Floodwall Pumping Facility Award D~~~E ~<k~ MEMORANDUM August 14, 2006 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Floodwall Pumping Station Improvement Projects Sealed bids were received for the Floodwall Pumping Station Improvement Projects. Public Works Director Don Vogt recommends award of the contract to the low bidder, Kluck Construction, in the amount of $446,420.80, broken down as $223,860.80 for the base bid and $222,560.00 for alternates A, Band C. The total project cost is 18.6% over the engineer's estimate. I concur with the recommendation and respectfully request Mayor and City Council approval. fti ~If!il Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Don Vogt, Public Works Director D~~~E ~c/k.~ MEMORANDUM August 14, 2006 TO: Michael C. Van Milligen, City Manager FROM: Don Vogt, Public Works Director ~ SUBJECT: Floodwall Pumping Station Improvement Projects INTRODUCTION The enclosed resolutions provide for the final adoption of plans and specifications and the award of a construction contract for the Floodwall Pumping Station Improvement Projects. BACKGROUND In the FY05 and FY06 Capital Improvement Projects budgets, a total of $555,766 was budgeted to improve the Hawthorne, Bee Branch and Maus Lake floodwall pumping facilities. These projects were combined and bid proposals were originally solicited last winter. When the bids were opened, the lowest bid was found to be 40% higher than the engineer's estimate. All bids were rejected and the project was subsequently broken into five components (base and alternates A, B, C and D). New bid proposals were then solicited last month. Our bid solicitation noted that bid award would be determined by the lowest base bid, with alternate projects awarded as the total budget allows. The base bid for these combined projects provides for the purchase and installation of generators, transfer switches, generator enclosures and associated conduit and wiring for providing auxiliary power to the floodwall pumps located at the Hawthorne Street and Maus Lake pumping facilities. Alternate bids A, B, C and D provide for numerous improvements to the Bee Branch pumping facility. These improvements would include: Alternate Bid A . Relocate 150 horsepower pump control to interior of existing building . Install two manual transfer switches Alternate Bid B . Construct support wall and install generator pad . Install project site chain link fence Alternate Bid C . Construct concrete sidewalk, handrail and steps Alternate Bid D . Furnish and install a 1,280 KW diesel engine generator with associated conduit, wiring, connections, and switches to provide auxiliary power to the facility's two 500 hp and one 150 hp pumps. DISCUSSION A tabulation of the five sets of bids received accompanies this memorandum, as does a letter from our project engineering firm, IIW Engineers and Surveyors P.C.. IIW has recommended contract award to Kluck Construction, which submitted the lowest base bid. IIW also recommended that the City of Dubuque proceed with project Alternates A, Band C. RECOMMENDATION I recommend that the contract be awarded to Kluck Construction of Dubuque, Iowa for its base bid of $223,860.80, plus project alternates A, Band C for the additional cost of $222,560.00. The total project cost, as recommended, is 18.6% over the engineer's estimate. A Capital Improvement Project budget request for FY08 will be submitted to you in October for monies for Alternate D, in order that, pending City Council approval next March, the noted Bee Branch generator may be purchased and installed in calendar 2007. BUDGET IMPACT A tabulation of the project's initial and subsequent, recommended budgets is as follows: ESTIMATE LOW BID WITH ALTERNATES Construction Contract Contingency Engineering TOTAL CONSTRUCTION $ 440,430.00 48,936.00 66.400.00 $ 555.766.00 $ 446,420.80 42,945.20 66.400.00 $ 555.766.00 This project will be funded with monies ($555,766.00) budgeted specifically for it in the Public Works Department's FY05 and FY06 Capital Improvement Projects budgets. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions providing for the final adoption of plans and specifications and the award of the construction contract in the amount of $446,420.80 to Kluck Construction. ATTACHMENTS ," RESOLUTION NO. 395 -06 RESOLUTION ADOPTING PLANS AND SPECIFICATIONS Whereas, on the 17tJi day of July 2006, plans, specifications, form of contract and estimated cost were filed with the City Clerk of Dubuque. Iowa for the Floodwall Pumping Station Improvement Projects. Whereas, notice of hearing on plans, specifications, form of contract, and estimated cost was published as required by law. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the said plans, specifications, form of contract and estimated cost are hereby approved as the plans, specifications, form of contract and estimated cost for said improvements for said project, Passed, adopted and approved this 21st day of August, 2006. Roy D. Buol, Mayor Attest: Jeanne F. Schneider City Clerk RESOLUTION NO. 396 -06 AWARDING CONTRACT Whereas, sealed proposals have been submitted by contractors for the Floodwall Pumping Station Improvement Projects pursuant to prior resolution and notice to bidders published in a newspaper published in the city of Dubuque, Iowa on the 21st day of July 2006. Whereas, said sealed proposals were opened and read on the 9th day of August 2006 and it has been determined that the base bid of Kluck Construction of Dubuque, Iowa in the amount of $223,860.80 was the lowest bid for providing all labor and materials and performing the work as provided for in the plans and specifications. The contract will also include project altemates A, Band C for the additional cost of $222,560.00. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the contract for the above improvement be awarded to Kluck Construction and the City Manager be and is hereby directed to execute a contract on behalf of the City of Dubuque for the complete performance of the work. BE IT FURTHER RESOLVED: That upon the signing of said contract and the approval of the contractor's bond, the City Treasurer is authorized and instructed to return the bid deposits of the unsuccessful bidders. Passed, approved and adopted this 21st day of August, 2006. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, City Clerk RESOLUTION NO. 397-06 APPROVING CONSTRUCTION CONTRACT WITH KLUCK CONSTRUCTION FOR THE FLOODWALL PUMPING STATION IMPROVEMENT PROJECTS Whereas, the City Council by Resolution No.3 9 6 -06 awarded the construction contract for the Floodwall Pumping Station Improvement Projects to Kluck Construction; and Whereas, Kluck Construction has submitted the attached executed contract and bond. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: 1. The contract and bond attached hereto are hereby approved. 2. The City Manager is hereby authorized and directed to execute the contract on behalf of the City of Dubuque. Passed, approved and adopted this 21st day of August, 2006. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk August II, 2006 John Klostermann City of Dubuque - Public Works 925 Kerper Court Dubuque,IA 52001 Re: City of Dubuque, [owa Hawthorne Street, Bee Branch and Maus Lake Flood Wall Pumping Facilities Generator Installation A ward Recommendation lIW Project No.: 05036-01 Dear John: In accordance with owner instructions, bids for the Hawthorne Street, Bee Branch and Maus Lake Flood Wall Pumping Facilities Generator Installation project were opened and read at 2:00 P.M. on August 9, 2006. Five (5) bids were received for this project. A tabulation of the bids is enclosed. After reviewing the bids, it was determined the low bid was submitted by Kluck Construction, [nc. of Dubuque, Iowa in the amount of $223,860.80 which is the amount, less any Alternate bid items. Kluck Construction, Inc. has the experience, workforce and equipment to properly complete this contract. Therefore, we recommend award of Hawthorne Street, Bee Branch and Maus Lake Flood Wall Pumping Facilities Generator [nstallation project to Kluck Construction, Inc. in the amount of $223,860.80, which is the amount, less any Alternate bid items. The engineer's estimate for this project was $678,156.00 for all work. The low bid of $765,356.80 for all work is $87,200.80 or 12.86% above the engineer's estimate. We also recommend the City proceed with Alternates A, Band C. These three alternates, along with the base bid project, can be completed within the budgeted construction funds. Sincerely, /l7;';;:;ir;tC ~'P.E. PresiJent Ene. Copy: Kluck Construction, Inc p:\05\036\036-01\secretarial docs\contract documents\rebid\award recommendation letter. doc IIW EngIneers & Surveyors, P.C. Dubuque. IA Hazel Green. WI INTEGRITY, EXPERTISE. SOLUTIONS. lJl'ZJ- j)c:nni~ F. \\'.Hlc'h. p~~ "i' ChHl'k.\ ,-\, C:~t(:_ i'I-: (::11"\ D. S.:ii,'H'; ,I'!- 'v1icha,_~i ,-'\. .i,1:1~1~\1. I'l.; .\E F:ol1<ild A. B,dl'l~'r. fiE',".)" 1(11111 .M. Tr,II1I1WI", PI.'i Timothy.1. Tr,\l1d. FE John F \Vandsl1ider. Pi: .Julie P. \kchd. PE J,\l1le~ I). KallJ1<:':. PE [,lIom,ls J. Osln. PLS Wmy A. Chilrh:fS. PLS Ccotfry T BI~',ndin. Pi: Mark C. Juh<..'en. PF. Civil Engineering Structur:ll Enginet'ring ETlvirnnmentJI Engineering Municipal Engineering Tmnsnortatinn Engineering i\rchitectur;]l Engil1eerin!! L.md Surveyim:~ Quulity Crwtrol Testin!! Georcc:hnical EJ1gineerin'c 11."." [)")1ll~\"I'."lJ1i;1 .\-,'10]1',1 ()lI!lucHi(',low,l 5:::'fl()2-:;,f,::; :;(-i1,.~""2-,h...). )(<'1,.5sr'.7~! I t',I\ , \' \\' ". . I ! ".'(~ 11 <::1". c;n :,l of 2 Page CITY OF DUBUQUE, fOWA HAWTHORNE STREET, BEE BRANCH AND MAUS LAKE, FLOOO WALL PUMPING FACILITIES GENERATOR INSTALLATION BID TABULATION 'w.-' 9, 2006 ject No. 05036-01 LOW BIDDER % BELOWI ENGINEER'S ABOVE ESTIMATE ENG. EST. ....u""....~ frie Const TOTAL PRICE Tschi Tricen Const TOTAL PRICE Stumpf Const TOTAL PRICE Portzen Const TOTAL PRICE Kluck Const TOTAL PRICE $330.00 $5.900.00 $22,000.00 $116.500.00 $21,500.00 $1,100.00 $1,700.00 $5,600.00 $174,630.00 $200.00 $4,578.00 $23,921.00 $123,141.00 $15,468.00 $1,000.00 $700.00 $1,540.00 $170,548.00 $201.00 $1,955.00 $9,732.00 $134,192.00 $16,705.00 $91.00 $558.00 $3,129.00 $166,563.00 $5,000.00 $3,330.00 $12,000.00 $112,500.00 $16,500.00 $95.00 $600.00 ,200.00 ,225.00 $200.00 $2,395.40 $12,687.50 $131,237.00 $16,485.00 $90.00 $550.00 $1,218.00 $164,862.90 QUANTITY LS LS LS LS LS LS LS LS 5.26% 19.77% 37.91% 42.65% -28.33% -2.17% -8.33% $190.00 $2,000.00 $9,200.00 $92,000.00 $23,000.00 $92.00 $600.00 $1,200.00 TOTAL $128,282.00 NO. DESCRIPTION IV. ~~,,~LI~~UU.. II.~IUUII.", ~.."" ",.~UII.", ~~~~.~"'J" Company including required Power Pump Building. 2 3 4 5 6 7 8 Remove no longer used electrical apparatus on outside of Complete final grading. Restore rock surface. !! $151 .50% $150.00 $200.00 $70.00 $4,500.00 $66.00 LS 10.00% $60.00 $2,500.00 railroad MAUS PARK PUMP STATION Electrical Permit fees Prepare site for construction including site grading and excavation and including flagman or associated expenses. Construct generator set enclosing structure with generator $6,300.00 $16,500.00 $26,500.00 $9,750.00 $1,100.00 ,700.00 _ ,,300.00 $ ,300.00 $1 $4,006.00 $22,923.00 $36,281.00 $4,971.00 $100.00 $200.00 $4,400.00 $73,081.00 $2,700.00 $9,514.00 $40,332.00 $5,367.00 $91.00 $205.00 $2,484.00 $60,763.00 $4,100.00 $11,300.00 $43,000.00 $10,000.00 $95.00 $200.00 $1,500.00 $74,695.00 $3,552.50 $9,906.40 $38,665.00 $5,297.00 $90.00 $203.00 $1,218.00 $58,997.90 LS LS LS LS LS LS LS 42.10% -5.65% 38.58% -47.55% 0.00% -62.41% -32.33% $10,500.00 $27,900.00 $10,100.00 $90.00 $540.00 $1,800.00 $53,490.00 pad and security gate. Furnish and install the diesel engine generator set. Furnish and install an automatic transfer switch Coordinate power supply connections with the Power Company. Remove no longer used electrical apparatus on outside of Pump Building. Complete final grading. Restore rock surface. 9 10 11 12 13 14 15 16 TOTAL $245,930.00 $243,629.00 $227,326.00 $225,920.00 $223,860.80 TOTALI $181,772.00 HAWTHORNE STREET PUMP STATION AND MAUS PARK PUMP STATION CITY OF DUBUQUE, IOWA Page 2 of 2 HAWTHORNE STREET, BEE BRANCH AND MAUS LAKE, FLOOD WALL PUMPING FACILITIES GENERATOR INSTALLATION BIO TABULATION-CONTINUED August 9, 2006 IIW Project No. 05036-01 ENGINEER'S LDW ESTIMATE BIDDER % BELOWI ABOVE ENG. EST. Kluck Const Partzen Const Stumpf Const Trieon Const Tschiggfrie Const TOTAL TOTAL TOTAL TOTAL TOTAL NO. DESCRIPTION QUANTITY PRICE PRICE PRICE PRICE PRICE Alternate A A1 In5tall150 Hp pump control in existing Control Building. Remove existing control. Install $51,000.00 17.11% LS $59,725.00 $59,000.00 $61,524.00 $59,404.00 $72,95000 A2 Coordinate power supply connections with the Power Company including required Power $92.00 -217% LS $90.00 $95.00 $91.00 $100.00 $1,100.00 A3 Electrical Permit Fee $200.00 103.50% LS $407.00 $3,400.00 $413.00 $450.00 $550.00 A4 Furnish and install two manual transfer switches $88,000.00 -3.09% LS $85,280.00 $88,000.00 $86,419.00 $84,019.00 $90,974.00 Total for Alternate A $139,292.00 $145,502.00 $150,495.00 $148,447.00 $143,973.00 $165,574.00 Alternate B B1 Construct Sheet C1 wall and generator pad with conduit for future wiring of generator set $24,300.00 88.51% LS $45,807.00 $28,000.00 $31,374.00 $78,141.00 $94,140.00 82 Construct project site chain link fencing with gates $3,100.00 -24.94% LS $2,327.00 $2,000.00 $3,684.00 $5,869.00 $2,400.00 83 Excavation Permit Fee $500.00 -100.00% LS NA $800.00 $60.00 $300.00 $550.00 Total for Alternate B $27,900.00 $48,134.00 $30,800.00 $35,118.00 $84,310.00 $97,090.00 Alternate C C1 Construct concrete sidewalk and steps. $7,200.00 49.08% LS $10,734.00 $12,000.00 $11,350.00 $9,625.00 $16,000.00 C2 Furnish, install and paint handrail. $20,200.00 -9.95% LS $18,190.00 $25,355.00 $26,298.00 $25,200.00 $26,400.00 Total for Alternate C $27,400.00 $28,924.00 $37,355.00 $37,648.00 $34,825.00 $42,400.00 Alternate D 01 Furnish and install the diesel engine generator set. $291,500.00 5.51% LS $307,576.00 $307,000.00 $324,373.00 $303,031.00 $298,000.00 02 Complete conduit and wiring installation from capped conduit from transfer switches $10,000.00 6.04% LS $10,604.00 $11,500.00 $10,746.00 $10,448.00 $7,875.00 03 Coordinate power supply connections with the Power Company $92.00 -2.17% LS $90.00 $90.00 $91.00 $100.00 $1,100.00 04 Electrical Permit Fee $200.00 233.00% LS $666.00 $7,450.00 $675.00 $800.00 $550.00 Total for Alternate 0 $301,792.00 $318,936.00 $326,040.00 $335,885.00 $314,379.00 $307,525.00 TOTAL FOR ALL BID ITEMSI $678,156.001 12.86% $765,356.801