Contract Century Drive Storm Sewer Repair ;I D'G~~E ~ck~ City of Dubuque Engineering 50. W. 131h Street Dubuque, IA 52001 (563) 589-4270 (563) 589-4205 FAX CITY OF DUBUQUE, IOWA SHORT FORM IMPROVEMENT CONTRACT THIS IMPROVEMENT CONTRACT (the Contract), made in triplicate, dated for reference purposes between the City of Dubuque, Iowa, by its City Manager, through authority conferred upon the City Manager by its City Council (City) and Tschiggfrie Excavating of the City of (Contractor Name) 425 Julien Dubuque Dr., Dubuque, IA 52003 (Contractors Address - City and State) For and in consideration of the mutual covenants herein contained, the parties hereto agree as follows: CONTRACTOR AGREES: 1. To furnish materials and equipment and to perform all labor necessary for (the Project): the construction of approximately 63 feet of 36-inch diameter storm sewer under Century Drive near the US20 intersection. The work described above shall be completed at the following location(s): Across Century Drive near the US20 intersection. The Project shall be constructed to the existing grades and to any revised grades as described in this Project contract; in strict accordance with the requirements of the laws of the State of Iowa and ordinances of the City of Dubuque relating to public works, and in accordance with the Contract Documents which provisions and documents are each and all hereby referred to and made a part of this Contract just as much as if the detailed statements thereof were repeated herein. Page 1 of4 i '. 2. Contract Documents shall mean and include the following: All ordinances and resolutions heretofore adopted by the City Council having to do with the Project; the Contractor's Proposal; and the conditions described in the Contract, including any Special Conditions, Plans and Specifications and General Requirements as adopted by the City Council for the Project. 3. All materials used by the Contractor in the Project shall be the best of their several kinds and shall be put in place to the satisfaction of the City Manager. 4. The Contractor shall remove any materials rejected by the City Manager as defective or improper, or any of said work condemned as unsuitable or defective, and the same shall be replaced or done anew to the satisfaction of the City Manager at the cost and expense of the Contractor. 5. Five percent (5%) of the Contract price may be retained by the City for a period of thirty (30) days after final completion and acceptance of the Project by the City Manager to pay any claim that may be filed within said time for labor and materials done and furnished in connection with the performance of this Contract and for a longer period if such claims are not adjusted within that time, as provided in Iowa Code Chapter 573. The City shall also retain additional sums to protect itself against any claim that has been filed against it for damages to persons or property arising through the prosecution of the work and such sums shall be held by the City until such claims have been settled, adjudicated or otherwise disposed of. 6. The Contractor has read and understands the City of Dubuque Standard Specifications including General Requirements and has examined and understands the project description described in Section 1 and any attached Special Conditions herein referred to and agrees not to plead misunderstanding or deception because of estimates of quantity, character, location or other conditions surrounding the same. 7. The Contractor shall guarantee for a period two years and make good any other defect in any part of the Project due to improper construction or material performance notwithstanding the fact that said Project may have been accepted and fully paid for by the City. The guarantee shall commence on the date that the City pays full compensation for the complete performance of this contract. 8. The Contractor shall fully complete the Project under this Contract on or before 11/24/06 (DATE) 9. To the fullest extent permitted by law, the Contractor shall indemnify and hold harmless the City from and against all claims, damages, losses and. expenses, including but not limited to attorneys' fees, arising out of or resulting from performance of the Contract, provided that such claim, damages, loss or expense is attributable to bodily injury, sickness, disease or death, or injury to or destruction of property (other than the Project itself) including loss of use resulting there from, but only to the extent caused in whole or in part by negligent acts or omissions of the Contractor, the Contractor's subcontractor, or anyone directly or indirectly employed by the Contractor or the Contractor's subcontractor or anyone for whose acts the Contractor or the Contractor's subcontractor may be liable, regardless of whether or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder. Page 2 of 4 . . 10. Unless otherwise provided in the Contract Documents, the Contractor shall provide evidence of insurance which meets the requirements of the City's Insurance Schedule for General Contractors or Artisan Contractors. THE CITY AGREES: Upon the completion of the Contract, and the acceptance of the Project by the City Council, the City agrees to pay the Contractor as full compensation for the complete performance of this Contract, the amount determined for the total number of units completed at the unit prices stated in the Contractor's Proposal and less any liquidated damages provided for in the Contract Documents. The number of units stated in the contract, special conditions and contractors proposal is approximate only and the final payment shall be made by the work covered by the Contract. CONTRACT ESTIMATED AMOUNT $ 22206.65 THE MAXIMUM CONTRACT AMOUNT SHALL BE LIMITED TO AN INCREASE OF LISTED ESTIMATED AMOUNT. 10 % OF THE ABOVE CITY OF DUBUQUE, IOWA L( PRINCIPAL: By: !(J()Ycr.- Date Contractor ichael C. Van Milligen City Manager By: Signature Date Printed Name Tille ACKNOWLEDGEMENT OF ATTACHED SPECIAL CONDITIONS: By: Signature Date Printed Name Tille Page 3 of4 The following soecia conditions shall applv to this Proiect: THE CONTRACT SHALL INCLUDE THE ATTACHED QUOTE PROVIDED BY TSCHIGGFRIE, ESTABLISHING THE IDENTIFIED UNIT PRICES FOR THE WORK TO BE PERFORMED, - ..~,-- ._n _ __J REV, 08/06 Page 4 of 4 OCT-II-2006 WED 12:31 PH TSCHIGGFRIE CO. FAX NO. 5635577585 P. 02/02 TSCHIGGFRIE EXCAVATING 425 Julien Dubuque Drive Dubuque. IA. 52~ Ph#(563) 557-7450 Ph# (800) 365-9155 F3ll#(663) 557-751l5 Deron Muehring City of Dubuque 50 W 13th St Dubuque, Iowa 52001 Ph fI. 563-589-4270 Fax t# 563.sa9-4149 ~.., .~.".L;:,. ~ ~ .. .. .. Quote * .. * Froj. Name: Froj. No.: Bid Dale' DBQ -- Century Drive Stonn Sewer R. owne~ DBQ - Century Drille storm Sewer Repair County: 10110106 5'00 PM Location' MiseGev L1n.. Item Unit 01' No. No. Bid IlIlm Descrlntlon Qtv Measure Unit Price Amount 2 1200.01 Traffic Control 1.00 LS - 8v General 3 1300-10 SUI Fence 100.00 LF 2.50 250.00 -4 1400-10 Removal of Pavement Drivewav. Curb & Guller 177.00 SY 10.70 1 893.90 5 1400-41 Removal of Slorm Sewer & Culver! Pi"'" 63.00 LF 16.15 1 017.45 6 2400-01 Storm Sewer Main - 36" RCP 63.00 LF 212.30 13374.90 7 2200-20 Granular Backfill storm Sewer esO.OO TON 3.00 2 850.00 B 2700-60 PCC Curb & Guller 30" 40.00 LF 21.15 846.00 9 2850.01 Pavement Markinas Painted 1.00 LS 250.00 250.00 10 2100-70 Graded Slone Ba... 117.00 Ton 13.20 1 544.40 13 1400-22 HMA sawcul 40.00 LF 4.50 180.00 Total Quote = 22,206.65 Kruse CONDIT!ON:;:: Special Noles: Traflfic Control by CIIy of Dubuque Granular backfill is an approx quanllly. will be bill on actual quantities Granular backfill is trucking only, CIly to purchase Fill Lime 36" pipe Supplied by Ctty of DUbuque Stone baSe Is fi ured 111 thick \2C2Lft Randy Steffen (563) 590-1502 DU~~E ~ck~ City of Dubuque Engineering 50. W 13" Street Dubuque, IA 52001 (563) 589-4270 (563) 589-4205 FAX CITY OF DUBUQUE, IOWA SHORT FORM IMPROVEMENT CONTRACT THIS IMPROVEMENT CONTRACT (the Contract), made in triplicate, dated for reference purposes between the City of Dubuque, Iowa, by its City Manager, through authority conferred upon th~ Manager ~y its City Council (City) and r? Y' r \I Cell\. ",-VI" OLL~ b "'- of the City of (c<intractor Nar1.e) 'tJ t- o;n ~:JrJ 5;lOc!:3 (Contractors Address - City and State For and in consideration of the mutual covenants herein contained, the parties hereto agree as follows: CONTRACTOR AGREES: 1. To furnish all material and equipment and to Pro.ect): ~ \-0 ,.,v-o-..I-v erform all labor necessary for (the De I Ii.. "V<l-I'.e.- . "'-.) The work described above shall be completed at the following location(s): C;-, do e.~ct." \<- o c of .1/v\A^f ~ The Project shall be constructed to the existing grades and to any revised grades as described in this Project contract; in strict accordance with the requirements of the laws of the State of Iowa and ordinances of the City of Dubuque relating to public works, and in accordance with the Contract Documents which provisions and documents are each and all hereby referred to and made a part of this Contract just as much as if the detailed statements thereof were repeated herein. Page 1 of 4 2. Contract Documents shall mean and include the following: All ordinances and resolutions heretofore adopted by the City Council having to do with the Project; the Contractor's Proposal; and the conditions described in the Contract, including any Special Conditions, Plans and Specifications and General Requirements as adopted by the City Council for the Project. 3. All materials used by the Contractor in the Project shall be the best of their several kinds and shall be put in place to the satisfaction of the City Manager. 4. The Contractor shall remove any materials rejected by the City Manager as defective or improper, or any of said work condemned as unsuitable or defective, and the same shall be replaced or done anew to the satisfaction of the City Manager at the cost and expense of the Contractor. 5. Five percent (5%) of the Contract price may be retained by the City for a period of thirty (30) days after final completion and acceptance of the Project by the City Manager to pay any claim that may be filed within said time for labor and materials done and furnished in connection with the performance of this Contract and for a longer period if such claims are not adjusted within that time, as provided in Iowa Code Chapter 573. The City shall also retain additional sums to protect itself against any claim that has been filed against it for damages to persons or property arising through the prosecution of the work and such sums shall be held by the City until such claims have been settled, adjudicated or otherwise disposed of. 6. The Contractor has read and understands the City of Dubuque Standard Specifications including General Requirements and has examined and understands the project description described in Section 1 and any attached Special Conditions herein referred to and agrees not to plead misunderstanding or deception because of estimates of quantity, character, location or other conditions surrounding the same. 7. The Contractor shall guarantee for a period two years and make good any other defect in any part of the Project due to improper construction or material performance notwithstanding the fact that said Project may have been accepted and fully paid for by the City. The guarantee shall commence on the date that the City pays full compensation for the complete performance of th is contract. 8. The Contractor shall fully complete the Project under this Contract on or before I)..-~I o~ (DATE) 9. To the fullest extent permitted by law, the Contractor shall indemnify and hold harmless the City from and against all claims, damages, losses and expenses, including but not limited to attorneys' fees, arising out of or resulting from performance of the Contract, provided that such claim, damages, loss or expense is attributable to bodily injury, sickness, disease or death, or injury to or destruction of property (other than the Project itself) including loss of use resulting there from, but only to the extent caused in whole or in part by negligent acts or omissions of the Contractor, the Contractor's subcontractor, or anyone directly or indirectly employed by the Contractor or the Contractor's subcontractor or anyone for whose acts the Contractor or the Contractor's subcontractor may be liable, regardless of whether or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder. Page 2 of 4 10. Unless otherwise provided in the Contract Documents, the Contractor shall provide evidence of insurance which meets the requirements of the City's Insurance Schedule for General Contractors or Artisan Contractors. THE CITY AGREES: Upon the completion of the Contract, and the acceptance of the Project by the City Council, the City agrees to pay the Contractor as full compensation for the complete performance of this Contract, the amount determined for the total number of units completed at the unit prices stated in the Contractor's Proposal and less any liquidated damages provided for in the Contract Documents. The number of units stated in the contract, special conditions and contractors proposal is approximate only and the final payment shall be made by the work covered by the Contract. CONTRACT ESTIMATED AMOUNT $ L/, 000 THE MAXIMUM CONTRACT AMOUNT SHALL BE LIMITED TO AN INCREASE OF / L> % OF THE ABOVE LISTED ESTIMATED AMOUNT By: PRINCIPAL: P-err~ Lons-rr<lc-fiOVZ ~ . <~.--71";';'~ Signature Date By: CITY OF DUBUQUE, IOWA 11 k1-;1~ ichael C. Van Milligen City Manager I (f /J //C~ Date ,)ohtJ P.e("(''j. Printed Name DlVI')Ri/ Title ACKNOWLEDGEMENT OF ATTACHED \ SPE~IAl CONDITIONS: By: (-~KJ P we / (> 1011'1/ {) ~ 'STgi1ature I Date J,o h n P eo r.-'-.) Pnnted Name I ('J IA..~Y\.tC V- Title Page 3 of 4 T d h II I t thO P t he followina special con Itlons 5 a app y 0 IS rolec: EXAMPLE SPEC'iAL CONDITIONS: /NONE- ) / , / OR .----- THE CONSTACT SHALL INCLUDE THE ATTACHED DRAWINGS NUMBERED 1,2 AND 3 OR THE CONTRACT SHALL INCLUDE THE ATTACHED MATERIAL SPECIFICATION TITLED "---" REV. 08/06 Page 4 of 4 D~~~E ~YN.-~ City of Dubuque Engineering 50. W. 13'h Street Dubuque, IA 52001 (563) 589-4270 (563) 589-4205 FAX CITY OF DUBUQUE, IOWA SHORT FORM IMPROVEMENT CONTRACT THIS IMPROVEMENT CONTRACT (the Contract), made in triplicate, dated for reference purposes between the City of Dubuque, Iowa, by its City Manager, through authority conferred upon the City Manager by its City Council (City) and Perry Construction of the City of Dubuque, Iowa. For and in consideration of the mutual covenants herein contained, the parties hereto agree as follows: CONTRACTOR AGREES: 1. To furnish all material and equipment and to perform all labor necessary for Replacement of sidewalk and patching of steps at 11 th Street The work described above shall be completed at the fOllowing location(s): 11th Street Steps and adjacent sidewalk replacement The Project shall be constructed to the existing grades and to any revised grades as described in this Project contract; in strict accordance with the requirements of the laws of the State of Iowa and ordinances of the City of Dubuque relating to public works, and in accordance with the Contract Documents which provisions and documents are each and all hereby referred to and made a part of this Contract just as much as if the detailed statements thereof were repeated herein. 2. Contract Documents shall mean and include the following: All ordinances and resolutions heretofore adopted by the City Council having to do with the Project; the Contractor's Proposal; and the conditions described in the Contract, including any Special Conditions, Plans and Specifications and General Requirements as adopted by the City Council for the Project. 3. All materials used by the Contractor in the Project shall be the best of their several kinds and shall be put in place to the satisfaction of the City Manager. 4. The Contractor shall remove any materials rejected by the City Manager as defective or improper, or any of said work condemned as unsuitable or defective, and the same shall be replaced or done anew to the satisfaction of the City Manager at the cost and expense of the Contractor. 5. Five percent (5%) of the Contract price may be retained by the City for a period of thirty (30) days after final completion and acceptance of the Project by the City Manager to pay any claim that may be filed within said time for labor and materials done and furnished in connection with the performance of this Contract and for a longer period if such claims are not adjusted within that time, as provided in Iowa Code Chapter 573. The City shall also retain additional sums to protect itself against any claim that has been filed against it for damages to persons or property arising through the prosecution of the work and such sums shall be held by the City until such claims have been settled, adjudicated or otherwise disposed of. 6. The Contractor has read and understands the City of Dubuque Standard Specifications including General Requirements and has examined and understands the project description described in Section 1 and any attached Special Conditions herein referred to and agrees not to plead misunderstanding or deception because of estimates of quantity, character, location or other conditions surrounding the same. 7. The Contractor shall guarantee for a period two years and make good any other defect in any part of the Project due to improper construction or material performance notwithstanding the fact that said Project may have been accepted and fully paid for by the City. The guarantee shall commence on the date that the City pays full compensation for the complete performance of this contract. 8. The Contractor shall fullv complete the Project under this Contract on or before October 31, 2006. 9. To the fullest extent permitted by law, the Contractor shall indemnify and hold harmless the City from and against all claims, damages, losses and expenses, including but not limited to attorneys' fees, arising out of or resulting from performance of the Contract, provided that such claim, damages, loss or expense is attributable to bodily injury, sickness, disease or death, or injury to or destruction of property (other than the Project itself) including loss of use resulting there from, but only to the extent caused in whole or in part by negligent acts or omissions of the Contractor, the Contractor's subcontractor, or anyone directly or indirectly employed by the Contractor or the Contractor's subcontractor or anyone for whose acts the Contractor or the Contractor's subcontractor may be liable, regardless of whether or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder. 10. Unless otherwise provided in the Contract Documents, the Contractor shall provide evidence of insurance which meets the requirements of the City's Insurance Schedule for General Contractors or Artisan Contractors. .. THE CITY AGREES: Upon the completion of the Contract, and the acceptance of the Project by the City Council, the City agrees to pay the Contractor as full compensation for the complete performance of this Contract, the amount determined for the total number of units completed at the unit prices stated in the Contractor's Proposal and less any liquidated damages provided for in the Contract Documents. The number of units stated in the contract, special conditions and contractors proposal is approximate only and the final payment shall be made by the work covered by the Contract CONTRACT ESTIMATED AMOUNT $l0C'O. G C THE MAXIMUM CONTRACT AMOUNT SHALL BE LIMITED TO AN INCREASE OF 5% OF THE ABOVE LISTED ESTIMATED AMOUNT ,IOWA PRINCIPAL: Michael C. Van Milligen City Manager IdJ )~fol Date ( By: Signature r.....) c~, Date By: ~h h 1~_r-r:!J Printed Name j{jl,\n~,r Title By: ACKNOWLEDGEMENT OF ATTACHED SPECIAL CONDITIONS: Mtve- ~ Signature Date Printed Name Title