Loading...
Usha Park Parking Lot Project Recording MemoMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Usha Park Parking Lot Project DATE: November 12, 2013 Dubuque band AI- America City 1 2007 • 2012 • 2013 Through the competitive quotation process for public improvements, the Usha Park Parking Lot Project was awarded on October 24, 2013, to Drew Cook & Sons Excavating Co., Inc., in the amount of $95,294. City Engineer Gus Psihoyos recommends that the award for the Usha Park Parking Lot Project be officially recorded in the minutes of the City Council. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: FROM: Gus Psihoyos, City Engineer j•� !'� DATE: November 4, 2013 SUBJECT: Usha Park Parking Lot Project Michael C. Van Milligen, City Manager Dubuque au- America cm 11111 ! 2007 • 2012 • 2013 The Usha Park Parking Lot Project includes construction of a concrete parking that provides for 25 parking stalls. The parking lot will be graded to allow for future expansion. The parking lot will have a 270 foot long bio- filtration trench constructed on the east and north sides to capture rainfall runoff. The bio- filtration trench will contain a sand /compost/topsoil mixture that allows the storm water runoff to infiltrate into the ground. This project was expedited because of issues arising with people at Usha Park using private parking lots and the additional complications caused by the Hempstead High School construction project. The following is a summary of the bids received: Drew Cook & Sons Excavating Portzen Construction McDermott Excavating Tschiggfrie Excavating $ 95,294.00 $100,726.25 $101,761.30 $119,156.00 Through the competitive quotation process for public improvements, this project was awarded on October 24, 2013 to Drew Cook and Sons Excavating of Dubuque, Iowa, in the amount of $95,294.00. In accordance with the competitive quotation requirements of Iowa Code, Section 26.14, it is necessary that the award for the Usha Park Parking Lot Project to be officially recorded in the minutes of the City Council. cc: Jon Dienst, PE THECDY0F DUB E Masterpiece an the Mississippi City of Dubuque • Engipeedng Dlvhlon - Bid Tabulation Pro).ctNsm.: Who Park Parilno Lot Project dData Enginoor•s Estimato - i'',,, ili !,'.iDrow'.Codk & Sons Exc. he. Porten COnsttuetion, he. McDermott Excavating TachIggfdo Excavating Co. - s LINE NO. ITEM NUMBER BID ITEM DESCRIPTION PLAN QUANTITY UNIT UNIT PRICE TOTAL TOTAL PRICE BID UNIT PRICE TOTAL PRICE BID UNIT PRICE TOTAL PRICE BID UNIT PRICE TOTAL PRICE BID UNIT PRICE TOTAL PRICE Division 1 - General Provisions 1 1010.103 Mobilization 1 LS $ 2,000.00 $ 2,000.00 $ 2,000.00 ' $ 2,000.00 $ 2,500.00 $ 2,500.00 $ 1,500.00 $ 1,500.00 5 ' 11,610.00 $ 11 610.00 Sub Total $ 2,000.00 Sub Total $ 2,000.00 Sub Total $ 2,500.00 Sub Total $ 1500.00 Sub Total $ 11610.00 Division 2010 - Earthwork. Subgrade, and Sabha* I 2 2010. 108 -D -1 Topsoil On -site 115 CY $ 15.00 $ 1,725.00 $ 10.00 $ 1,150.00 $ 12.00 $ 1,380.00 $ 7.00 $ 805.00 $ 14.25 $ 1 638.75 3 2010. 100-0.2 Topsoil Compost-amended 200 CY $ 35.00 $ 7,000.00 $ 16.50 $ 3,300.00 $ 5500 $ 11,000.00 $ 35.00 $ 7,000.00 $ 38.20 $ 7,640.00 4 2010. 108 -E0 Excavation Claws 10 990 CY $ 10.00 $ 9,900.00 $ 11.50 $ 11,385.00 $ 9.00 $ 8,910.00 $ 10.40 $ 10,296.00 $ 9.10 $ 9,009.00 5 2010 - 10$-1-0 Subbase Coarse Aggregate Subbase -3'Breaker 500 TON $ 20.00 $ 10000.00 $ 15.00 $ 7,500.00 $ 16.00 $ 8,000.00 $ 17,50 $ 8,750.00 $ 16,70 $ 8,350.00 e 2010-108 -I-0 Subbase, Granular Subbase - Gradation 12s 400 TON $ 16.00 $ 6,400.00 $ 16.00 $ 6,400.00 $ 16.00 $ 6,400.00 $ 17,50 $ 7,000.00 $ 17,35 $ 8.940.00 Sub Total $ 35,025.00 Sub Total $ 29,735,00 Sub Total $ 38690.00 Sub Total $ 33851.00 Sub Total $ 33577.75 Division 4040- Subdr lna and Footing Drain Collectors 7 4040. 1085-0 SubdMn, fe Perforated CPE 300 LF $ 5.50 $ 1,650.00 $ 6.10 $ 1,830.00 $ 11.00 $ 3,300.00 $ 10.60 $ 3,180.00 $ 14.55 $ 4,365.00 8 4040 -108-0-0 Subdraln Outlets and Connections, Cora Drill. 6. 1 EA $ 300.00 $ 300.00 $ 500.00 $ 500.00 $ 750.00 $ 750.00 $ 400.00 $ 400.00 $ 1,184.00 $ 1,184.00 Sub Total $ 1,950.00 Sub Total $ 2,330.00 Sub Total $ 4,050.00 Sub Total $ 3,580.00 Sub Total $ 5,549.00 Division 7010 - Portland Cement Concrete Pev.mant 9 7010.108x-0 Pevemanl,PCC, 5* (Thickness) 1375 SY $ 30.00 $ 41,250.00 $ 37.00 $ 50,875.00 $ 34.25 $ 47,093.75 $ 38.00 1 $ 52,250.00 $ 42.55 , $ 58,506.25 Sub Total $ 41,250,00 Sub Total $ 50,875,00 Sub Total $ 47,093.75 Sub Total $ 52,250.00 Sub Total $ 58,506.25 Division 7020 • Hot Mix Asphalt Pavement 10 7020 - 108.8-0 Pavement or Overlay,HMA, 8' (Thickness) 55 SY $ 35.00 $ 1,925.00 $ 45,00 $ 2,475.00 $ 40.00 $ 2,200.00 $ 42.10 $ 2,315.50 $ 47,40 $ 2,607.00 $ • $ 1,925.00 Sub Total $ 2,475.00 Sub Total $ 2,200.00 Sub Total $ 2 315.50 Sub Total $ 2 607.00 Division 8010 -Tr.mc Signals & UghOng 11 8010. 108 -B -1 Conduit Trenched, PVC, 2• 80 LF $ 13.00 $ 1,040.00 $ 10.00 $ 800.00 $ 12.00 $ 960.00 $ 10.00 $ 800.00 $ 12,65 $ 1,012.00 $ • 8 1 040.00 Sub Total $ 800.00 Sub Total $ 980.00 Sub Total $ 800,00 Sub Total 5 1 012.00 IDOT Division 2527- Pavement Marking 12 !DOT 2527.04A-1 Painted Pavement Markings 0.5 STA $ 75.00 $ 712.50 $ 2800 $ 247.00 $ 55.00 $ 522.50 $ 55.00 $ 522.50 $ 50.00 $ 475.00 13 10072527.04 -A-4 Painted Symbols and Legends 2 EA $ 100.00 $ 200.00 $ 65.00 $ 130.00 $ 110.001 $ 220.00 $ 110.00 $ 220.00 $ 100,00 $ 200.00 $ - $ 912.50 Sub Total $ 377.00 Sub Total $ 742.50 Sub Total $ 742.50 Sub Total $ 675.00 IDOT Division 2528 - Tratllc Control 14 10012520.04-A Traffic Control 1 LS $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 $ 750.00 $ 750.00 $ 660,00 $ 680.00 $ ' 600,00 $ 600.00 Sub Total $ 1,000.00 Sub Total $ 500.00 Sub Total $ 750.00 Sub Total $ 660.00 Sub Total $ 600.00 Division 8040. signing M.teNN. 15 10072524.04.A Type A signs 3 SF $ 75.00 $ 225.00 $ 175.00 $ 525.00 $ 110.00 $ 330.00 $ 110.00 $ 330.00 $ 100.00 $ 300.00 Sub Total $ 225.00 Sub Total $ 525.00 Sub Total $ 330.00 Sub Total $ 330.00 Sub Total $ 300.00 Division 9010 - S.acting 15 0010.108x-0 Conventional - Seeding, Fertilizing. one Mulching. Type 1 0.21 AC $ 1,000.00 $ 210.00 $ 7,500.00 , $ 1,575.00 ;5' 7,000.00 $ 1,470.00 $ 7,150.00, $ 1,501.50 $ 6,500,00 $ 1,365.00 Sub Total $ 210.00 Sub Total $ 1,575.00 Sub Total $ 1,470.00 Sub Total $ 1,501.50 Sub Total $ 1,365.00 Division 0040- Erosion and Sediment Control 17 0040. 108-0 -1 Filter Socks, 12• 400 LF $ 4.00 $ 1,600.00 $ 6.50 $ 2,600.00 $ 6.00 $ 2,400.00 $ 6.05 $ 2,420.00 $ 5.50 $ 2,200.00 18 0040- 108 -D-1 Stabilized COnstmc8on Entrance 5 50 5 180.00 $ 1,080.00 $ 100.00 $ 600.00 $ 300.00 $ 1,800.00 0 135.00 $ 810.00 $ 78.00 $ 468.00 10 0040.108 -P-1 Dust Control, Water 2 MGM. $ 50.00 $ 100.00 $ 150.00 $ 300.00 $ 100.00 $ 200.00 $ 200.00 $ 400.00 $ 107.00 $ 214.00 20 0040 -108R-0 Turf Reinforcement Mats, Propos LandIok 450 or Equal 3 SO $ 150.00 $ 480.00 $ 110.00 $ 352.00 $ 100.00 5 320.00 $- 94.00 $ 300.80 $ 85.00 $ 272.00 21 9040 - 108 -T -2 Inlet Protection Device. Maintenance 2 EA $ 100.00 $ 200.00 $ 125.00 $ 250.00 $ 110.00 $ 220.00 $ 150.00 $ 300.00 $ 100.00 $ 200,00 Sub Total $ 3,460.00 Sub Total $ 4,102.00 Sub Total $ 4,940,00 Sub Total $ 4,230.80 Sub Total $ 3,354,00 Total Est. $ 88,997.50 Total Bld $ 95,294.00 Total Bld $ 100,726.25 Total Bid $ 101,761.30 Total Bid $ 119,156.00 %Over t Undo ) 7.07% 13.18% 14.34% 33.89% u u Total Bid Amount $ 85,997.50 $ 95,294.00_ $ 100,726.25 $ 101,761.30 $ 119,156.00 Total Selected Altenato(s) Amount $ -- $ -- $ $ - $ - Contract Awnrd Amount: 18 88,997.50 $ 95,294.00 $ 100,726.25 $ 101,761.30 $ 119,156.00