Introduction
On July 17, 2006, the City Council approved the issuance of a contract with Great
Lakes Archeological Research Center (GLARC) to perform the Dubuque Shot Tower
Archeological Investigation.
Discussion
City staff and GLARC have agreed that the project schedule should be extended
approximately one month allow the project architect adequate time to assess the Shot
Tower foundation and the depth of soil that can be removed safely from the interior,
based on the geomorphological survey work conducted earlier in August by the
geomorphology sub-consultant to GLARC.
The delay will also to allow our Shot Tower educational partners, Central Alternative
High School and Loras College's Archeological and Cultural Heritage Program, an
opportunity to participate because school will have been in session longer, enabling
instructors to organize field trips for the students.
In addition, the Iowa Department of Natural Resources has offered to perform a Phase
2 environmental survey at no cost to the City during the archeological investigation to
determine the presence of any heavy metals from the production of lead shot. The
IDNR was not been able to come to Dubuque for this survey until September.
The amended project schedule will not change the remainder of the contract or the
agreed upon compensation for the work performed by GLARC. It also will not affect the
rehabilitation work that is planned for the Shot Tower.
Recommendation
I recommend that you sign and date both copies of the enclosed contract amendment
with GLARC, and then return them to the Planning Office to transmit a copy to GLARC.
Enclosures
Aft../'
G~CAT LAf<'CS A~C! lACOLOGICAL r\[S[A~U I C[~H[~
I -I <' i :, ( 'I I] /, ~ 1 - I), - : I I' I
Mr. David Johnson, Assistant Planner
Planning Services Department
City of Dubuque
50 West 13th Street
Dubuque, Iowa 52001
August 31, 2006
RE: Archaeological Investigations Dubuque Shot Tower Project
Dear Mr. Johnson;
As per your email dated August 30, 2006, we are modifYing the schedule for the above referenced project, listed
under "5.0 Project Schedule" in the Scope of Work. The scheduled under "5.0 Project Schedule" is revised as
follows:
Task
Notice to Proceed:
Archival and Background Research
Archaeological Field Studies
Geomorphological Field Studies
Laboratory Analysis
Draft Report Submittal
Final Report Submittal
Curation
Days from Notice to Proceed
o days (July 17, 2006)
28 days (August 14)
70 to 77 days (September 25 to October 2)
70 to 77 days (September 25 to October 2)
81to 88 days (October 6 to 13)
93 days (October 18)
Within 30 days upon receipt of comments
Within six months upon acceptance of final report
Consultation
As needed throughout the project, to be concluded
within three months following acceptance ofthe
final report
Sincerely,
Jennifer Harvey, President
Concur:
(lL1~;Jl
Name, Title /
( ~I/~(v
/
r1loc
Da
,
Alp'/
GREAT LAf<ES ARCHAEOLOGICAL RESEARCI j CENTER
f- ;::. - '-, - -', (- - , 1 ~ _ ., ;_1;- = - '. ~ - r-j -..:' -
Mr. David Johnson, Assistant Planner
Planning Services Department
City of Dubuque
50 West 13th Street
Dubuque, Iowa 52001
August 31, 2006
RE: Archaeological Investigations Dubuque Shot Tower Project
Dear Mr. Johnson;
As per your email dated August 30, 2006, we are modifYing the scbedule for the above referenced project, listed
under "5.0 Project Schedule" in the Scope of Work. The scheduled under "5.0 Project Schedule" is revised as
follows:
Task
Notice to Proceed:
Archival and Background Research
Archaeological Field Studies
Geomorphological Field Studies
Laboratory Analysis
Draft Report Submittal
Final Report Submittal
Curation
Days from Notice to Proceed
o days (July 17, 2006)
28 days (August 14)
70 to 77 days (September 25 to October 2)
70 to 77 days (September 25 to October 2)
8Ito 88 days (October 6 to 13)
93 days (October 18)
Within 30 days upon receipt of comments
Within six months upon acceptance of final report
Consultation
As needed throughout the project, to be concluded
within three months following acceptance of the
fmal report
Sincerely,
Jennifer Harvey, President
CODcur:
(21J ~.kfL
{
{c ~ .~q~
f// /d{'
,
Date
Name. Title
":~~::""~l::-t.'/t;",'~;;'=-~i :.'_\"~,_':~==-t."\- .,.--,'.::=~~--'t"':1~\"':S!L.-I::I- "':'~~~12f~:;'\