Contract Signed: Floodwall Improve. Change Order , D~~~E ~~~ MEMORANDUM October 31,2006 TO: Michael C. Van Milligen, City Manager FROM: Don Vogt, Public Works Director~ SUBJECT: Floodwalllmprovement Projects Change Order INTRODUCTION The purposes of this memorandum are to provide information and recommend action regarding the attached change order for the Floodwalllmprovement Projects currently underway. BACKGROUND The Floodwalllmprovement Projects, providing auxiliary power to the Maus Lake and Hawthorne Street pumping stations, along with numerous infrastructure enhancements at the Bee Branch pumping station, are currently underway. The total budget appropriation for the projects is $555,766.00 - $446,420.80 for the construction contract, $66,400 for engineering fees, and $42,945.20 for contingencies. DISCUSSION A memorandum from Street and Sewer Maintenance Supervisor John Klostermann regarding change order #2 is attached. Also attached is change order #2 in triplicate. The work associated with this change order is considered essential for the improvements at the Bee Branch pumping station. The cost of this change order is $2,097.50. When added to change order #1, total change order costs to date would equal $8,925.91. This would leave a contingency fund balance of $34,019.29. The additional cost of these two contract changes equals 2% of the original construction contract for the project. ACTION STEP Your endorsement of the attached change order is recommended and requested. Attachments . rHEC1TYOF ~ DUB E ~~~ MEMORANDUM October 30, 2006 To: Don Vogt, Public Works Director From: John Klostermann, Street/Sewer Maintenance Supervisor ~ L Subject: Floodwalllmprovement Projects - Change Order # 2 Introduction The purpose of this memorandum is to request your approval to change order #2 for the Floodwalllmprovement Projects. Discussion Change order # 2 is for work associated with the retaining wall footing located at the Bee Branch Floodwall Pumping Station. While excavating for the retaining wall footing at the Bee Branch Pumping Station it was necessary to enlarge the designed footing to protect the existing concrete wall. The change order also reflects extra cost to the contractor to jackhammer out poured concrete to expose the existing electrical conduit not located on the plans. I have reviewed the change order as submitted with Charles Cate of IIW and we both feel that the change order is fair and just. Action Required I am requesting that you review change order #2 and recommend payment. . ' CHANGE ORDER Change Order No: 2 Date: October 24, 2006 Agreement Date: August 21,2006 Owner: Project: City of Dubuque Hawthorne Street, Bee Branch and Maus Lake Flood Wall Pumping Facilities Generator Installation Kluck Construction, Inc. No. 05036-01 Contractor: Description of Change: 1. Additional Concrete 2. Additional labor 16 hours 3. 2 men 5.5 hours each=11 hours 4. Air Compressor 2 hours $747.50 $800.00 $550.00 N/A $2,097.50 Justification for Change: 1. Enlarge retaining wall footing to protect existing footing approximately 33 feet 2. Enlarge retaining wall footing to protect existing footing approximately 33 feet 3. Support for existing footing and walls from undermining/jack hammering 4. Support for existing footing and walls from undermining/jack hammering Change in Contract Price: The amount of the contract will be Increased by this change order by the sum of Two Thousand Ninety Seven and 50/100 Dollars ($2,097.50) Adjustment in Amount of Contract: 1. Amount of Original Contract 2. Net Addition due to all previous change orders 3. Amount of contract not including this change order 4. Addition to contract due to this change order 5. Amount of contract including this change order $446,420.80 $6,828.41 $453,24921 $2,09750 $455,346.71 Change Order Conditions: The contract completion period established by the original contract and previous change orders will remain unchanged. Work performed under this change order will be subject to all the requirements as stated herein and in the contract documents and all change orders. The Contractor expressly agrees that he will place under coverage of his Contractor's Improvement Bond and insurance all work covered by this change order. 1-1 Change Order Page 2 All work performed under this change order shall be performed in accordance with the requirements of this change order, the plans, the specifications, and the contract documents. BY .C. Recommended for Acceptance: NAME Signature Charles A. Cate, P.E. Type or Print President lo/'l1/~ TITLE DATE Accepted and/or Requested: CONTRACTOR Kluck Construction, Inc. J Attest: Signature BY BY NAME Signature TITLE 1'tr; t!( /J//lffL DATE Ii) d/:ilJ0 Type or Print TITLE Type or Print Approved and/or Requested: Attest: BY BY il' / . I / I Signature NAM 'I ,{'1iN( V(A,,"1'11 (/I ./ --1 NAME Signature TITLE ( , 7 /'1~.fr/ / ! (/1 )( /(J? Type or Print TITLE Type or Print DATE 1-2