Loading...
Dubuque Intermodal Transportation Center_DocumentsTHE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Dubuque Intermodal Center Budget DATE: November 27, 2013 Dubuque kitetri All- America City 'I'll®, 2007 • 2012 •2013 The City of Dubuque was awarded an $8,000,000 State of Good Repair (SGR) grant to be used for an Intermodal Center adjacent to the Historic Millwork District. The Intermodal Center has three components; parking, terminal and bus storage. The parking and the terminal are the main priorities for the grant funds with any remaining funds for the bus storage facility. The Intermodal Center is designed to improve access to transportation services in and around the City of Dubuque, as it will provide a center at which all modes of transportation will be accessed including: pedestrian, bicycle, park'n'ride, intercity buses (Burlington - Trailways and Lamers), taxis, hotel shuttles, and area public transit service (The Jule and the Regional Transit Authority or "RTA "). The parking ramp component, 3 levels, includes 92 transit dependent and 200 non - transit dependent spaces, will provide parking for users of public transit, staff based in the intermodal center and the general public. The facility will also provide bicycle storage to support commuter travel or recreational use. The approved feasibility study by the Federal Transit Authority accommodates all improvements listed above with the City contributing $ 6.62 million in local funds toward the 200 general public parking and Federal Transit Authority State of Good Repair Grant contributing $5.69 million to complete the project. During the design process of the Intermodal Center changes were made to the design to accommodate the needs of green space next to the parking structure. There were also changes in cost due to the foundation and an escalation of construction costs since the project construction date moved from fall 2013 to spring 2014. The list below provides the changes and costs associated with them: • Adding restrooms in the parking ramp to accommodate the usage of green spaces + $61,500. • The cost of foundations and structural slab based on the soils testing + $300,000. • Escalation Fall 2013 bid (per last estimate) to spring 2014 + $678,500. Overall the changes increase the cost of project by $1,040,000. City staff, ECIA and Neumann Monson Architects staff worked together to reduce costs to get them closer to the original costs estimates submitted to the FTA for the project. The following list of line items are recommended for modification to save money: • Using perforated steel in lieu of glass at the north walkway saves $113,000. • Redesigning the terminal saves $880,000 by replacing the glass second story facade with materials that match the first story. • IPE cladding at lower portion of terminal saves $50,000. • Further reduce height at one story mass of terminal by one foot saves $10,000. • Removing the east elevator shaft and modifying the stair towers in the parking facility saves $170,000 • Precast planks with a topping slab instead of cast -in -place concrete on pedestrian bridge saves $30,000 • Change terra -cotta on the south to perforated metal panels saves $60,000 • Change glass on the north to perforated metal panels saves $39,000 The budget provides a savings of $2.3 million in FTA funds that could be transferred to the Bus Storage and Maintenance facility and $25,381 savings in local funds for City after committing budgeted City resources. While this will be the topic of a future City Council meeting, this appears to provide sufficient funding, using additional state grant money and funds available from the Federal Surface Transportation dollars available through DMATS, to build a bus storage facility and Jule Transit offices at the former Public Works Facility on Kerper Boulevard. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Tim Horsfield, Parking System Supervisor Chandra Ravada, ECIA Transportation Director 2 East Ce TO: FROM: Chandra Ravada, Transportation Director, ECIA CC: a regional response to local needs November 27, 2013 Memo Michael Van Milligen, City Manager EC A Maurice Jones, Economic Development Director Kelley Deutmeyer, Executive Director, ECIA Teri Goodmann, Assistant City Manager Tim Horsfield, Parking Division Manager Jenny Larson, Finance Director Candace Eudaley, Jule Transit Manager SUBJECT: Dubuque Intermodal Center Budget PURPOSE To provide an update on the budget for the Dubuque Intermodal Center, potential savings options based on Value Engineering options, and the estimated remaning funds for the Bus Storage and Maintenance Facility based on estimates provided by Neumann Munson Architects (NMA) for the Dubuque Intermodal Center. BACKGROUND The City of Dubuque was awarded an $8,000,000 State of Good Repair (SGR) grant to be used for an Intermodal Center adjacent to the Historic Millwork District. The Intermodal Center has three components; parking, terminal and bus storage. The parking and the terminal are the main priorities for the grant funds with any remaining funds for the bus storage facility. Based on the parking needs for the Historic Millwork District and the terminal portion of the Intermodal facility the City had planned to utilize 75% of the $8,000,000 SGR funding for the Intermodal Center and shift the remaining funds to the Bus Storage and Maintenance Facility (BSMF), which is the second phase of the project. If the remaining SGR funds are not shifted to the BSMF after the Intermodal is constructed, the funds will be recaptured by the FTA and reallocated to other projects. The Intermodal Center is designed to improve access to transportation services in and around the City of Dubuque, as it will provide a center at which all modes of transportation will be accessed I Dubuque Metropolitan Area Transportation Study I Eastern Iowa Development Corporation i Eastern Iowa Regional Utility Services System I Eastern Iowa Regional Housing Authority I ECIA Business Growth, Inc. I I Region 1 Employment and Training I ECIA Regional Planning Affiliation I Region 8 Regional Transit Authority I 7600 Commerce Park, Dubuque, IA 52002 I www.ecia.org I ecia @ecia.org I 563.556.4166 I Iowa only: 800.942.4648 I Relay Iowa 800.735.2943 I f: 563.556.0348 including: pedestrian, bicycle, park'n'ride, intercity buses (Burlington- Trailways and Lamers), taxis, hotel shuttles, and area public transit service (The Jule and the Regional Transit Authority or "RTA "). The parking ramp component, 3 levels - 92 transit dependent and 200 non - transit dependent spaces, will provide parking for users of public transit, staff based in the intermodal center and the general public. The facility will also provide bicycle storage to support commuter travel or recreational use. The approved feasibility study by Federal Transit Authority (FTA) accommodates all improvements listed above with the City contributing $ 6.62 million in local funds toward the 200 general public parking and and FTA State of Good Repair Grant contributing $5.69 million to complete the project. The second portion of the project, the BSMF will provide housing for The Jule's brand -new fleet of clean diesel buses that were purchased with federal and state grant funds during 2011 -2012, as well as reduce long term maintenance costs by replacing the existing 100 year old facility. The BSMF will also provide options for future expansion; reduce deadhead travel and potential delays of the service. The BSMF will be located on the Intermodal Campus at the site of the old City garage and will compliment the services provided at the Intermodal Center. The City hired IIW and Conlon Construction to develop a plan to construct the BSMF in multiple phases using any left over funding from the SGR grant. The City programed $ 433,307 in FY 14 and $939,206 in FY 15 for local match to the BSMF and Intermodal Center project. The BSMF remains a priority for the FTA in Kansas City. DISCUSSION As part of final design process, The City conducted two Value Engineering (VE) studies to reduce the cost of Dubuque Intermodal Center. Below is a detailed explanation of the cost savings from the VE and their impact on local dollars and federal funds for the BSMF. . Feasibility Study Budget The original 25% Design Drawing opinion of probable cost was done in December of 2011 as part 1 of NMA's scope. NMA used the RS Means (RS Means is a trusted name in construction costs for more than 70 years, RS Means offers annually updated construction cost information available in convenient online, eBook, book, or CD format — it is one of the construction industry's most dependable cost estimating solution) to gauge the cost of escalation and used this criteria (and added a 2% inflation rate) to establish the the project budget estimate to the FTA in the Spring of 2013. Table 1 below provides the original budget submitted to FTA in the spring of 2013. This budget estimated a savings of $2.5 million in FTA funds that could be transferred to Bus storage and Maintenance facility and $324,857 in local funds remaining after constructing the Intermodal Center. Budget Scenarios for Dubuque Intermodal Transportation Center Table 1: Bud s et for Intermodal Center Feasibilit Stud Items FTA Submission (Page 32) Costs FTA City Total 5,697,699 6,621,612 12,319,311 Funding Federal & State Funds FTA funds Intercity Bus grant Subtotal City funds Bond Match additional city funds Interest Subtotal Total Savings 8,000,000 $ 199,916 $ 8,199,916 $ 4,300,000 $ 2,636,469 $ 10,000 $ 6,946,469 $ 15,146,385 Savings in FTA funds Savings in City funds $ 2,502,217 $ 324,857 Feasibility Study + Additional scope Budget During the design process of the Intermodal Center changes were made to the design to accommodate the needs of green space next to the parking structure. There were also changes in cost due to the foundation and an escalation of construction costs since the project construction date moved from fall 2013 to spring 2014. The list below provides the changes and costs associated with them: • Adding restrooms in the parking ramp to accommodate the usage of green spaces + $61,500. • The cost of foundations and structural slab based on the soils testing + $300,000. • 2.5% Escalation Fall 2013 bid (per last estimate) to spring 2014 + $270,000. Overall the changes increase the cost of project by $631,500. Table 2 below provides the budget submitted to FTA + additional scope. This budget provides a savings of $2.2 million in FTA funds that could be transferred to the Bus storage and Maintenance facility. However, these changes in costs adds $187,132 in local funds to the Dubuque Intermodal Facility. Budget Scenarios for Dubuque Intermodal Transportation Center Table 2; Buu se' for Intermodal Cent .r Items I 'lit tud + additional sco • e1 FTA Submission (Page 32) +additional scope Costs FTA Cit Total $ 5,970,171 $ 7,133,601 13,103,773 Funding Federal & State Funds FTA funds Intercit Bus •rant Subtotal City funds Bond Match additional cit funds Interest Subtotal Total 8,000,000 199,916 8,199,916 4,300,000 $ 2,636,469 10,000 6,946,469 $ 15,146,385 Savings Savines in FTA funds Savines in Cit funds $ 2,229,745 $ 187,132 100% Design Drawing (DO) Budget In mid - October NMA issued a 100% DD pricing set and received the opinion of probable cost from their estimators for the Intermodal Center. The estimators informed NMA that the project costs have been climbing at a more escalated rate than previously anticipated which has now increased the Intermocdal Center by a $1.04 million from the Feasibility Study + Additional scope Budget. Table 3 below provides the budget for 100% DD. This budget provides a savings of $1.4 million in SGR funds that can be transferred to the Bus Storage and Maintenance facility but causes s shorfall of $412,072 that would have to come from local funds to complete Dubuque Intermodal Center. Budget Scenarios for Dubuque Intermodal Transportation Center Table 3: Budget for Intermodal Center f 100% Design Drawing Budget Items 100% DD (CPMI) Costs FTA $ 6,785,353 City $ 7,358,541 Total $ 14,143,894 Funding Federal & State Funds $ 8,000,000 FTA funds $ 199,916 Intercity Bus grant Subtotal $ 8,199,916 City funds Bond Match $ 4,300,000 $ 2,636,469 additional city funds Interest $ 10,000 $ 6,946,469 Subtotal Total $ 15,146,385 Savings Savings in FTA funds $ 1,414,563 Savings in City funds $ (412,072) First Round VE modifications budget City Staff and NMA staff worked together to reduce costs to get them closer to the original costs estimates submitted to the FTA for the project. The first set of Value Engineering (VE) savings are as follows: The following are the list of line items that are discussed as part of first round of value engineering: • Delete the Public Restrooms in the Parking Ramp ($61,500). • Using perforated steel in lieu of glass at the north walkway, saves ($113,000). • Eliminating the roof at the bridge, reducing the width to 6' -8" and using perforated steel guardrails, saves ($292,000). • Redesigning the terminal, saves ($880,000). Table 4 below provides the budget for First Round VE modifications. This budget provides a savings of $2.4 million in FTA funds that could be transferred to Bus Storage and Maintenance facility but the city needs to add $23,371 in local funds to complete Dubuque Intermodal Center. Budget Scenarios for Dubuque Intermodal Transportation Center $ 15,146,385 Table 4: Budget for Intermodal Center First Round VE modifications Bud et Items VE Items (Round 1) Costs FTA $ 5,795,754 City $ 6,969,840 Total Funding Federal & State Funds $ 12,765,594 FTA funds 8,000,000 $ Intercity Bus grant 199,916 Subtotal $ 8,199, 916 City funds Bond Match $ 4,300,000 additional city funds $ 2,636,469 Interest $ 10,000 Subtotal Total Savings $ 6,946,469 Savings in FTA funds $ 2,404,162 Savings in City funds $ (23,371) Second Round VE modifications budget The City Staff and NMA staff continued to look for costs savings measures and came up with more reductions in addition to the first set of Value Engineering (VE) to reduce the costs and get them more in line with the original esitmates submitted to the FTA. The following is a list of line items that were discussed as part of second round of value engineering in addition to first round of value engineering: • Reduce the terracotta 25% we could save ($130,000). • IPE cladding at lower portion of terminal ($50,000). • Further reduce height at one story mass of terminal - by one foot ($10,000). Table 5 below provides the budget for Second Round VE modifications in addition to first round VE modifications. This budget provides a savings of $2.4 million in FTA funds that could be transferred to the Bus Storage and Maintenance facility and $73,862 savings in local funds for City. Budget Scenarios for Dubuque Intermodal Transportation Center Table 5: Bud s et for Intermodal Center Second Round VE modifications Bud s et Items VE Items (Round 2) Costs FTA $ 5,762,987 City $ 6,872,607 Total Funding 12,635,594 Federal & State Funds FTA funds Intercity Bus grant Subtotal City funds Bond Match additional city funds Interest Subtotal Total S $ 8,000,000 199.916 8.199.916 $ 4,300,000 $ 2,636,469 $ 10,000 6,946,469 ,385 $ 15,146 g Savings in City funds $ 2,436,929 $ 73,862 VE items after City meeting The City staff and NMA presented VE 1 and VE 2 options and savings to City management. City management excluded some of the options including: deleting the public restrooms in the parking ramp and eliminating the roof at the bridge and added options including: removing the east elevator shaft and modifying the stair towers and using precast planks with a topping slab. The following are the list of line items that are under consideration and are left for future discussion after the meeting with City management: • Using perforated steel in lieu of glass at the north walkway saves ($113,000). • Redesigning the terminal saves ($880,000). • IPE cladding at lower portion of terminal saves ($50,000). • Further reduce height at one story mass of terminal by one foot saves ($10,000). • Removing the east elevator shaft and modifying the stair towers saves($170,000) • Precast planks with a topping slab instead of CIP concrete on pedestrian bridge saves ($30,000) • Change terra -cotta on the south to perforated metal panels saves ($60,000) • Change glass on the north to perforated metal panels saves($39,000) Taking the second floor off the terminal facility is not recommended because it changes the elevation of the structure and will necessitate reopening the feasibility study and resubmitting to SHPO for them to reopen their process. This could cause at least a 90 day delay in the project. Budget Scenarios for Dubuque Intermodal Transportation Center Table 6 below provides the budget after meeting with City management. This budget provides a savings of $2.3 million in FTA funds that could be transferred to Bus Storage and Maintenance facility and $25,381 savings in local funds for City. Table 6: Budget for Intermodal Facility (VE items after City meetin q) Items Costs FTA City Total Funding Federal & State Funds FTA funds Intercity Bus grant Subtotal City funds Bond Match additional city funds Interest Subtotal Total Savings VE Items (after City review) $ 5,898,006 $ 6,921,088 $ 12,819,094 $ 8,000,000 $ 199,916 $ 8,199,916 $ 4,300,000 $ 2,636,469 $ 10,000 $ 6,946,469 Savings in FTA funds Savings in City funds $ 2,301,910 $ 25,381 CONCLUSION Based on the various VE options, the design team is requesting City input so they can move forward with the project based on the direction we are provided on the VE for the VE options. These decisions will affect the overall project schedule, which also correlates with the specific items included as part of the VE process. Please see attached final design images from Newman Munson Architects. Thank you for your consideration. Budget Scenarios for Dubuque Intermodal Transportation Center Budget Scenarios for Dubuque Intermodal Transportation Center NEUMANN MONSON Page 9 1111 - 111'11 -I 11 • Budget Scenarios for Dubuque Intermodal Transportation Center a u Page 10 .VJJJJJJJA Ill 1-11-11-1111 i» • • I I I I NEUMANN MONSON ARC,I DUBOUE IN ERMODAL CAMPUS Budget scenartosfor Dubuque Intermodal Transportation Center Page 11 Q N NEUMANN MONSON ARCHITECTS DUROUE INTERMODAL CAMPUS Budget Scenarios for Dubuque Intermodal Transportation Center Page 12 NEUMANN MONSON C •f ' C Budget Scenarios for Dubuque Intermodal Transportation Center Page 13 m NEUMANN MONSON ARCHITECTS DUBOUE INTERMODAL CAMPUS Budget scenartosfor Dubuque Intermodal Transportation Center Page 14 m La m 'Ma! -`a`: eltali.+f Ire, t 4r- rail: arse PriPi *Ira lj.wWarrAI . �! f NEUMANN MONSON ARC,I DUDOUE IN ERMODAL CAMPUS Budget scenartosfor Dubuque Intermodal Transportation Center Page 15 III Ii1,_ 1 111111. 111111' I 111 II Y I "l 1. _ 11111.1.1_ 1 III V I 1 II I. mir 1111111 L .1 1 1 11 1 - -- 1 1 1 it I I II q. 1 1 u; Budget scenartosfor Dubuque Intermodal Transportation Center Page 16 0 1' 1 • 11' II'; 1v. • L i t t r:�1 1.1•11II 1 I' 111111 1,11 1 11 , . ,1, 1 111■11 111\1111 I" 1 • 1II111111 111 1 I' VI 1 1 111 -I 111 r •T� 11r N MONSON A a W Budget scenartosfor Dubuque Intermodal Transportation Center Page 17 SOUTH ELEVATION RAMP A G 7 J J NEUMANN MONSON ARCHIUEC'S Budget Scenarios for Dubuque Intermodal Transportation Center Page 18 Budget Sce »anosfor Dubuque Intermodal Transportation Center PEDESTRIAN BRIDGE_NO CANOPY PEDESTRIAN BRIDGE WITH CANOPY DUB OUE IN EN MODAL CAMPUS NEUMANN MONSON AN64PCCT`i