests 143kaal $ 345,00 $ (34100) I • lakt $ 348.00 $ (348.00) $ 1.0 No Change 1" Nett None Sebmmt $ Nkon Markup lD 5% $ Bond alnsurera0L5 %; $ TOTAL. Mod 311.01; $ • • • - $ $ - w STRAND ASSOCIATES' Work Change Directive 20r Directive No.: 90 Contract, 1.2010 Owner: Mr of Dubuaue By GVVT Contractor Ikon Construction Co„ Inc, Date: 3114113 Desaipilon of Work Cost Deduction Cast Add9lon Drawing 99.117,04 (Sheet 392) Provide butterfly valve as specified In 15510 on 3" PWS as shown drawing attached to this Work Change Directive, on 31,805 Total $1,805 duration end is not subject to Remarks: This Work Change Directive shall result in no change to project negotiation. Change In Contract Price by, 0 Supplemental Unit Price Q Unit Price Sum Lump Requested by, Enolneer Various Date Recommended by: - (1.-As"- 3114113 (Enghee0 Date Accepted by: f C--). 3. -0 -/3 Idt Date Approved b: , �=.6, S..., 3-32-/3 icr m Date -THIS PORN IS HOT ASUOM IE FOR A PROPERLY PREPARED AND EMOTED CHAN SORDER- Owrmra M01110o•na111164 aWOoechxgeD140,011E1 eNo90.eFt/ onMax 6' HHWR 6' HHWS STRUCTURE 70 low STRUCTURE 75 8' HHWR \ TO BOILER ROOM 8' HHWS FROM BOILER ROOM SEE DRAWING 99 -H7.01 FOR CONTINUATION HHWR HAWS _IIIX (YI', Or 8) STRUCTURE 70 STRUCTURE 75 3° HHWR 3/4 3/4 5 GALLON a,1 CHEMICAL 'I POT FEEDER — re HTX \75 -01/ HTX 75-03 J HHWR z-4° HHWS 99 -H A 7.02 NO SCA 'HEAT EXCHANGER AND ENERGY RECOVERY HYDRONIC SYSTEM SCHEMATIC LE File: S:\ MAD\ 1100 -- 1199 \1154 \008 \Acad \Strand Drawings \99- H7.02.dwg Time: Mar 14, 2013 - 11:10am ogod zzom yI W ccetm W o _ ~ 1 C) 1j JULY 2010 Drulilit e em , DATE:APRIL 2010 DES BY:MRS CHK BY: RAW • HEAT EXCHANGER AND ENERGY RECOVERY HYDRONIC SYSTEM SCHEMATIC WATER POLLUTION CONTROL PLANT MODIFICATIONS CITY OF DUBUQUE DUBUQUE, IOWA STRAND ASSOCIATES. INC.® ENGINEERS SHEET 392 99 —H7.02 JOB NO.1154 -008 Gadding Excellence' CHANGE ORDER REQUEST T0: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 JOB 8:103400 MOD N:0312 Al DATED: 3111113 FAX: 608 - 251 -8655 PHONE: 608- 251-4843 DESCRIPTION OF MODIFICATION: Cost to install butterfly valve, per the response to RFI 716. REQUESTED BY: Strand Associates Inc SUBCONTRACTOR JF Ahern Company Miron Management Fee 5.00 % - Subs Performance Bond 1.50 W TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: DATE: AMOUNT $1,694.00 $84.70 Subtotal $1,778.70 $26.68 $1,805.38 $1,805.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Miron Representativ ule Impact Dan3.e s le Date 3/12/13 Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN MIRON CONSTRUCTION CO., INC. Building Excellence Corporate Office P.O, Box 509 Neenah, WI 54957.0509 1471 McMahon Dive Neenah, WI 54955 Phone: 92019697000 Fax: 92019694399 www,miron-conslruction.com iiiiiliiiiiii n Owner OW of Dubuque Computed by JCD Project Dubuque WPCP Date 12•Mar13 Project No. 103400 Verified by Title Cost Proposal Request Documentadon Date Page 1 of 1 Revision 0 MadlR®tlon Quote Number: 31200 DesalpdanofModification: RF1.716 Items Included In this proposal; 31261 Item 312.01 u:u I. 0 Install butt* vafre pot AR716 response . 6 SDI $ 1894,00 • 11ma 1.0 No Change Hs Nye; None Subtotal: $ NGron Markup 5% 1 Bond B Insuance D 1,5%: $ TOTAL - Mod 311.00: $ 1,69440 64.70 26b8 1,110UB STRAND AeaocIATEr Work Change Directive 20s Directive No.: 91 Contract: 1.2010 Owner. City of!Moue By: OINT Contractor. Ikon Construction Con In Date: _31ie113 Description of Work Cat Deduction Cost Addition Provide hand railing In Administration Building Stairs Room 8112 to attached Cost Proposal Request No.109 Item 10941 Issued on 2013. Secure loose post on existing rolling In Stairs Room 8112. according March 1, $2,430 Total $2,430 project duration and Is not subject to Remarks: This WO* Change Directive shall result In no charge to negotiation. Change in Contract Price by: 0 Supplemental Unit Price Sum I Unit Price I Lump Requested by: Owner Dale Dale Recommended by: , Y S'tfr -` Ili At r.( ^n 11 3128113 7 sneer) Date 3 "� g''3 Accepted by: aado pate Approved by: /� _. � y '� /3 .4 Date -MS FORM IS NOT A SUBSTITUTE FORA PROPERLY PREPARED AND EXECUTED CHANGE ORDER GWLIhA9;UMD1110h 118011161102SIN WoetChange0heavulDidallo01 .RollegelAdndnSbla8119AOox Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1.2010 Page 1 March 1, 2013 No,109 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: T0: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 March 1, 2013 Miron Construction Co., Inc. Jonathan Daniels, Gerald David, Dawn Florian Steve Sampson Brown, Jonathan Brown Glenn Tranowski, Larry Solchenberger Stuart Summer Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and/or Time incidental to proposed modifications to the Contract Documents described herein, THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN, Drawing 80- ASM1.02 (Sheet 280) 109 -01 Provide steel pipe rail in Stairs 8112 per drawing attached to this proposal. !' ! • Isioqoue uolsuedxe -elp „B/E^-17 pue ele'd eseq „v /t. x „g x „g epino_ d -.lie's ;o idol le lsod'eels „z /L-L 1e011 -1an epinoid -Jeunnp /Cq pelselas Jo'oo •payloads se luled gslu3 pue awud 'EO'SSV -66/ Helad of -1e11wis nel adid'aa1s „Z /L-L palunoua Venn epinoid -013 0 m i CO) �z L Ls SCI IV1S _LA SO-10 el O_LI Nv. r C I LO -6O L oN lldo I Building Excellence` CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 JOB M:103400 MOD M:0310.02 DATED: 322113 FAX: 608- 251 -8655 PHONE: 608- 251 -4843 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Revised cost associated with stairs 8112 railing, per CPR 109 dated 3/1/13. REQUESTED BY: Strand Associates Inc SUBCONTRACTOR Breuer Metal Craftsmen, Inc. Miron Construction Co., Inc Omni Glass & Paint Inc Miron Management Fee - Miron Work Performance Bond 1.50 TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: DATE: 3/01/13 AMOUNT $1,274.00 $712.64 $109,20 Subtotal $2,095.84 $298.00 Subtotal $2,393.84 $35.91 $2,429.75 $2,430.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Mixon Representativ Sc 101e Impact 170101 41 Daniels Owner Representative THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHO hiiIRON CONSTRUCTION CO., INC. Building Excellence Date 3/22/13 Date �1 Corporate Office P.O. Box 509 Neenah, WI 54957.0509 1471 McMahon Drlve Neenah, WI 54956 Phone: 9E19694000 Fax: 920f969,7399 www,miron•construction,com illifilf/rQir Owner City of Dubuque Computed by )CO Project Dubuque WPCP Date 22441r43 Project No. 103400 Verified by Title Cost Proposal Request Dowmenbobon Date Page l of 1 Revision 0 Modification Quote Number. 31002 Description of Modification: CPR•109 Stems Included In this proposal: 109-01 Item 109.01 lido 1A 101 Rating (2 homvdkus 4 Maus) 2.0 Rake per Omar Quote 2001 tJagdal $ 1,27400 $ • Ili x nzs4 $ 10443 S 5,21 $ • 1.0 PalmRetNC 2.0 Wiremadap Saetrat 1016 1.0 No Chance " °Note; None Subtotal: $ Mho Marko DI i595 $ Bond & Insurance @ LA; $ TOTAL• CPR 109.00; 1,27,00 f 821.84 191.10 f 10630 35.91 $ 2,92914 STRAND ASSOCIATES' Work Change Directive 20t Directive No.: 92 Contract: 1.2010 Owner. Ckv of Dubuque By: RAIN Contractor, Won Construction Co„ Inc. Date: 3127!13 Description of Work Cast Deduction Coat Addition At Final Clarifier No. 1, remove and replace grout under the sludge seal ring and the floor where the existing grout was failing on a materials basis, Contractor estimated the work would not require 8 hours. If more hours are required, Contractor shall notify Owner EngineerlRPR prior to the work exceeding 8 hours. collector time and more than and TBD Total TBD duration, Please review the time material Invoices for work that will be Remarks: This Work Change Directive shall result in no change to project sheets with the resident project representative on site daily and provide performed on a time and materials basis, Change in Contract Price by: Supplemental Unil Price Lump Sum I Unit Price Requested by: Owner 31203 Date 3127113 Recommended by: time, , �+ ( glneer) Date Accepted by: 4 i / (c,,.: / 40 ate 4„Approved -sr--- 13 by: _call Nine° Date —THIS FORM IS NOT SUBSTITUTE FOR A PROPERLY PREPARED AND EXECUTED CHANGE ORDER- OVON S :14S4D11ICI- 11001H6410211WroWoe Change DlredfeealthrecemNo02.FC1 Grout RepaZdoce Building Excellence' CHANGE ORDER REQUEST T0: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Costo re -grout base of Final Clarifier 1 tube. JOB #:103400 MOD 8:0331.00 DATED: gl2GIl3 FAX: 606- 251 -8655 PHONE: 608 -251 -4843 REQUESTED BY: Strand Associates Inc SUBCONTRACTOR Miron Construction Co., Inc Miron Management Fee 15.00 % - Miron Work Subtotal DATE; AMOUNT Performance Bond 1.50 % TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: Please find back up materials enclosed regarding this modif Contractor is (not) to proceed with the work as noted above with the Owner is adjusted as follows: Approved Cost Miron Representative $548.15 $82.22 $630.37 $9.46 $639.83 $640.00 ication. . The contract Sche le Impact Date 4/26/13 nathan Daniels Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN SON CONSTRUCTION CO. INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 54957.0509 1471 McMahon Drive Neenah, WI 54956 Phone: 9201969-7000 Fax: 9201969.7399 www.miromenstruction.com NUM Owner Project Project Tido 331.00 WCD•092 331.01 City of DubugJo Computed by ICI) Dubuque WPCP Data 26•AOr•t7 L Voided Cost Proposal Requeot Documentation Date Pape loft Revision 0 7 _ modification Quote Number: DesaiplionelNodifiati on: Items Inducted In this promo': Item 009.01 fix 1.0 Re•q base of ItoI dada& 1 tube (1 Finisher 5 Hours) tkiklI Iii $ MOD $ 398.15 $ • $ out ! 1.0 Change m IMie: None Subtotal: Km tidied() 15% Bond &Insurance t; l,5%: 1 TOTAL. Nod 31140: i 150.00 $ 39115 i DSO $ 59.72 9.46 $ 639.63 �a STRAND AssociAlge Work Change Directive 20u Directive No.: 93 Contract: 1.2010 Owner: City of Dubuque By: GWT Contractor: Miron Construction Co„ Inc. Dale: 412113 Description of Work Cost Deduction Cost Addition Inside Aeration Tank B, re- install one existing baffle using stainless hardware and install new stainless steel bolls where bolts are missing anchor existing baffles. Perform this work on a time and materials basis. steel to Total TBD project duration, Please review the time material invoices for work that will be exceeds 32, please notify Engineer Remarks: This Work Change Directive shall result litho change to sheets with the resident project representative on site daily and provide performed on a time and materials basis. If hours charged for this work and Owner prior to proceeding. Change In Contract Price by: 0 Supplemental Unit Price El Unit Price 0 Lump Sum Requested by, Owner 412!13 Date // U Recommended by: � ;i14 (r4.� 001.,4 412113 (�gieeer) Date Accepted by: 14 - 3 —/1 (C recto • Date Approved by: /1 � Li- S rl � .,l (Owner) Date —THIS FORM IS NOT SUBSTITUTE FOR A PROPERLY PREPARED AND EXECUTED CHANGE ORDER— cwrIb ASuwrnaroaa1911116n023MKIWork and Clteclivesarecnerro9JAerMlon Tar NB Bats acu Building Excellence` CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, A.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Cost associated with Structure 10B Baffles. JOB 0:103400 MOD A: 0332-00 DATED: VI 0113 FAX: 608 -251 -8655 PHONE: 608 -251 -4843 REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT Miron Construction Co., Inc $701.75 Miron Management Fee 15.00 - Miron Work $105.26 Subtotal $807.01 Performance Bond 1.50 % $12.11 TOTAL AMOUNT OF THIS MODIFICATION: $819.12 CHANGE ORDER AMOUNT REQUESTED: $819.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Sched le Impact Miron Representative Date 5/10/13 J athan Daniels Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN tl?�N CONSTRUCTION CO., INC. Building Excellence Corporate Oplce P.0, Box 509 Neenah, W154957.0509 1471 McMahon Drive Neenah, WI 54956 Phone: 9201969.7000 Fax: 920196947399 www,mlron•construcllon.com I/il .pp f filOo—®jj> Owner Project Project No. Tide City of Dubuque Computed by ]CD Dubuque WP CP Date 10•Msy13 107400 Verified by Cost Proposal Request Documentation Date Page 1 of 1 Revision 0 ModifationQuotedenten 332.00 Dasalp don olModllicadon: WM093 Items fndeded loads proposal: 332 -01 Item 33201 tllmu 1.0 Reinstall balksandtedware (1 Fitter luborer5Nous) da l $ • Mt $ 701,75 $ - Ctateramts 1.0 waling° r"NoMi None Subtotal: Minn Markup ®15% Bond &Insuanoe®LS %; TOTAL -Mod 332.00: $ • $ • $ 1111 $ 819.12 $ 7005 $ 105,26 S STRAND A9e0LYATI9.6t ears neeAs 20v Work Change Directive Directive No.: 94 Contract 1 -2010 Owner. CIN of Dubuque By: GWT Contracior: Mlron Construction Co„ Inc. Date: 4!4113 Description of Work Cost Deduction Cast Addition Provide epoxy injection for beam cracks greater than 0.012 inches the Aeration Tank B beams according to FRP reinforcing manufacturer requirements. Contractor shall review areas to receive fiber reinforcement showing cracking with the Engineer and Owner, and shall identify footage of cracks requiring injection in Tank B prior to performing the Provide full depth epoxy crack injection in Aeration Tank B top concrete similar to Specification Section 07950, Cracks shall be injected inside of the tank. Not all the cracks may need to be treated if they and not showing signs of deterioration, Contractor shall review showing cracking with the Engineer and Owner, and shall identify footage of cracks requiring injection in Tank B prior to performing the Apply finish coat of Tyco S according to manufacturer recommendations Aeration Tank B beams receiving externally bonded FRP reinforcement, If more than 8 kits of epoxy are used to reinforce Aeration Tank provide additional epoxy kits to comply with FRP reinforcing manufacturer wide on the linear work, slab from the are tight areas the linear work. onto B beams, $58.62 per lineal foot $58.62 per lineal fool $0 $575.514th requirements, Total TBD Remarks: This Work Change Directive shall resull in no change to project duration. Quantities to be verified wilh Owner and Engineer, The unit price Indicated shall include all malerials, labor, Inddenials, and Conl rector's mark-up for subcontractors and bands. After the work is complete, a calculated lump sum cost vnllbe Included ina future change order. Ilfs not acceptable for Flbrwrapto Include aAaiun) molftellon cost for work al Aeration Tank e. Change in Contract Prise by: Q Supplemental Unit Price Unit Price 0 Lump Sum Requested by, OwneriMiro Various Date , I. Recommended by: '�� 414113 (Engineer) Date Accepted by. ' N. A, 4 —q--I3 , 'clot Date soi 9-16 � 3 Approved by: •0 (e �e0 Date -THIS FORM IS NOT SUBSTITUTE FOR A PROPERLY PREPARED AND EXECUTED CHANCE ORDER.. In'9dn5,044DH IC4•I19911154lOINVE k C iente Clter4Neaafaclive Na 04/Eaton Tank E Epoxy Njectonday +IhS4) IoN ■• N Nb'ld JNIIM dQCMI 'IR ul, Late tripli Mir � ieBr " µC,y el f 4 I� "4r Y 7 eamIppaugr n IDJMNI lEtnllrae 1*,4. Iilrmlrlauaor annn �y^ I ffORIM Ilifn & 111111a0111fleAlkten Ilariaanfraaant1101 OP •M• wr {rte' 3/ 1411111 l a,tvtna smonturnounttnfidfq tOthMtl SI I, u I�r 1 I rtlfritlt16ion N' iilnnitr111�1U11inIhhlOtUauillMlhlnlhlhurhldnn�tlntYOhnMfl��nMiuil� ,,l �t 1111.1 4ir ' L111ihhililhlrh N)I�Illrl�ltlllpjltihtljl [ I 1 Iltl)I}�IiIrIUFlilil�l 11 �bTiiiflirhLtuliwiifwiri dliffulru�,ltii�lnno' I I hhrlisfthbiwiislinllia :y aEiJTl p �n1iGTihlliiii11T1LublrhllLL `.I Ito 1r� dllll�lifih it i I hl Ij�1111 hbhilhm L ;I 11gIAIh1111hhplitiSilihi +itlTi�iuililiil+ +ll��.a 1614i4401i16iiii fii I ,,fir 1 iii !hi nrki IT Mill • /NO NOHOW IM HUM 41 r"2,q mi g I>+w� ri�arrr�w 4/ W3A NO I V Building Excellence' CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 JOB/I:[03400 MOO 0:0327.00 DATED: 5110113 FAX: 608- 251 -8655 PHONE: 608 -251 -4843 DESCRIPTION OF MODIFICATION: Cost associated with Structure 40B crack injection - concrete repair. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT Fibrwrap Construction Services $16,370.00 Miron Management Fee 5.00 % - Subs $8113.50 Subtotal $17,188.50 Performance Bond 1.50 % $257.83 TOTAL AMOUNT OF THIS MODIFICATION: $17,446.33 CHANGE ORDER AMOUNT REQUESTED: $17,446.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Miron Representative edul Impact than Daniels Date 5/10/13 Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN "IPnN CONSTRUCTION CO, INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 54957.0509 1471 McMahon Ddve Neenah, WI 54956 Phone: 9201969.7000 Fax: 9201969.7399 WWw,mirort•constructlonn cam /NM I/PIM Owner Project Project Pro City of Dubuque Computed by JCD Dubuque WP(P Date 10•Mdy.13 Verified Cost Proposal Request Documentallon Date Page 1 of 1 Revision 0 NodIA ®Non Quote Number: 327.00 OesaiptlanofModification; EDO% item fedudd in thin proposal: 32741, 321 -02, 327 -03, 327.04 Item 327.01 Rom 1.0 Epoxy MO beam auks In anon tank &i4.1lON 1,0 No Change Iptal See Becow $ • Item 327 -02 90ntrap 1. 0Bpo Nylnjettslab rods inaealbn Pot a (224LN Mal $ 1$32000 $ - 1,0 No Change Item 327-03 MOM 1. 0 Apply Nth coat Tyro 5 epoxy to aeration WSBbeans = $ IOW - - WattNmes 1,0 It Change Item 327 -04 bog 1. 0paitioelMsof every onaaab ConoattTins tank B beams (7.5Na) $ $ DI 4,05010 • LO No Charge «" Nole: None Abtolak $ 16,370.00 Muon Markup D5% p 816.50 Bond &Insnance01,5%: $ 25783 TOTAL- Mod 327.00: $ 17,446.33 STRAND AeaoclATIV Work Change Directive 20w Directive No.: 95 Contras 1.2010 ONnee City of Dubuque By: GWT _ Contractor. Won Construction Con Inc Date: 415113 Description of Work Cost Deduction Cost Addition Delete all protective coating as specified In Section 09881 from the Aeration Tank B as described In attached Cost Proposal Request dated Apn11, 2013, interior of No. 114 $55,495 Total $55,495 Remarks: This Work Change Directive shall result In no change to project duration negotiation. and Is not subject to Change In Contract Price by: [] Supplemental Unit Price ® Lump Sum 1 Unit Price Requested by: Strand Associates 411113 Date Recommended by: E4t.mt'ig 415113 (En9 neer) Date Accepted by. %Date J�egwi Da e i �"t�'l Approved by: atage I er) Date -THIS FORM IS NOT SUBSTIME FOR A PROPERLY PREPARED AND EXECUTED CHANGE 0RDER- IntlalaN 011100- 11ek111N102NW AYMChinearocNulprechiRattle *Protests) aegAnion Tank B,dx Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1.2010 Page 1 April 1, 2013 No,114 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1.2010 April 1, 2013 Miron Construction Co., Inc, Jonathan Daniels, Gerald David, Dawn Floriano Steve Sampson Brown, Jonathan Brown Glenn Tranowsld, Larry Solchenberger Stuart Summer Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and/or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN, Drawing 40- ASM1.01(Sheet 102) Delete the Protective Coating specified in Section 09881 from the interior of Aeration Tank B. Building Excellence" CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 10B 4:10A00 MOD ft:0322 .04 DATED: 43113 PAX: 608 - 251.8655 PHONE: 609- 251 -4843 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Coat associated with Aeration train B interior protective coating deletion, per CPR 114 dated 4/1/13. REQUESTED BY: Strand Associates Inc SUBCONTRACTOR Champion Coatings Inc Performance Bond TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: ( Subtotal ( ( ( DATE: 4/01/13 AMOUNT $54,675.00) $54,675.00) ( $820,13) $55,495.13) 9Sz $55,495.00) Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above, The contract with the Owner is adjusted as follows: Approved Cost Miron Representativ Sc. dule Impact Owner Representativ n Da -ie s Date 4/03/13 Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Copy: File / dmf Jobsite 91RON CONSTRUCTION CO„ INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 54957.4509 1471 McMahon Drive Neenah, WI 54956 101=9204894000 Fax; 920!969.7399 www.mfron- construction,com IIIIIINi,MIHy Owner ON of Dubuque Computed by 1CD Project DubugceWPCP Date 2.A2r•13 Project Verified by Title C.ossttProposal Request Documentation Page 1 of l Revision D Modification Quote Number. 32240 Description ofModification: CP11•114 Items Included In tall proposal: 11401 Item 11401 O IMogn Ili $ (54,675,00) $ • 1. 0OdestheC988lmaa 'ng Iran Aeration Tank 0 fA0G1tl]mCS 1.0 No gunge a« We; NOne Subtotal: aced AInsurance@L5%: TOTAL. CPR 11400: t (54,675,00) f (02013) $ (55,495,13) ►•�,1 STRAND ASSOCIATES' Work Change Directive 20x Directive No.; 98 Contract 1.2010 Owner: City of Dubuoue By: CWT Contractor. Mirvn Construction Co., Inc. Date: 4115113 Description of Work Cost Deduction Cost Addition Drawing 28- DASM1.01(Sheet 84) Where new walls meet existing walls, provide #5 drilled adhesive shown on Mlron shop drawing Submittal No. 247.0 which was stamped Strand on February 8, 2012. dowels as by $1,508 Total $1,508 Remarks; This Work Change Directive shall result In no change to project duration negotiation, and is not subject to Change In Contract Pdce by: Q Supplemental Unk Price 0 Unk Price ® Lump Sum Requested by: Strand Associates 415!13 Date c�'- yL Recommended by: �'�+�• �'° .4"L 4116113 (Engineer) Date Accepted by: � 4- 6-5 5 (c� Date t // 13. q-1‘13. Approved by: Arad . (Owner) / Date -THIS FORM IS NOT SUBSTITUTE FOR A PROPERLY PREPARED AND El(ECUTED CHANGE ORDER- In16kIS:V8A011r00- 11E18410281Wr IWAChugeOhchulareitoNo98 .Sbualue28Dmnluloc Wiling Excellence' CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 1OB11aOAN MODB:0028 AO DATED: 41I0113 FAX: 608- 251 -8655 ?HONE: 608- 251 -4843 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Cost assocated with adding dowels to Structure 28 per shop drawing markups, RFI 740. REQUESTED BY: Strand Associates Inc SUBCONTRACTOR Miron Construction Co., Inc Miran Management Fee 15.00 t - Miron Work Subtotal Performance Bond 1.50 t TOTAL AMOUNT OF THIS MODIFICATION: DATE: AMOUNT $1,291.52 $193.73 $1,485.25 $22.28 $1,507.53 CHANGE ORDER AMOUNT REQUESTED: Contractor is (not) to proceed with the work as noted above, with the Owner is adjusted as follows: Approved Cost Schedule Impact Miron Representative Jonathan Daniels $1,508.00 The contract Date 4/10%13 Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Copy: File / dmf Jobsite MIRON CONSTRUCTION CO., INC. Building Excellence Corporate Office P.O. Box 549 Neenah, WI 54957•C509 1471 McMahen Drive Neenah, WI 54956 Phone: 92019697000 Fax :92019694399 www.miron•construction,com pgp�1�I,,J �g Iff ifill irgla 57 Owner City of Dubuque Computed by JCO Project Dubuque WPCP Date 9-Apr -l3 Project No. 103400 verified by Title Cast Proposal Request Documentation Date Page loll Revision 0 Modification Quote Number. 32000 Description ol Modification: WI-740 MomsIncluded in tills proposal: 328.01 Item 328.01 bb00 1. 0Adidowdsromudure 2 8 per shop drawing markups pra:petters6hours) eta tabu $ 350.00 s 9,11 52 $ - $ 00040s1 Intl 1.0 No Change in Nate: None 9sbtalal: 11I0011arkuP0159< Bond &Insurance Pia: TOTAL• CPR 32841t $ 350.00 $ 991.52 f 52.50 $ 141.23 $ 22.28 $ 1,607,53 44,11 STRAND ASSOCIATES' Work Change Directive 20y, 20z, 20aa Directive No,: 97 'Contract: 1.2010 Owner: City of Dubuque By: MI Contractor. aggnstrutri Co„ Inc. Date: 4(17113 tionofWork Cast Description Deduction Cost Addition Provide site lighting modifications as described in attached Cost Proposal Request No, 112 dated April 1, 2013, Provide hydrogen sulfide monitor in Thickener Room as described in attached Cost Proposal Request No. 113 dated April 1, 2013. Provide landscape modifications as described in attached Cost Proposal Request No, 115 dated April 2, 2013, In addition, provide the fallowing $6,589 changes: 1 On the Plant Data Chart on Drawing 05•C1.12 (Sheet 28), change Haokberry "Chicagoland" to "Prairie Pride" variety and change all "While Spruce" to "Black Hills Spruce." Change edging specified in 02950 to concrete bullet edger as manufactured by King's Material, Inc. $1,415 $4,221 Total $953 Remarks: This Work Change Directive shall result in no change to project duration and Is not subject to negotiation, Change In Contract Price by I Supplemental Unit Price Unit Price I Lump Sum Requested by: Strand Associates, Miron, Owner Various Date r il-oa do Recommended by: � �M1' (Engineer) 4/17113 Date Accepted by: ,- ----_-'� (�;� ' I/ " 17e ll Data Approved by: j , l% 4' er) U x f � rb •-rl Date -THIS FORM IS NOT A SUBSTITUTE FOR A PROPERLY PREPARED AND EXECUTED CHANGE ORDER- Nliols189SlADI loo•i lON11S4%23lWrdlwool elnspe OYedNoiOPeclWo No ST.400 Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 1 April 1, 2013 No. H2 ISSUED BY: CJ 1F,NT NAME: PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL REQUEST Glenn W. Tranowslci City of Dubuque WPCP Modifications 1.2010 April 1, 2013 (revised) Miron Construction Co., Inc. Jonathan Daniels, Gerald David, Dawn Florian Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer Miron Construction Co., Inc, City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and/or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Specification 16990 - Existing SCC•MA1N (Page 16990.63) ADD the following signal: Digital Outputs Exterior Site Lighting - Group D Wire Comments 2414 To Group D site lighting contactor in Mechanical Room 8009 Drawing 0541.04 (Sheet 44) CHANGE the LP -80 -03 circuit for the Type AA fixtures located on the north side of the entrance sign shown on the enlarged North Entrance Gate Plan from circuit "15" to circuit "17 ". Drawing 8011.02 (Sheet 309) ADD a single pole 20 amp contactor in NEMA 12 junction hox on the northeast wall of Mechanical Room 8009 next to the other lighting contactor enclosures. Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 2 April 1, 2013 Drawing 99:E6,24 (Sheet 423) CHANOE fhe description far the 20 amp single pole circuit breaker in the LP -6043 panel schedule, circuit 17, from "SPARE" to "SITE LTS - GROUP D (ENTRANCE SIGN) ", Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1.2010 Page 1 April 1, 2013 No.112 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 April I, 2013 (revised) Miron Construction Co., Inc. Jonathan Daniels, Gerald David, Dawn Floriano Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larty Solchenberger Stuart Summer Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc RW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Conuact Price and/or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Specification 16990 - Existing SCC -MA1N (Page 16990.63) ADD the following signal: Digital Outputs Exterior Site Lighting - Group D Drawing 0511.04 (Sheet 44) Wire Comments 2414 To Group D site lighting contactor in Mechanical Room 8009 CHANGE the LP -80.03 circuit for the Type AA fixtures located on the north side of the entrance sign shown on the enlarged North Entrance Gate Plan from circuit "15" to circuit "17". Drawing 80 -E1.02 (Sheet 309) ADD a single pole 20 amp contactor in NEMA 12 junction box on the northeast wall of Mechanical Room 8009 next to the other lighting contactor enclosures. Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 2 April 1, 2013 Drawing 99 -E6,24 (Sheet 423) CHANGE the description for the 20 amp single pole circuit breaker in the LP -80.03 panel schedule, circuit 11, from "SPARE" to "SITE LTS - GROUP D (ENTRANCE SIGN)", Bu17dmgExcegence' CHANGE ORDER REQUEST T0: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 JOB 0:103400 MOD R:0329 a DATED: 4110113 FAX: 608 - 251 -8655 PHONE: 608 -251 -4843 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Cost associated with Administration Building site lighting, per CPR 112 REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT Faith Technologies, Inc. $1,327.24 Miron Management Fee 5.00 lc - Subs $66.36 Subtotal $1,393.60 Performance Bond 1.50 t $20.90 TOTAL AMOUNT OF THIS MODIFICATION: $1,414.50 CHANGE ORDER AMOUNT REQUESTED: $1,415.00 Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Schedule Impact Miron Representative Date 4/10/13 Jonathan Daniels Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Copy: File f dmf Jobsite MIRON CONSTRUCTION CO„ INC. Building Excellence Corporate Office P,O. Box 509 Neenah, WI 54957 -0509 1471 McMahon Ddve Neenah, W154956 Phone: 9201969.7000 Fax; 9201969.7399 www.mironconstructfamcom �_.j . cv"�,,, 1'1`7�s f1!•��f7,,ai'ld fit �C!�ut�`� Owner City of Dubuque Computed by 3CD Project Dubuque WRCP Date 9- Rfr•13 Project No, 103400 Verified by Title Cost Propas' Request Decumentalion Date Page Iof1 Revision 0 Modigwtlon Quote Number. 320.00 Description of Modification: CPR-112 Items Included In MI5 proposal: 11201 Item 111.01 Et 1,0 Modifirabons per CPR 112 Edelial $ 361.29 3 1m 1 966Ao 1 DribactIlmrc 1,0 he Change 4" Hole: None subtotak $ Mronbhikup06%$ Bond B Ins arce 0 1.491: $ TOTAL • CPR 11240: 161,24 1606 2090 1 1,414,61 $ 466,00 $ 4630 Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 1 April 1, 2013 No.113 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: T0: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1.2010 April 1, 2013 Miron Construction Co., Inc. Jonathan Daniels, Gerald David, Dawn Florian° Steve Sampson Brown, Jonathan Brown Glenn Tranowski, Lany Solchenberger Stuart Summer Mixon Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price andlor Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Drawing 7541.10 (Sheet 259) CHANGE the description for the 20 amp single pole circuit breaker in the LP -75.01 panel schedule, circuit 4, from "LIT - 75.01, LIT - 75.02" to "LIT - 75.01, LIT- 75 -02, H2S Monitor RM 7509 ". Drawing 75-E1.11 (Sheet 260) a "H2S Gas Detection and Alarm Control Panel' with remote mounted 0.100 PPM H2S gas sensor. Control panel shall be mounted on the north wall of Thickening Room 7509 located 8 -feet 6- inches east of the double -doors and 6 -feet above the floor, Remote H2S sensor shall be wall - mounted on the east wall 18 -feet south of the north wall and 18- inches above the floor, Control panel and sensor package shall be RI CI Instruments Model Beacon 110 with alarm strobe and 0 -100 PPM H2S sensor. Provide an RKI Instruments calibration cup for the sensor. Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 2 April 1, 2013 ADD the following Key Note 18 and associate it with the new H2S Gas Detection and Alarm Control Panel and remote mounted H2S sensor; "18. Provide one shielded -pair cable in 314 -inch conduit from H2S Gas Detection and Alarm Control Panel to remote mounted 112S sensor. Sensor head shall be located 18- inches above the floor. Provide 2-#12 AWG conductors and #12 AWG ground in 314 -inch conduit from lighting panel LP- 75.01, circuit 4, to H2S Gas Detection and Alarm Control Panel. CLARIFICATION: Conduit and wiring to the H2S Gas Detection and Alarm Control Panel from LP- 75.01, circuit 4 (noted in new Key Note 18) shall be extended from transmitter LIT -75 -01 located in Thickening Room 7509. Building Excellence CHANGE ORDER REQUEST T0: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 JOB Y:103,100 MOD 0:0321 Ap DATED: VI Oil 3 FAX: 608- 251 -8655 PHONE: 608- 251 -4843 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003-7996 DESCRIPTION OF MODIFICATION: Cost associated with Structure 75 Thickener Room H2S monitoring, per CPR 113. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT Faith Technologies, Inc. $3,960.26 Miron Management Fee 5.00 1 - Subs $198.01 Subtotal $4,158.27 Performance Bond 1.50 1 $62.37 TOTAL AMOUNT OF THIS MODIFICATION: $4,220.64 CHANGE ORDER AMOUNT REQUESTED: $41221.00 Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Schedule Impact Miron Representative Date 4/10/13 -- Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Copy: File / dmf Jobsite MIRON CONSTRUCTION CO., INC, Building Excellence Corporate Office P.O. Box 509 Neenan, WI 549570509 1471 McMahon Ddve Neenah WI 54956 Phone: 920f9697000 Fax: 92019694399 www,miron•construction.com Owner City of Dubuque Computed by 7CD Project Dubuque WPCP Date 10•Apr-13 Project Verified 4100161/F2Dr� ! 'Re CostProposal Request Documentation Date Pape l of'. Revision 0 Modification Quote Number: 3214 Description of Modification: CPR•113 Items Included In Ibis proposal: 113 -01 Item 113411 fulli1 1,D Faith Impll11/S Cas Dattttlon System 2.D Wunderlic - Suppff of H2S Wier 34 Falth Markup Ml WM 5110 f 98110 1 2,630.00 1 139,16 1 148.69 $ - 1 (mom 1.0 Negev 444 Note None Sullied!: Mlmn Ma* do % Bond & Insurance 6 L59b; TOTAL • CPR 11100: $ 2,82096 1 14139,88 $ 1412 $ 56.99 $ 6237 $ 4,77065 Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page l April 2, 2013 No, 115 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: T0: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1.2010 April 2, 2013 Miron Construction Co., Inc. Jonathan Daniels, Gerald David, Dawn Florian° Steve Sampson Brown, Jonathan Brown Glenn Tranowski, Larry Solchenberger Stuart Summer Min Construction Co., Inc. City of Dubuque Strand Associates, hie UW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and/or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Affecting the Drawings Drawing 05 -C1.12 (Sheet 28) Provide changes to Landscaping Plan as shown on the drawing attached to this CPR. Affecting the Specification Section 02936 - Seeding and Sodding Delete the following paragraphs in their entirety from Section 02936 - Seeding and Sodding: Paragraph 2.01.C. Native Prairie Mix Paragraph 2.01.D, "Weed content..." Paragraph 3,07.G. "Native Prairie..." Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1.2010 Page 2 April 2, 2013 ADD the following paragraph to Section 02936 -3.02: "F. In areas shown to have Native Prairie Mix on Landscaping Plan: Remove foreign materials, weeds, purple Loosetrife, noxious weeds and other invasive or undesirable plants and their roots. Remove contaminated subsoil in accordance with local, state, and federal regulations. Provide a minimum of three separate applications of vegetation control herbicide on the areas shown to have Native Prairie Mix on the Landscaping plan. AD2 the following paragraph to Section 02936.3.05: "I. In areas shown to have Native Prairie Mix on Landscaping Plan, provide oat cover crop after successful removal of existing vegetation." ADD the following paragraph to Section 02936 -3.07: "U. In was shown to have Native Prairie Mix on the Landscaping Plan, Contractor shall mow cover crop to 4 to 6 inches one time the first season of establishment." we SEE ENLARGED PUN ON THIS SHEET FOR ADDITIONAL DETAIL AND PLANT CALLOUIS —RO D ALTERNATIVE NO. 7 3 —WS 2— L— 2- 1—RO 3—AP 2—JIL 3 —RS ..ou000nol.nonooe000eopsor3ee BID ALTERNATIVE NO. 3 1 —RO 1 —WP ALTERNATIVE NO. 6p1 PLANT DATA CHART PLANT CODE COMMON NAME SCIENTIFIC NAME LARGE GROWING DECIDUOUS TREES RS NC HB Red Sunset Maple Northern Catalpa Hackberry Aar rubnun 'Red Sumer Catalpa speciosa Cattle occidenml le 'Chlagcand' AV O. MATURE lieGNr 50 SO' 65 SIZE WtBI' PLANTED 25" Cal 2"Cal. rCal. 1007 50tE MODE 8&B B&B B&B MIMMU4 SIZE MIN BALL OR POT MIN CONT. SRE 28" 24" USA CONT. DEPTH 19" 16" 16" MIN HOLESQE MIK HOLE OIL 44" 40" 40" MIN HOLE OB-H 16" 16" 16" Fa7T. PACK PEOD 4 4 4 MULCH RING PA. 45" 48" 48" PLANT BED DETAIL PO RO Pin Oak Red Oak Quereue paluabis Quakes rubra 65' 70' rCal. 2"Cal. Emerald Queen Maole 1 3"C81. MEDIUM GROWING DECIDUOUS TREES ER WK Eastern Redbud WIMer King Hawthorn Carets ca madam's CrataegusvlHtlls 'Winter Kira' SMALL GROWING DECIDUOUS TREES 30' 20' 2"Cal. 88B B&B B8B 24" 24" 32" 16" 16" 20" 40" 40" 44" 16" 16" 20" 4 4 4 48" 48" 66" r Cal. B&B B&B 24" 2.4" 16" 16" 40" 40" 16" 16" 4 4 48" 48" TC Flowering Crabapple Maim'Tina' 15' 1.5"Cal. B&B 20" 15" 32" 16" 3 Bed C JTL Japanese Tree Lilac EVERGREEN TREE8 WS BHS White Spruce Black tills Spruce Syringa Reticulate Picea glauca Piaa glaua 'Densala' 25 65' 35' 2" Cal. 5' HT 6' HT B&B B&B B&B 24" 22" 15" 16" 16" 36" 35" 39" 16" 16" 15" 3 3 BS Colorado Spruce Piaa pungens 50' 0 HT B88 22" 15" 35" 15" 3 Bed 48" 48" 48" AP AudAan Pine DECIDUOUS SHRUBS KSV DF SRY GF Koreanpia Viburnum Dwarf Fothergllla Shrub Rose Gold Flame Spires EVERGREEN SHRUBS SJ I SavinJuniper PERENNIALS P8 I Pachysandra Pines Nigra Viburnum anon Fothergilla garrison Rose hybrids 'Radeunny' Splraaa x bumalda C1old Flame' 55' 5 3' 3' 3' 5 HT 3' HT 24" HT 15" NT 24" HT B&B B&B POT POT POT 27" 1r 12" 12" 12' Juntpenss =bins I 19" I 12" I CAN I tr 'Calgary Carper Pachysandra terminally 6.8" I 3" POT I 2" 18" 9" 9.. g.. 9" 43" 28" 28" 26" 28" 15" 9" 9" 9" 9" 8" 1 28" 1 9' 1 3" 1 -1 4 2 48" Bad Bed Bed Bad — I Bad LANDSCAPING PLAN 0 20' 40' 60' 160' h 3—WK 1—WS 1 —RO 1 —RO IOWA- oNi CALL 1- 800 - 292 -8989 is www.iowaonecall.com or AREA OF SITE 1�oli�i1 BLUE GRASS LAWN MIX LOW MAINTENANCE LAWN MIX NATIVE PRAIRIE MIX TURF REINFORCED MAT RAIN GARDEN STONE MULCH GENERAL NOTES: 1. PROVIDE STONE MULCH OVER WEED BARRIER WITH EDGING BENEATH ALL ALUMINUM STAIRS AND WHERE INDICATED ON THE DRAWINGS. KEY NOTES: 0 PROVIDE LOW MAINTENANCE LAWN MIX AS PART OF LUMP SUM BASE BID. Replace 4 -RL with Emerald Queen Maple I LANDSCAPE FLAGPOLE HARDWOOD MULCH EDGING • OF 3) OVER WEED BARRIER 1 —WS DSCAPE EDGING 11 —SRY X 1 —RL 1 —RO d a. 0 0 z 1 1 1 4 Q W 0 Delete 2 -AP ENLARGED 201ANSCAPINSG PLAN Stone Mulch D MULCH OVER WEED BARRIER TYPICAL FOR ALL FOUNDATION PLANTINGS L■ 1f •N •NTR.LPLANTM•D F AT •N•a W 0 D m 2 G 0 (Delete 1 -RL STRAND ENGINEERS SHEET 28 05 -C1.12 JOB NO.1154 -008 File: S:\ MAD\ 1100 -- 1199 \1154 \008 \Acad \Strand Drawings \05- C1.12.dwg Time: Jul 16, 2010 - 4:38pm Building Excellence' CHANGE ORDER REQUEST T0: Mr Glenn W, Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: JOB#:103400 MOD N:0324.01 DATED: 4/16113 FAX: 608 - 251 -8655 PHONE: 608- 251 -4843 Revised cost associated with landscaping modifications, per CPR 115 dated 4/2/13. REQUESTED BY: Strand Associates Inc DATE: 4/02/13 AMOUNT SUBCONTRACTOR Nauman Nursery, Inc. Performance Bond TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: ( $6,492.00) Subtotal ( $6,492,00) ( $97.38) ( $6,589.30 ( $6,589,00) Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost _Schedule Impact Miron Representative �— '� �� Date 4/16/13 Job an Daniels Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Copy: File / dmf Jobsite (ARON CONSTRUCTION CO„ INC Building Excellence Corporate Office PA• Box 509 Neenah, W154957-0509 1471 McMahan Drive Neenah, WI 54956 Phone: 9201909.1000 Fax: 920/969.7399 www mlron-constructloacom r �/. N iiiiifllitfor Owner CM of Dubuque Computed by JCD Project Dubuque MCP Date 15- Apr -1: Project No, 103400 Verified by MaCOSIProposal Request Pau menlaton Date Page I of 1 Revision 0 Modification Quote Number: 32400 OesaipbanafModification: CPR-11S Items included In thls proposal: 11501 Item 115.01 N34mene Lo Stone Mulch Charges par CPR 115 LO Delete 4 WS per CPR 115 3,0 Delete 2 AP per CPR 115 4.0 Delete 1 RL per CPR 115 5.0 Replace RLwith Queen Mapk per CPR IIS 6.0 pat see crop In leu of rathe mix per CPR 115 7.0 Maw cat crop once prior to werseedi CPR 115 BS 1,214,00 (1,080,00) (756,00) (410,00) (5,470.00) f - g per 010 Change "Chkagalawr liadthemt to "Praire Pride' 9.0 Change "WAW Spire to "Black Hills "Spoke 10.0 Substitute Ktg's mated precast bullet edger for plestk edging n) IA No Change 4" ma: Addilional veablion conl(ol herbicide after 3 add $250 each S:Atoab 1 Bond &Imwame@Int 1 TOTAL • CPR 113.00; (6,492.00) (9438) 6 (6,5119,3/) 41•1 STRAND ASSOCIATES' Work Change directive 20bb, 20cc, 20dd Directive No,: 98 Contras 1.2010 Owner Cflv of Dubuque By: GWT Contractor. Miron Construction Co., Inc, Date: 4124(13 Description of Wait Cost Deduction Cast Addition Provide sidewalk adjacent to Maintenance Building as described in Cost Proposal Request No. 102 dated January 8, 2013. Contractor no credit to delete sidewalk over the tunnel, Provide Administration Building locker room modifications as described attached Cost Proposal Request No. 110 dated March 12, 2013. At eight locations along walkway between WAS Storage Tank No.1 WAS Storage Tank No, 2, provide WI thick aluminum checkered floor as specked In 05520 over opening from existing grating to existing toeboard. New plate shall be bent to provide toeboard with height to match toeboard. provide countersunk stainless steel anchoring system for For areas where new butterfly valves are to be installed, coordinate location to allow W &RRC operators to access the valve actuator. attached provided in and plate existing plates. plate $2,574 $2,823 $'1,544 Total $7,741 duration and Is not subject to Remarks: This Work Change Directive shall result in no change to project negotiation. Chafe In Contract Price by: 0 Supplemental Unit Price I Unit Price re! Lump Sum Requested by: Strand Associates, Miron, Owner Various Date Recommended by: )6 N\ � 4124113 (Engineer) Date Accepted by: 4-PC-13 se l Date Approved by: tAir4. Pimer} � 15-- l - zoi . Date •THIS FORM 1S NOT SUBSTITUTE FORA PROPERLY PREPARED AND EXECUTED CHANGE ORDER- 101161931M011100-119811154 0291WilftWork Change 0Incives'Orrecttve No NAM No.102 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: T0: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1.2010 January 8, 2013 Miron Construction Co., Inc. Jonathan Daniels, Dawn Florian, Gerald David Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer Miron Construction Co., Inc, City of Dubuque Strand Associates, Inc lIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price andlor Time incidental to proposed modifications to the Contract Documents described herein. Please submit a separate quote for each item. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED MTH THE WORK DESCRIBED HEREIN. Drawing 05•C1.03 (Sheet 20) Provide concrete sidewalk adjacent to Maintenance Building according to the drawing attached to this Cost Proposal Request. InilialslS:'MADsI 100- 119911I5410211WrdY.ost hposcl RequestslCPR.102.Site Modifcaliaro,docx Provide concrete sidewalk (typ.) EL■627.94 e628.23 ,1 TOC■628.56 R ■10.0' MID. PT. TOC- 627.93' N- 3646987.46 E- 5687012.41 \ 1 EL7628.10 S DRA N 05 -C1.03 - 628.46 EL- 628.46 / T fi,�• EL =636.96 ?.`•.'•T:; ' - 636.98 qt. 645.50 PRIMARY CLARIFIER NO. 1 EL- 645.50 EL■636.98 X636.87 636.95 28.00 - 628.46 - 628.22 SOLIDS PROCESSING BUILDING 5 TOC- 627.69 BID ALTERNATE N. 3 FFE- 621150 EL- 628.41 TOC- 628.94 EL■636.49 EL -636. 0.-636.4 EL■636.56 EL- 628.41 FFE- 628.5 +/- TOC- 628.74 - 628.16 FOR TOC -628.6 N■3646922.26 a 628.41 - 5687126.82 - EOR N -3 E -5 R -15 MID. N- 364688 .36 - 5687029:18 T0C■628.60 ■628.48 I, 7.:46 12 0. -62 TOC- 627.17 1 N EL■636.04 EL■635.88 - 638.60 l E0 TOC■628.10 N- ..646899.63 E- 687109.86 EL■636.65 - 636.53 - 636.23 - 636.04 3 t \� �� -N- 36446836249" F t E- 5687020.02 TOC ■626.9 \ \5 `t\ I , 12' 3/8° COVER AGGREGATE 1/1 SLOPE / / s EE0g�� 626.75 N-38 98.32 E- 5687000.29 PROPOSED GRADE EL620 3/8° COVER AGGREGATE 1 -1/2° TO 3° CLEAN STONE EL615 SNECTIO N O SCALE 05-01, KEY PLAN NO SCALE TOC -6 •R TOC-� rr 626.21 N- 3646809.93 E■5687053.30 O , o • EL4627. c`-'410414,V EL- ¢26.53\ EL -62k 11 • -628. T0C■628.54] -ELC• is -638.1' .636.77 PRIMARY CLARIFIER 1,10. 3 a EOR EL- 636165 - 364687S. _ E • 687267.42 X63 ,0 0 GRIT EL- 637.98 6t.R 14- FACILITIES N-364 10 °-�- R�10.�•E -5687 EOR TOC ■628: N.3646844.77 E- 568704.39 TOC= 6271881 T�27.48j, E(- 627.8 \ .29 Q 0. -1 627.3 ST MH -2 -2 I _ OR TOC■628.27 ■ 3646829.18 ▪ 5687119.94 R ■15.0' MID. PT. TOC -628. N.3646639.3 ■5687134.78 NI23 `'1 :855.961. E- 5= 7269.95, OR EL.. 37.03 I N =3646:•0.58 E ■5687 61. 0. 6.3 N -3• •:65.21 E -5 • 7274.45 • EL■635.2 N- 646849.24 E- - 687302.02 i ' R -15.0' MID. PEI N -36467 0.- 627.88E -568_7 EL■626.95 EL -62 : 3• EL ■627.7 E0. 27.267 N 64 S E5•' EOR T0C ■627. N■3646750.31 _- 5687084.97 FOR EL- 633`09 ▪ t tN- 364678246 E- 5687297.00 30 / / - R -15.0. EL 632.6§ / • N- 3648780.89 1510' / • E}5687282,0� qld 6{674.0 ----• Z -- aH \Eg687,149,26 1 � \lam_` -- - - ---- "" - 634.14 EOR EL- 633.15 N- 3646790.39 E■5687308.23 EL- 633.11, -. EL- 633.87 N- 3646794.11 E- 5687343.54 MID. PT. 0.- 932.95 N- 3646792.25 E- 5687325.88 EL -632.6 EOR EL- 632.39 �- M- 632.68 EL- 63 =.51 N- 3646766.04 632.40 5687284.25 _ 2- - 629:63 - --- - -- 0.57,8) 02C-- -625.8 DETAILED SITE GRADING PLAN - 2 -0.L - � _632,16 - - x u wA= ota CALL 1- 800 - 292 -8989 Iw www.Iowaonecall.com BID ALTERNATE NO. 6 KEY NOTES CATCH BASIN MANHOLE PER SPECIFICATION SECTION 02600. O DRIVE -WAY CURB SECTION O STEP O STANDARD CURB p PAVEMENT - HEAVILY LOADED SEE DETAIL OR DETAIL PAVEMENT - LIGHTLY LOADED SEE DETAIL OR DETAIL U GRADE TO DRAIN TO SOUTH, 10' WIDE AT ELEVATION 625.8 EXCAVATE BOTTOM OF SUMP TO ELEVATION 615.0 AND FILL WITH 1 -1/2° TO 3° CLEAN STONE gO IN PLANT WASTE PUMP STATION 90 13 ADDITIONAL PARKING SPACES TO BE INCLUDED IN 81D ALTERNATIVE NO. 3 11 SEE DRAWING 92- ASM1.01 Q CHAIN UNK FENCE WITH FABRIC 13 CHAIN LINK FENCE 14 REJECT CURB JULY 2010 0 z 0 z ■ DATE:APRIL 2010 4a U DES 6Y:JPK DETAILED SITE GRADING PLAN • 2 WATER POLLUTION CONTROL PLANT MODIFICATIONS DUBUQUE, IOWA IIW ENGINEERS & SURVEYORS, P.C. INThOR1, EXPERTISE SOLUTIONS ABao T . � ENGINEERS SHEET 20 05-C1.04 JOB N0.1154 -008 File: S:\ MAD \1100 -- 1199 \1154 \008 \Acad \IIW Drawings \05- C1.04.dwg Time: Jul 16, 2010 - 4:38pm BuiidingEnelienci. CHANGE ORDER REQUEST T0: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 10B N:103400 MOD # :0190.00 DATED: 4123113 FAX: 608- 251 -8655 PHONE: 608- 251 -4843 DESCRIPTION OF MODIFICATION: Cost associated with sidewalk at Maintenance Building, per CPR 102. REQUESTED BY: Strand Associates Inc SUBCONTRACTOR Tschiggfrie Excavating Miron Management Fee 5.00 W - Subs Performance Bond 1.50 i TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: DATE: AMOUNT $2,415.00 $120.75 Subtotal $2,535.75 $38,04 $2,573.79 $2,574.00 Please find back up materials enclosed regarding this modification. Contractor is Intl to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Miron Representative Am. ` hedule Impact ie ll�h�ii��f f Date 4/23/13 Owner Representativ Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN NIIRON CONSTRUCTION CO., INC. Building Excellence Corporate Office Pe, Box 509 Neenah, WI 54951.0509 1471 McMahan Drive Neenah, WI 54956 Phone: 92069-7000 Fax:9201969.7399 www,miro•consiruction.com iii %ljf /r ti%i Owner ON of Dubuque Computed by 1CD Project Dubuque WPCP Date Project No. 103400 nita•1] Verified by Tide Cost Proposal Request Doamentadon Date Page 1 of 1 Revision 0 Modification Quote Number: 290.00 Description of modification: Y2•102 Items Included In Ibis proposal: 102.01 Item 102-01 Tsdacciu 1.0AkJsdewalk.* Structure 90 per CP 0102 >cji $ 2,415.07 $ (o(1tYn'tTmeT 10 Na Clenge "' II01e: None Subtoal: neon markup @ 5% Bond & Insurance@ 1.555, TO7AL•C11102 -00: $ 2,415,00 $ 120,75 $ 30.04 $ 2,573,79 Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1.2010 Page 1 March 12, 2013 No.110 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: T0: Distribution COST PROPOSAL REQUEST Glenn W, Tranowski City of Dubuque WPCP Modifications 1 -2010 March 12, 2013 Miron Construction Co., Inc, Jonathan Daniels, Gerald David, Dawn Florian° Steve Sampson Brown, Jonathan Brown Glenn Tranowski, Larry Solchenberger Stuart Summer Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc Dr Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and/or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN, Provide revisions to lockers and benches in Womens Locker Room 8008 and Mens Locker Room 8001 according to the attached drawing. 2t'-4 =MN �YLI�CML ®���11a NE 1111■P=te 7 •MISt BA jounurmilmommuummammousihn, MMMM wiwilmr4 ammingummeremenamminummrsaumanimimma.rvria 5 -2 LOCKER ROOM Iii ®JY,. �:C31l__ S ®IB� aM11111111111111.111111111111 >!>� tie G A GED aLaoR 1uw T`i F-NLARGED LOO r— ENLARGED' FLOOR i PL bO+R4hO4 AN Y Move fixed bench with back against east wall as shown. Delete two single tier lockers and turn over to Owner. Install the double tier locker as shown. Where lockers are removed, frame a shelf to match locker depths with studs and gypsum board. New and remaining walls and shelf shall be tiled with ceramic wall tile. Shelf height shall match height of fixed bench. D 1A4 �WOMENS LOCKER ROOM 8008 BO- ASM o ' WORM HEAD SHOWER CURTAIN ROD AND SHOWER'cuRYAo4 CERAMIC IREY4M.L. -- HAND HELD SHOWER- 6Q' 040Wt R BOSE- -WMt CuM BAR GENERAL NOTES SITE PLAN EL 637.00 = BASEMOsIT FINISHED FLOOR. 1. UNLESS SHOWN OTHERWSE, DIMENSIONS TO NEW INTERIOR PARTmoH WALLS ARE GNEN TO THE CENTERIJNE OF 1HE WALL DIMENSIONS TO MASONRY WALLS ARE FROM SURFACE. 2. PROVIDE UNTELS OVERALL MASONRY OPENINGS. WHERE LINTEL DETAIL IS NOT INDICATED, UN TEL SHALL BE PROVIDED IN ACCORDANCE WfH DETAIL PROVIDED BY ENGINEER DURING CONSTRUCTION. 3. ALL INTERIOR DOORS TO OCCUPIED ROOMS AND EXTERIOR DOOMS SHALL HAVE A MINIMUM 1' -6. CLEARANCE FROM LATCH END OF DOOR TO ANY OBSTRUCTION SWING SLOE. THE SIDE OPPOSITE THE DOOR SWING SHALL HAVE A MINIMUM 1'-0. CLEARANCE TO ANY OBSTRUCTION FROM LATCH END OF DOOR. 4. SEE ROOM FINISHED SCHEDULE AND SPECIFICATION FOR TREATMENTS OF WALLS, FLOORS. AND CEIUNGS NOT CALLED OUT ON DRAWINGS. 5. SEA. SHEET 80- ASM4.02 FOR WALL TYPES DELINEATED WITH rI SYMBOL 6. UNLESS NO1FD OTHERWISE ALL INTERIOR PM11T(ON WALL FRAMING AND SHEATHING SHALL TERMINATE *6' ABOVE THE CEILING HEIGHT. INTERIOR BLOCK WALLS SHALL BE CONTINUOUS TO T16 STRUCTURE ABOVE 7. EJGSDNG FLOORS SHALL BE CLEANED. SCRAPED, AND LEVELED OR SKIM - COATED FOR PREPARATION FOR NEW FLOORING FINISHES... 8. ALL OPENINGS IN MISTING WALLS. WHERE NO NEW DOOR OR WINDOW FRAME S BEING INSTALLED, SHALL HAVE THE MASONRY AT THE JAMBS GROUTED FULL MID OPENING ENCASED WHH. DRYWALL TO PROVIDE SMOOTH UNIFORM FINISH JAMBS PROVIDE CORNER GUARDS AS SPECIFIED 9. SEE DETAIL J/99- AS5.05 FOR TYPICAL SIDE ELEVATION OF ACCESSIBLE TOILET. KEY NOTES; 0 15..12...x12'02" SINGLE 11ER LOCKERS ON CONCRETE BASE (1 DOUBLE TIER). • 6- .12:x18x72- SINGLE TIER LOOKERS ON CONCRETE BASE. O 22- 12"x12 x74- SINGLE TIER LOCKERS ON CONCRETE BASE (1 DOUBLE TIER). O 10-12 x18Sc72- SINGLE 11ER LOCKERS ON CONCRETE BASE. 0 SOAP DISPENSER. O 48"x42 MIRROR. Q PROVIDE P-LMA LAVATORY COUNTER WITH 4" COVE SPLASH ON BACK AND SIDE WALLS. 0 URINAL SCREEN. O TOILET PARNRON. 10 TOILET PARNTION DOOR. 11 HORIZONTAL AND VERTICAL GRAB BARS. 12 TOILET TISSUE DISPENSER. 13 SEMI RECESSED TOWEL AND WASTE RECEPTACLE. 14 4' -0' WOOD BENCH. 15 36'x42 MIRROR. 16 CLOTHES HOOKS, TYP. 1© PROVIDE CEMENT BOARD BACKING IN ALL SHOWER AREAS AND PROVIDE WATERPROOF ,®PROVIDE A 20 -INCH 61' 42 -INCH ADA LOCKER. ROOM BENCH WITH BACK SUPPORT. AS UANUFACNRED BY ROBINSON STEEL CO, OR EQUAL BENCH AND BACK SUPPORT SHALL BE HARDWOOD AND PEDESTALS SHALL BE STEEL_ 10. PROVIDE ADA ACCESSIBLE LOCKER W THIS LDCA11ON. Tai FOLD UP SHOWER SEAT, (ON OPPOSITE WALL 1111. REMOVE CONCRETE FLOOR AS REQUIRED TO GET FLOOR PITCH TO FLOOR DRAIN CERAMIC TitE awe 4 ad EZus Sows 0 MI IN z Q to 4 0ci, p, JULY 2010 r rs .� a° MITRPOR Z 1111 � 0 S W G'L ` r - IE,%r1 D 1A4 �WOMENS LOCKER ROOM 8008 BO- ASM o ' WORM HEAD SHOWER CURTAIN ROD AND SHOWER'cuRYAo4 CERAMIC IREY4M.L. -- HAND HELD SHOWER- 6Q' 040Wt R BOSE- -WMt CuM BAR GENERAL NOTES SITE PLAN EL 637.00 = BASEMOsIT FINISHED FLOOR. 1. UNLESS SHOWN OTHERWSE, DIMENSIONS TO NEW INTERIOR PARTmoH WALLS ARE GNEN TO THE CENTERIJNE OF 1HE WALL DIMENSIONS TO MASONRY WALLS ARE FROM SURFACE. 2. PROVIDE UNTELS OVERALL MASONRY OPENINGS. WHERE LINTEL DETAIL IS NOT INDICATED, UN TEL SHALL BE PROVIDED IN ACCORDANCE WfH DETAIL PROVIDED BY ENGINEER DURING CONSTRUCTION. 3. ALL INTERIOR DOORS TO OCCUPIED ROOMS AND EXTERIOR DOOMS SHALL HAVE A MINIMUM 1' -6. CLEARANCE FROM LATCH END OF DOOR TO ANY OBSTRUCTION SWING SLOE. THE SIDE OPPOSITE THE DOOR SWING SHALL HAVE A MINIMUM 1'-0. CLEARANCE TO ANY OBSTRUCTION FROM LATCH END OF DOOR. 4. SEE ROOM FINISHED SCHEDULE AND SPECIFICATION FOR TREATMENTS OF WALLS, FLOORS. AND CEIUNGS NOT CALLED OUT ON DRAWINGS. 5. SEA. SHEET 80- ASM4.02 FOR WALL TYPES DELINEATED WITH rI SYMBOL 6. UNLESS NO1FD OTHERWISE ALL INTERIOR PM11T(ON WALL FRAMING AND SHEATHING SHALL TERMINATE *6' ABOVE THE CEILING HEIGHT. INTERIOR BLOCK WALLS SHALL BE CONTINUOUS TO T16 STRUCTURE ABOVE 7. EJGSDNG FLOORS SHALL BE CLEANED. SCRAPED, AND LEVELED OR SKIM - COATED FOR PREPARATION FOR NEW FLOORING FINISHES... 8. ALL OPENINGS IN MISTING WALLS. WHERE NO NEW DOOR OR WINDOW FRAME S BEING INSTALLED, SHALL HAVE THE MASONRY AT THE JAMBS GROUTED FULL MID OPENING ENCASED WHH. DRYWALL TO PROVIDE SMOOTH UNIFORM FINISH JAMBS PROVIDE CORNER GUARDS AS SPECIFIED 9. SEE DETAIL J/99- AS5.05 FOR TYPICAL SIDE ELEVATION OF ACCESSIBLE TOILET. KEY NOTES; 0 15..12...x12'02" SINGLE 11ER LOCKERS ON CONCRETE BASE (1 DOUBLE TIER). • 6- .12:x18x72- SINGLE TIER LOOKERS ON CONCRETE BASE. O 22- 12"x12 x74- SINGLE TIER LOCKERS ON CONCRETE BASE (1 DOUBLE TIER). O 10-12 x18Sc72- SINGLE 11ER LOCKERS ON CONCRETE BASE. 0 SOAP DISPENSER. O 48"x42 MIRROR. Q PROVIDE P-LMA LAVATORY COUNTER WITH 4" COVE SPLASH ON BACK AND SIDE WALLS. 0 URINAL SCREEN. O TOILET PARNRON. 10 TOILET PARNTION DOOR. 11 HORIZONTAL AND VERTICAL GRAB BARS. 12 TOILET TISSUE DISPENSER. 13 SEMI RECESSED TOWEL AND WASTE RECEPTACLE. 14 4' -0' WOOD BENCH. 15 36'x42 MIRROR. 16 CLOTHES HOOKS, TYP. 1© PROVIDE CEMENT BOARD BACKING IN ALL SHOWER AREAS AND PROVIDE WATERPROOF ,®PROVIDE A 20 -INCH 61' 42 -INCH ADA LOCKER. ROOM BENCH WITH BACK SUPPORT. AS UANUFACNRED BY ROBINSON STEEL CO, OR EQUAL BENCH AND BACK SUPPORT SHALL BE HARDWOOD AND PEDESTALS SHALL BE STEEL_ 10. PROVIDE ADA ACCESSIBLE LOCKER W THIS LDCA11ON. Tai FOLD UP SHOWER SEAT, (ON OPPOSITE WALL 1111. REMOVE CONCRETE FLOOR AS REQUIRED TO GET FLOOR PITCH TO FLOOR DRAIN CERAMIC TitE awe 4 ad EZus Sows 0 MI IN z Q to 4 0ci, p, JULY 2010 r rs .� a° - Z 1111 11,11 0 S W Z, ` r DATE:APRIL 2010 0 cs z J (i) a 01 a Z 41. 0 CI I. W 2 PI = w = 4 WATER POLLUTION CONTROL PLANT MODIFICATIONS STRAND ABBOCIATEB.I 1C`W ENOINEERB SHEET 282 80 -ASM 1.04 N0.1154 -006 File: S:\ MAD\ 1100 -- 1199 \1154 \008 \Acad \Strand Drowings\80-ASM1.04.dwg lime: Feb 16, 2012 - 9:31am Building Excellence" CHANGE ORDER REQUEST T0: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 JOB 4:103400 MOD #: 0313.00 DATED: 4118(13 FAX: 608- 251 -8655 PHONE: 608 - 251 -4843 DESCRIPTION OF MODIFICATION: Cost associated with Structure 80 lockers, per CPR 110 3/12/13. REQUESTED BY: Strand Associates Inc DATE: 3/12/13 SUBCONTRACTOR AMOUNT Floor Show Furniture &Flooring $488.00 Wall -Tech Inc $11973.00 Subtotal $2,461.00 Miron Management Fee 5.00 % - Subs $123.05 Subtotal $21584.05 Performance Bond 1.50 % $38.76 TOTAL AMOUNT OF THIS MODIFICATION: $21622.81 :a s CHANGE ORDER AMOUNT REQUESTED: $2,623.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost / S�tgeeddule Impact Miron Representative Date 4/18/13 an Daniels Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN allRON CONSTRUCTION CO., INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 34957 -0509 1471 McMahon Drive Neenah. WI 54955 Phone: 92019694E Fax: e01869.7399 www.mironanstruction,com �/� p Iiiii/I/lpnill Owner Carol Dubuque Computed by JCD Project DubugaeWPT Date IB•Mr -13 Project No, 103400 Verified by Title Cost Proposal Request Documentation Date Page 1 of 1 Revision 0 Modlllatlon Quote Number: 31380 DesaiptlDnofMO RD:3bn: CPR-110 Items included in thls proposal: 11001 Item 110.01 Itillleth l,0 fameShersperCPR11D aC912 1 igml $ 1,97360 $ 418,00 0 1.0 Tie Ms perCPR 110 C8002113131. I.0 rb orange wa We: Walltech has mounted a slaved chancre order prior to oroceedino Subtotal: MhoMika@ Pia Bond & Inswanm4P 1.59a: Int • cpm,10.00: $ 2,461.00 $ 123.05 $ 38.16 S 2,622.81 Buffdingf xcefienci CHANGE ORDER REQUEST T0: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 108 0:103440 MOD 4:0323 MI DATED: 4/14113 FAX: 608- 251 -8655 PHONE: 608-251 -4843 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Revised cost associated with Structure 78 existing grating /air valve opening, per RFI 733. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT Breuer Metal Craftsmen, Inc. $754,00 Miron Construction Co., Inc $1,425.28 Subtotal $2,179,26 Miron Management Fee - Miron Work $326.89 Subtotal $2,506.17 Performance Bond 1.50 % $37.59 TOTAL AMOUNT OF THIS MODIFICATION: $2,543.76 CHANGE ORDER AMOUNT REQUESTED: $2,544.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost S �e ule Impact Miron Representative��� P �( J Danie s Date 4/14/13 Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN VON CONSTRUCTION CO., INC. Building Excellence Corporate Office P.O. Box 599 Neenah, WI 54957 -0509 1471 McMahon Drive Neenah, WI 54956 Phone: 920/9697000 Fax; 920/969.7399 www.miron•construction,com 1 11 fif rQry I //� Owner Gti of Dubuque Computed by )CD Project Dubuque *CP Date Pkir•13 ProJed�e CCoostProposalRequestDoamentaton Verified ate Pape 1 of t Revision 0 Modification Quote Number: Description of Modification: Items Included In this ropotal: 32301 RR• 173 32301 Item 323.01 ha 1,0 wall weecomi g cot peed per RFl 7i3 a lromwikes 0 hours) $ 154.00 $ • $ 1,425.28 $ OntrattTm¢f 1.D No Change "' Ncle: None Srbtetal $ Minx; Markup @1SWo $ DA k Insuraeot 01,5°10: $ TOTAL•Mod3t3.01: 159,00 f 1,425.28 113,10 $ 213.79 3759 $ 2,S$3.76 s STRAND ABSCCIATBB" Work Change Directive 20ee, 20ff, 20gg, 20hh Directive No.: 99 Contract: 1.2010 Owner City of Dubuque By: GWT Contractor Miran Construction Co., Inc. Date: 4128113 Description of Work Cost Deduction Cost Addition Provide modifications to plumbing vents as described In attached Cost Proposal Request No, 108 dated January 23, 2013. Drawing 40-ASM3,01(Sheet 104) In Section 4140-ASM3.01, provide aluminum grating per detail H199•AS5,03 and as specified In Section 05531 at the top of the added aeration tank outlet box. Provide surface mounted grating support angles at existing walls and embedded support angles at new walls. Drawing 754ISM1.01(Sheet 203) gip the following to Key Note 7: "Provide a 14" thick neoprene cover to close the opening. Neoprene cover shall be approximately 3-inches wider than opening. Cutout neoprene around the conveyor to provide a tight fit to the conveyor, Secure neoprene cover to west wall of Passageway 7514 with stainless steel plate and fasteners at the lop of the opening." Provide to heater and receptacles at the Liquid Oxygen Storage Tanks $4,308 $1,558 $889 $2,152 power as described in attached Cost Proposal Request No, 117 dated April 18, 2013, Total $8,907 Remarks: This ihlork Change Directive shall resun In no change to project duration and Is not subject to negotiation, Change In Contract Price by: [] Supplemental Unit Price Q Unit Price IR Lump Sum T Requested by: Strand Associates, Miron, Owner Various Date _ 8 by � T/�tAP -In"`� 4!26113 Recommended :. (En near) Date Accepted by: 1144 -13 n do Date ��' Approved by: 40, 1 e li -26.15 Date THIS FORM IS NOT SUBSTITUTE FORA PROPERLY PREPARED AND EXECUTED CHANGE ORDER» Ir> mmao111oo- 11aa111B410201WeakChangeD' mdvea1Dl! ecoveNo9D .SIri6Videlt(40flrabgt76 CovOcOxygen Paraiba Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page I January 23, 2013 No,106 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: T0: COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 January 23, 2013 Miron Construction Co., Inc, Distribution Jonathan Daniels, Gerald David, Dawn Floriano Steve Sampson Brown, Jonathan Brown Glenn Tranowski, Larry Solchenberger Stuart Summer Miron Construction Co., Inc, City of Dubuque Strand Associates, Inc IN/ Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and/or Time incidental to proposed modifications to the Contract Documents described herein, THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Drawing 75 -P1,03 (Sheet 227) In the Conveyor Room 7521 polymer area, remove the existing vent pipe on the west wall. In Basement 7519, remove the existing 8-inch diameter cast iron pipe north of the stairs on the west wall south of the overhead door to the tee and provide cap at the tee. Also at this location, provide two pipe supports to support the 6 -inch PVC pipe located on the wall near the floor and attached to the cast iron pipe. Drawing 75 -P1,07 (Sheet 231) In Centrifuge Room 7513 south of Door 7513A, remove vent from polymer area below up to existing wye. Remove wye and replace with a 90- degree elbow with materials matching existing, Patch floor to match existing tile, Building Excellence' CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 JOB 0103400 MOD 0295 4)0 DATED; 423113 FAX: 608.251 -8655 PHONE: 608- 251 -4843 DESCRIPTION OF MODIFICATION: Cost associated with solids processing building vents, per CPR 106. REQUESTED BY: Strand Associates Inc SUBCONTRACTOR JF Ahern Company Miron Management Fee 5.00 % - Subs Performance Bond 1.50 % TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: DATE: AMOUNT $4,042.00 $202.10 Subtotal $4,244.10 $63.66 $4,307.76 $4,308.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Miron Representativ chedule Impact Owner Representative Date 4/23/13 Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN k IRON CONSTRUCTION CO.. INC. Building .Excellence Corporate Office P,O. Box 509 Neenah, WI 54957 .0509 1471 McMahon Ddve Neenah, W1 54956 Phone: 9201969.7000 Fax: 920/969.7399 www.mironsconslruction.com iarnMiran Owner Ctyof Dubuque computed by 1CD Project Dubuque WPCP Data 23•APr13 Project No, 103900 Verified by Title Cost Proposal Request Documentation Date Page 1 of 1 Revision 0 Modifiklon Quote Number; Description of Hodifxatiom Items Included In this proposal: 29600 CP11d06 10601 item 106.01 gio0 1.0 Fairing vent modtlratiom per CPR 106 Ish! 1 4,042.¢0 $ o:4hact flmgl 1.0 "lo Chage ^• rah: None Subtctal: Kum Markup@ 545 $ Bond &InwrorceQlL5%: $ TOTAL• CPR 106.00 $ 9,042AD KID 6166 $ OVA Building Excellence" CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: JOB 4:103400 MOD 4:0308.00 DATED: $25/13 FAX: 608 -251 -8655 PHONE: 608 - 251 -4843 Cost associated with Structure 40 east outlet addition fall hazard, per RFI 705. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT Breuer Metal Craftsmen, Inc. Miron Construction Co., Inc Miron Management Fee - Miron Work Performance Bond 1.50 % TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: $842.00 $492.40 Subtotal $1,334.40 $200.16 Subtotal $1,534.56 $23.02 $1,557.58 $1,558.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost chedu Impact Miron Representative / Date 4125/13 athan Danis s Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN if'ON CONSTRUCTION CO., INC. Budding Excellence Corporate Office P.O. Box 509 Neenah, WI 54957.0509 1471 McMahon Drive Neenah, WI 54956 Phone: 9201969.7000 Fax: 9201969.7399 www,miron•construction.com ��t ��� %rlldllint/ Owner of Dubuque Computed by 1C1) ,City Prof ed Dubuque WPCP Date 24•Apr•13 Project No, 103400 Verified by VD Cos! Proposal Request Documentation Date Page 1 of 1 Revision 0 Modification quote Number 306-00 DesmllptimsofModification: Rfl-105 Items Included In this proposal: 30841 Item 308.01 Lt2 1.0 Breuersuppff embed and grating per RFl 705 20 0 s00 Embed (t Carpenter 4 Hours) Sidi $ 842 $ - Lek $ 31414 $ 176.16 t • 3.0 instal Greene (1 ironworker 2Homs) Qmlatiosv 1.O NotrOe ' *•Ibfe: None Subtotal: f Mlron Markup OM i lord alnsweece@l,5°k f TOTAL • Mod 308-00: 84200 126,30 23.02 $ 1,55738 8 492.40 $ 73.86 Building Excellence' CHANGE ORDER REQUEST TO: Mr Glenn W. Trarowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 'RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 10B 0:103400 MOD 4:0117.00 DATED; 021113 FAX: 608- 251 -8655 PHONE: 608- 251 -4843 DESCRIPTION OF MODIFICATION: Cost associated with Conveyor 75 -03 wall opening air transfer, per RFI 721. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR Breuer Metal Craftsmen, Inc. Miron Construction Co., Inc Miron Management Fee - Miron Work Performance Bond 1.50 % TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: Subtotal Subtotal AMOUNT $448.00 $313.84 $761.84 114.28 876.12 $13.14 $889.26 $889,00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Miron Representati Owner Representati ) Schedule Impact Date 4/23/13 Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN MIRON CONSTRUCTION CO., INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 54957 -0509 1471 McMahon Drive Neenah, WI 54956 Phone: 9201969.7000 Fax: 920/969-7399 www.miron•conslroclion,com OirnMirann Owner ClryolDubuque Computed by 1CD Project Dubuque WPCP Date 23•Aa•13 Project No. 103400 Verified by Title Cast Proposal Request Documentation Date Page 1a1 Revision 0 Modification Quote Number. 317.00 emiptlon of Modification: 41- 721 Items Included In thls proposal: 317.01 Item 31701 Mbee 1,0 Breuer Provide Cover Plate and Seal &al $ 44690 j • Isbz $ 31314 $ - 2.0lnstai Nor Pa and Seal (1CarpenWr4Hoots) 1.0 No Change O4shle: None Subtotal: Won Markup ($154$ Pond &Imuanced) l,5%: TOTAL • Mod 317 -00: $ 498,00 $ 67,20 $ 13.14 $ 889.26 $ 31394 $ 4798 Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 1 April 16, 2013 No,117 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: T0: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 April l6, 2013 Miron Construction Co., Inc. Jonathan Daniels, Gerald David, Dawn Florian° Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer Miron Construction Co., Inc, City of Dubuque Strand Associates, Inc EN Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price andlor Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Drawing 05 -EIA5 (Sheet 45) ADD a 480 load connection labeled "TRIM HEATER ", circuited to PP- 35.01. The trim heater is located south of the southern most oxygen storage tank near the center of the pad. A D two 120 volt fixed power connections labeled "02 PAD GFI RECEPTT" and "02 PAD CONTROL PANEL ", circuited to LP -35 -01 circuits 26 and 28 respectively. The GFI receptacle is located approximately 4 -feet west of the trim heater location noted above and the control panel is located approximately 4 -feet east of the trim heater. Drawing 3511.01 (Sheet 96) CHANGE, the label for both 20 amp single pole circuit breakers in LP -35 -01 circuits 26 and 28 from "SPARE" and "SPARE" to "02 PAD GFl RECEPT" and "02 PAD CONTROL PANEL" respectively. CLARIFICATION: Conductors for the two 120 volt branch circuits from LP -35.01 and the 480 volt three phase branch circuit from PP -35.01 to equipment at the Liquid Oxygen Storage Tanks pad shall be routed in 3!4 -inch conduit and intercept the two existing 314 -inch conduits routed Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1.2010 Page 2 Apri116, 2013 underground from the storage tank pad and up the exterior south wall of the Excess Flow Drainage Pump Station at the southwest comer of the building. Drawing 99 -E6.23 (Sheet 422) CHANGE the lS amp three pole circuit breaker in PP -35-01 circuits 31139141 to a 25 amp three pole circuit breaker and label, "02 PAD TRIM HEATER ". Building Excellence' CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 Jos N:103400 MOD 0:0333 A0 DATED: 4125113 FAX: 608 - 251 -8655 PHONE: 608 -251 -4843 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Cost associated with adding power to 02 tank heater and receptacles, per CPR 117 dated 4/16/13. REQUESTED BY: Strand Associates Inc DATE: 4/16/13 SUBCONTRACTOR AMOUNT Faith Technologies, Inc. $2,018.86 Miron Management Fee 5.00 % - Subs $100.94 Subtotal $2,119.80 Performance Bond 1,50 11 $31,80 TOTAL AMOUNT OF THIS MODIFICATION: $2,151,60 CHANGE ORDER AMOUNT REQUESTED: $2,152.00 Please find back up materials enclosed regarding this modification, Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Soh ule Impact Miron Representative . Date 4/25/13 J an Daniels Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN '.!IRON CONSTRUCTION CO., INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 54951.0509 1471 McMahon Drive Neenah, Wi 54956 Phone: 92019694000 Fax:93969 -M www.miroconstruction.com �y i illititva I p Owner GtyofDubuque Computed by ICD Project Dubuque WPCP Date 213 Project No, 103400 Verified by Title Cost Proposal Request Documentation Oat° Page 1 of 1 Revision 0 Modification Quote Nu mber: 333-00 Description ofModification: CP8417 Items Included to tins proposal: 11741 Item 117.01 Lab 1.0 & trial modl0meons CPR 117 MU $ 599,10 $ tamr $ 1,41956 S pm SDI 1.0NoChange "' nay: None sots: Won Markup @9% 0oad & Inmmo @ 1.595: TOT0.l•CPR11710: f 59930 t 19.97 $ 31,00 $ 2,151,60 $ 1,41956 $ 7 0.90 STRAND ASSOCIATES' Work Change Directive 2Oii Directive No.: 100 Contract: 1.2010 Owner: Citv of Dubuque By: GWT Contractor: Miron Construction Co., Inc. Date: 4130113 Description of Work Cost Deduction Cast Addition Provide emergency stop for Flammable Liquid Fuel Storage System as described In attached Cost Proposal Request No. 111 dated March 19, 2013. $6,775 Total $6,775 Remarks: This Work Change Directive shall result in no change to project duration and is not subject to negotiation. Change in Contract Price by: I Supplemental Unit Price Q Unit Price ►I Lump Sum Requested by: Strajr d l,, satiates. Miron Various Date J�N'`^tr� Recommended by: _i (Engineer) 4130113 Date Accepted by: (Contractor) Date Approved by: (Owner) Date —THIS FORM IS NOT SUBSTITUTE FOR A PROPERLY PREPARED AND EXECUTED CHANGE ORDER- InglaIs1S1 44011140 - 1108 111541023110d1Work Change arec lvealOUedien No 100,Sbuclure OD Fuel Sla0on EmergencyShutoffdoe No.111 ISSUED BY: CLIENT NAME. PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 March 19, 2013 Miron Construction Co., Inc. Jonathan Daniels, Gerald David, Dawn Florian Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer e STRAND Associms. Miron Consnction Co., Inc. City of Dubuque Strand Associates, Inc In6` Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and/or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANCE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Drawing 90-E1,01 (Sheet 343) DELETE the following from the second and third sentences of Key Note 17 as added to the Contract in Change Order 16s. "through the exterior Estop control station," "Provide a red maintained NEMA 4X FRP E -stop control swim" a_Q Key Note 22 as follows: 22. Provide a NEMA 12 junction box with 20 amp contactors as required to disconnect the hot and neutral conductors for LP -90.01 fuel system equipment circuits 61, 63, 65/67, 69, 71, and 73. The fuel system equipment circuits shall be routed through the contactor junction box to the associated equipment. Provide a red maintained NEMA 4X FRP E- Stop control station on the exterior of the building and 2-#14 in 3/4 -inch conduit from E- stop to contactor junction box. Power to all fuel system equipment shall be deenergized when the E -stop is depressed, and otherwise energized. Contactor junction box control power shall be from LP -90.01 circuit 61 and wired fail -safe to deenergize all circuits if control power is lost or the e-stop wiring is disconnected. Provide a 1/8 -inch thick engraved laminated Micarta safety sign above the E -stop with minimum 3 -inch high characters reading, "FUEL SYSTEM POWER DISCONNECT." Sign shall have a red background with white characters. Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 2 March 19, 2013 Install the exterior E -stop control station one -foot east of door 900213 and the Fuel System Power Contactor Junction box in Shop Room 9004, located on the south wall of Utility Room 9005. Associate new Key Note 22 with both pieces of equipment. CLARIFICATION The NEMA 4X FRP estop control station was included in Change Order 16s, Building Excellence" CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 1085:103400 MOH :03154 DATED: 426/13 FAX: 608- 251 -8655 PHONE: 608 -251 -4843 DESCRIPTION OF MODIFICATION: Cost associated with fuel system E -stop, per CPR 111 dated 3/19/13. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT Faith Technologies, Inc. $6,357.11 Miron Management Fee 5.00 % - Subs $317.86 Subtotal $6,674.97 $100.12 Performance Bond 1.50 t TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: $6,775.09 $6,77500 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost dule Impact Miron Representative Date 4/26/13 • athan Daniels Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN MRON CONSTRUCTION] CO., INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 54957.0509 1471 McMahon Drive Neenah, WI 54956 Phone: 9201969.7000 Fax: 92019691399 www.miron•conslruction.com 111f1M1N0I/ Owner City of Dubuque Computed by XD PrefectDobuqueWPCP Date 26tha Project No, 103400 Verified by Title Cost Proposal Request Dooumentatibn Date Pape 1 of I Revision 0 ModificationQuoteNumber. Description of Modification, Items included in this proposal; 71500 cm.i I 111 -01 Item 111.01 Edl1h LD Fuel System E Stay Medications per CPR 11l Ell 1s4o1 S 1,01549 $ 4,Pll 11 $ - f ;males 1.0 No [lunge '^ Nine: None Subtok0 Miron Marko, S) 5% toad & insurance @IA: TOTAL- COR111.011 $ 01599 F 95+1,12 $ 9020 $ 227.00 $ 100,12 $ 6,115.99 Building Excellence CHANGE ORDER REQUEST T0: Mr Glenn W. Tranowski, P.B. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Cost associated with brick allowance. 201 10B M:ONM MODM;D334.00 DATED: COO FAX: 608- 251 -8655 PHONE: 608 - 251 -4843 REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT Monona Masonry Inc ( $17,060.00) Subtotal ( $17,060.00) Performance Bond ( $255.90) TOTAL AMOUNT OF THIS MODIFICATION: ( $17,315.90) CHANGE ORDER AMOUNT REQUESTED: ( $17,316.00) Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Miron Representative Owner Representative ,r Schedule Impact Date 4/24/13 Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Copy: File / dmf Jobsite uiIRON CONSTRUCTION CO., INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 54957 .0509 1471 McMahon Olive Neenah, WI 54956 Phone: 9201969.7000 Far: 9201969.7399 www.miron•constraction.com irillMirtin Owner OW of Dubuque Computed by 3CD Project Dubuque WPCP Date 13410.13 Project No. 11)3100 Verified by Tice CostProposal Request Documentation Date Page 1 of 1 Revision 0 Modification Quote Number; 33400 Descripbon of Modlficationr arktAliawance items Included In this proposal: 33431 Item 33401 IsIM 1.0 Tofa att Cant for Project 189,558 LOTetalAlbsrance Cost als60gt10W nitel s (113,734,00) $ 96,61400 $ 3.0TotalNaval Cost ats510J1000 ConhastTlmt<s 10 No (lenge no Note: None %Waal: Bond A Insurance pl,5 %: TOTAL• Nod 3340d: $ (17,060.00) j (255.90) $ (17,319.90) Building Excellence' CHANGE ORDER REQUEST T0: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 10DA:103400 MOD # 0169 40 DATED; 4130113 FAX: 608- 251 -8655 PHONE: 608 -251 -4843 DESCRIPTION OF MODIFICATION: Cost associated with blocking for TV and plaques in Admin Lobby. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT Miron Construction Co., Inc Miron Management Fee 15.00 % - Miron Work Performance Bond 1.50 % TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: $525.75 $78.86 Subtotal $604.61 $9.07 $613.68 $614,00 Please find back up materials enclosed regarding this modification. Contractor is {not} to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Sche 1e Impact Miron Representative Date 4/30/13 athan Daniels Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN :PCN CONSTRUCTION CO., INC. Building Excellence Corporate Office P.O. Box 309 Neenah, WI 54957.0509 1471 McMahon Drive Neenah, WI 54956 Phone: 92019697000 Fax: 92019897399 www,miron•constructlon.com IIIgigy�pp. f/FItiQ%I Owner Qty of Dubuque Computed by )CD Project Dubuque WPCP Date 301121 Project No. 103900 Verified by Title Cost Proposal Request Documentation Date Pape Iof1 Revision 0 Rogation Quote Number, 16940 Description ofNodinuatlom BbdlogfaTV and Plaques inAdminlobbY Items Indvded In this proposal: 16401 Item 169.01 lA Illodinp In Denis Wing Mb $ 6465 $ • labot $ 961.1D P CIdilltimal 1.0 No Change mNote: None Subvel: Hon Markup* lS% Pond a Insurance ®1,3%: l TOTAL • Mod 16940: f 69.65 i 9.70 9.07 $ 61348 $ 961.10 $ ED N\ L= 625.25 Ek ■ / 5.0 L 25.00 V'N L=62394/624°3 E624.75- _6237624.32' _ / N NORTH GRAPHIC SCALE 0 20 40 (IN FEET) DRAWING MAY HAVE BEEN REDUCED 2011 11W ARCHITECTURE CIVIL ENGINEERING CONSTRUCTION SERVICES ENVIRONMENTAL ENGINEERING LAND SURVEYING MUNICIPAL ENGINEERING STRUCTURAL ENGINEERING TRANSPORTATION ENGINEERING PREGRRY.EXPERTISE.SOLUTIONS © COPYRIGHT 2011 ALL RIGHTS RESERVED. THESE DOCUMENTS HAVE BEEN PREPARED SPECIFICALLY FOR THIS PROJECT ONLY. NO PART OF THIS DOCUMENT MAY BE REPRODUCED OR DISTRIBUTED IN ANY FORM WITHOUT THE PERMISSION OF IIW, P.C. ALL INFORMATION IN THIS DOCUMENT IS CONSIDERED 1 S a VJ W cn rV z o oo CO w <0Z I ? Z 1 0 a co O—°0 Z U � 0 0 o J 0 o_ > W C O l0 O m N 3 ❑ RI 0 Sheet No EX.C11 Project No: 08146 -03 Building Excellence' CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, A.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 10B 4:103400 MOD it: 0153 MI DATED: 2108113 FAX: 508- 251 -8655 PHONE: 508-251 -4843 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003-7996 DESCRIPTION OF MODIFICATION: Revised cost to change grading & asphalt, per RFI 320, REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT River City Paving $.00 TOTAL AMOUNT OF THIS MODIFICATION: $.00 = == CHANGE ORDER AMOUNT REQUESTED: $.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost c ed ye Impact Miron Representative `�— Date 2/08/13 r� , an Daniels Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Copy: File / dmf Jobsite MIRON CONSTRUCTION CO., INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 54957 -0509 1471 McMahon Dive Neenah, WI 54956 Phone: 9201969.7000 Fax; 9201969.7399 www.mfromconstructfon.com / �/.aq ills itati l p Owner Oty of Dubuque Computed by 3CD Project Dubuque WPCP Date R•Feb•13 Project No. 103400 Verified by rale cost Proposal Request Documentation Date Pego 1 of 1 Revision 0 Modification Quote Number 153•01 Description of Modification: RR -320 Items lnciuded In this proposal: 153.0 Item 153.01 RirErSlttiodOA 1.0 lance grading and asphalt pre RP] 32D responses' Kat $ • $ • tat& $ $ rADdlmZ 1,0 No Change u* Nme: Please see River CiN Pavinds note that slopes as revised will cause ouddlina, and a letter Ieconanizina such is requested prior to installation. subtotal $ Miron Markup to 531 $ Bond Ersurance11S %; $ TOTAL • Mod 159.011 • • • 0 • $ • $ • 6a,� STRAND ASSOCIATES' Work Change Directive 20nn Directive No.: 101 Contract: 1.2010 Owner: City of Dubuque By: GWT Contractor: Minn Construction Co., Inc Date: 5/7113 Description of Work Cost Deduction Cost Addition Drawing 05•E1,02 (Sheet 42) North of west sliding gale, provide intercom station and card reader mounting stand at gate access control station. Mount intercom reader to gate access control station at 83- inches above concrete according to detall J199- E5,02. on upper and card base $4,240 Total $4,240 project duration and is not subject to Remarks: This Work Change Directive shall result In no change to negotiation. Change in Contract Price by: Supplemental Unit Price ip Unit Price Sum r4 Lump Requested by, Strand Associates, Miro Valious Dale Recommended by: !a (Engineer) r,i4. " 517113 Dale Accepted by: S--7"q3 actor Date �/. Approved by, I /alttlf�J (Owner) • °4�'� 5:-/5--i? Date -THIS FORA IS NOT SUBSTITUTE FOR A PROPERLY PREPARED AND EXECUTED CHANGE ORDER- Ieirale15 :10011100 -11NIN 1Q410291wrtl11Vorlt Change CeecaVeslarecDyeNo 101.weel Gale PrOrimIN Reader d Weream.doe BupdingExcellente CHANGE ORDER REQUEST T0: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 JOB 0,103400 MOD 0:0275.00 DATED: 4116111 FAX: 608 - 251 -8655 PHONE: 608 - 251 -4843 DESCRIPTION OF MODIFICATION: Cost to add second card reader to West entrance gate. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR American Fence Co, of Iowa Faith Technologies, Inc. Miron Management Fee 5.00 t - Subs Performance Bond 1.50 t TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: AMOUNT $660.00 3,318.29 Subtotal $3,978.29 $198.91 Subtotal $4,177.20 $62.66 $4,239.86 = $4,240.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Schedulre Impact Miron Representative an Daniels Date 4/16/13 Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN 'IRON CONSTRUCTION CO.. INC. Building Excellence Corporate Office P.O. Box 509 Neenah, WI 54957.0509 1471 McMahon Drive Neenah, WI 54958 Phone: 92019694000 Fax: 9201969.7399 www.mfron•constructlon.com gy�pp. iiiiiJ/!/�oji Owner GtyofDubuque Computed by KO Project Dubuqu6 WPCP Date 1S•Aso Project No. 103400 Verified by Title Cost Proposal Request Documentation Date Page 1 of 1 Revision D Modification Quote Number 27500 Oomingo°ofModification; Add 2rd Card Reader to West EntemoraGate Items Included In this proposal: 275-01 item 27501 f it 1,6 Add indad reader m West er-0eaacegate Amerlan Fele Nadal $ nag $ $ 660.00 $ • $ I. itt 2,579.68 LO Add Ind card reader to Wed only/negate Saolal'0ma6 1,0 No Change "'Note: None skto ; Ikon Markup* 5% Band & Immo 01St TOTAL. Nod 275.0k $ 1,396,61 t $ 69,93 d $ 62 fib $ 4,239.86 2,57968 128,98