Contracts A.Y.McDonald & Fire Hdqtrs DU~~E ~Yk-~ MEMORANDUM October 9, 2006 TO: Michael C. Van Milligen, City Manager FROM: Gil D. Spence, Leisure SeNices Manager r SUBJECT: A.Y. McDonald Park, Change Order Attached are three copies of a change order for the A.Y. McDonald Park Construction .. Project. This is a "non-participating" change order, meaning it is not a part of the project covered by the lOOT Trails Grant we received. This change order adds $17,793.96 to the contract and includes a number of small items listed on the change order. Please sign all three copies and return them to me. Thanks! GDS:et attachments Form 830240wd 7/00 t;,~ Iowa Department of Transportation - Change Order Non-Substantial: Non- Part Part o IZI o 0 No. 1 Non-participating Substantial: Concurrence Date Contract Accounting 10 No.: 24571 County Dubuque Project No: NRT-NT06(9)--9G-31 Kind of Work: HMA trail and Landscaping Date Prepared: October 3, 2006 Contractor: Portzen Construction, Inc. of Dubuque, IA (P0085), Contractor You are hereby authorized to make the following changes to the contract documents. A - Descrtption of change to be made or extra work to be done: 8005 - Add sand material for fill underneath concrete slab in front of restroom, including hauling and compaction. 8006 - Add an item for raising the height of an existing fire hydrant. 8007 - Add a pay item for concrete that was delivered to the site but not installed. 8008 - Add a pay item for concrete that was used for mudsills. 8009 - Add an item for removing rock in a planting area and replacing it with topsoil. 8010 - Add an item for installation of erosion stone B - Reason for change or extra work: 8005 - Overexcavation of topsoil required in front of the restroom facility. Sand used to fill up to required depth instead of base stone. 8006 - Grade raised by Phase I work, and fire hydrant was not adjusted. 8007 - Contractor would like to be reimbursed for the matertla cost of concrete that was not installed, but required due to the restrtctions on minimim load sizes 8008 - Contractor would like to be reimbursed for concrete mudsills placed as structure footings. 8009 - Rock was iocated in a planting area on the project. Additional excavation and topsoil were required in order to plant the area. 8010- Erosion stone instead of mulch adjacent to Boat ramp (Continued on~U \ ~ Approved ~ <; <\ (Signature) Durrant Grouo Project Architect l~a~1 (J(p Receipt is acknowledged of this change or extra work and terms of settiement are hereby agreed to. By ) City of Dubuque J 6 - Lf-o t" Date !()! 9/rlC ~ DISTRIBUTION: Project Engineer- Forward original to Distrtct. District - Nonsu_l- Forward orginal and one c:opyto tre Ofti::e of Conslruclion and two oopies back to tre Project Engineer. ~ Substantial - Forward original and two copies to the Office of Construction. AccDunting ID ND. ~14 I 5 i 7 11 I I 1 234 5 6 C-1 -Settlement for cost of work tD be made as follows: 8005 - 8010 Agreed unit price Change Order No. 1 - nDn participatinQ C-2 - JustificatiDn for cost(s) 8005 cost for hauling material; 8006 cost is in line with cost of materials and labor; 8007 Material cost; 8008- same cost as bid cost of fDoting; 8009-8010 time and material cost If Credit D - ITEMS INCLUDED IN CONTRACT Add .CR" Change Line Item Number Unit Price Quantity Amount No. .xxx .XXX .XX -,- 7 7 7 7 7 7 7 TOTAL IfCredtt, E - ITEMS NOT INCLUDED IN CONTRACT Add "CR" Change Item Description Item Number Function Unit Price Quantity Amount No. Code .XXX .XXX .XX 8005 HAULlNlj," PLACING &GOMPACTING ON- SITE FILL SAND CY 9.000 65.090 585.81 8006 FIRE HYDRANT EXTENSION (MATERIAL & LABOR) LS 666.000 1 666.00 8007 CONCRETE DELIVERED BUT NOT INSTALLED CY 125.000 34.27 4283.75 8008 I CO-NCRETE nJR MUDSILL CY 450.000 19.25 8662.50 8009 CORE OUT & TOPSOIL (MATERIALS & LABOR) LS 2170.000 1 2170.00 8010 E~ON STONE SY 7.350 194.000 1425.90 8 TOTAL $17 793.96 Form 830240wd 7/00 ~~ Iowa Department of TransportatIon - Change Order Non-Substantial: Non- Part Part o [ZI o 0 Concurrence Uate No. 1 Non-participating Substantial: Contract Accounting ID No.: 24571 County Dubuque Project No: NRT-NT06(9)--9G-31 Kind of Work: HMA trail and Landscaping Date Prepared: October 3, 2006 Contractor: Portzen Construction, Inc. of Dubuque, IA (P0085), Contractor You are hereby authorized to make the following changes to the contract documents. A - Description of change to be made or extra work to be done: 8005 - Add sand material for fill underneath concrete slab in front of restroom, including hauling and compaction. 8006 - Add an item for raising the height of an existing fire hydrant. 8007 - Add a pay item for concrete that was delivered to the site but not installed. 8008 - Add a pay item for concrete that was used for mudsills. 8009 - Add an item for removing rock in a planting area and replacing it with topsoil. 8010 - Add an item for installation of erosion stone B - Reason for change or extra work: 8005 - Overexcavation of topsoil required in front of the restroom facility. Sand used to fill up to required depth instead of base stone. 8006 - Grade raised by Phase I work, and fire hydrant was not adjusted. 8007 - Contractor would like to be reimbursed for the materila cost of concrele that was not inslalled, but required due to the reslrictions on minimim load sizes 8008 - Conlractor would like 10 be reimbursed for concrete mudsills placed as slructure footings. 8009 - Rock was localed in a planting area on Ihe project. Addilional excavalion and topsoil were required in order 10 plant Ihe area. 8010 - Erosion stone inslead of muich adjacent 10 Boat ramp (Continued on r~mr d~ Approved ~ C--t (Signalure) Durrant Grouo Project Archilect 1014) (k Dale Receipt is acknowledged of Ihis change or extra work and lenms of settlement are hereby agreed 10. Portzen Construction, Inc. By )}dAlltlhr APProved;1/~ ity of Dubuque )D-Lf-b(/ Date (~/ 1(<<- Date DISTRIBUTION: Project Engineer - Forward original to District. District - Nonsubslantial- Forward orignal and one copy to !he Office ofConslruclion and two CXlpies bad< to !he Project Engineer. . Substantial - Forward original and two copies to the Office of Construction. Accounling 10 No. ~ 1 234 5 6 C-1 -Settlement for cost of work to be made as follows: 8005 - 8010 Agreed unit price Change Order No. 1 - non participatinR C-2 - Justification for cost(s) 8005 cost for hauling material; 8006 cost is in line with cost of materials and labor; 8007 Material cost; 8008- same cost as bid cost of footing; 8009-8010 time and material cost If Credit D - ITEMS INCLUDED IN CONTRACT Add 'CR" Change Line Item Number Unit Price Quantity Amount No. .xxx .xxx .xx 7 7 7 7 7 7 7 TOTAL IfCredU, E - ITEMS NOT INCLUDED IN CONTRACT Add 'CR" Change Item Description Item Number Function Unit Price Quantity Amount No. Code .xxx .xxx .xx 8005 HAULING, PLACING & COMPACTING ON- SITE FILL SAND CY 9.000 65.090 585.81 8006 FIRE HYDRANT EXTENSION (MATERIAL & LABOR) LS 666.000 1 666.00 8007 CONCRETE DELIVERED BUT NOT INSTALLED CY 125.000 34.27 4283.75 8008 CUNCRETE FOR MUDS ILL CY 450.000 19.25 8662.50 8009 COREuUT & TOPSOIL (MATERIALS & LABOR) . LS 2170.000 1 2170.00 8010 ERO:;ION :;TONE SY 7.350 194.000 1425.90 8 TOTAL $17 793.96 Form 830240wd 7/00 ~~ Iowa Department of Transportation - Change Order Non-Substantial: Non- Part Part o [8J o 0 No. 1 Non-participating Substantial: Concurrence Date Contract Accounting 10 No.: 24571 County Dubuque Kind of Work: HMA trail and Landscaping Project No: NRT-NT06(9)--9G-31 Date Prepared: October 3, 2006 Contractor: Portzen Construction, Inc. of Dubuque, IA (P0085), Contractor You are hereby authorized to make the following changes to the contract documents. A - Description of change to be made or extra work to be done: 8005 - Add sand matenal for fill underneath concrete siab in front of restroom, including hauling and compaction. 8006 - Add an item for raising the height of an existing fire hydrant. 8007 - Add a pay item for concrete that was delivered to the site but not installed. 8008 - Add a pay item for concrete that was used for mudsills. 8009 - Add an item for removing rock in a planting area and replacing it with topsoil. 8010 - Add an item for installation of erosion stone B - Reason for change or extra work: 8005 - Overexcavation of topsoil required in front of the restroom facility. Sand used to fill up to required depth instead of base stone. 8006 - Grade raised by Phase I work, and fire hydrant was not adjusted. 8007 - Contractor would like to be reimbursed for the matenla cost of concrete that was not installed, but required due to the restrictions on minimim load sizes 8008 - Contractor would like to be reimbursed for concrete mudsills placed as structure footings. 8009 - Rock was located in a planting area on the project. Additional excavation and topsoil were required in order to plant the area. 8010 - Erosion stone instead of mulch adjacent to Boat ramp (Continued on re~e) l)\~ Approved ~ q (Signature) . Durrant Grouo Project Architect ~ Receipt is acknowledged of this change or extra work and terms of settlement are hereby agreed to. By /6 - 4-C0 Date ~~I ~M/ ~ Approved DISTRIBUTION: Project Engineer - Forward original to District. District - Nonsubslanlial- FOIWBrd ..gina and one copy to the 0IIice of ConstrucIion and two copies bad< to the Project Engineer. ~ Substantial - Forward original and two copies to the Office of Construction. Accounting 10 No. ~ 1 234 5 6 C-1 -Settlement for cost of work to be made as follows: BOOS - B01 0 Agreed unit price Change Order No. 1 - non participating C-2 - Justification for cost(s) BOOS cost for hauling material; B006 cost is in line with cost of materials and labor; 8007 Material cost; BOOB- same cost as bid cost of footing; 8009-8010 time and material cost If Credit D - ITEMS INCLUDED IN CONTRACT Add 'CR" Change Line Item Number Unit Price Quantity Amount No. .XXX .XXX .XX 7 7 7 7 7 7 7 TOTAL ItCredit, E - ITEMS NOT INCLUDED IN CONTRACT Add 'CR" Change Item Description Item Number Function Unit Price Quantity Amount No. Code .XXX .XXX .XX 8005 HAULING, PLACING & c;OMPAc;TING ON- SITE FILL SAND . CY 9. 000 65.090 585.81 8006 FIRE HYDRANT EXTENSION (MATERIAL & LABOR) LS 666.000 1 666.00 8007 CONCRETE DELIVERED BUT NOT INSTALLED CY 125.000 34.27 4283.75 8008 CONCRETE FOR MUDS ILL CY 450.000 19.25 8662.50 8009 CO.RE OUT & TOPSOIL (MATERIALS & . LABOR) LS 2170.000 1 2170.00 8010 EROSION STONE SY 7.350 194.000 1425.90 8 TOTAL $17793.96 D~~~E ~c/N.-~ MEMORANDUM October 10, 2006 FROM: Michael C. Van Milligen, City ManaTiY) Gus Psihoyos, City Engineer JJ0 Fire Headquarters - Sidewalk Replacement TO: SUBJECT: Enclosed is the improvement contract between the City of Dubuque and Skyline Construction for the replacement of sidewalk at the Fire Headquarters on 9th Street. I have reviewed the documentation and found it to be in order. Ken TeKippe has approved the Certificate of Liability Insurance to ensure its compliance with the City's insurance requirements. I would request that you execute the contract and return it to my office. ~c: Steven Sampson Brown, Project Manager ~~(ncs D~~~E ~c/4.-~ MEMORANDUM September 25, 2006 TO: Steve Sampson Brown, Civil Engineer FROM: Kelly Ambrosy, Engineering Assistant K~ SUBJECT: Short Contract with Skyline Construction Attached please find executed sidewalk replacement at Fire Headquarters. The sales tax form is also attached. Ken TeKippe, Finance Director, is in the process of working with Skyline's insurance agent for the remaining insurance forms. Please please me know if there are any problems on this contract. Thanks. D~~~E ~ck~ City of Dubuque Engineering 50. W. 13'h Street Dubuque, IA 52001 (563) 589-4270 (563) 589-4205 FAX CITY OF DUBUQUE, IOWA SHORT FORM IMPROVEMENT CONTRACT THIS IMPROVEMENT CONTRACT (the Contract), made in triplicate, dated for reference purposes between the City of Dubuque, Iowa, by its City Manager, through authority conferred upon the City Manager by its City Council (City) and Skyline Construction of the City of Dubuque, Iowa. For and in consideration of the mutual covenants herein contained, the parties hereto agree as follows: CONTRACTOR AGREES: 1. To furnish all material and equipment and to perform all labor necessary for (the Project): Fire Headquarters Sidewalk Replacement - approximately 1,593 square feet at 6" depth The work described above shall be completed at the following location(s): Fire Headquarters - 9th Street The Project shall be constructed to the existing grades and to any revised grades as described in this Project contract; in strict accordance with the requirements of the laws of the State of Iowa and ordinances of the City of Dubuque relating to public works, and in accordance with the Contract Documents which provisions and documents are each and all hereby referred to and made a part of this Contract just as much as if the detailed statements thereof were repeated herein. Page 1 of 4 2. Contract Documents shall mean and include the following: All ordinances and resolutions heretofore adopted by the City Council having to do with the Project; the Contractor's Proposal; and the conditions described in the Contract, including any Special Conditions, Plans and Specifications and General Requirements as adopted by the City Council for the Project. 3. All materials used by the Contractor in the Project shall be the best of their several kinds and shall be put in place to the satisfaction of the City Manager. 4. The Contractor shall remove any materials rejected by the City Manager as defective or improper, or any of said work condemned as unsuitable or defective, and the same shall be replaced or done anew to the satisfaction of the City Manager at the cost and expense of the Contractor. 5. Five percent (5%) of the Contract price may be retained by the City for a period of thirty (30) days after final completion and acceptance of the Project by the City Manager to pay any claim that may be filed within said time for labor and materials done and furnished in connection with the performance of this Contract and for a longer period if such claims are not adjusted within that time, as provided in Iowa Code Chapter 573. The City shall also retain additional sums to protect itself against any claim that has been filed against it for damages to persons or property arising through the prosecution of the work and such sums shall be held by the City until such claims have been settled, adjudicated or otherwise disposed of. 6. The Contractor has read and understands the City of Dubuque Standard Specifications including General Requirements and has examined and understands the project description described in Section 1 and any attached Special Conditions herein referred to and agrees not to plead misunderstanding or deception because of estimates of quantity, character, location or other conditions surrounding the same. 7. The Contractor shall guarantee for a period two years and make good any other defect in any part of the Project due to improper construction or material performance notwithstanding the fact that said Project may have been accepted and fully paid for by the City. The guarantee shall commence on the date that the City pays full compensation for the complete performance of this contract. 8. The Contractor shall fullv complete the Project under this Contract on or before October 31, 2006. 9. To the fullest extent permitted by law, the Contractor shall indemnify and hold harmless the City from and against all claims, damages, losses and expenses, including but not limited to attorneys' fees, arising out of or resulting from performance of the Contract, provided that such claim, damages, loss or expense is attributable to bodily injury, sickness, disease or death, or injury to or destruction of property (other than the Project itself) including loss of use resulting there from, but only to the extent caused in whole or in part by negligent acts or omissions of the Contractor, the Contractor's subcontractor, or anyone directly or indirectly employed by the Contractor or the Contractor's subcontractor or anyone for whose acts the Contractor or the Contractor's subcontractor may be liable, regardless of whether or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder. Page 2 of 4 10. Unless otherwise provided in the Contract Documents, the Contractor shall provide evidence of insurance which meets the requirements of the City's Insurance Schedule for General Contractors or Artisan Contractors. THE CITY AGREES: Upon the completion of the Contract, and the acceptance of the Project by the City Council, the City agrees to pay the Contractor as full compensation for the complete performance of this Contract, the amount determined for the total number of units completed at the unit prices stated in the Contractor's Proposal and less any liquidated damages provided for in the Contract Documents. The number of units stated in the contract, special conditions and contractors proposal is approximate only and the final payment shall be made by the work covered by the Contract. CONTRACT ESTIMATED AMOUNT $ 11,150.00 THE MAXIMUM CONTRACT AMOUNT SHALL BE LIMITED TO AN INCREASE OF 5% OF THE ABOVE LISTED ESTIMATED AMOUNT. By: PRINCIPAL: Id/Jj/(J/,. Date ( By: '5/{ y I : --<'~ G..... ') -k-vc--\-.. '"'"' Contractor I1J) ~ af- Signatuf . fY}~\( t, '11..- J~"<-, 'Printed Name 9/'-P-/(J{, Date {J,-<<-":>:J......~\- Title ACKNOWLEDGEMENT OF ATTACHED SPECIAL CONDITIONS: By: J(j (f) Signature Date Printed Name Title Page 3 of 4 PROJECT INFORMATION REQUIREMENTS FOR STATE OF IOWA SALES TAX EXEMPTION CERTIFICATES FOR CONTRACTORS & SUBCONTRACTORS Submitting Department: _ _Engineering Department Please complete this form in its entirety and submit along with the executed Construction Contracts, Bonds and Certificate of Insurance. Upon receipt, the City Finance Department will work with the Iowa Department of Revenue to issue Sales Tax Exemption Certificates to the approved contractor(s) to allow for the purchase or inventory withdrawal of materials for the specified Construction Project free from State of Iowa Sales Tax. Construction Project Name: Fire Headquarters Sidewalk Replacement Project Description: Sidewalk repairs at Fire Headquarters Start Date (Bid let date): ~ 9-22-06 I Completion Date: 110-31-06 I. General Prime Contractor: Contact Name: Complete Address: (Include PO Box and Street Information) City, State, Zip Code Telephone Number: Federal 1.0. Number: (or Include Social Security Number) Work Type to be Completed: Skyline Storage & Trucking, Inc. Mark Arthoeffer 13582 Skyline Road Zwingle, IA 52079 (563) 599-2375 42-1512376 Replace concrete sidewalks 2. Subcontractor: Complete Address: (Include PO Box and Street Infonnation) City, State, Zip Code Telephone Number: Federal 1.0. Number: (or Include Social Security Number) Work Type to be Completed: Aur 18 06 02:40p Loveless Tri State Ins 5635849237 p.2 ACORD,. CERTIFICATE OF LIABILITY INSURANCE I DATE (MMIOOIYY) PRODUCER 2 06 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE DOES NOT AMEND. EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. I Tri-State Insurance. Group, LLC 3400 Asbury Road, Suite 10 Dubuque, Iowa 52002 ~8~ INSURED Skyline storage & Trucki.ng Inc. INSURERS AFFORDING COVERAGE 13626 Skyline Road Zwingle, Ia 52079 INSURER A Ac1.l i ty In.s....u.r.ance Co-.mp.-any: INSURER B: INSURER c: INSURER 0: INSURER E- COVERAGES THE POL1CIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO wHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. I~f~ TYPE OF INSURANCE POUCY NUMBER ~~~~YM'ij%~mVE P8k+iY MJ~ON LIMITS GENERAL LlABIUTY ~. COMMERCIAL GENERAL LIABILITY CLAIMS MADE W OCCUR A F70705 ~'lAGGREGATE LIMiT APPLIES PER: I POLlCY ~~t'T LOC AUTOMOBILE LIABILITY Q ANY AUTO H ALL OWNED AUTOS S SCHEDULEO AUTOS A HIRED AuTOS F7 0 7 0 5 NON-OWNED AUTOS F70705 EACH OCCURRENCE . 1.000 000_ FIRE DAMAGE (Anyone fire) --iliLQ MEO EX? (Anyone person) <=:.:l. 1,lded_ 102-02-06 02-02-07 PERSONAL s. ADV INJURY . QQ9_ GENERAl AGGREGATE S ,jLQ 0 000. pRODUCTS - COMP/OP AGG , 00.000 COMBINED SINGLE LIMIT '1,000,000 (Eaacc:ident) BOOIL Y INJURY $ (Per parson) 02-0.2-06 02-02-07 BODlL Y INJURY , (Peraceidant) PROPERTY DAMAGE $ (Peraccidenl) AUTO ONLY - EA ACC1DENT $ OTHER THAN EAACC , AUTO ONLY: AGG S EACH OCCURRENCE , 000.000 AGGREGATE !4-QOJL 02-02-06 02-02-07 GARAGE UABILlTY ANY AUTO EXCESS LIABIUTY OCCUR 0 CLAIMS MACE A DEDUCTIBLE RETENTION S WORKERS COMPENSATION AND EMPLOYERS' UAmUTY F70705 A .OntER F70705 A In:l.and MaJ:ine 02-02-06 02-02-07 10,000 02-02-06 02-02-07 Cargo Coverage DESCRIPTION OF OPERATlONSlLOCATIONSNEHICLESJEXCLUSJONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS city of Dubuque 2006 Sidewalk Inspection Project #1- Except for non payment of premium The City ofDubuque, including a:l.l its elected officials, all its employees and volunteers,all it's boards, commissions and or authorities, and their boaJ:d members,employees, and volunteers are additional insureds on the geneJ:al liab~lity policy for our insured Skyline Storage & Trucking Inc. CERTIFICATE HOLDER ADDITIONAL INSURED; INSURER LETTER: CANCELLATlON SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPlRAT DATE THEREOF, niE ISSUING INSURER WILL ~O MAIL ..3.0....- DAYS WAlTTE NonCE TO THE CERTIACATE HOLDER NAMED TO THE LEFT, aUT FAILURE TO 00 SO SHA!. IMPose NO OBLIGATION OR UABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS 0 Fax 589-4205 @ACORDCORPORATION 1981 City of Dubuque/Engineering Dept City Hall Dubuque, Iowa 52001 ACORD 25-S (7/97) ,.;Aug, i8 08 02:39p . . , .. . .. I. . Loveless Tri State Ins 5835849237 p. 1 LOVELESS /,,/ TRI-STATE ~ INSURANCE GROUP, LLC 3400 Asbury Road, Suite 10 I Dubuque, Iowa 52002 I PHONE (563) 584-9235 I TOLL fREE (877) 584-9235 I fAX (563) 584-9237 Fax To: ~ CUt\~ Sm-~ Fax: c:5<:(;,C( - 'f(J.CJ '5 From: Mike Loveless Phone: Pages: -;;< Date: 'i{ - / $--{] Co Re: ~ C;'e 710~0;~7lt(-- CC: rR Urgent 0 For Review.J Please Comment 0 Please Reply 0 Please Recycle y-~{ C~_ ~ ~~tJ~~r8ML ~U1rnfl2 shord6 be (l(bJ~ Wee 15" B(--Ud~ Cf4 ~ ~ .~ dLcfJere - ~~(/ov- (]Jf~~~ experience trust I. ~~p 29 06 03:15p @ Loveless Tri State Ins 5635849237 p. 1 '.. LOVELESS .fi ~~!~~!~~? 3400 Asbury Road, 5uite 10 I Dubuque, Iowa 52002 I PHONE 1563) 584-9235 I TOLL FREE (877) 584-9235 I FAX 15631584-9237 Fax o1c- -yo ,JoL ()J+-L" ~ i 01 ,------ ~ (; / / T", l,d A"1'~ t11 / ~ Fax: 58"9 I From: Mike Loveless Pages: I. Date: o/Z~0 CC: Phon", Re: 8ktt Li ~ Trk' ~ Urgent 0 For Review U Please Comment 0 Please Reply:J Please Recycle ~e.. ~/1~ / ~~ eM-- ocet/ ~ ~ ~ ---f;h ,,-u/l cvt5~c(/ ~~<<e_ Sfh;z~eY:/~cVf7~_ /~ ~ u..d://?/~y~ ~.-..<~. ~a ~ ~eh)~ /7~~C-CU/;~~~ ~tY7/MI4I'~ P1fa:..e:. U/a4-- :0 ~ ~~ ft! 5CV;~fh? md. c-;z:~~=-<- /77~~ experience trust Sep 2~ 06 03:15p Loveless lri State Ins 5635849237 p.2 ~ODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER_ THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW_ INSURERS AFFORDING COVERAGE ACORD,. CERTIFICATE OF LIABILITY INSURANCE rri-State Insurance Group, LLC 3400 Asbury Road, Suite 10 Dubuque, Iowa 52002 563-584-9235 SURED Skyline Storage & Trucking Inc. 13626 Skyline Road Zwingle, Ia 52079 INSURER A: INSURER B: INSURER c: INSURER 0: INSURER E: surance Comp...any: OVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. eXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN rv1AY HAVE BEEN REDUCED BY PAID CLAIMS. 'R TYPE OF INSURANCE POUCY NUMBER - j- p01.WrlFFECT}~E P&k{i';r?:~~J}9N LIMITS CR DATE MMfDDfYY ~NERAl LIAI3!L.ITY I EACH OCCURRENCE · 1_000.00rl v COMMERCIAL GENERAL LIABILITY I FIRE DAAtAGE (Anyone fire) . 5_0 nnn I CLAIMS MADE GJ OCCUR: MED EXP (Any ane person) . I_tl_C' .....-... A. ~ F70705 02-02-06 02-02-07 PERSONAL & ADV INJURY . 1 """ """ - GENERAL AGGREGATE $ 1 _ nllJl """ -:;i'L AGGREGATE LIMIT APPLIES PER; PRODUCTS - CQMP/OP AGO :, 1 '-,,-,,-,..-- """ r--. PRO- n- "V POLICY JECT LOC AUTOMOBILE LIABIUTY , COMBINED SINGLE LIMIT ~I ANY AUTO (Eaaccldllnl) $1,000,000 ~' ALL OWNED AUTOS BOOIL Y INJURY . "'- SCHEDULED AUTOS (PerpersOll) A. -X HIRED AUTOS , F70705 02-02-06 02-02-07 BODilY INJURY -X. , (Per accidenlJ $ NON-OWNED AUTOS - ------------ . PROPERTY DAMAGE . (Perac:Cidenl) ==1:0E L1AO",TY AUTO ONLY- EA ACCIDENT S ANY AUTO OTHER THAN EAACC , I i AUTO ONLY: AGG . , EXCESS lIABILITY EACH OCCURRENCE ' '1 _ 000. OQJL___ ~ OCCUR II CLAIMS MADE AGGREGATE · 1_J1ll9_~0~ F70705 02-02-06 02-02-07 . A. R DEDUCTIBLE . RETENTION S S WORKERS COMPENSATION AND X I iii\\ilf.J:l. I I al~- EMPLOYERS' LIABILITY F7070S 02-02-06 .02-02-07 E.L. EACH ACCIDENT S 1nn _OQQ A. E.L. DISEASE. EA EMPLOYE . 1"" - ,,";,,- E.L. DISEASE - POLICY LIMIT I $ 5"n-nn" I OTHER F70705 02-02-D6 02-02-07 Cargo Coverage 10,000 "IInland Marine , i :SCRIPTION OF OPERA110NS/LOCATIONSNEHICLESlEXCl.USIONS ADDED BY ENDORSEMENTfSPECIAl. PROVISIONS E'roject:2006 City of Dubuque Sidewalk Inspection program or any other curbing ~r sidewalk work in the public right of way for the city of Dubuque. The city ~f Dubuque ~s an additional insured per attached IL7063. (This includes ongo~ng ~nd completed operations;primary/noncontributory;per project aggregate :G2503;govermental immunities;waiver of subrogation on workers compensation. ERTIFICATE HOLDER ADDITIONAL INSURED; INSURER LETTER: CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAll...3..0.- DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHAl.L City of Dubuque/Engineering Dept City Hall Dubuque, Iowa 52001 IMPOSE NO OBL.IGATION OR lIABILITY OF ANY KINO UPON THE INSURER, ITS AGENTS OR Fax 589-4205 CORD 25-5 (7197) Sep 29 06 03:15p Loveless Tri ADDITIONAL INSURED CITY OF DUBUQUE, IOWA This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM COMMERCIAL GENERAL LIABILITY COVERAGE PART BIS-PAK BUSINESS LIABILITY AND MEDICAL EXPENSES COVERAGE FORM 1. The City of Dubuque, Iowa, including all its elected and appointed officials, all its employ- ees and volunteers, all its boards. commissions and/or authorities and their board members, employees and volunteers, are included as ad- ditional insureds with respect to all work and services perfonmed for them. This coverage shall be primary to the additional insureds and not contributing with any other insurance or similar protection available to the additional in- sureds, whether other available coverage be primary, contributing or excess. 2. The following applies when the City of Du- buque, Iowa is named as an additional insured: a. We expressly agree and state that the pur- chase of this policy and the naming of the City of Dubuque, Iowa as an additional in- sured does not waive any of the defenses of governmental immunity available to the City of Dubuque, Iowa under the Code of Iowa Section 670.4 as it now exists and as it may be amended from time to time. b. We further agree that this policy of insur- ance shall cover only those claims not sub- ject to the defense of governmenlal immu- nity under the Code of Iowa Section 670.4 as it now exists and as it may be amended State Ins 5635849237 p.3 IL-7063(7 -02) from time to time. Those claims not subject to the Code of Iowa Section 670.4 shall be covered by the terms and conditions of this policy. c. The City of Dubuque, Iowa shall be respon- sible for asserting any defense of govern- mental immunity I and may do so at any time and shall do so upon timely written request by us. d. We shall not deny coverage under this poli- cy and we shall not deny any of the rights and benefits accruing to the City of Du- buque, Iowa under this policy for reasons of governmental immunity unless and until a court of competent jurisdiction has ruled in favor of the defense(s) of governmental im- munity asserted by the City of Dubuque, Iowa. e. We and the City of Dubuque, Iowa agree that the above preservation of governmental immunities shall not otherwise change or alter the coverage available under the poli- cy. 3. We will give thirty (30) days advance written notice of cancellation, nonrenewal, reduction in coverage or limits and/or material change by endorsement and ten (10) days written notice for nonpayment of premium to: City of Dubuque and Dubuque County, Cily Hall, 13th and Cen- tral, Dubuque, IA 52001. This endorsement su- persedes the standard cancellation statement on the Certificate of Insurance to which this endorsement is attached. Sep 29 06 03: 16p Loveless Tri State Ins 5635849237 p.4 NOTICE OF CANCELLATION ENDORSEMENT IL-7002(10.90) All Coverage Parts included in this policy are subject to the following condition: If we cancel this policy, for any reason other than nonpayment of premium, we will mail advance notice to the person(s) or organization(s) as shown in the Schedule. SCHEDULE Person or Organization (Namlll and Address) Advance Notice (Days) CI1Y OF DUBUQUE IA ENGINEERING OEPT CI1Y HALL 13TH & CENTRAL DUBUQUE IA 52001 30