Health Ctr Parking Lot Pro. D~~~E ~<k~ MEMORANDUM October 11 , 2006 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Crescent Community Health Center Parking Lot Project City Engineer Gus Psihoyos is recommending award of the bid for the City parking lot that will serve the Crescent Community Health Center to Portzen Construction, Inc., in the amount of $100,937. I concur with the recommendation and respectfully request Mayor and City Council approval. /hut ~~ Michael C. Van Milligen MCVM/ksf Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer David Harris, Housing and Community Development Director Mary Rose Corrigan, Public Health Specialist D~~~E ~~~ MEMORANDUM October 11, 2006 FROM: Michael C. Van Milligen, City ManageD Gus Psihoyos, City Engineer A. . Crescent Community Health Center Parking Lot Project (CIP 1021848: Community Health Center) TO: SUBJECT: INTRODUCTION The enclosed resolutions authorize the award of the construction contract for the Crescent Community Health Center Parking Lot Project. BACKGROUND The Crescent Community Health Center (CCHC) Parking Lot Project located in the southwest corner of 18th Street and Elm Streets involves reconstructing the existing parking lot adjacent to the proposed Crescent Community Health Center. The developer, Pine Box, LLC owns the building where the CCHC will locate. In order to provide adequate parking for the CCHC, the City purchased property south of the proposed parking lot. The City is negotiating an agreement with Pine Box, LLC to exchange properties of equal area so that the City's parking lot will be adjacent to the entrance to the CCHC. The Engineering Department has coordinated the design with the developer to expedite the construction of the parking lot this year, weather permitting. After deconstruction or relocation of the houses, and exchange of the properties, the developer will complete the remaining parking areas as required on the approved site plan. The award of this project will be subject to a final agreement between the developer and the City. The proposed parking lot will accommodate 30 parking stalls. The parking lot will be Phase 1 of the overall parking available to the building. The developer plans to construct two additional parking lots adjacent to the building site at a later date. The project will include the removal of the existing asphalt surface, installation of new curb and gutter, installation of sidewalks around the perimeter of the parking lot, installation of sidewalks directly adjacent to the building serving the parking lot, installation of conduit for future security gate installation, installation of storm sewer, installation of pavement, striping of the lot and the installation of light bases so lighting can be installed later. The Engineering Department is also working with the developer on the lighting specifications. This bid does not include the lighting poles and fixtures. The estimated cost for the poles and fixtures is $5,000. BID RESULTS Sealed bids were received for the project on October 10, 2006. Portzen Construction, Inc. of Dubuque, Iowa, submitted the low base bid in the amount of $100,937.00. This amount includes the base bid and Alternate 1 (Concrete Paving). This amount is 0.73% under the estimate of probable cost. The Engineering Department recommends accepting the concrete paving alternate. The acceptance of the alternate increases the cost of the project by $15,812.00. A summary of the bid proposals received is as follows: Contractor Name Concrete Alternate Bid Asphalt Base Bid Portzen Construction, Inc. Tschiggfrie Excavating, Inc. Top Grade Excavating, Inc. Drew Cook Excavating, Inc. McClain Excavating, Inc. Horsfield Construction, Inc. $ 100,937.00 $ 112,089.90 $116,197.50 $ 123,703.00 $ 126,652.05 $156,701.25 $ 85,125.00 $ 94,891.80 $ 92,671.50 $ 90,223.00 $ 97,856.05 $ 131,909.25 RECOMMENDATION I recommend that the contract be awarded to Portzen Construction, Inc. in the amount of $100,937.00. BUDGET IMPACT The estimate of probable costs for the Crescent Community Health Center Parking Lot Project is summarized as follows: Asphalt Cost Concrete Cost Estimate Estimate Bid Award Construction Contract $ 81,602.50 $101,678.50 $100,937.00 Contingency 8,160.25 8,160.25 8,160.25 Construction Engineering & Inspection 13,464.41 13,464.41 13,464.41 ~103.227.16 $123.303.16 $122.561.66 The project funding summary is as follows: Fund Description CIP 1021848 - Community Health Center Fund Amount $ 122,561.66 Total Project Funding .$122.561.66 ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolutions awarding the Crescent Community Health Center Parking Lot Project to Portzen Construction, Inc. in the amount of $100,937.00. Prepared by Jon Dienst, PE cc: Cynthia Steinhauser, Assistant City Manager Barry Lindahl, City Attorney Dawn Lang, Budget Director Mary Rose Corrigan, Public Health Specialist David Harris, Housing/Community Development Director Bob Schiesl, PE, Assistant City Engineer RESOLUTION NO. 516-06 RESOLUTION ADOPTING PLANS AND SPECIFICATIONS Whereas, on the 4th day of October, 2006, plans, specifications, form of ncontracLand estimated cost were filed withthElQity_Qlerk of Dubuque, Iowa for the Crescent Community Health Center Parking Lot Project. Whereas, notice of hearing on plans, specifications, form of contract, and estimated cost was published as required by law. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the said plans, specifications, form of contract and estimated cost are hereby approved as the plans, specifications, form of contract and estimated cost for said improvements for said project. Passed, adopted and approved this 16th day of October, 2006. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 517-06 AWARDING CONSTRUCTION CONTRACT FOR THE CRESCENT COMMUNITY HEALTH CENTER PARKING LOT PROJECT WheH'@?,~el:ljed_ pr()Ro~CII~ha'Je bElEln sl.lbll1itted__by contractors for the Crescent Community Health Center Parking Lot Project pursuant to Resolution No. and notice to bidders published in a newspaper published in the City of Dubuque, Iowa on the 4th day of October, 2006. Whereas, said sealed proposals were opened and read on the 10th day of October, 2006, and it has been determined that the bid of Portzen Construction, Inc. of Dubuque, Iowa, in the amount of $100,937.00 was the lowest bid for the furnishings of all labor and materials and performing the work as provided for in the plans and specifications. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the contract for the above improvement be awarded to Portzen Construction, Inc. subject to an agreement between the City of Dubuque and Pine Box, LLC, approved by the City Council by November 6, 2006, and the Manager be and is hereby directed to execute a contract on behalf of the City of Dubuque for the complete performance of the work. BE IT FURTHER RESOLVED: That upon the signing of said contract and the approval of the contractor's bond, the City Treasurer is authorized and instructed to return the bid deposits of the unsuccessful bidders. Passed, approved and adopted this 16th day of October, 2006. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 518-06 APPROVING CONSTRUCTION CONTRACT WITH PORTZEN CONSTRUCTION, INC. FOR THE CRESCENT COMMUNITY HEALTH CENTER PARKING LOT PROJECT Whereas the City Council by Resolution No. 517-06 awarded the construction contract for the Crescent Community Health Center Parking Lot Project to Portzen Construction, Inc.; and Whereas Portzen Construction, Inc. has submitted the attached executed contract and bond. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: 1. The contract and bond attached hereto are hereby approved subject to an agreement between the City of Dubuque and Pine Box, LLC, approved by the City Council by November 6, 2006. 2. The City Manager is hereby authorized and directed to execute the contract on behalf of the City of Dubuque. Passed, approved and adopted this 16th day of October, 2006. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY OF DUBUQUE" ENGINEERING DIVISION" BID TABULATION SHEET BID TABULATION FOR: Crescent Community Health Center Perking Lot BID DATE: October 10, 2006 REVISED PER ADDENDUM 1 Co. BIDDER: Tsch BIDDER; Portzen Conslructlon,-lnc, TOTAL COST 3.594.15 1.311.00 6,402.20 4,752.65 1,-218.20 ! ! ! ! $ UNIT COST ;;11~'~i~~:;7' $ 7.35 $ 3.80 $ 11.90 ! ~ $ 1,-218.20 ." TOTAL COST .o,-;'ME" C'" . .,-,., -- ! 3,423.00 $ 1.207.50 ! 6,725.00 ! 4,220.50 $ 1~2oo.00 UNIT COST 7.00 3.50 12.50 11.50 ,200.00 I UNIT I i;~l\'~':J&.~~r;iar~~~~,~;;~#1k:~~~'~' CY 489.00 $ 7.50 $ 3.667.50 $ SY 345.oo! 5.00 J: 1,725.00 ! ~ 538.00 ! 10.00...1 5,380.00 .! Ton 367.00 $ 9.00 $ 3,303.00 $ Each 1.00 $" 200.00 $ '200.00 $" ESTIMATE COST ESTIMATE UNIT COST ESTIMATE QUANTITY ~~{~~s;~x~~, BID ITEM DESCRIPTION _~~J;~il.~llL~JDfI~4:r'"""ra 1 Excavation, Unclassified 2 Backfill. Topsoil 3 Graded Stone Base 4 3" Crushed Stone Base 5 Remove Existing Sign FO\Kldation 9.801.<JO 5,445.00 3,424.00 4,797.50 1,692.00 845.00 4,749.50 1,971.60 2,464.00 343.00 ! ! ! ! ! ! ! ! ! $ ','''-4;;'i-!%~-4i':'"f;~~ ! 54.45 ! 54.45 ! 5.35 $ 5.05 "$ 7.05 ! 8.45 ! 14.75 ! 63.60 $ 17,60 "$ 2.45 _.<>._._-z.~,,~,;_""'.n_ g'o''-'',''''__'''''_,C ! 10,260.00 ! 5,700.00 ! 3,200.00 ! 3,800.00 ! 1,080.00 ! 1,000.00 ! 3,864.00 $ 1,209.00 "$ 3.500.00 '$ 350.00 57.00 57.00 5.00 4.00 4.50 10.00 12.00 39.00 25.00 2.50 8,640.00 ! 5,500,00 ! 3.200.00 ! 3,800.00 ! 1,320.00 !. 1,000.00 ! 7,084.00 ! 1,364.00 ! 3,360.00 ! 294.00 $ ~~~~~.~~:~t+f~~::~~.F Too 180.00 $ 48.00 $ Too 100.00 '$ 55.00 $ SF 640.00 '$ 5.00 $' SF 950.00 '$ 4.00 $' SF 240.00"$ 5.50 $' SF 1oo.00! 1O.00:::! lF 322.oo! 22.oo..! SY 31.00 $ 44.00 $ iF 140.00 '$ 24.00 $ iF 140.00 '$ 2.10 $' &~~~~'1l"'''~ 6 HMA 300k Binder Course, 112" (PG 64-22 7 HMA 300k Surface COlSSe, 1(2" (PG 64-22' 8 PC COllaete Sidewalk _ Thickened Edge, 4", Construct 9 PC Concrete Sidewalk, 4", Remolle and Construct 10 PC Conallte Sidewalt, 6", Remo\le and Construct 11 PC Concrete Access Ramp, Detectable 12 PC Conaete Curb & Gutter, 2.5', Cons\Juct 13 PC Concrete Drilleway, 6", Remove and Cons' 14 Remolle & R~lacement of PC Curb & Gutter 15 HMA Sawcut JA,~:>:~~':1~~' 968.00 $ 51.95 $ 1,142.90 2,975.00 $ 74.65 $" 5,225.50 1,850.00 $ 1,880,60 $" 1,880.60 2,500.00 $ 1,867.35 $ 1,867.35 125.00 $ 113.30 $" 113.30 1,800.00 $ 2,250.60 $" 2,250.60 1,496.00 $" 25.60 $" 1,740.80 4L060.00 $" 36.95 $' ~ ! ! ! ! ! ! ! $ 44,00 42.50 1,850.00 2,500.00 125.00 1,800.00 22.00 29.00 "'~"~. e, ! ! ! ! ! ~ ! $ ,Nd ~:"I9,![~~E~.~~:~~tt;ft;"':;i~~,.''\''t':~~1,;:;l~#;:';\::,~f'~~-""~"~~_:~'!;m~ii,mn'l~'t~.;r;;:" 16 15M RCP Storm Pipe J:E.... R $ 3O.00...!. ~ 17 18" RCP Storm Pipe J:E.... l!!... $ 35.oo...! 2,450.00 18 Storm Sewer, Intake 101-8, Complete ...!:L....L $ 1,650.oo...!. 1,650.00 19 Manhole 48" Diameter. Complete J"L -.!..-- t 1,8oo.00...!. 1,800.00 20 Storm Water Curb Opening Neenah R..J262..J Each -.!..-- ! 215.00...1 215.00 21 Trench Grate, Neenah WIR 4990, Type D COlier Each 1 $ 500.00 $ 500.00 22 8" PVC Pipe - ~ 68 ! 20.00:::! 1,360.00 23 12~ PVC Pil lF 140 $ 25.00 $ 3L5OO.00 2,408.00 50.00 175.00 3,199.40 4,372.70 3.500.00 4,907.80 4,-074.05 :~%~1~"t-; .Mtf $ 7.oo...!. $ 25.00...!. $ 0.25...!. $ 799.85...1 $ 7.30...1 $ 7.00...1 ! ~..! $ 4,.074.05 $ - 2,752.00 60.00 210.00 2,800.00 3,594.00 2,500.00 1,696,00 5pOO.00 .~.. ! ! ! ! ! ! ! $ 8.00 30.00 0.30 700.00 8.00 5.00 8.00 5,000.00 :~$';fi~c;:~1:;~f,e'.M!~~~;~';~~~~ii~}~,~~~"'::' SY 344.00 $ 5.75 $ 1.978.00 $ Each 2.00 $ 150.00 $ 300.00 '"$ LF 700.00 $ 0.30 $' 210.00 $ Each 4.00 $ 1,500.00 $' 6,000.00 $ iF 599.00 $ 5.50 $' 3.294.50 $" iF 500.00 $ 5.00 $' 2,500.00 $ iF 212.00 $ 16.00 $' 3,392.00 $" is 1.00 $ 2.000.00 $' 2LOOO.00 $" ":,,,,y;' _M!lt~~~~El!g,".lllI5:;'I"'i?!ll'.f'.it'}~\11'4~' 24 Sod 25 Pavement Maridngs - Text/Symbols 26 Pavement Markings -linear 27 light Bases, Complete 28 2" PVC Conduit 29 1-112~ PVC Conduit 30 4" PVC Conduit 31 Mobilization 112,089.90 11,208.99 18,494,83 141,-793,72 ~ ! ! s BaseBldSllb-Tobd 100,937.00 10,093.70 16,654.61 127,-685.3 ~ ! s $ Bue BId Sllb-Total 101,723.00 10,172.30 16,784.30 128,-679.60 ! ! $ $ Base BId Sub-Total Contingency (10%) COIlstruclion Engineering & Inspection (15%) Total Construction estImate: 10.19% 10 32L444 $ 26.55 s -0.77% 31,772.00 s Under/OVElf Engineef's Estimate 26.00 $ SY 1222.00! Bid Tablllatlon Sheet lor ~JSi6j~Bj(jAIt~it,~G1:ifr~te Paving 32 PC COIlcrete Pavemen!,. (7"),- Class "C" CITY OF DUBUQUE. ENGINEERING DMSlON. BID TABULATION SHEET October 10, 2006 BID DATE Lot Parkin, BID TABULATION FOR Crescent Community Health Centsl REV1SED PER ADDENDUM 1 3,667.50 1,697.50 7,532.00 4,771.00 200.00 ! ! ! ! $ ~tof~1\q;.'! ! ~ ! ~ ! 14.00 ! 13.00 $ 200.00 $ 10.00 -.-! 4,890.00 $ 7.00...1 2,415.00 $ 9.75...! 5,245.50 ! ~...! 2,936.00 $ 1 poo.oo $ 1,-000.00 o 3,667.50 1,725.00 5,380.00 3,303.00 200.00 ! ! ! ! $ ESTIMATE UNIT COST 7.50 5.00 10.00 ~ 200.00 ! ! ! $ ESTIMATE QUANTITY 489.00 345.00 538.00 367.00 1.00 I UNIT I ~y.i\TlQ~~J9~E);'!I'''',& ",,"il!li~":~~.!f.;.;.-..,~ 1 El:cavation, Unclassified ----9:... 2 BackfiU, Topsoil ..2L 3 Graded Stone Base T Of! 4 3" Crushed Slone Base ~ 5 Remove Existing Sg, FOlI1 Each 810 ITEM DESCRIPTION 9,900,00 5,500.00 3,360.00 3.800.00 1,080.00 800.00 4,266.50 1,550.00 2,555.00 280.00 :i!'*'-;.t;':~~P~~;;~~~t~~~ ! 55.00...! ! 55.00..! $ 5.25 $ ! 4.00::I ! 4.50...1 !. 8.00 i ! 13.25...! $ 50.00 $ ! 18.25 J: $ 2.00 $ 60.00 -.-! 10,800.00 6O.00..! 6,000.00 4.75...1 3,040.00 4.00...1 3,800.00 5.25...! 1,260.00 7.50...! 750.00 13.00...! 4,186.00 43.00 $ 1,333.00 18.oo::I 2,520.00 4.00 $ 560.00 ! ! ! ! ! ! ! ! ! $ 8,640.00 5,500.00 3,200.00 3,800.00 1,320.00 1,000.00 7,084.00 1,364.00 3,360.00 294.00 dation 5~~~MI;!ol~\'!t~.#iWkit~;;:<'"}~'~J!~~~~~"t~~ '\'fI.?C,:g,...,. )!,J ~.{f~~:;:"..L,,_-..~:~~::~:' ,~j~2P'"'< 6 HMA 300kBinder Course, 1(2"(PG64-221 Ton 160.oo! 48.00...!.. 7 HMA3ookSurfaceCourse,1!2"(PG64.22) Ton 1oo.00! 55.oo...!.. 8 PC Concrete Sidewalk - Thickened EdQe, 4", Construct SF 640.oo!. 5.oo-.-!.. 9 PC Concrete Sidewalk, 4", Remove and Construct SF 950.00 $ 4.00 $ 10 PC Concrete Sidewalk, 6", Remove and Construct SF 240.00"$ 5.50 $"' 11 PCConcreteAccessRamp,Deteclable SF 1oo.00! 10.00 $ 12 PC Concrete Curb & Gutter, 2.5', Construct lF 322.00 $ 22.00 $ 13 PC Concrete Drivewav. 6", Remove and COfIStruct ~ 31.oo! 44.00 $ 14 Remove & Replacement of PC Curb & Gutter IF 140.00 $ 24.00 $ 15 HMA Sawcut iF 140.00 '$ 2.10 $ _:;.",-,," 1,628.00 3,745.00 2,275.00 2,075.00 125.00 1,750,00 3,094.00 4~970.oo .~.::-;$t,'jJ.~'~~~~'t~:;')3:{'i~::'~;-&~~ ~,~4.,~':';i~::t}tiXi'~:J,~Y~' 660.00 $ SO.OO --.-!. 1.100.00 $ 74.00...! 2,450.00 $ 75,00 $ 5,250.00 $ 53.50 $ 1,650.00 $ ,900.00"$ 1,900.00 $ 2,275.00"$ 1,800.00 $ ,500.00::I 1,500.00 $ 2,075.00::I 215.00 $ 15O.00...! 150.00 $ 125.oo...! 500.00 S ,700.00 $ 1,700.00 $ 1,750.00 $ 1.360.00 $ 27.50 $' 1,870.00 $ - 45.50 $' a,-5OO.00 $ 33.50 $ 4,-690.00 $ 35.50 '$ ~_-:--r"~~~""-~~'*~~t ~ 22 $ 30.00 $ 70 $ 35.00 $ 1 $ 1,650,00 $' 1 $ 1,800,00 $ 1 $ 215.00 $' 1 $' 500.00 $' 68 "$ 20.00 $' 140 "$ 25.00 $' hE. hE. L5 L5 E"" E~ hE. L' ~W>~~EWE~~",';,::'~~~;~;~~~;;;+~\~!~ 16 15" RCP Storm Pipe 17 18" RCP Storm Pipe 18 Storm Sewer, Intake 101-lt Complete 19 Manhole 48" Diameter, Complete 20 Storm Water Curb Opening Neenah R-3262-3 21 Trench Grate., Neenah WIR 4990,- T. D Cover 22 8" PVC Pipl '23 1TPVCPil 3,784.00 ~ 175.00 5,256.00 2,096.50 1,750.00 1.590.00 4JOO.OO rgfN~~'~-f,..~g;t::r';:::mIl~-:1~="''''''~~~'~i:?: 7.25 $ 2,494.00 $ 11,00 $ 50.00 $ 100.00 $ 25.00 $" ~ $ 1,750.00 $ 0.25 $' 8OO.00::I 3,200.00 $ 1,314.00 ~ 7.00 $ 4,193.00 $ 3.50 $ ----s:75 $ 3,375.00 $ 3.50 $ ~ $' 4,664.00 $ 7.50 $' 4,000.00 $' 4LOOO.00 $ 4,-700.00 '$ ! ! ! ! ! ! ! $ .978.00 300.00 210.00 6,000.00 3,294.50 2,500.00 3,392.00 2,-000.00 ! ! ! ! ! ! $ 150.00 0,30 ,500.00 ~ 5.00 16.00 2,000,00 ! ! ! $ ! ! ! $ 344,00 2.00 700.00 4.00 599.00 500.00 212.00 1.00 C~~-ffll; 5Y E,'" 2L E"" L' LF L' L5 RMI~ll~!'ltg~.~0")?,'fiL'l!:~~~ 24 Sod _ 25 Pavement M bols 26 Pavement M 27 lI~htBases, 28 2"PVCCo", 29 1-1I2"PVCI 30 4" PVC Con 31 Mobilization Base Bid Sub-Total I 101,723.00 BaseBfdSub-Total $ 116,197.50 B.."BldSllb-Tobl $ 123,703.00 Contingency (10%) $ 10,172.30 I 11,619.75 $ 12,370.30 Construction Engineering & Inspection (15%) $ 16,784.30 $ 19,172.59 $ 20,411.00 Total Construction Estim.llte: $ 128,679.60 $ 146,989.84 $ 156,484.30 Under/Ove!' Engin. 14,23% 21.61% $48,880.00 $40.00 ~-"tA~4~'~,~" $ 40L326.00 33.00 $ 34.216.00 $ 28.00 '" ,i#,'1,,'~';;~~34.-'9'h~5;: 1222.00 $ She, Bid Tabulatilll 5Y '~,',;,'(;:~foc~t~ ,,1 ".p..' ~'~~~:M~~1~Coocrm&P~~ 32 PC Concrete Pavemen.h (7"). Class "C" CITY OF DUBUQUE" ENGINEERING DMsrON" BID TABULATION SHEET BID TABULATION FOR Cres<:ent Community Health Center Parking Lot BID DATE: October 10, 2006 REVISED PER ADDENDUM 1 BIDDER; HOnifield Construction, Inc, Co., Inc. BIDDER: McClAIN Exeavatin' TOTAL COST 7.335.00 3,450.00 8,070.00 5,505,00 500.00 ! ! ! ! . UNIT COST ',~;~~fPX ! 15.00 ! 10.00 !. 15.00 ! 15.00 $ 500.00 TOTAL COST 3667.50 1,466.25 8,608.00 4,771.00 400.00 ! ! ! ! $ UNIT COST 7.50 4.25 16.00 13.00 400.00 ESTIMATE COST 3,667.50 1,725.00 5,380.00 3,303.00 200.00 ! ! ! ! . ESTIMATE UNIT COST 7.50 5.00 10.00 9.00 200.00 ! ! ! ! I ESTIMATE QUANTITY ,"", 489.00 345.00 538.00 367.00 1.00 I UNIT I Cy SY Too Too E.", .'1:~.. BID ITEM DESCRIPTION _~1tQ"YAt1()N'I;'~jr,,!1 1 Excavation,Unclassifiad 2 Backfill, Topsoil 3 Graded StOfle Base 4 3"CrushedStoneBase 5 Remove Existing Sign Foundation ! ! ! I 11,700.00 7,500.00 4,480.00 6,650.00 1,920.00 3,500.00 6,440.00 1,550.00 3,500.00 560.00 ! ! ! ! ! ! ! ! ! $ 63.00 J. 11,340.00 ! 65.00 63.00...!. 6,300.00 ! 75.00 4.75...!. 3,040.00 ! 7.00 5.25...!. 4,987.50 ! 7.00 8.25...1 1,980.00 ! 8.00 8.00...!. 800.00 ! 35.00 13.50 S 4,347,00 $ 20.00 48.00 $' 1,488.00 $' SO.OO 16.50:1 2,310.00 ! 25.00 2.50 $ 3SO.oo $ 4.00 ""~.'~ ~~'1-~;:t;~ ~:w:,i~\,,~ ~;!:' 48,00...!. 8,640.00 $ 55.00...!. 5,500,00 $ 5.00...!. 3,200.00 $ 4.oo...!. 3,800.00 $ 5.50 $ 1,320.00 $ 10.00 J.: 1,000.00 $ 22.00...!. 7,084.00 $ 44.oo...! 1,364.00 $ 2~...! 3,360.00 $ 2.10 $ 294.00 $ ~~pAveMeNT'~"~M~~#i~~~;H.i':i~;"i;~t~~lfirl~L~lAA';~'~;-:~~:f~t;r-';io.~~' 6 HMA 300k Binder Course, 1/2" (PG 64-22) Ton 180.00! 7 HMA 300k Surface Course, 112" ePG 64-22) Ton 1oo.oo! 8 PC COIlcrete Sidewalk - Thickened Edl:Ie, 4" Construct SF 640.00! 9 PC Concrete Sidewalk, 4", Remove and Construct SF 950.00 $ 10 PC Concrete Sidewalk, 6", Remove and Construct SF 240.00 $ 11 PC Concrete Access Ramp, Detectable SF 1oo.00! 12 PC Concrete Curb & Gutter, 2.5', Construct LF 322.00 $ 13 PC Concrete Drivewav, 6', Remove and Construct ~ 31,oo! 1-4 Remove & Replacement of PC Curb & Guttllf LF 140.00 $ 15 HMA Sawcut iF 140.00 $' 1,650.00 5,950.00 2,500.00 2,500.00 150.00 750.00 3,400.00 8,400.00 ! ! ! ! ! ! ! $ ~"'~! $ 75.00 S 85.00 $ 2,500.00 t 2,500.00 ! 150.00 ! 750.00 $ 50.00 "$ 60,00 ~~~i~~~~-,~~~' ! 660.00 $ 9O.oo...!. 1,980.00 $ 2,450.00 S 93.00 S 6,510.00 "$ 1,650.00 $ 2,000.00 $' 2,000.00 ! 1,800.00 $ 2,000.00...1 2,000.00 $ 215.00 $ 150.00 $ 150.00 !: 500.00 $ 1,725.00 J.: 1,725.00 ! 1,360.00 $ 45.00...1 3,060.00 $ 3,-500.00 $ 41.00 $ 5-'.740.00 30.00 35.00 1,650.00 1,800.00 215,00 500,00 20.00 25.00 ~1!if;:;~. ~ ! 70 $ 1 S 1 !: 1 $ 1 $' 68 $ 140 $' ,;0:; ...!L IF ~ ~ E.'" E~ h!'. IF M~SX(j~M;~EWE,~~3~'~'~r":is:,:~~~~ 16 15~RCPStormPipe 17 18" RCP StOfTTl Pipe 18 StOllTl Sewer, Intake 101-B, Complete 19 Manhole -48" Diameter. Complete 20 Storm Water Curb Opening Neenah R-3262-3 21 Trench Grate, Neenah W1R 4990,- Type 0 Cover 22 8"PVCPip< 23 12" PVC Pi 3,096.00 70.00 1,050.00 4,200.00 4,642.25 3,750.00 5,141.00 12,-000.00 l'\~"Olr.~~~;;~~i'; ,';"ri~::;~:, ,~~~\~'-~~~:'~-a1:i~:k1~l~fr;~~~c"'~_n~",",,~' SY 344.00 $ 5.75 $ 1,978.00 $ 4.50 $ 1,548.00 Each 2.00 $ 150.00 $" 300.00 $ 15.00 $" 30.00 LF 700.00 $ 0.30 $' 210.00 $ 2.00 $' 1,400.00 Each -4,00 $ 1,5OO.00..!. 6.000.00 $ 1,100.00 J:: 4,400,00 lF 599.00 $ 5.50 $ 3,294.50 $ 5.00 $ 2,995.00 LF 500.00 $ 5.00 $" 2,500.00 $ 4,70 $ 2,350.00 LF 212.00 $ 16.00 $" 3,392.00 S 19.40 $ 4,112.80 lS 1.00"$ 2LOOO.OO $' 2,000.00 $ 2Looo.00 $' 2,,-000.00 bol. s-TextlS 8inear lete 156,701,25 15,670.13 25,855.71 198,-227.08 ! ! ! s Bue Bid Sub-Total 126,652,05 12,665.21 20.897.59 160,-21-4.84 ! ! $ $" 101,723.00 S.....SklSub-Totar 10,172.30 16,784.30 128,679,60 ! ! ! I Base Bid Sub-Total Conlingency(10%) Construction Engineerrng & Inspection (15%) Totel Construction Estimate: 54,05% 43,992.00 24.51% Under/Over Engifll ,216.00 BldTllbulallo' " ;t.~PR.i~BId A1temate.r-~~c6ri&ile'f~~t5a,'iiL~;.:;C~';#4g:':JfJ.t"' 32 PC Concrete pavement,JZ"1 Class .C' THE CITY OF ~ DUBOOUE ~cI4-~ MEMORANDUM September 26, 2006 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Crescent Community Health Center Parking Lot Project City Engineer Gus Psihoyos is recommending initiation of the public bidding process for the Crescent Community Health Center Parking Lot project. He further recommends that a public hearing be set for October 16, 2006. I concur with the recommendation and respectfully request Mayor and City Council approval. Ni ~frJL Michael C. Van Milligen MCVM/ksf Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer D~~~E ~ck~ MEMORANDUM September 26, 2006 FROM: Michael C, Van Milligen, City Ma~~. Gus PSI hoyos, City Engineer ~ . TO: SUBJECT: Crescent Community Health Center Parking Lot Project (CIP 1021848: Community Health Center) INTRODUCTION The enclosed resolutions authorize the public bidding procedure for the Crescent Community Health Center (CCHC) Parking Lot Project DISCUSSION The CCHC Parking Lot Project located in the southwest corner of 18th Street and Elm Streets involves reconstructing the existing parking lot that is currently adjacent to the proposed Crescent Community Health Center. Pine Box, LLC currently owns the building where CCHC will locate, In order to provide adequate parking for the CCHC, the City purchased property south of the proposed parking lot The City is working on an agreement with Pine Box, LLC to exchange properties of equal area so that the City's parking lot will be adjacent to the entrance of the CCHC, The Engineering Department has coordinated the design with the developer to expedite the construction of the parking lot this year, weather permitting, After deconstruction or relocation of the houses, and exchange of properties, the developer will complete the remaining parking areas as required on the approved site plan, The award of this project will be subject to a final agreement between the developer and the City, The proposed parking lot would accommodate 30 parking stalls, This parking lot would be phase 1 of the overall parking available to the building, The developer of the building plans to construct two additional parking lots adjacent to the building site at a later date, The project will include the removal of the existing asphalt surface, installation of new curb and gutter, installation of sidewalks around the perimeter of the parking lot, installation of sidewalks directly adjacent to the building serving the parking lot, installation of conduit for future security gate installation, installation of storm sewer, installation of asphalt pavement, striping of the lot and the installation of light bases so lighting can be installed later. A copy of the conceptual site plan is attached showing the proposed layout of the parking lot. Engineering requests the proposed project be bid as an asphalt parking lot with an additive concrete pavement alternate. PROJECT SCHEDULE The schedule for the project is as follows: Initiate Public Bidding Process Advertisement for Bids Pre-Bid Construction Conference Receipt of Bids Notice of Public Hearing on Plans and Specifications Public Hearing Award of Contract Project Completion Date October 2, 2006 October 4, 2006 October 6, 2006 October 10, 2006 October 6, 2006 October 16, 2006 October 16, 2006 November 22, 2006 RECOMMENDATION It is recommended that the City Council establish the date of the public hearing and authorize the City Clerk to advertise for proposals. BUDGET IMPACT The estimate of probable cost for the Community Health Services Parking Lot is summarized as follows: Estimate Construction Contract Contingency Construction Engineering & Inspection $81,602.50 8,160.25 13,464.41 Total Project Cost ~103.227.16 The project funding summary is as follows: Fund Description Fund Amount CIP 1021848 - Community Health Center $ 103,22716 Total Project Funding $103.227.16 ACTION TO BE TAKEN The City Council is requested to establish the date of the public hearing and to authorize the City Clerk to advertise for proposals through the adoption of the enclosed resolutions. Prepared by Jon Dienst, PE cc: Cynthia Steinhauser, Assistant City Manager Barry Lindahl, City Attorney Dawn Lang, Budget Director Mary Rose Corrigan, Public Health Specialist David Harris, Housing/Community Development Director Bob Schiesl, PE, Assistant City Engineer \ !ii I l1 !!fi;i~ 11:' w 0 ~ ~ ~ ~ l.l- 0:.: ;: ~ 0 u ~~: e i" Il i ~~ g~ ~ ~ ~ ~ ~~ ~" NVld 3llS OMlldDNO:J ~ , , ~ V I o ~ ~(/"J , ~~, ~~~ c~y Ul r..,.." ~ u~;::; z...., o.....~ uCl:)Jj -' ~ " / " <: " .~"'-"'''''q"O ,....s ""''''"''", ",/.' 'S,ld\' DIJ1O:J NOlDNIHSV M ~4~ rc )nIOM 3.LIS E~ \, ~~ Ii ~I~ :!!. ,':i!~ fi~- !l::'i ~~E ~u'" ::i~- ~j;; ~~i ~~i- f!,~~~ i.i'~,,~ <:i"' ~~H ~ ~~ .1::I,j,LL:.,II1i.1 " - '" ~ < x ~ . ...........-... IIIIII1 ; - ~ E / -- ------ is ... ~ i !!II ~I ~I i: iJ '" z ~ ;-.z' ---~3 -,':- -' ~ z::::' E,~ ~- Z~ ~::: --~€i I . ,,~ , ,. -; !,. .LEI-~.LS l!1~1 .. I .. I!'; n! 11m RESOLUTION NO. PRELIMINARY APPROVAL OF PLANS AND SPECIFICATIONS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Crescent Community Health Center Parking Lot Project in the estimated amount of $103,227.16 are hereby approved and ordered filed in the office of the City Clerk for public inspection. Passed, approved and adopted this day of ,2006. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. FIXING DATE OF HEARING ON PLANS AND SPECIFICATIONS Whereas, the City Council of the City of Dubuque, Iowa has given its preliminary approval on the proposed plans, specifications, and form of contract and placed same on file in the office of the City Clerk for public inspection of the Crescent Community Health Center Parking Lot Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a public hearing will be held on the 16th day of October, 2006, at 6:30 p.m. in the Public Library Auditorium at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and cost of said improvement, and the City Clerk be and is hereby directed to cause a notice of time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be not less than four days nor more than twenty days prior to the day fixed for its consideration. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, contract, or estimated cost of the improvement. Passed, approved and adopted this day of ,2006. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk NOTICE OF HEARING ON PLANS AND SPECIFICATIONS Notice of public hearing on proposed plans and specifications, proposed form of contract and estimate of cost for the Crescent Community Health Center Parking Lot Project. NOTICE IS HEREBY GIVEN: The City Council of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimate of cost for the Community Health Services Parking Lot Project, in accordance with the provisions of Chapter 384, City Code of Iowa, at 6:30 p.m., on the 16th day of October, 2006, in the Public Library Auditorium, 360 West 11 th Street, in Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimate of cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto or to the cost of the improvements. Any visual or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the ,2006. day of Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. ORDERING BIDS NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the Crescent Community Health Center Parking Lot Project is hereby ordered to be advertised for bids for construction. BE IT FURTHER RESOLVED, that the amount of the security to accompany each bid shall be in an amount which shall.conform to the provisions of the Notice to Bidders hereby approved as a part of the plans and specifications heretofore adopted. That the City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall not be less than four days nor more than forty-five days prior to the receipt of said bids at 2:00 p.m. 10th day of October, 2006. Bids shall be opened and read by the City Clerk at said time and will be submitted to the Council for final action at 6:30 p.m. on the 16th day of October, 2006. Passed, approved and adopted this day of ,2006. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk