Contracts Signed - Eagle Pt Park Concrete , ~~ DUB~E ~c/k-~ MEMORANDUM November 17, 2006 TO: Michael C. Van Milligen, City Manager FROM: GiI D. Spence, Leisure Services Manage ! SUBJECT: Eagle point Pari< Concrete Replacement project Attached is a copy of change order #1 for the Eagle point Park Concrete Replacement Project. This project includes replacement of the concrete on the East Porch of the Riverfront Pavilion and concrete around the Shiras Memorial Pavilion. This change order deals with work around the Shiras Memorial and includes three rather small items that total $2,983.53. There is an $18,000 contingency with this project. Please sign the change order and return it to me. Thanks. GDS:et attachment ') CHANGE ORDER Distribution to: Owner Architect Contractor Field Other PROJECT: Eagle Point Concrete replacement CHANGE ORDER #1 TO City of Dubuque Leisure Services DATE: 11/13/06 PROJECT NO CONTRACT FOR CONTRACT DATE: VARIATION IN REQlJIRED WORK OR MAIERlALS FROM TIlAT SPECIFIED IN TIlE PROJECT DOCUMENrs SHOULD BE BROUGHT TO THE ARCHIIECT'S AND THE GENERAL CONTRACTOR'S lMMEDlA IE ATTENTION ADJUSTMENT IN CON7RACT PRICE SHALL BE AGREED UPON IN WR/TlNG BEOPRE ANY INSTAlLATIONIS MADE, OTlfERWlSE THE OWNER SHALL ASSUME THATNO PRICE ADJUSTMENT WIll. BE NECESSARy, Remove flag pole. Concrete base Dig in Electrical Service, Drill new hale from underside Of concrete to underside of Light pole to outside of pavilion, Dig 2' deep trench from pavilion to electric pole. Hammer Drill Backhoe lumping jack Skid Steer Labor . . Additional Concrete under PavIlIon 2'-6" x 6'-6" Additional Concrete Sidewalk 6' x 5'-6" Remove the top side of a Foundation wall the length of concrete slab Skid steer with Hammer Skid steer Dump Truck Labor Bond Total Amount of Change Order # 1 $775,00 2 hrs @$85,00 2 hrs @$20,00 2 hrs @$75,00 7 hrs @$50.00 $20,00 $170,00 $40.00 $150.00 $350,00 -- -- -----'-;:;:;::ING ANY ADJUSTMENT IN TIlE CONTRACT SlIM OR CONTRACT TIME. SIGNATURE OF THE CONTRACTOR INDICATES THIs AGREEMENT HEREWlTII, f2fJ' (/ ~'/iJ_ A"lhon,e', ~J!/' Kluck Construction, Inc. Owner Contractor 14301 Hwy 20 West fldn~~ '. / --6~__ - _./ j/{ -_ -L By: //- /1-ac" Date: $154.44 $302.40 6.5 hrs@$85.00 $552.60 15 hrs@$75,00 $112,50 2.5 hrs@$75,00 $187.50 2,5 hrs @$50.00 $125,00 $44.09 Add: $2,983.53 Address Hy: III /~/b'? { Date: D~~~E ~YN-~ MEMORANDUM November 17, 2006 TO: Michael C. Van Milligen, City Manager FROM: GiI D. Spence, Leisure Services Manage ! SUBJECT: Eagle Point Park Concrete Replacement Project Attached is a copy of change order #1 for the Eagle Point Park Concrete Replacement Project. This project includes replacement of the concrete on the East Porch of the Riverfront Pavilion and concrete around the Shiras Memorial Pavilion. This change order deals with work around the Shiras Memorial and includes three rather small items that total $2,983.53. There is an $18,000 contingency with this project. Please sign the change order and return it to me. Thanks. GDS:et attachment . CHANGE ORDER Distribution to: Owner Architect Contractor Field Other . . ^',,=:<.<'::~h:::::::::~:::::~:::i:.:::~::;:~:~;~::::::::;:;:;;~::::<;;:;:;:::i;::;::::::::::::::::::::::::~::::::::;:;:::;::~;:::~;::::;:~;;;;;::::~;;:::;:i;;;;:::';::;;;;~::i:::::' ::::~:;::;:i::;';~;:;:;:::::;:::::::i:::::i:::;:i:i::;:::::;::::;:::;:::::::::::;::~;.:::;:r::::::::;:::::;:::;:;::::::::;:;i:;:::::;::';;:X:::::;:::::i:::-;:::;:::m:::::';;::;';;::::>>::::::;:i:<<;:::';;:::;:::;:::::::;~::::;::I.':::;:::;:X:::;:;::""'" PROJECT: Eagle Point Concrete replacement CHANGE ORDER #1 TO City of Dubuque Leisure Services DATE: 11/13/06 PROJECT NO: CONTRACT FOR: CONTRACT DATE: VARIATION IN REQUIRED WORK OR MATERIALS FROM THAT SPECIFIED IN THE PROJECT DOCUMENTS SHOULD BE BROUGHT TO THE ARCIDTECT'S AND THE GENERAL CONTRACTOR '5 IMJ\1EDlA TE ATTENTION ADJUSTMENT IN CONlRACT PRiCE SHALL BE AGREED UPON IN WRITING BEOFRE ANY INSTAllATION IS MADE. OTHERWISE THE OWNER SHAlL ASSUME THAT NO PRiCE ADJUSTMENT WILL BE NECESSARY. Remove flag jX>le. Concrete base Dig in Electrical Service. Drill new hole from llllderside Of concrete to llllderside of Light pole to outside of pavilion. Dig 2' deep trench from pavilion to electric pole. Hammer Drill Backhoe Jumping jack Skid Steer Labor Additional Concrete llllder Pavilion 2'-6" x 6'-6" Additional Concrete Sidewalk 6' x 5'-6" Remove the top side of a FOlllldation wall the length of concrete slab Skid steer with Hammer Skid steer Dump Truck Labor Bond Total Amollllt of Change Order # I S775.00 2 hrs @$85.00 2 hrs @$20.00 2 hrs @$75.00 7 hrs @$50.00 $20.00 $170.00 $40.00 $150.00 $350.00 $154.44 $302.40 6.5 hrs @$85.00 $552.60 1.5 hrs@$75.00 $112.50 2.5 hrs@$75.00 $187.50 2.5 hrs@$50.00 $125.00 $44.09 Add: $2,983.53 Authorized: SIGNATURE OF THE CONTRACTOR INDICATES TIllS AGREEMENT HEREWITH, INCLUDING ANY ADJUSTMENT IN TIlE CONTRACT SUM OR CONTRACT TIME ~ Kluck Construction, Inc. Contractor 14301 Hwy 20 West .-Adili:~ .. I -/!i{<--L By: //- /1-C;C- Date: ;ttJ ~IIJ-- OWner Address By: J/ J ) G /tft I I d'.."":::::;';;;'':::X;:';X;:;:MX;;;;;:::$,:::;;';;:;:~>>:&::::::>;:0>>;;;~>>-;::::X",:::0;0;-':::::::;;''::::::<<.<<m;;:;:y;;;..<<;::o;;:::~::,.;::::::~::::;:;:::::;:::m;::::Y;:<<::<::::::::::;';:::;~:;:::::;~X~::::y;;::w;;;;;:::::::<<;::::y>>.:::y.:x:::;::O;;:X;:>>';>>';-;>>';-;-mm;::::~~.."..~.:.:..~>>;::W;m;0;-;;;>>,;-;-'::::::<;"'." Date: