Contracts Signed - A.Y. McDonald Proj Chg Ord. 2 , D~~~E ~c!4-~ MEMORANDUM November 27,2006 TO: Michael C. Van Milligen, City Manager FROM: Gil D. Spence, Leisure Services Manager SUBJECT: A.Y. McDonald Park Project Attached are four copies of change order #2 for the A.Y. McDonald Park, Phase II project. The two main areas of change are: . We added more filter fabric than called for to aid in weed control. . More shrubs were planted than were specified on the unit price bid sheet. The number on the bid sheet was lower than the number of shrubs shown on the plans. The work was performed to match the plans. Please sign all four change orders and return them to me for distribution. Thanks! GDS:et attachments , l~orlll ~,)240wd . 7(00 ~ FeE 1V E D ~... Iowa Department of Transportation ...... ..." Change Order Non-Substantial: Non- Part Part o 0 o 0 Concurrence Date T"'1[f{ F< ii-,.,~, ,t No. 2 non-participating Substantial: Contract Accounting ID No.: 24571 County Dubuque Project No: NRT-NT06(9)--9G-31 Kind of Work: HMA Trail and Landscaping Date Prepared: November 14, 2006 Contractor: Portzen Construction, Inc. of Dubuque, IA (P0085), Contractor You are hereby authorized to make the followin9 changes to the contract documents. A - Description of change to be made or extra work to be done: Installation of additional shrubs (non-participating) Installation of additional landscape fabric (non-participating) Core out for erosion stone placement South of North Parking Lot (non-participating) 8 - Reason for change or extra work: Quantity bid was not reflective of quantity of shrubs shown on the plans Decision to add landscape fabric at all locations under shrubs and trees. Not added at planting locations where flower plantings which would spread were placed. Drainage from parking area and across trail showed potential for long term erosion and washing of mulch originally place. Corrective measure determined to be site core out and placement as stone to selVe as mulch around plantings and slow the water. Approved Director, Office of Systems Planning Date 4~lJ\s\J Project Architect or Engineer ll.lY '0" Date (Continued on reverse side) Receipt is acknowledged of this change or extra work and terms of settlement are hereby agreed to. Approved contingent upon funds being available under the existing project agreement or upon additional Federal-aid funds being made available by a modified project agreement. By !J-/~ -l7(.-. Date ce, City of Dubuque //1,) Jja Date Date For the Division Administrator Federal Highway Administration Approved DISTRIBUTION: Project Engineer- Forward original to District. District - Nonsubstantial- Forward original and one copy to the Office of Construction and tv.Io oopies back to the Project Engineer. - Substantial - Forward original and two copies to the Office of Construction. . >, ,. Accounting 10 No. ~ 1 234 5 6 C-1 -Settlement for cost of work to be made as follows: Change Order No. 2 Non- participatin~ 8011 - Lump sum cost of $630.00. C-2 - Justification for cost(s) 8011 Analysis of time and materials to verify this as an appropriate cost 0- ITEMS INCLUDED IN CONTRACT If Credit Add "CR" Change Line Item Number Unit Price Quantity Amount No. .xxx .xxx .xx 7008 0300 Landscape Fabric2599-9999018 2.200 4579.660 10,075.25 7009 0350 Shrubs 2610-0000110 49.500 268,000 13266.00 7 7 7 7 7 TOTAL 23,341.25 If Credit, E - ITEMS NOT INCLUDED IN CONTRACT Add "CR" Change Item Description Item Number Function Unit Price Quantity Amount No. Code .xxx .xxx .xx 8011 Earthwork Core-out and Stone Mulch Placement 1.000 630.000 630.00 8 8 8 8 8 8 TOTAL 630.00