City Hall Restroom RenovationsTHE CITY OF DUB E ~-~~ December 15, 2006 Memorandum TO: Michael Van Milligen, City Manager FROM: Rich Russell, Building Services Manager ~~~ RE: City Hall-15` Floor Restroom Renovations INTRODUCTION: The purpose of this memo is to request that you sign the three copies of Change Order #1. DISCUSSION: Change Order #1 covers additional floor demolition and preparation. The old the floor did not easily separate from the existing subfloor. Damage to the existing gypcrete subfloor requires that we remove and replace it with a new layer of gypcrete. Because gypcrete requires 12 days to harden/set up, an extension 17 days has been requested to the completion date. An additional four days is needed to remove the rest of the old gypcrete. This allows for a new completion date of January 22, 2007. RECOMMENDATION: (recommend that the three copies of Change Order #1 be signed and returned to me for processing. cc: Dawn Lang, Budget Director Jenny Larson, Budget Director CHANGE ORDER Distribution to: ADCI DOCUMENT OWNER ^ ANDERSON Design & Consulting, Inc. ARCHITECT ^ Architectural & Engineering Design CONTRACTOR ^ P.O. Box 735, 169 Main Street, Dubuque, IA 520040735 FIELD ^ te1: 563-582-7241 fax: 563-582-7243 OTHER ^ PROJECT: City Hall 1st FI Restroom Remodel CHANGE ORDER # 25106-1 (Name, address) City Hall, Dubuque, IA 52001 DATE: 12/13/2006 TO (Contractor) PROJECT NO: 25106 Portzen Construction I CONTRACT FOR: Restroom Remodel 205 Stone Valley Dr Dubuque, IA 52003 ~ CONTRACT DATE: 11/11/2006 VARIATIONS IN ftEOUIRED WORK OR MATERIALS FROM THAT SPECIFIED IN THE PROEJCT DOCUMENTS SHALL BE BROUGHT TO THE AROHITECNRAL DESIGN FIRM'S AND THE GENERAL CONTRACTOR'S IMMEDIATE ATTENTION. ADJUSTMENi1N CONTRACT PRICE SMALL BE AGREED UPON IN WRITING BEFORE ANY INSTALLATIONS MADE, OTHERWISE THE OWNER SHALL ASSUME THAT NO PRICE ADJUSTMENT WILL BE NECESSARY. You are directed to make the following changes in this contract: 1. Demo & dispose underlayment Add: $2,160.00 2. Prep floor & protect doors/walls Add: $200.00 3. Install gypcrete 2000 Add: $1,857.00 4. General contractor overhead Add: $422.00 5. Install ceramic file flooring in the entry way of each bathroom in lieu of Add: $0.00 the sheet vinyl specified Total A mount of Change Order f125106-1 Add: $4,639.00 Not valid until signed by both the Owner and ANDERSON Design & Consulting, Inc. Signature of the Contractor indicates his agreement herein, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) was $76,828.00 Net change by previously authorized Change Orders $0.00 The (Contract Sum) prior to this Change Order was $76,828.00 The (Contract Sum) will be (increased) (desreased~ (aRSkfanged} by this Change Order $4,639.00 + The new (Contract Sum) including this Change Order will be $81,467.00 The Contract Time will be (increased] (desreased~ (unchanged) by zero The Date of Substantial Completion as of the date of this Change Order therefore is: (~) days 17r Authorized: ANDERSON Design 8 Consulting, Inc. ARCHITECTURAL DESIGN Portzen Construction CONTRACTOR City of Dubuque OWNER P.O. Box 735 Address Dubuque, IA 520040735 By Date /2'/S ~OCe 205 Stone Valley Drive Atldress Dubuque, IA 52002 ~ ,., gy - ~.G'f.~~e-.~fi~ Date ~• /S lye City Hall Address IA By ~ -VWt 6N6 Date /~ / r ADCI Document ' Change Order " ANDERSON Design & Consulting, Inc.' ARCHITECTURAL EXCELLENCE " ~ V -_'~__~i'C ~m l:'I ;~ L.I,t ~;. ~;~ t i~]:i2 r ,_ ~ ]1.11 ~; "]! ~~~~;~~~ ~:c~~i~~~~i~.ti~~9 ~~c. Cer,.mercial, l:ererai & L:dustn_a: C:c;tstcvetiop, Concrete \rdork- S4'als & Flatwo$: Pu~'ctg .. Excnvating .- Steel Euild;~; ----- Zt15 ;'.hone'/alley Dr.T + Dnhu.iue, 7:1 5200? + -_~~~531 SS"'-764;. FA7C (553} 55?-504r"", 4-- _- 6arember 11. 'lDDti Andat'con Daslgn Z Consulting 1233 Rhombarg Ave. qubuque,lewa 52DC1 Attn: ,Terry Anderson! Ra: plour Rep2 rs We proposo to pirovide aquinment: labor, ar,d maiflrials to remove il,e ramalning cnmentlous andarlayment at exlstin9 floor and install a new gypcrete 2DD0 underlayment as folle+n~s; QP.y Unit Cast Yatad demo and dispose underlaymant 1 Is $ 2,160.00 $2;166.D0 prep floor & protect doorslwafls 1 Is $200.DD $200.UG install gyDCteta 200D 1s $ l,d5i".GD $1,ES57.D0 general contractor averitesd 1 Is $ 422.DG $422.D0 total adeli[ions $4.839.D0 total dfldli82S $O.DD Total Contrarct.4djustnaent $~.d39.04 yVe request an extension at tho wntraot daadline is accomrnodate ttnis additional were, 'J•!e an!ioipate 4 days of desnolitivn and prep work, 1 day of gyprrote install, and 1'L days trf gyQcreta cure time beiom ceramic the can ho ins?willed. This is a total of 1 y days alter approval e! this roauost. 3lnceraiy, ~\ + hk~.~ ~~%~ .,C~' Uan Arnold I L ~~'~rt~~~ ~~i~str~.c~i~~, I~.c~ Coc;ttn2xciat, G®reral & Irdustrial Corunlcti~;: C. ncrete 1~`ork -Walls & F'?a: cvcrk Faving -.- 7i'xcavatia>2; Steel Build,r:g 205 Stone V;~le-~+Dr. a DcUtutue, l.~ 52003 • ;;563 i 557.76~t2 FAX (563j `57.9048 L7ecamber 12, 2000 Antlecscn Design & Consulting 1233 Rhomberg Ave. 6cbuqua,lowa 62001 A?tn' JerryAnderscn Re: City Hall 1st Flnor Bathracm Rernodel We propose to provide equiprr~eni, labor, and materials to install ceramic the ticoring in the entry way of t3ach bathroom (two reams) in lieu of the sheet vinyl specified as fol ov,•s: C[ty Unit provide k install additional ceramic 1 Is tiie floats in entry moms Coat Total $ - $a.ao $O.UO $0170 30.00 ?atal additions $0.00 Cotai daducds $0.00 ?alai t:mrtract Ad~u^tmant 30.00 7hi= proposal is for flooring only anti does not inciuda the at the wall or base. Woad base per plan Ir;rou have any questions recardiog tnis no charge proposal, please contact our offices. S'ncerely, .--~-~` ~'--J---- DamAmold