Loading...
9th and 11th Sts One-Way to Two-Way Conversion Project AwardMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager Dubuque band AI- America City 11111r 2007 • 2012 • 2013 SUBJECT: 9th Street and 11th Street One -Way to Two -Way Conversion Project (CIP 3602442, 1021041, 3001029, 3001615, 3001631) DATE: August 12, 2013 Sealed bids were received for the 9th Street and 11th Street One -Way to Two -Way Conversion Project. City Engineer Gus Psihoyos recommends award of the contract to the low bidder, Portzen Construction, Inc., in the amount of $797,011.20, which is 6.92% under the engineer's estimate of probable cost. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: August 8, 2013 RE: 9th Street and 11th Street One -way to Two -way Conversion Project (CIP 3602442, 1021041, 3001029, 3001615, 3001631) INTRODUCTION Dubuque britd All-Ametica City 11111 2007 • 2012 • 2013 The enclosed resolution authorizes the award of the construction contract for the 9th Street and 11th Street One -way to Two -way Conversion Project. DISCUSSION This project will involve the conversion of the following streets from one way to two way traffic: • 9th Street between Locust Street and Kerper Boulevard • 10th Street between Bluff Street and Central Avenue • 11th Street between Central Avenue and Kerper Boulevard • Elm Street from 9th Street to 11th Street • Pine Street from 9th Street to 11th Street The construction work will involve the reconfiguration of traffic signals at existing intersections, new pavement markings, new signage, fiber optic vaults and conduit and pedestrian access ramps. The two -way traffic pattern on the aforementioned streets will occur in the summer of 2014 after all work is complete. The railroad crossing on 9th street near Elm Street and on 11th Street near Elm Street will be reconstructed and the crossing signals relocated to allow for two -way traffic. City staff have coordinated with Canadian Pacific Railroad to schedule this work. Canadian Pacific forces will reconstruct the crossings in the spring of 2014. City of Dubuque Engineering coordinated closely with the Iowa Department of Transportation (IDOT) on this project. IDOT staff reviewed the proposed construction documents and concurs with the conversion of the streets to two -way. Prior to the actual converting of the traffic to two -way on the aforementioned streets, the Engineering Department will be utilizing the media and variable message signs to educate the public on the new traffic configuration for these streets. BID RESULTS The City of Dubuque received the following bids for the 9th Street and 11th Street One -way to Two - way Conversion Project. on August 8, 2013: Contractor Bid Results Portzen Construction, Inc. $ 797,011.20 Horsfield Construction, Inc. $ 814,892.95 Tschiggfrie Excavating, Inc. $ 858,095.26 RECOMMENDATION I recommend that the contract for the 9th Street and 11th Street One -way to Two -way Conversion Project be awarded to Portzen Construction, Inc. of Dubuque, Iowa in the amount of $797,011.20 which is 6.92% under the engineer's estimate of probable cost. BUDGET IMPACT The summary of cost for the 9th Street and 11th Street One -way to Two -way Conversion Project is as follows: Estimate Award Construction Contract $856,244.89 $797,011.20 Contingency 113,887.00 113,887.00 Construction Engineering & Inspection 367,998.00 367,998.00 Purchase of Traffic Equipment and Streetlights 281,971.00 281,971.00 Railroad Crossing Modifications (CP Rail) $279,375.02 $279,375.02 Total Project Cost $1,899,475.91 $1.840,242.22 The anticipated available project funding is as follows: CIP No. Fund Description 3602442 1 -way to 2 -way Conversion Project 1021041 Curb /Catch Basin Replacement 3001615 Signal Intersection Reconstruction 3001631 Traffic Signal Fiber Optic Network Total Project Funding 2 Fund Amount $ 1,750,000.00 30,000.00 30,000.00 30, 242.22 $1.840.242.22 REQUESTED ACTION I recommend that the City Council adopt the attached resolution awarding the 9th Street and 11th Street One -way to Two -way Conversion Project to Portzen Construction, Inc. in the amount of $797,011.20. Prepared by Jon Dienst, PE cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Phillip Wagner, Acting Economic Development Director Dave Ness, Civil Engineer II Duane Richter, Engineering Technician 3 RESOLUTION NO. 275 -13 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE 9TH STREET AND 11TH STREET ONE -WAY TO TWO -WAY CONVERSION PROJECT Whereas, sealed proposals have been submitted by contractors for the 9th Street and 11th Street One -way to Two -way Conversion Project (the Project) pursuant to Resolution No. 208 -13; and Whereas, said sealed proposals were opened and read by the City of Dubuque on the 8th day of August, 2013, and it has been determined that Portzen Construction, Inc. of Dubuque, Iowa with a bid in the amount of $797,011.20, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to, Portzen Construction, Inc. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 19th day of August, 201 Attest: /d _yr irnstahl, CMC, °ty Clerk Kevin Roy D. Buol, Mayor LINE NO. Masterpiece on the Mississippi City of Dubuque - Engineering Division Bid Tabulation Project Name: 9TH STREET AND 11TH STREET ONE WAY TO TWO WAY CONVERSION ITEM NUMBER 1 1010 -103 2 2010 - 108 -D -3 3 2010 - 108 -E -0 4 2010 - 108 -1 -0 5 2010 - 108 -1 -0 6 2010 - 108 -1 -0 7 2010 - 108 -1 -0 8 2010 - 108 -J -1 BID ITEM DESCRIPTION Division 1 - General Provisions Mobilization Division 2010 - Earthwork, Subgrade, and Subbase Topsoil, Off -site Excavation, Class 10 Subbase, Special Backfill - Gradation 30 Subbase, Modified Subbase - Gradation 14 Subbase, Granular Subbase - Gradation 12a Subbase, Coarse Aggregate Subbase - 3" Breaker Removal of Structure Division 3010 - Trench Excavation and Backfill 9 3010 - 108 -D -0 Bedding Material, Clean Stone, 1" 10 4020 - 108 -A -1 11 4020 - 108 -A -1 12 4020 - 108 -0 -0 13 4040 - 108 -A -0 14 4040 - 108 -D -0 15 5010 - 108 -A -1 16 5010 - 108 -A -1 17 5010 - 108 -0 -2 18 5020 - 108 -H -0 19 5020 - 108 -0 -0 20 5020 - 108 -A -0 21 6010- 108 -A -0 22 6010- 108 -A -0 Division 4020 - Storm Sewers Storm Sewer Gravity Main, Trenched, 15" RCP Storm Sewer Gravity Main, Trenched,18" RCP Removal of Storm Sewer, Under 36" Dia. Division 4040 - Subdrains and Footing Drain Collectors Subdrain, 4" Perforated CPE Subdrain Outlets and Connections, Core Drill, 4" Division 5010 - Pipe and Fittings Water Main, Trenched, DIP, 6" Water Main, Trenched, DIP, 20" Fittings by Weight, DI Division 5020 - Valves, Fire Hydrants, and Appurtenances Fire Hydrant Adjustment Fire Hydrant Assembly Valve, Gate, DIP, 6" Division 6010 - Structures for Sanitary and Storm Sewers Manhole Type, PC, 48" SW -401 Manhole Type, PC, 60" SW -401 Bid Date 8- Aug -13 PLAN QUANTITY UNIT Engineer's Estimate ESTIMATED UNIT PRICE TOTAL PRICE Portzen Construction, Inc. BID UNIT PRICE TOTAL PRICE Horsfield Construction, Inc. BID UNIT PRICE TOTAL PRICE Tschiggfrie Excavating, Inc. BID UNIT PRICE TOTAL PRICE 1 LS $ 24,000.00 $ 24,000.00 $ 70,000.00 $ 70,000.00 $ 20,000.00 $ 20,000.00 $ 26,915.00 $ 26,915.00 Sub Total $ 24,000.00 Sub Total $ 70,000.00 Sub Total $ 20,000.00 Sub Total $ 26,915.00 108.3 CY $ 15.00 $ 1,624.50 $ 30.00 $ 3,249.00 $ 40.00 $ 4,332.00 $ 26.80 $ 2,902.44 2019 CY $ 12.00 $ 24,228.00 $ 7.50 $ 15,142.50 $ 20.00 $ 40,380.00 $ 14.00 $ 28,266.00 142 TON $ 15.00 $ 2,130.00 $ 15.00 $ 2,130.00 $ 19.50 $ 2,769.00 $ 16.20 $ 2,300.40 605 TON $ 16.00 $ 9,680.00 $ 15.00 $ 9,075.00 $ 19.50 $ 11,797.50 $ 15.85 $ 9,589.25 1526 TON $ 25.00 $ 38,150.00 $ 16.00 $ 24,416.00 $ 20.50 $ 31,283.00 $ 16.85 $ 25,713.10 400 TON $ 25.00 $ 10,000.00 $ 21.00 $ 8,400.00 $ 19.50 $ 7,800.00 $ 17.70 $ 7,080.00 1 EA $ 500.00 $ 500.00 $ 1,200.00 $ 1,200.00 $ 5,000.00 $ 5,000.00 $ 7,015.00 $ 7,015.00 Sub Total $ 86,312.50 Sub Total $ 63,612.50 Sub Total $ 103,361.50 Sub Total $ 82,866.19 156 TON $ 18.00 $ 2,808.00 $ 17.00 $ 2,652.00 $ 25.00 $ 3,900.00 $ 17.85 $ 2,784.60 Sub Total $ 2,808.00 Sub Total $ 2,652.00 Sub Total $ 3,900.00 Sub Total $ 2,784.60 13.7 LF $ 42.00 $ 575.40 $ 85.00 $ 1,164.50 $ 122.00 $ 1,671.40 $ 37.35 $ 511.70 3.7 LF $ 45.00 $ 166.50 $ 100.00 $ 370.00 $ 155.00 $ 573.50 $ 53.75 $ 198.88 3.7 LF $ 3.70 $ 13.69 $ 30.00 $ 111.00 $ 30.00 $ 111.00 $ 22.35 $ 82.70 Sub Total $ 755.59 Sub Total $ 1,645.50 Sub Total $ 2,355.90 Sub Total $ 793.27 752.5 LF $ 10.00 $ 7,525.00 $ 8.00 $ 6,020.00 $ 15.00 $ 11,287.50 $ 7.30 $ 5,493.25 1 EA $ 200.00 $ 200.00 $ 650.00 $ 650.00 $ 500.00 $ 500.00 $ 368.00 $ 368.00 $ $ 7,725.00 Sub Total $ 6,670.00 Sub Total $ 11,787.50 Sub Total $ 5,861.25 46.2 LF $ 32.00 $ 1,478.40 $ 85.00 $ 3,927.00 $ 87.00 $ 4,019.40 $ 110.00 $ 5,082.00 10 LF $ 45.00 $ 450.00 $ 250.00 $ 2,500.00 $ 345.00 $ 3,450.00 $ 312.00 $ 3,120.00 380 LBS $ 5.00 $ 1,900.00 $ 8.00 $ 3,040.00 $ 10.00 $ 3,800.00 $ 13.05 $ 4,959.00 $ $ 3,828.40 Sub Total $ 9,467.00 Sub Total $ 11,269.40 Sub Total $ 13,161.00 1 EA $ 400.00 $ 400.00 $ 1,000.00 $ 1,000.00 $ 7,500.00 $ 7,500.00 $ 766.00 $ 766.00 1 EA $ 2,200.00 $ 2,200.00 $ 3,600.00 $ 3,600.00 $ 5,000.00 $ 5,000.00 $ 2,816.00 $ 2,816.00 2 EA $ 800.00 $ 1,600.00 $ 1,100.00 $ 2,200.00 $ 1,500.00 $ 3,000.00 $ 1,128.00 $ 2,256.00 $ $ 4,200.00 Sub Total $ 6,800.00 Sub Total $ 15,500.00 Sub Total $ 5,838.00 2 EA $ 3,200.00 $ 6,400.00 $ 2,900.00 $ 5,800.00 $ 2,400.00 $ 4,800.00 $ 2,984.00 $ 5,968.00 1 EA $ 3,500.00 $ 3,500.00 $ 3,600.00 $ 3,600.00 $ 3,900.00 $ 3,900.00 $ 3,801.00 $ 3,801.00 LIN E NO. Project Name: 9TH STREET AND 11TH STREET ONE WAY TO TWO WAY CONVERSION ITEM NUMBER 23 6010- 108 -B -0 BID ITEM DESCRIPTION Intake Type, CIP, SW -501 (101 -B) 24 6010- 108 -B -0 Intake Type, CIP, SW -503 (101 -B Special) 25 6010- 108 -3 -0 26 6010- 108 -E -0 27 6010- 108 -H -0 28 6010- 108 -H -0 29 7010- 108 -A -0 30 7010- 108 -A -0 31 7010- 108 -A -0 32 7010- 108 -E -0 33 7030- 108 -A -0 34 7030- 108 -B -0 35 7030- 108 -E -0 36 7030- 108 -E -0 Intake Type, CIP, SW -505 (104 -B) Manhole Adjustment, Minor Rem ove Intake Remove Manhole Division 7010 - Portland Cement Concrete Pavement Pavement, PCC, 10" (Thickness) Pavement, PCC, 10" (Thickness), Integral Color Pavement, PCC, 11" (Thickness) Curb and Gutter, 30" (Width), 8" (Thickness) Division 7030 - Sidewalks, Shared Use Paths, and Driveways Rem oval of Sidewalk Rem oval of Curb Sidewalk, PCC, 4" (Thickness) Sidewalk, PCC, 7" (Thickness) 37 7030- 108 -F -2 Brick Sidewalk with Concrete Base 38 7030- 108 -G -0 Detectable Warning 39 7030- 108 -G -0 Detectable Warning - Installation Only Division 7040 - Pavement Rehabilitation 40 7040 - 108 -A -0 Full Depth Patches HMA 41 7040 - 108 -H -0 Rem oval - Pavement 42 8010- 108 -B -0 43 8010- 108 -B -1 44 8010- 108 -B -1 45 8010- 108 -B -1 46 8010- 108 -B -1 47 8010- 108 -B -1 48 8010- 108 -B -1 49 8010- 108 -B -1 50 8010- 108 -B -1 Division 8010 - Traffic Signals & Lighting Conduit, Trenched, PVC, 1 1/2" Conduit, Trenched, HDPE, 1 112" Conduit, Trenchless, HDPE, 1 112" Conduit, Trenched, PVC, 2" Conduit, Trenched, HDPE, 2" Conduit, Trenchless, HDPE, 2" Conduit, Trenched, PVC, 4" Conduit, Trenched, HDPE, 4" Conduit, Trenchless, HDPE, 4" 51 8010- 108 -B -2 Conduit, Re- route, Trenched, PVC - 2" 52 8010- 108 -B -3 Conduit, Innerduct, HDPE, 4- 1" 53 8010- 108 -A.1 54 8010- 108 -A.2 55 8010- 108 -A.1 56 8010- 108 -F.1 57 8010- 108 -F.2 58 8010- 108 -N.5 59 8010- 108 -G -0 60 8010- 108 -N.1 61 8010-108-N.6 Handhole, PC, Rectangular Handhole, Composite, Small Handhole, PC, Round Fiber Optic Vault, PC Fiber Optic Vault, PC, Over Existing Conduit Rem oval - Street Light Pole Connections to Handholes and Vaults Rem oval - Existing Handhole Rem oval - Traffic Signal, Intersection Bid Date 8- Aug -13 PLAN QUANTITY UNIT Engineer's Estimate ESTIMATED UNIT PRICE 2 EA $ 2,500.00 1 EA $ 3,000.00 1 EA $ 3,000.00 1 EA $ 1,500.00 3 EA $ 500.00 1 EA $ 500.00 Sub Total TOTAL PRICE $ 5,000.00 $ 3,000.00 $ 3,000.00 $ 1,500.00 $ 1,500.00 $ 500.00 Portzen Construction, Inc. BI D UNIT PRICE 2,000.00 2,600.00 3,600.00 300.00 450.00 600.00 $ 24,400.00 Sub Total TOTAL PRICE $ 4,000.00 $ 2,600.00 $ 3,600.00 $ 300.00 $ 1,350.00 $ 600.00 Horsfield Construction, Inc. BI D UNIT PRICE $ 2,200.00 $ 2,500.00 $ 3,900.00 $ 400.00 $ 420.00 $ 500.00 $ 21,850.00 Sub Total TOTAL PRICE $ 4,400.00 $ 2,500.00 $ 3,900.00 $ 400.00 $ 1,260.00 $ 500.00 Tschiggfrie Excavating, Inc. BID UNIT PRICE $ $ $ $ 21,660.00 Sub Total 3,232.00 4,297.00 5,125.00 532.00 486.00 486.00 TOTAL PRICE $ 6,464.00 $ 4,297.00 $ 5,125.00 $ 532.00 $ 1,458.00 $ 486.00 $ 28,131.00 2296 SY $ 50.00 $ 114,800.00 $ 49.00 $ 112,504.00 $ 46.65 $ 107,108.40 $ 47.95 $ 110,093.20 4 SY $ 65.00 $ 266.50 $ 225.00 $ 922.50 $ 560.00 $ 2,296.00 $ 317.00 $ 1,299.70 882 SY $ 60.00 $ 52,896.00 $ 65.00 $ 57,304.00 $ 51.00 $ 44,961.60 $ 58.50 $ 51,573.60 144 LF $ 25.00 $ 3,607.50 $ 32.00 $ 4,617.60 $ 33.00 $ 4,761.90 $ 27.25 $ 3,932.18 Sub Total $ 171,570.00 Sub Total $ 175,348.10 Sub Total $ 159,127.90 Sub Total $ 166,898.68 328.4 SY $ 7.00 $ 2,298.80 $ 9.00 $ 2,955.60 $ 12.00 $ 3,940.80 $ 6.60 $ 2,167.44 45 LF $ 10.00 $ 453.00 $ 6.00 $ 271.80 $ 10.00 $ 453.00 $ 8.10 $ 366.93 61 SY $ 25.00 $ 1,530.00 $ 40.00 $ 2,448.00 $ 45.00 $ 2,754.00 $ 47.00 $ 2,876.40 320 SY $ 40.00 $ 12,812.00 $ 63.00 $ 20,178.90 $ 48.00 $ 15,374.40 $ 51.30 $ 16,431.39 6 SY $ 60.00 $ 378.00 $ 215.00 $ 1,354.50 $ 275.00 $ 1,732.50 $ 327.00 $ 2,060.10 99 SF $ 35.00 $ 3,465.00 $ 32.00 $ 3,168.00 $ 30.00 $ 2,970.00 $ 34.65 $ 3,430.35 44 SF $ 25.00 $ 1,100.00 $ 15.00 $ 660.00 $ 25.00 $ 1,100.00 $ 29.20 $ 1,284.80 Sub Total $ 22,036.80 Sub Total $ 31,036.80 Sub Total $ 28,324.70 Sub Total $ 28,617.41 40.9 SY $ 125.00 $ 5,112.50 $ 34.00 $ 1,390.60 $ 32.00 $ 1,308.80 $ 34.85 $ 1,425.37 3,260 SY $ 2.00 $ 6,520.00 $ 8.00 $ 26,080.00 $ 14.00 $ 45,640.00 $ 7.70 $ 25,102.00 Sub Total $ 11,632.50 Sub Total $ 27,470.60 Sub Total $ 46,948.80 Sub Total $ 26,527.37 520 LF $ 15.00 $ 7,800.00 $ 8.00 $ 4,160.00 $ 8.25 $ 4,290.00 $ 13.80 $ 7,176.00 3,240 LF $ 10.00 $ 32,400.00 $ 5.50 $ 17,820.00 $ 4.65 $ 15,066.00 $ 8.20 $ 26,568.00 2,680 LF $ 15.00 $ 40,200.00 $ 5.90 $ 15,812.00 $ 5.50 $ 14,740.00 $ 8.15 $ 21,842.00 410 LF $ 15.00 $ 6,150.00 $ 8.00 $ 3,280.00 $ 12.00 $ 4,920.00 $ 21.50 $ 8,815.00 245 LF $ 20.00 $ 4,900.00 $ 7.00 $ 1,71 5.00 $ 1 1.75 $ 2,878.75 $ 21.20 $ 5,1 94.00 345 LF $ 13.00 $ 4,485.00 $ 14.50 $ 5,002.50 $ 13.50 $ 4,657.50 $ 13.20 $ 4,554.00 175 LF $ 18.00 $ 3,150.00 $ 11.00 $ 1,925.00 $ 17.50 $ 3,062.50 $ 33.60 $ 5,880.00 85 LF $ 20.00 $ 1,700.00 $ 16.00 $ 1,360.00 $ 19.00 $ 1,615.00 $ 34.85 $ 2,962.25 245 LF $ 25.00 $ 6,125.00 $ 19.00 $ 4,655.00 $ 17.50 $ 4,287.50 $ 25.95 $ 6,357.75 39 LF $ 250.00 $ 9,750.00 $ 20.00 $ 780.00 $ 24.50 $ 955.50 $ 26.30 $ 1,025.70 755 LF $ 30.00 $ 22,650.00 $ 5.00 $ 3,775.00 $ 1.50 $ 1,1 32.50 $ 8.20 $ 6,191.00 1 EA $ 2,200.00 $ 2,200.00 $ 2,300.00 $ 2,300.00 $ 1,500.00 $ 1,500.00 $ 1,179.00 $ 1,179.00 1 EA $ 500.00 $ 500.00 $ 650.00 $ 650.00 $ 550.00 $ 550.00 $ 1,119.00 $ 1,119.00 8 EA $ 1,000.00 $ 8,000.00 $ 1,500.00 $ 12,000.00 $ 1,300.00 $ 10,400.00 $ 1,111.00 $ 8,888.00 2 EA $ 3,250.00 $ 6,500.00 $ 3,700.00 $ 7,400.00 $ 2,850.00 $ 5,700.00 $ 3,677.00 $ 7,354.00 2 EA $ 2,000.00 $ 4,000.00 $ 4,900.00 $ 9,800.00 $ 3,600.00 $ 7,200.00 $ 4,028.00 $ 8,056.00 4 EA $ 500.00 $ 2,000.00 $ 330.00 $ 1,320.00 $ 650.00 $ 2,600.00 $ 524.00 $ 2,096.00 67 EA $ 300.00 $ 20,100.00 $ 110.00 $ 7,370.00 $ 150.00 $ 10,050.00 $ 498.00 $ 33,366.00 1 EA $ 300.00 $ 300.00 $ 550.00 $ 550.00 $ 450.00 $ 450.00 $ 350.00 $ 350.00 1 LS $ 55,000.00 $ 55,000.00 $ 19,000.00 $ 19,000.00 $ 10,500.00 $ 10,500.00 $ 13,344.00 $ 13,344.00 LIN E NO. Project Name: 9TH STREET AND 11TH STREET ONE WAY TO TWO WAY CONVERSION ITEM NUMBER 62 8010- 108 -K -0 BID ITEM DESCRIPTION Traffic Signal Division 8020 - Pavement Marking 63 IDOT 2527.04 -A -1 Painted Pavement Markings 64 IDOT 2527.04 -A -4 Painted Symbols and Legends 65 IDOT 2527.04 -A -8 Pavement Markings Removed 66 IDOT 2527.04 -A -9 Symbols and Legends Removed Division 8030 - Traffic Control 67 IDOT 2528.04 -A Traffic Control 68 IDOT 2528.04 -B Portable Changeable Message Signs Division 8040 - Signing Materials Bid Date 8- Aug -13 PLAN QUANTITY 1 UNIT LS Engineer's Estimate ESTIMATED UNIT PRICE $ 175,000.00 Sub Total TOTAL PRICE $ 175,000.00 Portzen Construction, Inc. BID UNIT PRICE $ 200,000.00 $ 412,910.00 Sub Total TOTAL PRICE $ 200,000.00 Horsfield Construction, Inc. BID UNIT PRICE $ 230,000.00 $ 320,674.50 Sub Total TOTAL PRICE $ 230, 000.00 Tschiggfrie Excavating, Inc. BID UNIT PRICE $ 238,481.00 $ 336,555.25 Sub Total TOTAL PRICE $ 238,481.00 $ 410,798.70 508.78 STA $ 75.00 $ 38,158.50 $ 22.00 $ 11,193.16 $ 20.00 $ 10,175.60 $ 22.00 $ 11,193.16 70 EA $ 100.00 $ 7,000.00 $ 48.00 $ 3,360.00 $ 45.00 $ 3,150.00 $ 49.50 $ 3,465.00 32 STA $ 75.00 $ 2,395.50 $ 66.00 $ 2,108.04 $ 60.00 $ 1,916.40 $ 66.00 $ 2,108.04 36 EA $ 100.00 $ 3,600.00 $ 66.00 $ 2,376.00 $ 60.00 $ 2,160.00 $ 66.00 $ 2,376.00 Sub Total $ 51,154.00 Sub Total $ 19,037.20 Sub Total $ 17,402.00 Sub Total $ 19,142.20 1 LS $ 15,000.00 $ 15,000.00 $ 30,000.00 $ 30,000.00 $ 27,000.00 $ 27,000.00 $ 29,579.00 $ 29,579.00 20 Day $ 75.00 $ 1,500.00 $ 110.00 $ 2,200.00 $ 100.00 $ 2,000.00 $ 110.00 $ 2,200.00 Sub Total $ 16,500.00 Sub Total $ 32,200.00 Sub Total $ 29,000.00 Sub Total $ 31,779.00 69 IDOT 2524.04 -C Sign Post, Wood, Type A or B Signs 28 LF $ 12.00 $ 336.00 $ 13.00 $ 364.00 $ 12.00 $ 336.00 $ 13.20 $ 369.60 70 IDOT 2524.04 -D Sign Post, Steel Breakaway, Type A or B Signs 30 LF $ 15.00 $ 450.00 $ 33.00 $ 990.00 $ 30.00 $ 900.00 $ 33.00 $ 990.00 71 Sign Assembly, Remove and Reinstall 8 EA $ 100.00 $ 800.00 $ 165.00 $ 1,320.00 $ 150.00 $ 1,200.00 $ 165.00 $ 1,320.00 72 Sign Assembly, Remove 10 EA $ 25.00 $ 250.00 $ 55.00 $ 550.00 $ 50.00 $ 500.00 $ 55.00 $ 550.00 73 IDOT 2524.04 -A Type A signs 66.5 SF $ 25.00 $ 1,662.50 $ 26.00 $ 1,729.00 $ 24.00 $ 1,596.00 $ 26.40 $ 1,755.60 74 Sign Face, Remove 6 EA $ 75.00 $ 450.00 $ 44.00 $ 264.00 $ 40.00 $ 240.00 $ 44.00 $ 264.00 75 Sign Face, Remove and Reinstall 2 EA $ 125.00 $ 250.00 $ 110.00 $ 220.00 $ 100.00 $ 200.00 $ 110.00 $ 220.00 Sub Total $ 4,198.50 Sub Total $ 5,437.00 Sub Total $ 4,972.00 Sub Total $ 5,469.20 Division 9010 - Seeding 76 9010 - 108 -B -0 Hydraulic - Seeding, Fertilizing, and Mulching, Type 1 Division 9040 - Erosion and Sediment Control 77 9040- 108 -D -1 Filter Socks, 8" 78 9040- 108 -D -2 Filter Socks, Removal 0.4 AC $ 28,314.00 $ 11,325.60 $ 5,000.00 $ 2,000.00 $ 4,600.00 $ 1,840.00 $ 5,060.00 $ 2,024.00 Sub Total $ 11,325.60 Sub Total $ 2,000.00 Sub Total $ 1,840.00 Sub Total $ 2,024.00 74 LF $ 10.00 $ 740.00 $ 10.00 $ 740.00 $ 10.00 $ 740.00 $ 5.50 $ 407.00 74 LF $ 2.00 $ 148.00 $ 5.00 $ 370.00 $ 2.00 $ 148.00 $ 1.10 $ 81.40 Sub Total $ 888.00 Sub Total $ 1,110.00 Sub Total $ 888.00 Sub Total $ 488.40 % Over / Under ( -) Total Est. $ 856,244.89 Total Bid $ 797,011.20 -6.92% Total Bid $ 814,892.95 -4.83% Total Bid $ 858,095.26 0.22%