Loading...
Shady Oaks Subd. accept Dii~~E ~c!N--~ MEMORANDUM December 12, 2006 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Acceptance of Public Improvements in Shady Oaks Subdivision Including an Extension into Mt. Carmel Heights City Engineer Gus Psihoyos is recommending acceptance of the public improvements that the developer, Tschiggfrie Excavating Co., has recently completed in Shady Oaks Subdivision and an adjacent development in Lot 7 of Mt. Carmel Heights. Maintenance of said improvements shall be the responsibility of the contractor and owner, Tschiggfrie Excavating Co., for a period of two years from the date of acceptance. I concur with the recommendation and respectfully request Mayor and City Council approval. (lL1 ~~/Jl\L--- Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer , __'..1 DU~'&1E ~Yk-~ MEMORANDUM December 11, 2006 FROM: Michael C. Van Milligen, City Mava " Gus Psi hoyos, City Engineer . " TO: SUBJECT: Acceptance of Public Improvements in Shady Oaks Subdivision Including an Extension into Mt. Carmel Heights INTRODUCTION The enclosed material provides for City Council acceptance of the public improvements which the developer, Tschiggfrie Excavating Co., has recently completed in Shady Oaks Subdivision and an adjacent development in Lot 7 of Mt. Carmel Heights. BACKGROUND As a condition of subdivision plat approval through Resolution No. 54-95, the developer of Shady Oaks Subdivision was required to install certain public improvements including street paving with curb, sanitary sewer main, watermain, storm sewers and catch basins, boulevard street lighting, and off-site detention facilities and to dedicate these improvements to the City upon completion. In conjunction with these improvements, the Sisters of Charity, BVM, requested the City take over maintenance and ownership of a new 8" sewer they were installing to new apartments on Lot 7 of Carmel Heights. DISCUSSION The Subdivision Ordinance requires that upon completion of all the required public improvements, the subdivider shall notify the City in writing of the completion of the improvements, requesting that the City either approve or reject the acceptance of the improvements, together with a statement of reasons for any rejection. On December 8, 2006, Tschiggfrie Excavating Co. requested City's acceptance of the improvements in Shady Oaks Subdivision. On April 18, 1996, the Sisters of Charity, BVM, requested City ownership and maintenance of sanitary sewer improvements. Upon inspection by the City, it has been determined that all of the public improvements required by Resolution No. 54-95 and those approved for sanitary sewer to Lot 7 of Carmel Heights, have been completed in accordance with plans approved by the City Council and in conformance with City specifications. Sidewalk construction and tree removal, if necessary for construction of the sidewalk, will be the responsibility of the abutting property owner. RECOMMENDATION I would, therefore, recommend that the City Council accept the public improvements. Maintenance of said public improvements shall be the responsibility of the contractor and owner, Tschiggfrie Excavating Co., for a period of two (2) years from the date of acceptance by the City Council. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution accepting the improvements. Prepared by Ronald J. Turner, PLS RESOLUTION NO. 595-06 ACCEPTING PUBLIC IMPROVEMENTS IN SHADY OAKS SUBDIVISION INCLUDING AN EXTENSION INTO CARMEL HEIGHTS Whereas, pursuant to Resolution 54-95, certain public improvements including street paving with curb, sanitary sewer main, watermain, storm sewers and catch basins, boulevard street lighting, and,off-site detention facilities were installed by the developer of Shady Oaks Subdivision, inclusive of Lots 1 through 35, and Lot A, and Lot 7 of an extension into Lot 7 of Carmel Heights. Whereas, the improvements have been completed and the City Manager has examined the work. and has filed a certificate stating that the same has been completed in accordance with the plans approved by the City Council and in conformance with City specifications, and has recommended that the improvements be accepted by the City Council. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE: Section 1. That the recommendation of the City Manager be approved and that said public improvements in Shady Oaks Subdivision and the extension into Lot 7 of Carmel Heights be and the same is hereby accepted. Section 2. That the construction of sidewalks, including the removal of trees within the right of way, if necessary, is the responsibility of the property owner abutting said right of way. Section 3. That maintenance of said public improvements shall be the responsibility of the contractor and owner for a period of two (2) years from this date. Passed, adopted and approved this 18tn day of December, 2006. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk I I ---::==- ---:I:r-- -~_J----- \ I , ~ NORTH --'" -- -------- -------- -------- -------- -------- -- ---------- SHADY OAKS SUBDIVISION ACCEPTANCE VICINITY MAP GRAPHIC SCALE 300 150 0 150 ~-"""'" I 300 I DRAWING MAY HAVE BEEN REDUCED 1 INCH = 300 FEET I '"-------~ ~-------- \, ----------------- I I i li': I , I , 1 ----- -- -- I , \ I I \ , \ , , \ I , CARMEL HEIGHTS SANITARY SEWER EXTENSION -----1 \ ---r---L--T- I I --~ -----1 I I , I' I \ , \ , I \ I I \ I I \ I ________1- -------------------- DEC-II-2oo6 MoN 12:58 PM TSCHIGGFRIE CO. FAX NO. 5635577585 p, 01/01' 420 JlJ~.IEN DUaUQUE DRIVE PHONE 563 557.745U FAX 51i1557-75R5 DLJDUQUE. IOWA 52lJ03 S I . .- .. ~.-. .... . TS CHIG GF RIEEX CA V A TING City of Dubuque En~eering Dept 13 & Central Dubuque, Iowa 5200 I Ref: Shady Oaks Subdivision Acceptance Attn Ron Turner: We are IISking that the City of Dubuque accept the Street and Utility improvements to the Shady Oaks subdivision. Tschiggfrie Excavating has made all improvements r of November 7th 2006, in accordance to City of Dubuque specifications. The r~oval of trees in the city right away, and the installation of the sidewalks is the responsibility of each lot owner. If you have any questions, please oontract our office. ~A76 Michael M Schute Office Manger