Loading...
Dubuque Pack Memorial Site Landscaping Project AccepatanceMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Dubuque Pack Memorial Site Landscaping Project CI P: 7201654 DATE: November 22, 2013 Dubuque band AI- America City IIIii! 2007 • 2012 • 2013 City Engineer Gus Psihoyos is recommending acceptance of the Dubuque Pack Memorial Site Landscaping Project, as completed by Nauman Nursery, in the final contract amount of $39,254.79, which is approximately 6% above the original contract amount of $36,982.50. The landscaping included flagpoles, benches, sidewalk and plantings. The increase is due to the anodizing of the three flagpoles for extended life, colored mulch, and the addition of irrigation for all the plants. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi Dubuque klitil AD-America City I'll, 2007 • 2012 • 2013 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Dubuque Pack Memorial Site Landscaping Project CIP: 7201654 DATE: November 25, 2013 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Dubuque Pack Memorial Site Landscaping Project. BACKGROUND The Dubuque Pack Memorial Site Landscaping Project provided landscaping at the recently installed memorial marker at the East 16th and Sycamore Street location. The landscaping included flagpoles, benches, sidewalk and plantings. In accordance with Iowa Code § 384.103 and § 364.12(3)(c), and Iowa Code, Section 26.14, on March 28, 2013 the City solicited informal bids for the Dubuque Pack Memorial Site Landscaping Project. Nauman Nursery, Inc. of Dubuque, Iowa, submitted the low bid in the amount of $36,982.50. DISCUSSION The Dubuque Pack Memorial Site Landscaping Project was completed by Nauman Nursery of Dubuque, IA in the final contract amount of $39,254.79, which is approximately 6% above the original contract amount of $36,982.50. The increase is due to the anodizing of the three flagpoles for extended life, colored mulch, and the addition of irrigation for all of the plantings. RECOMMENDATION I recommend that the City Council accept the improvements and authorize payment of the contract amount of $ 39,254.79 to Nauman Nursery for the Dubuque Pack Memorial Site Landscaping Project. BUDGET IMPACT The cost summary for the Dubuque Pack Memorial Site Landscaping Project.: Award Final Construction $36,982.50 $39,254.79 Contingency 3,698.25 0.00 Engineering 6,102.11 5,515.50 Total Project Cost $46,782.86 $44,770.29 The funding summary for the project is as follows: CIP 7201654 ACTION TO BE TAKEN Funding Source Bee Branch Creek Restoration Fund Amount $ 44,770.29 I respectfully request that the City Council adopt the attached resolution accepting the improvements and authorizing payment of the contract amount of $39,254.79 to Nauman Nursery for the Dubuque Pack Memorial Site Landscaping Project. Prepared by Tom Freund, Engineering Technician cc: Marie Ware, Leisure Services Manager Deron Muehring, Civil Engineer RESOLUTION NO. 345 -13 ACCEPTING THE DUBUQUE PACK MEMORIAL SITE LANDSCAPING PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Dubuque Pack Memorial Site Landscaping Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Bee Branch Creek Restoration capital improvement appropriation for the contract amount of $39,254.79 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 2nd day of December. 2013. Attest: Kevin • irnstahl, MC ity Clerk - Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE DUBUQUE PACK MEMORIAL SITE LANDSCAPING PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Dubuque Pack Memorial Site Landscaping Project, and that said Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $44,770.29. Dated this 01011- day of /V 12013. Gus Psihoyos, City ngineer Filed in the office of the City Clerk on they day of THE CITY OF Dui Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589 -4270 PROJECT CLOSE OUT FORM Project Name: CIP Number: Project Contract Amount: Project Completion Date: DUBUQUE PACK MEMEORIAL CONSTRUCTION PROJECT CIP: 7201654 $36,982.50 28- Jun -13 Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: Nauman Nursery 4101 Pennsylvania Avenue Dubuque, Iowa 52002 563- 588 -2276 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE Unclassified Excavation 1 LS $ 800.00 1.00 $ 800.00 100.00% 100.00% 111.91% 100.00% 100.00% 21.67% 290.29% 100.00% 100.00% 100.00% 100.00% 100.00% 0.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 0.00% 1 2 Strip, Salvage, and Restore Topsoil 1 LS $ 800.00 1.00 $ 800.00 3 Concrete Sidewalk 830 SF $ 5.50 928.87 $ 5,108.79 4 Salvaged Brick Sidewalk Pavers 31 SF $ 15.00 31.00 $ 465.00 5 Donor Bricks 79 SF $ 9.50 79.00 $ 750.50 6 3/4 -IN Base Course 30 T $ 27.00 6.50 $ 175.50 7 Open Graded Base Course 17 T $ 29.00 49.35 $ 1,431.15 8 Stone Planter Wall 48 LF $ 102.00 48.00 $ 4,896.00 9 Stone Slab Bench 2 EA $ 2100.00 2.00 $ 4,200.00 10 20 -FT Flag Pole and Base 2 EA $ 1,950.00 2.00 $ 3,900.00 11 25 -FT Flag Pole and Base 1 EA $ 2,920.00 1.00 $ 2,920.00 12 Flag Pole Lighting 1 LS $ 5,300.00 1.00 $ 5,300.00 13 Compost Soil Amendment - 3 -IN Layer 14 CY $ 40.00 $ - 14 Shredded Hardwood Mulch 170 SY $ 4.50 170.00 $ 765.00 15 Trees - Deciduous Ornamental, B &B 2 EA $ 335.00 2.00 $ 670.00 16 Trees - Evergreen, B &B 5 EA $ 380.00 5.00 $ 1,900.00 17 Shrubs- Deciduous, 5 -Gal container 8 EA $ 65.00 8.00 $ 520.00 18 Perennials -1 GAL Pot 30 EA $ 18.00 30.00 $ 540.00 19 Perennials -1 QT Pot 57 EA $ 11.50 57.00 $ 655.50 20 Shovel -Cut Edge 175 LF $ 1.50 175.00 $ 262.50 21 Repair Seeding -Blue Grass 710 SY $ 1.00 710.00 $ 710.00 22 Erosion Control 1 LS $ 500.00 $ - SUBTOTAL $ 36,769.94 100.00% 100.00% 100.00% CHANGE ORDER 1 Annodize Flag Poles 1 1.00 $ 880.00 2 Colored Mulch 1 1.00 $ 140.00 3 Irrigation Installation 1 1.00 $ 1,464.85 Payment Totals $ 39,254.79 I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Total Contract Work Performed to Date: $ 36,769.94 Total Change Order Work Performed to Date: $ 2,484.85 Total Contract and Change Order Work Performed to Date: $ 39,254.79 Miscellaneous Costs Engineering 5.515.50 Michael Van Milligen, City Manager Dubuque, lowa Gus Psihoyos, City Engineer Dubuque, Iowa TOTAL FINAL PROJECT COSTS: $ 44,770.29 The Undersigned VANN. G oia.S.Y ontractor for the above improvement, doe,S)her�by accept a pt the above r" bove 'Total Due ntracto, as full settlement f ll //�ims sal ,rovement. APPROVED: BY: C. /l /Cx f V A- uIttA1%,J