Loading...
Sixteenth Street Railroad Crossing Approach_Project AcceptanceMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 16th Street Railroad Grade Crossing Approach Pavement Removal & Replacement Project Iowa DOT Project No. RRP -SF12 (024)- -8A -31 Iowa DOT Agreement No. 376127D DATE: November 14, 2013 Dubuque band AI- America City 1 2007 • 2012 • 2013 Assistant City Engineer Bob Schiesl is recommending acceptance of the construction contract for the 16th Street Railroad Crossing Approach Pavement Removal and Replacement Project, as completed by Portzen Construction, Inc., in the final contract amount of $42,117.78, which is a 6.1% increase from the original contract amount of $39,679.20. This is due to an increase of 152 tons of stone base material required to raise the profile of the east approach roadway. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Robert Schiesl, Assistant City Engineer Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer FROM: Robert Schiesl, Assistant City Engineer SUBJECT: 16th Street Railroad Grade Crossing Approach Pavement Removal & Replacement Project Iowa DOT Project No. RRP -SF12 (024)- -8A -31 Iowa DOT Agreement No. 376127D DATE: November 14, 2013 Dubuque blind All- America City 1 l'r 2007 • 2012 • 2013 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the the 16th Street Railroad Crossing Approach Pavement Removal & Replacement Project which was completed in conjunction with the 16th Street Railroad Grade Crossing Repair project. BACKGROUND In June 2012, the City of Dubuque and the Canadian Pacific Railway received a Railroad Grade Crossing Surface Repair Grant through the Iowa Department of Transportation (Iowa DOT) for the construction of surface improvements at the East 16th Street grade crossing. Per the terms of the grant agreement, the City is responsible for contracting and completing the necessary approach pavement improvements to provide an acceptable transition and driving surface over the new railroad surface crossing. The City received informal competitive quotations for the 16th Street Railroad Grade Crossing Approach Pavement Removal & Replacement Project on October 1, 2013. Portzen Construction, Inc. of Dubuque, Iowa submitted the low bid in the amount of $39,679.20. The project was awarded to Portzen Construction based on a competitive quotation process for public improvements in accordance with Iowa Code, Section 26.14. DISCUSSION The 16th Street Railroad Grade Crossing Approach Pavement Removal & Replacement Project was completed by Portzen Construction, Inc. in the final contract amount of $42,117.78, which is a 6.1% increase from the original estimated contract amount. The final contract amount is based on actual quantities incorporated into the project, which included an additional 152 tons ($3,300) of stone base material required to raise the profile of the east approach roadway. RECOMMENDATION I recommend that the City Council accept the improvements and authorize final payment of the contract amount of $ 42,117.78 to Portzen Construction, Inc. for the 16th Street Railroad Crossing Approach Pavement Removal & Replacement Project. BUDGET IMPACT The cost summary for the 16th Street Railroad Crossing Approach Pavement Removal & Replacement Project is as follows: The project funding summary is as follows: CIP No. Award Final Construction Contract $ 39,679.20 $ 42,117.78 Total Project Cost $ 39,679.20 $ 42,117.78 The project funding summary is as follows: CIP No. Amount Iowa DOT Railroad Grade Crossing Repair Grant (60 %) $ 25,270.66 Canadian Pacific Railway (20 %) 8,423.56 2502026 3501465 City - Railroad Crossing Improvements (20 %) 8,423.56 Total Project Funding $ 42.117.78 ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution accepting the improvements and authorizing final payment of the contract amount of $42,117.78 to Portzen Construction, Inc. for the 16th Street Railroad Crossing Approach Pavement Removal & Replacement Project. Prepared by Robert Schiesl, Assistant City Engineer cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street and Sewer Maintenance Supervisor RESOLUTION NO. 330 -13 ACCEPTING THE 16TH STREET RAILROAD CROSSING APPROACH PAVEMENT REMOVAL & REPLACEMENT PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 16th Street Railroad Crossing Approach Pavement Removal & Replacement Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the. City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Railroad Crossing Improvements and the Rehabilitation Railroad Tracks capital improvement appropriation for the contract amount of $42,117.78 Tess any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 18th day of November, 2013. Attest: el■ zd, A Kevi S. Firnstahl, MC y Clerk ar/ Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 16TH STREET RAILROAD CROSSING APPROACH PAVEMENT REMOVAL & REPLACEMENT PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 16th Street Railroad Crossing Approach Pavement Removal & Replacement Project, and that said Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $42,117.78. Dated this day of X2013. S JAAJ Filed in the office of the City Clerk on the Robert Schiesl, Assistant City Engineer day of K lele/- , 2013. /1_10 in S. Firnst- hI, CM City Clerk LINE NO. 1 2 3 4 5 City of Dubuque - Engineering Department Project Close Out - Final Payment Form PARTIAL PAYMENT NO: COUNCIL FINAL ITEM NUMBER PROJECT NAME: 16TH STREET RAILROAD CROSSING RECONSTRUCTION APPROACH PAVEMENT REMOVAL & REPLACEMENT CONTRACTOR: Portzen construction, Inc. ADDRESS: 205 Stone Valley Dr, Dubuque CITY, STATE, ZIP: Dubuque, Iowa 52001 BID ITEM DESCRIPTION PAVEMENT REMOVAL REMOVAL OF PAVEMENT, PCC 8" THICK AMOUNT OF CONTRACT: $ TOTAL CHANGE ORDERS TO DATE: $ REVISED CONTRACT AMOUNT: $ 39,679.20 2,438.58 42,117.78 THE CITY OF DUB Masterpiece on the Mississippi PAYMENT PERIOD FINAL: November 1, 2013 CONTRACT PREVIOUS TOTAL TO -DATE CURRENT PAY PERIOD FINAL QUANTITY UNIT UNIT COST QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT COMP. REMOVAL OF PAVEMENT, PCC SIDEWALK 6" THICK REMOVAL OF PAVEMENT, ACC 8" THICK SAWCUT 304.30 SY $ 14.00 52.50 SY $ 10.00 154.00 SY $ 8.00 100.00 LF $ 5.00 PAVEMENT REPLACEMENT STANDARD PORTLAND CEMENT CONCRETE PAVEMENT, CLASS C, CLASS 3 DURABILITY, 8 IN. PCC PAVEMENT, W /CD 452.00 SY $ 56.00 6 PCC SIDEWALK 4" THICK 400.00 SF $ 5.00 7 ADA PRECAST TILE - TRUNCATED DOME (RED) 8.00 EACH $ 120.00 8 MISCELLANEOUS MOBILIZATION 9 GRANULAR SUBBASE 10 11 TOPSOIL, FURNISH & SPREAD SEEDING AND FERTILIZING (URBAN) LINE NO. 12 13 ITEM NUMBER CHANGE ORDER DESCRIPTION / EXTRA WORK ITEMS 3" CLEAN STONE (RAILROAD DRIVEWAY) 304.30 $ 4,260.20 304.30 $ 4,260.20 100.0% 52.50 $ 525.00 52.50 $ 525.00 100.0% 154.00 $ 1,232.00 154.00 $ 1,232.00 100.0% 66.00 $ 330.00 66.00 $ 330.00 66.0% 427.82 $ 23,957.92 427.82 $ 23,957.92 94.7% 1.00 LS $ 3,000.00 45.00 TON $ 22.00 15.00 CY $ 40.00 30.00 SY $ 10.00 468.76 $ 2,343.80 468.76 $ 2,343.80 117.2% 8.00 $ 960.00 8.00 $ 960.00 100.0% 1.00 $ 3,000.00 1.00 $ 3,000.00 100.0% 197.46 $ 4,344.12 197.46 $ 4,344.12 438.8% 1.20 $ 48.00 1.20 $ 48.00 8.0% 2.55 $ 25.50 2.55 $ 25.50 8.5% AMOUNT EARNED TO DATE: $ 41,026.54 CONTRACT PREVIOUS TOTAL TO -DATE CURRENT PAY PERIOD FINAL QUANTITY UNIT UNIT COST QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT COMP. WATER STOP BOX EXTENSION 14 ADJUSTMENT OF FIXTURES (WATER STOP BOX) 27.76 TON $ 24.00 1.00 EACH $ 225.00 1.00 EACH $ 200.00 27.76 $ 666.24 1.00 $ 225.00 1.00 $ 200.00 27.76 $ 666.24 100.0% 1.00 $ 225.00 100.0% 1.00 $ 200.00 100.0% CHANGE ORDER AMOUNT EARNED TO DATE: TOTAL AMOUNT EARNED TO DATE: TOTAL DUE CONTRACTOR: ENGINEERING DESIGN: CONSTRUCTION ENGINEERING: TOTAL CONSTRUCTION COST: $ 1,091.24 $ 42,117.78 $ 42,117.78 $ 42,117.78 FINAL PROJECT FUNDING SUMMARY CIP Total Earned to Date 2502026 - 73211 $ Previous Total Earned to Date Total Current Amount Earned Less Current Retainage 23,965.00 $ 22,766.75 $ 1,198.25 $ 3501465 -73211 $ 18,152.78 $ Current Amount Earned Less Retainage 17,245.14 $ 907.64 $ Current Retainage Release $ 1,198.25 $ $ 907.64 $ Previous Current Total Final Materials Stored Materials Stored Amount Due $ $ $ $ $ 1,198.25 $ 907.64 TOTAL: $ 42,117.78 $ 40,011.89 $ 2,105.89 $ $ 2,105.89 $ - $ $ - $ 2,105.89 CERTIFICATE OF THE CITY MANAGER To the best of my knowledge and belief, I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager City of Dubuque, Iowa APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR The undersigned, Portzen Construction, Inc. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: Portzen Construction, Inc. DATE: ("j3 BY: TITLE: :L&? P7 cL4 °`