Loading...
Safety and Security Cameras Acceptable Use Administrative PolicyTHE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Purchase and Installation of Security Cameras DATE: January 8, 2014 Dubuque kattil All-America City 11111F 2007 • 2012 • 2013 The City currently has numerous traffic cameras controlling intersections that have traffic signals and these are frequently used by the Police Department to determine what occurred during traffic accidents and to solve crimes. The City also has numerous security cameras (Attachment I) at places like the City parking ramps, the Port of Dubuque, Comiskey Park and new restrooms at 5th and Bluff. The Safe Community Task Force recommended the use of security cameras. In June of 2013 the City Council approved the installation of additional security cameras and there are more that are budgeted for in the City's 5 year capital Improvement Program. Several of these have been installed and the following list will be installed in the calendar year 2014: Northwest Arterial Detention Basin Carter Road Detections Basin West 32nd Street Detection Basin City Hall Annex exterior ITS Traffic Control Equipment Traffic Signal Vehicle Detection Conversion Jackson Park Municipal Services Center Bee Branch US 20 Video Detection Camera Upgrades Street Camera Installation Airport Terminal (New) JFK at Wacker Signal Improvements Grandview at Loras Signal Improvements White Street at 14th, 17th and 20th Signal Improvements 1 way to 2 way Conversion Project Fire Station #2 Improvements Fire Station #5 Improvements City Attorney Barry Lindahl, Chief of Police Mark Dalsing, Information Services Manager Chris Kohlmann, City Engineer Gus Psihoyos, and Civil Engineer II David Ness have worked to develop a Safety and Security Camera Acceptable Use Policy. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:sv Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Jenny Larson, Budget Director Mark Dalsing, Chief of Police Marie Ware, Leisure Services Manager Mark Murphy, Emergency Communications Manager Chris Kohlmann, Information Services Manager Gus Psihoyos, City Engineer Lisa Hamilton, Senior Network /Systems Administrator Dave Ness, Civil Engineer II Duane Richter, Traffic Engineer THE CITY OF Dui Masterpiece on the Mississippi Making Dubuque a Safer Community Mayor Roy D. Buol and the Dubuque City Council hosted a community forum in September 2009 to initiate open dialogue on crime issues in our community and how to address them. The forum was attended by more than 130 citizens. In response to this high level of community engagement, the Mayor and City Council appointed 25 volunteer citizens to a "Safe Community Task Force." This diverse group of volunteers was asked to holistically look at both the causes of, and solutions to, crime in Dubuque and provide recommend goals and objectives to the leadership of Dubuque. Beyond the 25 appointed members, the Safe Community Task Force utilized sub - committees and work groups to get all interested parties involved. The sub - committees were: 1) neighborhood engagement/social capital, 2) enforcement, 3) management of physical environment, and 4) research and facts. A series of meetings were held and a number of recommendations were submitted to the City Council for further action. The following recommendations were developed by the Safe Community Task Force (SCTF) and subcommittees over 17 months and 35 meetings and submitted to the City Council from January 2010 through March 2011. 1) Reduce the time between rental inspections for problem properties 2) Do not allow property owners to receive city, state or federal funding unless their properties are in compliance or the owner is actively working towards compliance 3) Conduct crime study 4) Allow the Task force to act as a conduit for accurate information to public 5) Create ways to encourage people to light up their own property and surrounding public property 6) Install surveillance cameras in high crime areas in public places 7) Install 911 emergency kiosks 8) Reduce the time allotted for correcting property violations from the current two years 9) Encourage development of planned communities through mixed -use zoning 10) Develop and implement a juvenile curfew ordinance to use as a tod to help reduce crime. Research utility, efficacy and enforcement issues, taking the fdlowing suggestions into consideration: a) The pdice department would not conduct curfew sweeps of the community b) There would be designated and staffed location to hold juveniles who violate the curfew. Contact with parents or a responsible adult would not be handled by pdice. Penalties for curfew violations could include fines, community service requirements and parenting classes (See recommendation #43) 11) Provide additional resources for the Community Oriented Policing (COP) Program 12) Direct Police Dept. to enforce noise ordinances more aggressively 13) Direct Police Dept to enforce traffic ordinances more aggressively 14) Give the SCTF and Police Dept. the opportunity to respond to the crime study report and recommendations 15) The SCTF recommends its continued existence to monitor the implementation and progress of its recommendations through quarterly progress reports from city staff, and special meetings as necessary. The SCTF further recommends that the City Council consider creation of a Safe Community Commission 16) Support landlords in evicting problem tenants for cause 17) Mandate that landlords conduct renter backgrounds checks, using the City's free service 18) Establish threshold number of complaint calls that will place a problem property in priority category. Establish policies and processes for immediate response and resdution of problems invdving those properties 19) Tie frequency of property inspections to landlord's history of cooperation with code compliance. Establish a threshold number of problem complaints that Al trigger a meeting among the landord, the tenant, and representatives of the Housing & Police Depts. 20) Intensify exterior code enforcement efforts. Encourage city employees across depts. To identify and report property code enforcement problems and establish ways to reward employees 21) Create a data clearing house limited to verifiable and factual information that landlords and tenants can share and reference when making their rental decisions 22) Develop and offer frequently a training program on code enforcement and property management for all landlords. Require all landords to attend the program; issue only temporary occupancy permits/licenses until training has been completed 23) Address community concerns about the real or perceived impact of the Section 8 Program on the community by: a) Decreasing the desired number of Section 8 vouchers in the program to 900 b) Limiting voucher eligibility to Dubuque residents c) Increasing the staff capacity of the Family Self- Sufficiency (FSS) Program 24) Increase public understanding of the Section 8 Program 25) Increase participation of Section 8 residents in effective self - sufficiency programs 26) Provide training to housing commissioners to increase their leadership, public relations and community building skills 27) Implement an exception rent program to avoid concentrated pockets of poverty 28) Develop a stronger rde for the Resident Advisory Board to encourage residents of subsidize housing to give feedback on proposed new policies and procedures and to cultivate leadership within the low income residential community 29) Provide community service credits for participation in effective programs that foster self sufficiency 30) Continue to provide resources to Family Self- Sufficiency (FSS) Program based upon evidence of success 31) Human Relations: a) Increase tderance and mutual understanding among the diverse segments of the population. The adoption of educational initiatives that foster community solidarity and global citizenship should be among the first practical steps taken by our City b) Implement appropriate measures that safeguard the rights and opportunities of all 32) Develop a Neighborhood Watch Program 33) Increase resident participation using such vehicles as clean up campaigns, neighborhood picnics, new neighbor welcome events and other strategies developed by residents 34) Intercultural Competency Training should be offered periodically to businesses and the community at large. It should be mandatory for city board and commission members as well as for city staff 35) The Human Rights Dept. should receive continued support. In addition the city should devote resources to a human relations initiative that could include programs in the arts, cultural programs and other strategies that promote respect and understanding among residents 36) Support a welcoming program for all new renters through community -based organizations 37) Install streetlights in the midde of the block to brighten up the streets at night and increase visibility for residents 38) Improve neighborhoods by. a) Encouraging home ownership b) Encouraging a mixed - income approach to neighborhood development c) Creating (or re- creating) a sense of place through good design. All buildings using city, state or federal dollars should be required to meet these objectives and all projects should be required to meet the City's sustainability goals 39) Create an ordinance prohibiting the boarding of windows and doors facing streets 40) Develop and enforce policies consistent with the "preservation briefs" to maintain historic properties 41) Increase the number of trash receptacles on the street 42) Increase the number of neighborhood clean -ups and educate the community on City waste disposal policies in an effort to clarify the purpose of neighborhood clean -up programs 43) Modify the recommendation for a juvenile curfew ordinance and focus instead on creating a parental responsibility ordinance that is modeled after successful programs that includes engaging parents and teens in prevention efforts 44) Encourage and engage parents and youth in out -of- school -time programs and parenting classes by ensuring the programs are designed to matter to the participants 45) Encourage the Dubuque Community School District to develop a meaningful intercultural competence program for students at all levels 46) Create a conduit, such as a speakers bureau, to continue conveying accurate information to the public on crime and the perception of crime in the community. Include a broad group of informed residents on the panel and focus on reaching a broad cross - section of the community with the information 47) Use the information from the crime and poverty study to create a formal way to continue tracking data for the community in an ongoing manner, and investigate the potential for using crime mapping software. 48) Encourage the Telegraph Herald to run an "I'm a Dubuquer" series 49) Raise awareness among the general public and develop individual ambassadors through Intercultural Competence Training, the Bridges Initiative, and similar programs, who can then talk with others about what they have learned 50) Expand the recommendation for a neighborhood watch program to include efforts to build relationships amongst residents within the neighborhood 51) Expand the emphasis on community - oriented pdicing and consider expanding the number of non -sworn employees, including interns and volunteers, in the Police Department in effort to assist with Community - Oriented Policing (COP) efforts and to coordinate with other departments and organizations in the community policing effort 52) Engage community volunteers of various races and income levels in a monthly "Days of Caring" initiative by encouraging businesses to allow volunteers to participate on work time 53) As exterior code vidations are identified in neighborhoods, identify vdunteers who are willing to assist with helping property owners remedy those violations, which will address the property conditions while also building relationships and a sense of community. 54) Encourage community -u+ide support of initiatives that support self- sufficiency (i.e., beyond government and the public schods), with a particular focus on existing programs: Circles, Project HOPE, Intercultural Competence Training, Every Child/Every Promise, and the work that the Colts are doing with community outreach. Engage cdleges, churches, businesses 55) Support economic development efforts to create opportunities 56) Connect new residents, particularly those who may not be referred by an employer, to the welcoming program at the Greater Dubuque Development Corporation 57) Challenge all departments within the City to develop and maintain a model Section 8 Program for a city of this size, meeting the needs of the elderly and disabled and also developing self - sufficiency for families 58) Expand the lighting recommendation to "Brighten up the streets and alleys at night and increase visibility for residents wherever lights are needed." 59) Emphasize hot -spot policing and focus on problem sdving within those crime hotspots 60) Publicize the owners, numbers and types of complaints /vitiations in the top problem properties Many of these recommendations have been implemented and others are being reviewed for implementation. In October 2010, the City Council approved (upon recommendation from the Task Force) the creation of a Safe Community Advisory Committee. This committee has been commissioned for a year to oversee the implementation progress of the recommendations submitted to the City Council by the task force. The current committee members are: • Anthony Allen • Mary Rae Bragg • Diane Callahan • Jonathan Cheatham • Rachel Daack • Amanda Elkins • Ann Ernst • Doug Stillings • SusanStork The Safe Community Advisory Committee meets regularly to monitor progress and offer additional recommendations. For more information, call the City Manager's Office 563 -589 -4110 or visit: www. cityofdubuque .orglsafecommunity. CITY OF DUBUQUE ADMINISTRATIVE POLICY POLICY NUMBER 5.05 SUBJECT: SAFETY AND SECURITY CAMERA ACCEPTABLE USE POLICY APPROVED BY• CITY MANAGER EFFECTIVE DATE February 3, 2014 PURPOSE The City of Dubuque is committed to enhancing the quality of life of the members of the community by integrating the best practices of safety and security with technology. A critical component of a comprehensive security plan is the utilization of a security and safety camera system. The surveillance of public areas is intended to deter crime and assist in protecting the safety and property of the Dubuque community. This policy addresses the City's safety and security needs while respecting and preserving individual privacy. To ensure the protection of individual privacy rights in accordance with the City's core values and state and federal laws, this policy is adopted to formalize procedures for the installation of surveillance equipment and the handling, viewing, retention, dissemination, and destruction of surveillance records. The purpose of this policy is to regulate the use of camera systems used to observe and record public areas for the purposes of safety and security The existence of this policy does not imply or guarantee that cameras will be monitored in real time 24 hours a day, seven days a week. SCOPE This AP applies to all departments under the administrative control of the City Manager. RESPONSIBILITY Department Managers are responsible for making sure that the provisions of this AP are adhered to. POLICY The City of Dubuque has the authority to select, coordinate, operate, manage, and Policy Number: 5.05 Safety and Security Camera Acceptable Use Policy Page 2 of 7 monitor all City security surveillance systems pursuant to this policy. All departments using camera surveillance are responsible for implementing and complying with this policy in their respective operations. RESPONSIBILITIES The Dubuque Police Department, Information Services, Engineering, Leisure Services, Parking Division and the City Manager's Office are responsible for realization and assimilation of the policy. Information Services and the Dubuque Police Department are responsible for advising departments on appropriate applications of surveillance technologies and for providing technical assistance to departments preparing proposals for the purchase and installation of security camera systems. The Dubuque Police Department, Information Services and the City Attorney's Office shall monitor developments in the law and in security industry practices and technology to ensure that camera surveillance is consistent with the best practices and complies with all federal and state laws. The Dubuque Police Department, Information Services, and other City Manager designees will assess new camera locations. Maintenance and testing will be the responsibility of the department utilizing the camera system. The Chief of Police will review any complaints regarding the utilization of surveillance camera systems and determine whether this policy is being followed. Appeals of a decision made by the Chief of Police will be made to the City Manager, who will render a decision. An appeal of the City Manager's decision may be taken to the City Council. General Responsibilities The Chief of Police, Information Services and other City Manager designees will review proposals for camera installations and review specific camera locations to determine that the perimeter of view of fixed location cameras conforms to this policy and make recommendations to the City Manager. Responsibilities of Public Information Officer Relations and City Attorney's Office The City's Public Information Officer will review all external requests to release records obtained through security camera surveillance, with consultation and advice from the City Attorney's Office related to these requests prior to the release of any records. General Principles Information obtained from the cameras shall be used for safety and security purposes and for law and policy enforcement, including, where appropriate, judicial functions. Information must be handled with an appropriate level of security to protect against P olicy Number: 5.05 Safety and Security Camera Acceptable Use Policy Page 3 of 7 u nauthorized access, alteration, or disclosure All appropriate measures must be taken to protect an individual's right to privacy and hold City information securely through .its creation, storage, transmission, use, and deletion. All camera installations are subject to federal and state laws. Departments requesting security cameras will be required to follow the procedures outlined in this policy. Camera Placement Criteria This policy applies to all personnel, and departments of the City of Dubuque in the use of security cameras and their video monitoring and recording systems. Security cameras may be installed in situations and places where the security and safety of e ither property or persons would be enhanced. Cameras will be limited to uses that do n ot violate the reasonable expectation of privacy as defined by law. Where appropriate, the cameras may be placed citywide, inside and outside buildings. Although the physical cameras may be identical, the functions of these cameras fall into three main categories: A. Property Protection: Where the main intent is to capture video and store it so that if property is reported stolen or damaged, the video may show the perpetrator. Examples: an unstaffed building or a parking lot. B. Personal Safety: Where the main intent is to capture video and store it so that if a person is assaulted, the video may show the perpetrator. Examples: a public walkway, o r a parking lot. C. Extended Responsibility: Where the main intent is to have the live video stream in o ne area monitored by a staff member in close proximity. In this case video may or may n ot be recorded. Example: areas with limited staff. The City of Dubuque will consider any of the following locations for placement of a camera, including but not limited tow • All City owned property, including but not limited to buildings, parks, hike/bike trails, and parking lots; and any streets or alleys that intersect with said properties. • In conjunction with the placement of a 911 kiosk • Streets not designated as Local, i.e. street designations which include Collector, Minor Arterial, or Arterial streets; and any streets or alleys that intersect with these streets • Areas of Non -Single Family Zoning • Other publicly owned spaces or facilities upon request i e. Dubuque Community School District, Dubuque County; other institutional entities or areas for the public good. • Temporary cameras for special events • Any other areas deemed appropriate by law enforcement or traffic safety personnel P olicy Number: 5.05 Safety and Security Camera Acceptable Use Policy Page 4 of 7 The locations where cameras are installed may be restricted access sites such as departmental offices; however, these locations are not places where a person has a reasonable expectation of privacy. Cameras will be located so that personal privacy is maximized. Camera positions and views of residential housing shall be limited. The view of a residential housing facility must not violate the standard of a reasonable expectation of privacy. Unless the camera is being used for criminal investigations, monitoring by security cameras in the following locations is prohibited: • Bathrooms • Locker rooms • Offices • Conference/meeting rooms The installation of "dummy" cameras that do not operate is prohibited. Unless being u sed for criminal investigations, all video camera installations should be visible. Access and Monitoring All recording or monitoring of activities of individuals or groups by City security cameras will be conducted in a manner consistent with City policies, state and federal laws, and will not be based on the subjects' personal characteristics, including age, color, disability gender, national origin, race religion, sexual orientation, or other protected characteristics. Furthermore all recording or monitoring will be conducted in a professional, ethical, and legal manner. All personnel with access to City security cameras should be trained in the effective, legal, and ethical use of monitoring equipment. City security cameras are not monitored continuously under normal operating conditions but may be monitored for legitimate safety and security purposes that include, but are not limited to, the following: high risk areas, restricted access areas/locations, in response to an alarm, special events, and specific investigations authorized by the Chief of Police or designee. For Property Protection and Personal Safety cameras, access to live video or recorded ✓ ideo from cameras shall be limited to authorized personnel of the department which installed the cameras, the Police Department and other persons authorized by the Chief of Police or designee. The copying duplicating and/or retransmission of live or recorded ✓ ideo shall be limited to persons authorized by the Chief of Police or designee A record log will be kept of all instances of access to, and use of, recorded material. Nothing in this section is intended to limit the authority of the Dubuque Police Department in law enforcement activities. Policy Number: 5.05 Safety and Security Camera Acceptable Use Policy Page 5 of 7 Appropriate Use and Confidentiality Personnel are prohibited from using or disseminating information acquired from City security cameras except for official purposes. All information and/or observations made in the use of security cameras are considered confidential and can only be used for official City and law enforcement purposes. Personnel are also expected to know and follow all City of Dubuque Administrative Policies, including but not limited to those associated with technology: 2.07 Internet and Electronic Mail; 2 13 Acquisition and Use of Cellular Telephone Equipment, 2.19 IT and Internet Appropriate Use; 2.20 Social Networking, Acceptable Use and Administration of Computer and Communication Systems. Use of Cameras for Criminal Investigations The use of mobile or hidden video equipment may be used in criminal investigations by the Dubuque Police Department. Covert video equipment may also be used for non- criminal investigations of specific instances which may be a significant risk to public safety, security and property as authorized by the Chief of Police or designee Excluded Camera Uses This policy does not address the use of the following: • Webcams for general use by the City (e.g., remote meetings). • Video equipment for the recording of public performances or events, interviews, or other use for broadcast or educational purposes. • Cameras mounted in vehicles, including police and fire vehicles. Cameras primarily used for traffic engineering and traffic control. However, these cameras may have an incidental or ancillary use as security cameras for criminal investigations. Procedures Departments requesting security cameras will be required to follow the procedures outlined in this policy. Installation Individual departments installing video surveillance equipment shall submit a written request to their appropriate department manager describing the proposed location of surveillance devices justifying the proposed installation, and identifying the funding source or sources for purchase and ongoing maintenance. Policy Number: 5.05 Safety and Security Camera Acceptable Use Policy Page 6 of 7 The department manager or designee will review the request and recommend it to the Chief of Police and Information Services, if appropriate. The Chief of Police and/or Information Services will review all proposals from department manager. Upon completion of review of the project, the Chief of Police and/or Information Services will forward the proposal to the City Manager with a recommendation. The City Manager will be responsible for reviewing and approving or denying all proposals for security camera equipment recommended by the Chief of Police. Information Services shall oversee the installation of all approved security camera systems with the assistance of the Police Department, and other City departments as required. Purchasing will not accept, approve, or process any order for security camera systems without the approval of the City Manager. Training Camera control operators shall be trained in the technical, legal, and ethical parameters of appropriate camera use. Camera control operators shall receive a copy of this policy and provide written acknowledgement that they have read and understood its contents. Operation Video surveillance will be conducted in a manner consistent with all existing City policies. Camera control operators shall monitor based on suspicious behavior, not individual characteristics. Camera control operators shall not view private rooms or areas through windows. All operators and supervisors involved in video surveillance will perform their duties in accordance with this policy. Storage and Retention of Recordings No attempt shall be made to alter any part of any surveillance recording Surveillance centers and monitors will be configured to prevent camera operators from tampering with or duplicating recorded information. Surveillance records shall not be stored by individual departments. All surveillance records shall be stored in a secure City centralized location for a period of approximately 30 days and will then promptly be erased or written over, unless retained as part of a criminal investigation or court proceedings (criminal or civil), or other bona fide use as approved by the City Manager or designee. Individual departments shall not store video surveillance recordings. A log shall be maintained of all instances of access to or use of surveillance records. The log shall include the date and identification of the person or persons to whom access was granted. Policy Number: 5.05 Safety and Security Camera Acceptable Use Policy Page 7 of 7 Fees Individual City departments will establish policies and/or procedures for dissemination, and fee schedules for reproduction of City video. Michael C. Van Milligen, City Manager THE CITY OF DUB Masterpiece on the Mississippi Centerline Miles - with IA -DOT Functional Classification 12/09/2013 Legend IA -DOT Classification Other Principal Arterial:32.93 miles Minor Arterial: 39.34 miles Collector (Major and Minor Rural): 24.07 miles Local: 213.84 miles City limits DISCLAIMER: This information w as compiled using the Dubuque Area Geographic Information System (DAGIS), w hich includes data created by both the City of Dubuque and Dubuque County. It is understood that, w hire the City of Dubuque and participating agencies utilized the most current and accurate information available, DAGIS and ft's suppliers do not w arrant the accuracy or currency of the information or data contained herein. The City and participating agencies shall not be held liable for any direct, indirect, incidental, consequential, punitive, or special damage, w hether foreseeable or unforeseeable, arising out of the authorized or unauthorized use of his data or the inability to use this data or out of any breach of warranty whatsoever. WE Map Prepared by: TWK City of Dubuque Engineering Division 50 West 13th Street Dubuque, Iowa 52001 Phone: (563) 589 -4270 Fax: (563) 589 -4205 H:SEngineeringCCenterline Miles /201352013 12-09-2013 Road Centerline Miles for IADOT Classificatlon.mxd Q,OOSFVELT PENNSYLVANIA ON." Off - Street Trail "40 On- Street Trail Parks City -owned Parking Lot City -owned Parking Ramp City of Dubuque DMASWA CI Dubuque City Limitsd NORTH Masterpiece on the Mississippi TO: FROM: SUBJECT: DATE: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Surveillance Cameras June 17, 2013 Dubuque * ** ** AI Am I have begun the process to install surveillance cameras downtown. The initial list of probable coverage areas is enclosed. I was also asked for the City Policy on the use of these cameras. The City does not have a written policy. I have included CIP requests the City Council has approved that I believe are consistent with this deployment. The City has $200,000 in savings in the FY14 budget from salt purchases. With the amount the City has on hand and the amount on order to be delivered this summer by barge, the City has a two year supply. The City has about 14,000 tons. In an average year, the City uses just over 7,000 tons, and in the worst in memory, the City used over 12,000 tons a few years ago. If the City were to have a terrible 2013-2014 winter, the City would order more salt in the summer of 2014 to be paid from the FY2015 budget. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Mike Van Mil ligen a Cameras Page 1_of1 From: Mike Van Milligen To: Dalsing, Mark; Hamilton, Lisa; Kohlmann, Chris; Ness, Dave; Psihoyos... Date: 6/13/2013 4:15 PM Subject: Cameras CC: Brumwell, Crenna; Larson, Jenny; Lindahl, Barry I would like coverage in the following areas: Top priority: Iowa Street 12th Street to 17th Street Central Street from 11th to 20th Street 13th Street from Central to Main Street Bluff Street from llth to 17th Street Locust Street from llth Street to Foye Street Surrounding City hall The streets surrounding Prescott School Carnegie Stout Public Library City Hall Annex Secondary areas: 22nd Street from Central to Windsor 20th Street from 5 points to Central Street 17th Street from Bluff Street to Kerper Blvd 14th Street from Alta Vista to Sycamore Street file: / /C: \Users \mvamnill \AppData \Local \Temp \XPgipwise \51 B9F026DBQ_DODBQ_PO1... 6/14/2013 Mike Van Milligen ® Camera Quotes Page 1of2 From: Mike Van Milligen To: Richter, Duane Date: 6/14/2013 12:21 PM Subject: Camera Quotes CC: Brumwell, Crenna; Dalsing, Mark; Hamilton, Lisa; Kohlmann, Chris; La... Approved »> Duane Richter 6/14/2013 11:53 AM »> Mike, I have attached a quote for 10 cameras to be install at locations that can be tied back into Traffic \ City network. We had a meeting with Raycom and they are coming up with a plan to cover the area around the park and are also updating the quote we had last time for cameras around City Hall and Annex building. Thanks Duane Duane Richter, E.I.T. Engineering Tech. City of Dubuque »> Ken Fleege <ken.fleege @racom.net> 6/14/2013 6:54 AM »> Duane here is the quote.. Thx Ken From: Duane Richter [ mailto :Drichter @cityofdubuque.org] Sent: Thursday, June 13, 2013 4:49 PM To: Ken Fleege <ken.fleege @racom.net Cc: Dave Ness Subject: Quotes Ken, file: / /C:\ Users \mvaninill \AppData \Local \Temp \XPgrpwise \51 BBOAAFDBQDODBQ_P... 6/14/2013 Page 2 of 2 Can you send us a quote for: 10 - Axis Cameras 5 - 15 -50 MM Mega Pixel Tens 10 - Milestone licenses Thanks Duane file: / /C: \Users\mvanmill\AppData\ Local \Temp\XPgrpwise \51BBOAAFDBQ DODBQ P... 6/14/2013 A COM irtc ern rriu nieet 3190 Cedar Cross Ct Dubuque, IA 52003 563-583-2245 Fax 563-583-2460 www.racom.net Proposal Prepared for: Dubuque Engineering Address 50 West 13th Street Cify Dubuque State & Zip Code Iowa 52001 County Dubuque Phone/FAX Contact Name Dave Ness Contact E-mail DnessPcilvoldubuque.orq Axis Q1604 ÷ Milestone ITEM QTY PART NO. DESCRIPTION UNIT EXTENDED 1 10 452414 Q1604-E OUTDOOR $ 1,040.00 $ 10,400.00 2 10 354480 MILESTONE XPCODL CORP $ 263.00 $ 2,630.00 3 10 354487 MILESTONE YXPCODL 1 YEAR SUP $ 48.00 $ 480.00 4 5 n(s FUJINON YV3.3X15SA-SA2 $138.00 $690.00 SHIP SHIPPING ADDED TO INVOICE $ - $ $ - $ - $ - $ - $ - $ - $ - $ .. - $ - $ - $ - $ - $ - $ . $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Terms of Purchase:PAYMENT DUE AFTER PARTS ARRIVE Tax Rate Total Equ pment Price Installation Subtotal Taxes Shipping Total $ 14,200.00 $ 14,200.00 $ $ 14,200.00 System Description:MILESTONE CORP AND AXIS Q1604 Proposal Presented By: Ken Fleeqe Proposal Accepted By: 10 G1604 Ms Lals Mdeslorle 6.14.13,1sm- Plit.d 6114/2013 Date: 6-14-13 Dale: Mike Van iViiiiigen - Re: Fwd: BCD quote From: Mike Van Milligen To: Richter, Duane Date: 6/13/2013 4:50 PM Subject: Re: Fwd: BCD quote CC: Brumwell, Crenna; Dalsing, Mark; Hamilton, Lisa; Kohlmann, Chris; La... Pagel of2 Duane, OK to purchase. Ask Jennifer how to make it work within the correct budget year and which account to use. Mike >» Duane Richter 6/13/2013 4:32 PM »> Mike, In order to continue to retain video for 30 days and add additional cameras another server will need to be purchased. This server will allow us to add the additional cameras for the areas you requested as well as additional cameras in the future. This server would be added to traffic network, so additional storage will be needed for city network as well. I have also asked for a quote for 10 additional cameras and licenses to start with until we can layout exactly where all of cameras need to be installed and how many we will need. Thanks Duane Duane Richter, E.I.T. Engineering Tech. City of Dubuque > » > Dave Ness 6/13/2013 4:04 PM > » > »> On 6/3/2013 at 9:28 AM, in message < 6C0DDCF0FE217F438944242E5D30F4ED31E93DEA @MARSVRVM01.racom.net >, Ken Fleege <ken.fleege @racom.net> wrote: Dave, here is the description of the BCD quote.. Thx for the opportunity Ken BCD380V8- 08L -EXT: (1) BCDVidea - HP DL380E IP VIDEO SERVER- 2U -14 BAY file : / /C: \Users\mvanmill \AppData\ Local \Temp\XPgrpwise \51 B9F860DBQ_D ODB Q_PO 1... 6/14/2013 Page 2 of 2 ES'24201�9GHZ'�ERV[RIO08R2-5YEARN8DVVARRANlY (1) BCDVideo SECOND PROCESSOR- E5-Z4Z01.9GHzBCD]QOV8'E5-242O'2P (1) BCDVideo 4G8 RAM UPGRADE BCD3OOV8~4GBRAK8'UPG (1) BCDVideo - EXTERNAL RAID CONTROLLER BCD38OV8EXT-RAID-CONTL (8) BCDVideo 4SUGB SAS lSK DUAL PORT HARD DRIVE '3.S''8CO3OOV8-4S8SA8'3S8D KemFleege 1 Manager, Dubuque Operatons. RACOM 1 3190 Cedar Cross Ct, Dubuque, IA 52003 Tel: 563'583-22451 Cell: 563'S90-63731 Emoi|:ken.Meege@naconn.net (00 critIca-4 c.-.,or•n,..w�w RACOM file://C lB9Fh0)80DODB0POl— 014/2013 ttil rrirriunicatori8 3190 Cedar Cross Ct Dubuque, IA 52003 563 - 583 -2245 Fax 563 -583 -2460 www.racom.net Proposal Prepared for: Dave Ness Address 50 West 13th Street City Dubuque State & Zip Code Iowa, 52001 County Dubuque Phone /FAX 563 5891722 Contact Name Dave Ness Contact E-mail dness(aacitvofdubuaue.ora BCD Equipment ITEM QTY PART NO. DESCRIPTION UNIT EXTENDED _ 1 BCD380V8- 08L -EXT BCD SERVER $ 12,967.50 $ 12,967,50 2 1 BCD2600V- 36TB -3 BCD STORAGE $ 17,654.00 $ 17,654.00 3 1 SHIP ACTUAL SHIPPING W ILL BE APPLIED $ - $ $ - $ $ - $ $ - $ $ - $ $ - $ - $ - $ - $ - $ $ - $ $ - $ $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ $ - $ - $ - $ - $ - $ $ $ $ - $ $ $ $ - $ $ - $ $ - $ Terms of Purchase: Tax Rate oral equipment Pnce Installation Subtotal Taxes Shipping Total $ 30,621.50 $ $ $ 30,621.50 System Description: BCD SERVER EQUIPMENT TO BE SHIPPED DIRECTLY TO THE CUSTOMER Proposal Presented By: Ken Fleege Date: 6 -3 -13 Proposal Accepted By: Date: BDC SERVEi STORAGE 6.3.13.4..- Printed 6/3/2013 DEPARTMENT:' Leisure Services / Park Division STATE. PROGRAM:' Culture 21 Recreation PROJECT TITLI Jackson Park - PROGRAM:; I]EPARTMENT: FD /CIP NO: TOTAL PROJECT COST $ 234,000 EXP PRIOR TO FY 13 ESTIMATED FY 13 PROJECT BUDGET 2013 -14 2014 -15 2015 -16 2016 -17 2017 -18 2018 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction Other TOTAL B. PROJECT FINANCING Greater Downtown TIF TOTAL $ 12,000 $ 222,000 $ 234,000 $ 234,000 $ 234,000 $ PROJECT DESCRIPTION This project provides for constructing a rest room building in Jackson Park that will include a single men's and a single women's rest room and install security cameras. JUSTIFICATION There are no rest rooms available in Jackson Park and we are receiving an increased number of requests for them. The events that are happening in this park make the rest room a warranted addition. Parades originate from Jackson Park and a variety of neighborhood events call Jackson Park home. Cameras become a deterrent to vandalism. Cameras are currently in several parks at entries to rest rooms. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Element: Goal 10.1; and Recreation Element: Goals 1.1, 7.1, and 7.4. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Community Design. 45 rr 1,1,5.,.!9 T �, Ifi Wy , , D ,r. :, �rui.l � f{ �' ,, , . � ,, n r, f�! I, ,,, ,r> :I . � ,, d.. u.. 7., n(�r7 r .7,: , � i ., n,. (4 a n If 1 fl( l 4 ! , P 1 1 t^ I r -. k .,.:. rlr:. .,x. ,.:. .,. ':: . �.. ,:,,. il '� lib rlfm Y i 1.i�' s at D uisi n I q.. ,.. la i, .r, a_ �... .. ,. r +I. t Y tr 1 .. lrll rygl 11, fGr f Pl +�'rrf. Slj {4117A 1!, ^),.4 ti �s�bll ,`�LP( „ I 1 ,.: -. ;,.q, "nti M, ,SP yurn•S'pi( 11 [.], ,, a_ ., r Y .T:� 3... �" te, 1.:: �q: .. � a v ,. �T� I I..�Q� 3, .. I.. Y.�s. 1 I , a rf�' „�.., r. I. �..,.. r ,1 ,. l:.i: I,. ._.. e ec '...�.,. S. .) l! l:, s, � ...•:. it ,f .._��. �, .:ice :. .,l. ..:) : 1 7 i. , � f .. J _,,.. _'t I,:.1M t. tr _. „ . � � : v, ,. , U ,.. m, m , �'u4 . ' .:_� 'o.l sl ,., v ,. r.- , ,:t r.. n r r.. 5'G r,. d`1, S iW. t- , E:1 ..�r v. 'IT :. Y ,. rl'.f I. Y. ,a ft ,q t4�n ,C „r[5 %t11 r� na� 11 1 w,U3. rr;1JYt P! �A ti ,., -:.r: ,:.,,,:, Itl! t r. q,. ^l'u fi f. All „ d'f ,A t 11 i;'.r ”. :. 5...,11 1 I1 sl,.. PV, 1il.4, �,. -�,I 11 1, ! -- ,...r, ;,:m. - .: :V „�h k I - ).. ~,� , r., �' a, � a c - d. I. m ssI pp � �. i �, J .. , 1„ ,, ,,.yl „x :, (.� � ����. h � y.. U 4 1...'� i .,. � 1� -i,(. ., .... , he k 1 -. s l 1 4 .� rt , ,, fi,. i,,.7 -t ,'7 t�V YrJt 1S •, f 11 1. .I... i.. f 2� I�P?lfi }, -� i -t r,; 1.. 1, .,.. -. �.�L� I� {. "2 !- E �. ,... .- , , , ,� ^rf "I .P..:, ,J fl I.. ii. „u ki Yil1 D! ,><� .. I t.. f" ,,< i .,. .. � .n.�i 3 r...,..... s}E � � � . , _ l i , h , iR.. � I ..n vu n J ,.... . S. r r.,. ,. "111 � ,..f i twJ1..>U., si.l,k 1 , .., �(1 ..L,,,. z, � r -- W�)k71. Yt nrr .a, 4 f ,, �. i t Z.. .,, ,.. / ,. , r.,.. -. �.5 Vi. .L_i I t.. t�,. ,tti4ir. Il a.., ,t11 �s...,,- I,.. °w e! }rL rlKV � � 1 <e?.�.f h I r ., V�9 d,J,G',dn Ui..,l��r l. f1 . Jv_e 5: .:_ s lrl, O M1T.y .t,L. .. ,, � � '� I ,.,il ,. -.: ,s. �,.- . , �" .. ,Ar �� t ,�, 3 ...,,- ._ i.,l � , —.. l� rt. i ..,.t c r. r. ,l. > �r�, tl ..,,,� .,. t 1 -� ✓ S. I T,..,n L "C., .. ... -. /.,, s (,i �. .,, ,- a r , ff „_. � {;f d!uYY �{ �.,., ;. � -,.. ' .,- Ir x .,_'_- 1. � .. ..:.:.J�C r n_h. J _...,vs r. , A{}"'.. ,-... �. . , 1�..�: .r :.., � .f - .V 1. r� ..t�....r tf ,i'.r, �,� u. . "nr J 3 li rJ.,. ,.1,. T I .I..__ Iv_ _v. �I ,r„ .;r, ,,,� al9 ¢N S_.1..: ,..,. ,, Ji.)L -4�_ �`:: � . � c •:. x. -.... ,.. -, ,... .a ,Si.:. � ,_v: !!C..d .y. , ( �4 a�,.r, r, ,, J 1,... , ,. .7 ,- � .,,. _.- _.,.52'1 30.. -..W� , , -. EXP PRIOR TO FY 13 ESTIMATED FY 13 PROJECT BUDGET 2013 -14 2014 -15 2015 -16 2016 -17 2017 -18 BEYOND 2018 $ 27,130 A. EXPENDITURE ITEMS Design & Engineering Land and R,O.W. Construction Equipment TOTAL B. PROJECT FINANCING DRA Distribution TOTAL $ 25,000 $ 27,130 $ 27,130 $ - $ - $ - $ - $ - $ 25,000 $ 25,000 $ - $ 27,130 $ - $ - $ - $ - $ - $ 25,000 $ - PROJECT DESCRIPTION This project provides for replacement of security cameras in areas already placed. JUSTIFICATION Allison - Henderson, Comiskey, Veterans' Memorial and McAleece have cameras and we are seeing good results. As a means to reduce vandalism and to improve safety, we would like to establish a program to replace security cameras in areas already placed. Allison- Henderson cameras will need to be replaced and other areas by this time. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Public Safety Element: Goals 3.3, 3.4 and 4.2. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Community Design and Reasonable Mobility. 74 Lel ure Oer i I.eESigR z y Rcr e ti o vs ., , _ u�e R COO t# ul , ,r iR . o u #o a r 7" l I . r u u G �D ;P�yr� v T r J1 r • , p �I EXP PRIOR TO FY 13 ESTIMATED FY 13 PROJECT BUDGET 2013 -14 2014 -15 2015 -16 2016 -17 2017 -18 BEYOND YO A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction Other TOTAL B. PROJECT FINANCING General Fund TOTAL $ 30,000 $ - $ - $ - $ - $ - $ 30,000 $ 30,000 $ - $ - $ - $ - $ - $ - $ - $ 30,000 $ - $ - PROJECT DESCRIPTION This project provides for installing video security cameras at Flora and Sutton Pool bath house buildings. JUSTIFICATION Over the years both swimming pool bath house and leased concession areas have been burglarized and vandalized during the swimming pool season. Installing three security cameras on each bath house facility, with the recording devices located off premises, will allow for possible identification of trespassers by law enforcement authorities. Also, the presence of the camera domes may deter some illegal activities. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Recreation Element: Goal 1.1. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Community Design. 120 :.. _.. .I 7}'R;' V,.1 f ! :alla ., , [ .:.,: ,-.. .. ?:� .. Y�" It I, ^:,;, r, rr4 ,,. .�,a4 ,,w .,ubl�clNdrlts � �, � �t.. F�1?d .1 P } ) .. :,r .. ...._ ... -'nom ,, r.. r. �. I. . a., N '� ;. „,t.., t'.. ..,� ]t. !t P II11 n:nl.d�( � I r.,,lq,d fY5 �1 }, , -, r ,� .•_'':: 'n' (Y -,"�9 FFU�.hfF V Tn },i .....:I ,r. 1 _.� 7) II ,:. , . -. t I, . ,:' �, �9 rdA .ail n d4Y }rl- tyn�f�cf ! Loill�ors �� I 7J., .21,1 n 1 M1i 7r. \AI1 � 71:. ,.IE C/II ... L. ._ .1 4 ] =v i ., .,r , 7 1'..I t,,�T „1f r,.::; )r f:,: r dr( ;; ,.�. w �. , � r t ...,:. s� P: .a u. t- , )t.l„ W.. .�. ,T } 1.: 4. 1 tEf I.l .� (f .: ,1 � l'7 .;,: t t r -_.a 11 l I :. i. ... r'�: -r .., r ., i7!. It it ”, f..:rY .1, ,.. .....I I , lr -,., 1 ,..,,h. % VI am+ .4fC ,o 1,,(11 V ,, ,lu.. �, VH,)`t u,Y , r :__. A ':; I J„ ,rc..- !1 ":9f_ E t 4 Yy,i t! J TT.�'.vy `r f :. 7 '� '.:.. .,, v .,, .. ... ,. r'.. .,,. , z., �:�., P' Al .: ' c c �5�, c t � I .e.. xbl .w, l,.�it! a. tl �.L....1.. V ,r''V_.., a f �. .,;,.II� ..Q�„_ .... it 1 !... .1 fl A... � , r � : � Y �` ..t,� , �.: . (.,J. ,..a h �. h..:.: fis. . ....v. v ”' r rb I .:.... rra. .., ,r, ,.S... 2Yr ,, rr. ,,,I I I ... -4 4ry0 r .. � . ,. . ,., , _ , .� . t - ,... y,. , -. .. ,.. ,. ,, ,,.f a a�. ,. -..7 t `':� -. llf Y :. ,,. 49.t ..,., 3. a i., , nett Ifr�., Y. .v.,v,( ,. t. .,7,, lel, ,, .I,. jin .1'�EI 31r;' J�)�,�li., I �.... �., ,.rF. ,,. ( L��,. �y M1 1 t „ v r... ',. }fin sa,x Y FYI. T Ai i .I!�Y.:1 +, { 41.: Y Cl,t., t�l, �.. ?..: ., t -.-A r =;° id I 11,.hil C?A,.T n.,,.. li r .... .. �Jia 1 :... -. ...r ,, _,. u - >_......_ , ,+ -.; LY ..� ,; r �a. 11i.S . h,.e. .. .. . ...�i t .;;.� �. ',� ,_.:,:_ .• :.. a ,y. ,.,.. , t,r ( ,. t.. v. ..Slt ... ,.N.. �".,_:,. 1, ._...., .n... ,� ,f } (I.), .,,�. ;gal a ... 'I. _1.. 's "` :.n+•' -r ) C �1: QS 1, ..�- ,i.e. EXP PRIOR TO FY 13 ESTIMATED FY 13 PROJECT BUDGET 2013 -14 2014 -15 2015 -16 2016 -17 2017 -18 BEYOND 2018 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction Other TOTAL Road Use Tax Fund TOTAL $ - $ 19,834 $ - $ - $ $ - - $ 19,834 $ 19,834 $ - $ - $ - $ - $ - $ - $ - $ 19,834 $ - $ - $ - $ - PROJECT DESCRIPTION This project would provide funds to upgrade the current security camera system at the Municipal Services Center. JUSTIFICATION In 2005, the Municipal Services Center was completed at a total cost of $12,200,000. Its security camera system was installed at that time as part of the project and consists of eleven (11) cameras and one Digital Video Recorder (DVR). Two of the eleven cameras monitor areas inside of the building and the remaining cameras monitor the facility's exterior and grounds, The current system is not integrated into the City's municipal camera system and therefore not accessible within the City's monitoring network. Since the construction of the Municipal Services Center, camera and surveillance technology have changed significantly. The City's municipal camera system network allows Emergency Communication dispatchers to use any of the cameras in the system 24/7 to monitor City facilities and infrastructure. By upgrading the Municipal Services Center's current surveillance camera system to the specifications of the City's municipal camera system, surveillance of the Municipal Services Center would be increased, which would in turn provide additional security for the facility and the City's substantial investment in it. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Element: Goal 10.1. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principles of Community Design and Resource Management. 232 DEP', RTNINT i �';IP I �; /�y ( "- "} J Public Wo ies, f S, Tpr Gym Ma, .I 9rt P >� I 1l7 I Busl��ss >T� , {y��j„ p yW .i: 1 J6‘ J�q' �T�Li - y�: _.•: ..x� I f 1'! In ,d llll;r, I r er F Mrai►��Iervlds, Ce�it� SGU� L Caner Protc r i s d 1 r�°' ••° {� G :.4 M I.'� f /l ,,l i:. 1 t t ■ C!EI'�R`I M��NT 5� FDlCIP NOat 60 Mpg I] y L i0R 4�. pJT 39,666,; EXP PRIOR ESTIMATED PROJECT BUDGET 2013 2014 BEYOND TO FY 13 FY 13 -14 -15 2015 -16 2016 -17 2017 -18 201 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction Other $ - $ 39,666 $ - $ - TOTAL $ - $ 39,666 $ - $ - $ - $ - B. PROJECT FINANCING Refuse Collection Fund $ 19,833 Water Const Fund $ - $ 19,833 $ - $ - TOTAL $ - $ 39,666 $ - $ - $ - $ - PROJECT DESCRIPTION This project would provide funds to upgrade the current security camera system at the Municipal Services Center. JUSTIFICATION In 2005, the Municipal Services Center was completed at a total cost of $12,200,000. Its security camera system was installed at that time as part of the project and consists of eleven (11) cameras and one Digital Video Recorder (DVR). Two of the eleven cameras monitor areas inside of the building and the remaining cameras monitor the facility's exterior and grounds. The current system is not integrated into the City's municipal camera system and therefore not accessible within the City's monitoring network. Since the construction of the Municipal Services Center, camera and surveillance technology have changed significantly. The City's municipal camera system network allows Emergency Communication dispatchers to use any of the cameras in the system 24/7 to monitor City facilities and infrastructure. By upgrading the Municipal Services Center's current surveillance camera system to the specifications of the City's municipal camera system, surveillance of the Municipal Services Center would be increased, which would in turn provide additional security for the facility and the City's substantial investment in it. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Element: Goal 10.1. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principles of Community Design and Resource Management. 249 101✓F!A�27M�NT r... :! ,, , en,�,,. ,pp ,. CC r 1, G: �nde � � tip N�� ... ..x:.a.rir nm ,nl , r , , ' ,P }��,. ,, . "r'rn ,..., .,,. :G,.I. „,,,. \ ,; r .i,r!\ 4: , �ix ,t, � r1- -r. t, :,a „: r , f.,, _GI {,, ,. J.. ���li'a DU. n �� � !t � tu,wrd. 2tt G. _r :.. ,r. .,:tAY�1 h.,., -r r x : a , .. ,., c.. R ,. i.. 11.:41 "�) � {{ witr.... 541 I ! s -a. r r , n .:.i y. , .,. f.. .� r. �. .,...., (..I SITd7M= tpR'(�G . 1V1� ti 1 i Y 'I ,::v � .,,. ,. t 'vl. C . ,,. ',. i. r , r , It , v r l a 4c� � \ ,,. .1 F \, /,1i f�f f' lgh�J: :' , I 1 1:� , . Ptu W, fir i `$ r ill �d .ls�t;7. , , ,U ,,'V11�t`I� f � � r I , ,� , ,.,.. I .9.. trtP �, Ine `t 1 •.. ..):.._.. „. \ ,. n -.v —S ", ., ! r r ,.. n ,.. r. ,, . Id l,d:,.. L...,.0 a {I+r Gk7, rl.: 1) 1..:.] � ,J l._. �. .h J{F. .. lt5 k �7.: 4 1f ...r �:. �'. -.I „1. ..YL. rc ].fit h 1 ,.� ;; -1 � 9 ,•�f 1, iir .., . , ,.,...t , ,r„ n R �>s ,, .�. f. ..r. Y, rf. ,l: Y ':� l ..a 1. ('z'N.. T ® �, I. .:._,.. ,,.{. 1r}y r � <,.� :w: ana IT 1. „r a 3 u. ln,. ,. .P � (ti` TI`rtLE � , - s µ '�. r., r.. . n 'r.! r..r V a I.. t. +rl a .: -i^ e. TV. t}l.. Ir. .,,,, .,. I r . � 7 ., 6 , . 4 � t,,,.,�„ .,r,cl I ,,, ,._ +' , rrs,t i ,�” .. ,,,1W1. , o11{!F �_ r,. f �!. { t ': ,. a: .,. :,'�. u�., ,,r: �7f.�ur L,1s m8� ..�X. �..f1..��0 I -I..,. #��� rpu u �,, tl � r� p 0 ,. ,, rP.On'. I. ,. 1i�4,1.5'e �,. 4 t ;.I ,hi ..�, _. 1.1 1 f `.� d �.. L,?FrF3. Zsrr z "„ )... �. {: :,._.E. r,. r a { c Y5 �: ,. rro � fl ,. t ,,/. l .. r ,�..,. i r ,.. � r !. E4 -3., dmr. ,.. .,Jt 1. .5,. r �..,..,.It S., 7,� I ?. r r"._i1 ..�:+.. f 1 a�:. r.. { ..1 _ 1 t ,�+ —_ �. .. 1 ,.. I.: :, 5. ,i R. . ! 1 .r, 1.. { , .... f } I hR_ I r.� .t. L... ,. .,G. i -.1,. 1 .5, -.. f,Yl r. rf .vin r,lr., r....... .+?` ,fl .,t.\l�.h -0.,,_, v- :4t'�a!� a I,. d... :LT r .F. .I. _'k .,.- (...,,. ..,� �i4 � d i �ri>W , ,.a r T �N Ivn {fi - >,n�v` ... ” ,il m� � r,R- ,ri`.�� � . .,,. _, a4< 113C'bt`�.tit�AM" . ,� 1 v r til .. ;r }t, r �. : , ,. ..{.. y.. 'l l.. 1 { F:.. I . � s , s l` . 1 v la.... '.,.. „.- ILl� "+'A ^! - ;y(��y : r ,� � tnr =,f �It ,'..: G.. e/"1�.MIG. 11�7t..<.u._.vs✓•k � �..! ,, ,` x: _.. �+ 4'. ., ... i '.. �.��/S!, 1 ,.,_ ... r'rr :.r ..,;.._r f v,_ ! .... ,�...,��.�� -.. �.. .. t ,� d(ut, f- .CI .. . ..., {.1n.. JA ..5fl .,. �h .. -c_ S. u._ _L, ... -.. .. ryry ,._. 2�1:g t ��,�47 `�F � ,7`i�� i' t n,rr. , i PS. S „ , 1 ,. , ! st s � � C . -:.Fn ''—g .tZ t.. i ,... �..� i Lf )1,. ., .L. �.., �. �� "5' EXP PRIOR ESTIMATED PROJECT BUDGET 2013-14 2014 2015-16 2016-17 2017-18 BEYOND TO FY 13 FY 13 -15 2018 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction $ 34,578 Other $ - $ 40,000 $ 40,000 $ 40,000 $ - $ 34,578 TOTAL $ - $ - $ - $ 40,000 $ 40,000 $ 40,000 B. PROJECT FINANCING $ 5,000 DRA Distribution $ 29;578 General Fund $ - $ 40,000 $ 40,000 $ 40,000 $ - $ 34,578 TOTAL $ - $ - $ - $ 40,000 $ 40,000 $ 40,000 PROJECT DESCRIPTION The project will provide for the installation of additional security and surveillance cameras within the Port of Dubuque. The locations identified for surveillance coverage in FY14 include the Alliant Amphitheatre, the Shot Tower, the Brewery parking lot and the McGraw Hill - Special Events parking lot and Ice Harbor Drive. In FY15 the areas include the Grand River Center parking lot, Ice Harbor Drive and the National Mississippi River Museum and Aquarium Parking Lot. JUSTIFICATION This improvement package will expand and enhance security and surveillance coverage within the Port of Dubuque which will compliment the Riverwalk security camera system which was installed in response to the ongoing vandalism along the Port of Dubuque's Riverwalk. The expanded security and surveillance coverage will curtail vandalism and will also assist law enforcement officials with crowd control monitoring during large public events. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Element: Goal 7.2; and Public Safety Element: Goal 3.3. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Community Design. 364 DEPARTMENT r En fl ee i % rabic g rI�g I 1 1 li I s ,, ! f 'i( 1 1 I �E, s1, TE PROG lr 4.- 6 11r 5 I�u�7`�lc W r 's o, Lr_ �' j .l Ut1'r �fl1 11 !�"I/ il PL �fl ( �iL LPROJECT i.. t I :i : j �fEC �atl�riCa�U�dd r Il.'i.1 s re. �i r {Y1� Imo,,.:,{ " / .+ I `�'i"'1 I! il i Y 1111( I(! _ j.. - _ , l�laN��grYtinl ,I, ;;iD�PARTNIE�li �'y IW en i'� )t� t /.:.. !1 , ; is 1 } I, , JG 1/It•';� 11 1 eL 4f11 ld;x II �}� PR' Gi2 ,? 1 s - .J1 � { I + 11� la 'i 1C� t 1 I i }I T�, . �., PR1bJ'T : -;1 �� � ft .'2�iJ 4, ? EXP PRIOR TO FY 13 ESTIMATED FY 13 PROJECT BUDGET 2013 -14 2014 -15 2015 -16 2016 -17 2017-18 BEYOND 201$ A. EXPENDITURE ITEMS Design & Engineering Maintenance contract $ 15,000 $ 20,000 $ 20,000 $ 20,000 $ 30,000 $ 20,000 $ 65,000 Construction $ 35,000 Other $ - $ 65,000 TOTAL $ 50,000 $ 20,000 $ 20,000 $ 20,000 $ 30,000 $ 20,000 B. PROJECT FINANCING $ 65,000 Sales Tax Fund (30 %) $ 50,000 $ 20,000 $ 20,000 $ 20,000 $ 30,000 $ 20,000 $ - $ 65,000 TOTAL $ 50,000 $ 20,000 $ 20,000 $ 20,000 $ 30,000 $ 20,000 PROJECT DESCRIPTION This project would fund the installation of a new video management system that is located in the Traffic Operations Center. It would include software and hardware that would connect the 200 plus cameras that feed into the TOC and allow for recording and distribution. The first year covers the TOC and all traffic related cameras. The second year covers switching over the remainder of the city cameras to the same system. The remaining years cover additional camera licenses added each year. JUSTIFICATION The viewing of live video feeds along with reviewing of archived footage is a integral part of the day to day operations in the TOC. Currently 200 cameras feed back to the Traffic Operations Center and many more are expected to be added in the future. These cameras are used to view live traffic patterns that can be adjusted remotely from the TOC. These cameras are also used extensively by police for accident investigations and police searches. Often times this footage is requested by legal council and is used in court. We have outgrown the existing video software package that has been built up since 2004. The current system is over capacity and often times locks up and has to be rebooted, each time losing valuable data. This new software would allow simultaneous timelines to be traced and exported. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Transportation Element: Goals 1.1 and 1.2. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES: This project implements the Sustainable Principle of Healthy Air and Reasonable Mobility and Smart Energy Use. 369 ._. � a .,, rt 1( IV _ - ^�� /: r 1 rt+,, i i '. ':, Vr ,� ", D PAT -Nr r l , I� :1 i 1 I -1 yljv% 1iG : {,,f fi 9 � � � r , s .,. f i , ,r, uy Ett n�er . , /.Traffic., F y ,,. �, 11;1. � Dili. ,.r, ,, 0 , �r 1f t 2.: k_, I .., .�. •.ul. I ,.v t .,,.. :!��), 1 :,:.... 1 . �.r s I ,.. 1 .; ..,I , .. , ,,. ~s.r.+ r s. a o RA I., �� P � �e 1 ",,, t t �_. t �.. 1 Crd s1 .{ 1 iT +, •., r.. .r, 1 -:, r y}S 1. ,3gye! sYS fit,.lA7 „2 ut57c s ... .; P � k r �a:.. .ar 11 rt I d W �.� ➢ ..7 '� ,r1r �.� : 7 1 ..,,) 1 1 „ -„ 1J)! i r.,l.. i l .. v ,.. t. t.. r .r 7 -.. Y ,f P.. r, t - r �J c, �r.1,1. �� �,,.�' �N'.� r. � f k �r'_ M.., ,., r i �t�ee .: e. , La �� � I� �3 ;.. F. 1... ? .,.:, i,.. f { ?.:: V[, 1..dtot,N' i Yt ,,..a, ,V $� If H 1 . 1 s :: yr Y > flhfih ; , � 1., I ,� .,r f, 1 �, 3 .., 4, ll +, .: �, .!.! � '.'Y' h 51 :r i. .�r., I 1 5 r r N. tb ht I .:.., 1! Ilatb, a t � 1 r r. IA � 1. 1.� I I I�,..l.n.. S.v. ,f/', t",,,.. f u r t,., ➢,.: u.,r..b1 9. 1., . ,... 1. ,4. r.7 A. wt, r s, �.:. 11^�A �� U ( 12 , I� �?AR' r 1 � � ', , 4q `� N`T. � � ,_ ��, � ,.. � .,,�.. II 1 I7 Fa,, ! .: �.1 S 4n: J F lY tll t`;. Y t ,III f , �.., � .r i l 5� ! .'14r,frtlru 41S:: , ; , ,.ry, , a, o'�. I� � (� .0 �' „•yW, 'Y7S{. a.:f),. y.,. EXP PRIOR ESTIMATED 2017 BEYOND TO FY 13 FY 13 PROJECT BUDGET 2013 -14 2014 -15 2015 -16 2016 -17 -18 2018 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. $ 35,000 Equipment $ - $ 50,000 $ 25,000 $ 50,000 $ 50,000 $ 50,000 Other $ - $ 35,000 TOTAL $ - $ 50,000 $ 25,000 $ 50,000 $ 50,000 $ 50,000 B. PROJECT FINANCING $ 35,000 Sales Tax Fund (30 %) $ - $ 50,000 $ 25,000 $ 50,000 $ 50,000 $ 50,000 $ - $ 35,000 TOTAL $ - $ 50,000 $ 25,000 $ 50,000 $ 50,000 $ 50,000 PROJECT DESCRIPTION This project would fund the equipment, installation and software license for 12 fixed and 5 Pan Tilt Zoom (PTZ) cameras per year installed near roadways and signalized intersections throughout the City of Dubuque. JUSTIFICATION Currently, the TOC has communication lines throughout the city along major and minor arterials, city streets and near signalized intersections. Engineering uses these cameras to remotely monitor and adjust traffic operations. Over the last two years engineering and police have worked together using these cameras to aid the police in accident and crime investigations on a daily basis. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Transportation Element: Goals 1.2, 1.3 and 3.3; Infrastructure Element: Goals 4,1, 4.2, 4.3, 4.4 and 4.5; and Public Safety Element: Goals 2.1, 2.2, 2.3, 2.4, 2.5 and 2.7. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES: This project implements the Sustainable Principle of Healthy Air, Reasonable Mobility, and Smart Energy Use. 392 DEPARTMET �(, E e i T afti' °' 11g��� rig /,, r � i, �;�, � t :. ., r1 i,, . Si I 'J „� ri ,'; +,.., 1�, +,:., u �Y �1 �,k_ ' t St i' S CA7'E'PROGR,giVl.f;,➢ ! , , ,.r ,kt , (ky 1 :f (b I c b, ,�� It v1l tks � , 4 C „ . f , it S �:5- 4 , 1 f;•. {, u M1 ,: 7; + -'; k + .,�, , ,tf, Y' r Ilri sJ r, _fl r 1�`RC7JE�'' R', fIT L alr a,., ,,, i[ 4L ° s t.E , �.; i ,r s /.' s :�1 r S d' l // vI rlf�' (ildAb �b�f��tld(t,C�,�til�ra,W� rake :: _ �' 1,: , A t r ,, a���r 1„ l l Lr 14 L' -� 7 ;',: �1 i ,t >_ ( .,)t, It"._aa 4s Szt , L k L;, 5i yr7,ll n y:` r i� 'vF L t li 'f r I ,, ,r.r 'ri 7 :,1 )ti �1 OG pR RA ,. � i - ,p�aAR�"��N�r ,,.. / li tWlr tl,, �', 2C � `! t , , {,'COST, 'tFl 1 I ;TO l°AL sc d ✓ 11 ,r PI�t�J�GT 4 EXP PRIOR TO FY 13 ESTIMATED FY 13 PROJECT BUDGET 2013 -14 2014 -15 2015 -16 2016 -17 2017 -18 BEYOND 2018 $ 40,000 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction Equipment Other TOTAL B. PROJECT FINANCING Sales Tax Fund (30 %) TOTAL $ 25,000 $ - $ 40,000 $ 40,000 $ - $ 25,000 $ 25,000 $ - $ - $ - $ - $ - $ 40,000 $ - $ 25,000 $ - $ - $ - $ - PROJECT DESCRIPTION: This program would fund the upgrade of 24 of the 48 video detection cameras for years FY 2012 and FY 2015. Typically, there are four cameras per intersection (one for each approach). JUSTIFICATION: Currently the City of Dubuque has 12 intersections running on video detection. Many of these were installed along US 20 during the roadway improvements from 2002- 2004. The use of these cameras allows the traffic signals to detect vehicles waiting at lights without placing sensors on the roadway itself, making these very valuable during times of construction. Most of these cameras output a black and white picture. Newer color cameras are available as an upgrade at a reduced cost. These newer cameras operate better during extreme conditions (Snow, fog, ice, etc) and also have improved connector interfaces. These would come with a 3 year warranty. Funding from this program will be used to upgrade the video detection cameras from black and white to the newest version of color cameras. The remaining field equipment is compatible with these cameras after a firmware update. RELATIONSHIP TO OTHER PROJECTS: This project implements the Comprehensive Plan's Transportation Element: Goals 1.2, 1.3 and 3.3; Infrastructure Element: Goals 4.1, 4.2, 4.3, 4.4 and 4.5; and Public Safety Element: Goals 2.1, 2.2, 2.3, 2.4, 2.5 and 2.7. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use. 394 ,DEPARTMENT: Engineering 1 Traffic STATE PROGRAM: Public Works EXP PRIOR ESTIMATED TOFY13 FY13 PROJECT BUDGET PROJECT TITLE: Main. Street Securil Stre 2013 -14 2014-15 2015 -16 2016 -17 2017 -18 TOTAL PROJECT COST;: $ 50 ;000 BEYOND 2018 $ A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction Other TOTAL B. PROJECT FINANCING Sales Tax Fund (30 %) TOTAL $ $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ PROJECT DESCRIPTION This project would install security cameras and equipment to monitor Main Street from lstto.9th- Street. This would also allow remote management of traffic signals at 3rd, 4th and 9th Streets during special events on Main Street and the Port of Dubuque area. JUSTIFICATION Currently Main Street has no camera coverage. Special events in the Port of Dubuque often cause backups at 3rd and Main. This project would install cameras that would monitor Main Street with coverage from lst to 9th Streets and would include remote capabilities to adjust traffic flow at the 3rd, 4th and 9th Street traffic signals. RELATIONSHIP TO OTHER PROJECTS: This project implements the Comprehensive Plan's Transportation Element: Goals 1.2,1.3 and 3.3; Infrastructure Element: Goals 4.3 and 4.4; and Public Safety Element: Goals 2.1, 2.2, 2.3, 2.4, 2.5, 2.6 and 2.7. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use. 396 DEPA RT„rp En iree , �" J ," l rP,:!. 1 , I � i, 1 + ,r 1,1, I,.. IF$ S t! ,.ts lii. r (l ,,1 i II. "v r l l I =t , lr .:u ,t 1 i .. t �::, i ;surd .:•, j 111 P EOp , A., MM� EPi N T ti -h. , C I %�. l,t t..h -,3 , 1N1 tl l,. -�41 !, (,o " �S ,ORT ID JlE ,ti , E EXP PRIOR TO FY 13 ESTIMATED FY 13 PROJECT BUDGET 2013 -14 2014 -15 2015 -16 2016 -17 2017 -18 BEYOND 2018 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction Other TOTAL B. PROJECT FINANCING Sales Tax Fund (30 %) TOTAL $ - $ 50,000 $ - $ - $ $ - - $ - $ - $ - $ 50,000 $ 50,000 $ - $ - $ - $ - $ - $ - $ - $ 50,000 $ - PROJECT DESCRIPTION The program would fund a Mobile Camera Trailer that would be used to observe long term construction projects. This trailer would include cameras, traffic sensors and wireless communications so that police, fire and traffic personnel could remotely observe conditions during long term construction projects. JUSTIFICATION This mobile camera trailer would allow quick and mobile placement of cameras and sensors for remote observation of construction projects. It would allow police, fire and traffic personnel to remotely observe conditions in otherwise hard to reach areas such as the upcoming 61/151 Catfish Creek Project. Projects such as this have very limited access due to their remote locations and lack of alternate routes. RELATIONSHIP TO OTHER PROJECTS: This project implements the Comprehensive Plan's Transportation Element: Goals 1.2,1.3 and 3.3; Infrastructure Element: Goals 4.3 and 4.4; and Public Safety Element: Goals 2.1, 2.2, 2.3, 2.4, 2.5, 2.6 and 2.7. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use. 400 DEPARTMENT: !.EconOmici,.Develbprhen Transit Division STATE PROGRAM: Business Type PROJECTTITI Bus Stop Improve PROGRAM:• DEPARTMENT:, 5 FD /CIP NO :�; TOTAL PROJEC COST 778,727 BEYOND 2018 EXP PRIOR ESTIMATED TO FY 13 FY 13 PROJECT BUDGET 2013 -14 2014 -15 2015 -16 2016 -17 2017 -18 $ 500 $ 29,488 $ 42 $ 30,030 $ 30,030 $ 30,030 30,000 274,327 304,327 $ 268,327 $ 36,000 $. - $ 304,327 A. EXPENDITURE ITEMS Design & Engineering Construction Security System Other TOTAL B. PROJECT FINANCING Public Transit Grant DRA Distribution Transit Fund FTA Fund (80 %) TOTAL Ct IMPACT - OPERATIONS Operating Cost $ 35,000 $ 352,000 $ 34,200 $ 421,200 $ 309,600 $ 6,000 $ 105,600 $ 421,200 $ 2,000 2,400 $ 7,000 $ 7,000 $ 7,000 7,000 $ 2,880 7,700 7,700 $ 7,700 $ 7,700 3,456 8,470 8,470 8,470 8,470 4,147 $ 9,317 $ 9,317 $ 9,317 9,317 4,977 PROJECT DESCRIPTION This project provides for a number of passenger amenities at bus stop locations. There are key elements in making public transit attractive and safe to the public and these amenities include benches, adequate lighting, bus shelters, visible signage that indicates the locations of bus stops, increased accessibility for disabled persons and the general public through the installation of concrete pads and/or pathways at bus stops, and the placement of bicycle racks and trash receptacles at major transfer locations. FY12 and FY13 included a transfer facility (canopy) at the Area Residential Care (ARC) facility. Also in FY13, the bus stop signs along all the routes will be updated with a new logo and directions on how passengers can access "next bus" information. In FY14, new bus shelters and benches will be installed with funding from the insurance proceeds of $34,200 from a bus claim which is restricted by the Iowa Department Of Transportation for a captial project locally funded. Also in FY14, a Public Transit Infrastructure Grant (PTIG) for the Phase 11 portion of the ARC Transfer Center project will be pursued. Phase II funding will allow for the construction of an enclosed waiting area with public amenities and will allow forthe purchase and installation of a camera/security system that will be tied into the existing City cameras /security system_ FY16 and beyond includes bus shelters, benches and concrete pads to be installed or replaced where necessary. JUSTIFICATION Bus stop access needs to be improved in order to bring the stops into compliance with ADA standards as well as providing a better place for passengers to board /de- board the buses. Bus shelters provide protection from inclement weather, and benches add comfort during the wait. Trash receptacles, area lighting, bicycle racks and other amenities add convenience and safety for The Jule's passengers. The phase I1 portion of the ARC Transfer Center will establish a comfortable and weather -proof waiting area for passengers transferring buses on the West side of Dubuque. The security system at the ARC Transfer Center will provide enhanced safety as it offers the ability to monitor customer waiting areas and pull -in /pull -out bus areas remotely and in real time. 422 DEPARTMENT: Leisure Services/ Recreation Division' STATE PROGRAM: Culture & Recreation PROJECT TITLE: Flora and Sutton Swimming pools Cameras PROGRAM: DEPARTMENT: 34 FD /CIP NO: 100 - TOTAL PROJECT COST $ 30,000 EXP PRIOR TO FY 12 ESTIMATED FY 12 PROJECT BUDGET 2012 -13 2013 -14 2014 -15 2015 -16 2016 -17 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction Other TOTAL B. PROJECT FINANCING General Fund TOTAL $ 30,000 $ 30,000 $ 30,000 $ 30,000 BEYOND 2017 $ PROJECT DESCRIPTION This project provides for installing video security cameras at Flora and Sutton Pool bath house buildings. JUSTIFICATION Over the years both swimming pool bath house and leased concession areas have been burglarized and vandalized during the swimming pool season. Installing three security cameras on each bath house facility, with the recording devices located off premises, will allow for possible identification of trespassers by law enforcement authorities. Also, the presence of the camera domes may deter some illegal activities. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Recreation Element: Goal 1.1. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Community Design. 122 ,....1 DEPA TN7 _:..: i - ... ,,,.,:v 1.. _ ., p tl t 1:,,Ef ( 1177 ,r,: tary 14S.t1 ,.: pp. iV %,I z 1. I. Les - e S ices ., 1, �,,r�� Yt_, t s� „�:Ft� III,,:.,4, I 1 :,.. Conference ,, S,TAT�,Pi2OGfiMNI,, \„ „ L „ 'n :. ,:,::. II 1._, ...:: 1 ,n -: ,. aT + ,:, ., I , ,. 1 rllttl. �m , P s 7 irv:a1(F. � >".. en ra ,,�o�r t e t ., , R 4 ri ��:.,..: A � � , b'r� , � l ➢ \� D. .I.., ,,.J Y ! ... I 1 I. ....1.. 1. I1 ,l 1 ,1 N.II.: ?;! ,u.,:... I . „. Z /rJ_:41 1 au. V D, ' I i rTr ,. ".4U s b ill �k,i rF ,I , , I E CL �t ,, a . i , n ,, ., r:. d r. n,,., ...,, .' -., t „1 , r 1, ,'I"'So ,.. IJ .: t, ,' ,: � �_ .. -' r....: ,. C � Ra .e Cel�:teh � kl h ," ,. � � . , r+�� {�� „�. I,u•,,. n � �FY .: .. .. ..,,�. ,.,_. r �.. r �r 1 ,! r s, Sa 1. .. , i .,_ !t .r Y ,., :1 t ,,..1 t. ,>.r:�'h +A.i r.EYlk�sl6t )II 4 ills ,. 1'4 rI S�' ��ll II'r•.IL (IFS h 1J.1., �I I 1 ,r, f .dc. ,, <,._: :e -,. r. , :, r/ �... ,.., .o . ,. , c . t ,1 „ :. s�tl. /ris 4 ..:' 1 ill ,4 14M .w DCP_ O fl ,. :,. : ... r .:t 1t ,1. I .Y,. ,., ft.. \h....,. r. ll 1 ,. (_ I rI7.. _,. E.._, 1 4(,. �. 1 101 82 ,C 1 ..... ,, 1 ,_,.,, t .,. r I I. . {:,. !:. , 1 . ^...�.. i - 1 ....IfuR: r/. _ a n , :L... 4 „ut„,- ` � 1"4TALr 1 r 1,.. . . =l.,t 1 r 7 I l... {{ n � � _.,,, �,1/, 1,�1]•O.J. EXP PRIOR TO FY 12 ESTIMATED FY 12 PROJECT BUDGET 2012 -13 2013 -14 2014 -15 2015 -16 2016 -17 BEYOND 2017 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction Other TOTAL B. PROJECT FINANCING General Fund TOTAL $ 18,000 $ - $ - $ 18,000 $ 18,000 $ - $ - $ - $ - $ - $ - $ - $ 18,000 $ - $ - $ - $ - $ - PROJECT DESCRIPTION This project provides for installing security cameras inside and outside the back decks. This project includes two outdoor domes with heaters, two indoor domes, work station and license. JUSTIFICATION These security cameras would monitor the back docks for security reasons but also to monitor for safety reasons. Many building users and staff use the back docks to unload and load material. These cameras would provide a record of that usage in case of injury. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Element: Goals 7.3 and 10.1. RELATIONSHIP. TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principles of Regional Economy and Community Design. 146 DEPARTMENT: Engineering STATE PROGRAM: Business Type PROJECT TITLE: Detention Basin Security Improvements PROGRAM; 8C DEPARTMENT: 55 FID /CIP NO: 720 -2415 TOTAL PROJECT COST $ 55,000 EXP PRIOR TO FY 12 ESTIMATED FY 12 PROJECT BUDGET 2012 -13 2013 -14 2014 -15 2015 -16 2016 -17 BEYOND 2017 $ $ A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction Other TOTAL B. PROJECT FINANCING Stormwater Const Fund TOTAL 3,500 $ 51,500 $ 55,000 $ 55,000 $ 55,000 $ $ $ $ PROJECT DESCRIPTION: This project provides for the installation of lighting and security cameras at the NW Arterial, Carter Road, and W 32nd Street Detention Basins. The improvements will allow remote observation of the facilities to ensure that they function as required for flood control. JUSTIFICATION: It is normal that the detention basins are called into service during late evening and early morning thunderstorms. While these detention basins are inspected during these extreme rainstorms, storm conditions may prevent City staff from getting to the facilities in a timely manner. And the lack of lighting can hinder an adequate understanding of the condition of each facility during a rainstorm. The lighting and security cameras will also discourage malicious mischief. RELATIONSHIP TO OTHER PROJECTS: This project implements the Comprehensive Plan's Infrastructure Element: Goals 3.1 and 3.4; and Environmental Quality Element: Goal 5.4. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principles of Clean Water and Native Plants and Animals. 304 r try..;,, N, t v rSG:r IW/ 3m. DEpARTM�NT. ,. ^ r 1 :, i 1. t. 4 1 4 7 ,, r , a I 1 rt r \ sT ,;r 1, 1 ,,,,;, I , I ,,: , „., maerm =: . , x ! .,,, -.: I �1 g r �1 , \,f! I:Ih 11 .,, - r - d - r , I 1 r ,4., b, Illtt ,.; (�.� A L , � � �.. r. r i, I� L � , Ipp, ,4 ..,:. ;1 ,. ,J II ,. , 1` :�, ,,, 1, 4 u c...p � a { ,,. 11 r„ :.., Irl ,r 11 ,�,, , r _ , F _�1- s 1 I � ski ,�� �,t T1 >r a b. _ or, s __ . � �,I. II err ,� u It >, ,:1:� 1 tr ! . -r,7 :, cra t +�" ➢P il' _..1 J 111 ,.?. .. .:5 W t } k':! J PRt� �� I L ,, J ., ,. , �1. r .I t.:tf. ,., -,.w \,� lA: :,� 11 ..:,,. ....:.)f .U.. t1. L � �. - s_., � m J f, tL ,.., r, s .9; t , �: r , ,, i s ? ,y _, ., ,P:b D ra G t1�i ,q �, � � J r , f,, f q, ��rI,J3,l „,7 ><,1 „� mJ L iL�ttulnrl,. v ..'� . r 1 @ i. r, � ,I. 11 .flail lw,1 r�41f 1,'.4 l! 1 e. � k S,. u r „I -,; , � :.�: s o � 1 , I, I,�,�'tF r , , . r ,:. � ,,yl a 1 , ,:' ,.: ..�..:- PR ;: 4 . A ! ,. � -. ,.I c. � t �n��y1 S7 I.e�f r .,:.:.r '1' . � .,�» I , , ° : r D T M :. } � �!' , m xe.: 1 2 , . , I , , . , , rs . , Y...:I, I ,. �....., rll 5 -.. � I 1 ,r�,.,, \ll s, � 5. a ., � � ,.� w∎ ,, , � : .� . . .L .. s „, ,tl TA . ROJ. C7 ,.. . :1 1 �. ,l. . I \ k+ � t 3 t1 _-1 EXP PRIOR TO FY 12 ESTIMATED FY 12 PROJECT BUDGET 2012 -13 2013 -14 2014 -15 2015 -16 2016 -17 BEYOND 2017 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction $ 422 $ 34,578 Other $ 30,000 $ 35,000 $ 35,000 $ 40,000 $ 40,000 $, 422 $ 34,578 TOTAL $ - $ 30,000 $ 35,000 $ 35,000 $ 40,000 $ 40,000 B. PROJECT FINANCING . $ 5,000 DRA Distribution $ 422 $ 29,578 General Fund $ 30,000 $ 35,000 $ 35,000 $ 40,000 $ 40,000 $ 422 $ 34,578 TOTAL $ - $ 30,000 $ 35,000 $ 35,000 $ 40,000 $ 40,000 PROJECT DESCRIPTION The project will provide for the installation of additional security and surveillance cameras within the Port of Dubuque. The locations identified for surveillance coverage in FY11 include the Alliant Amphitheatre, the Shot Tower, the Brewery parking lot and the McGraw Hill - Special Events parking lot and Ice Harbor Drive. In FY12 the areas include the McGraw Hill - Special Events parking lot, Ice Harbor Drive and the National Mississippi River Museum and Aquarium Parking Lot. JUSTIFICATION This improvement package will expand and enhance security and surveillance coverage within the Port of Dubuque which will compliment the Riverwalk security camera system which was installed in response to the ongoing vandalism along the Port of Dubuque's Riverwalk. The expanded security and surveillance coverage will curtail vandalism and will also assist law enforcement officials with crowd control monitoring during large public events. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Element: Goal 7.2; and Public Safety Element: Goal 3.3. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Community Design. 349 DEPARTMENT:! Engineering STATE PROGRAM: Public Works PROJECT TITLE: Federal Building Renovation PROGRAM: 2C DEPARTMENT: 55 FDICIP NO: 360 -1841 350 -1841 102 -1841 TOTAL PROJECT COST $ 6,025,519 EXP PRIOR TO FY 12 ESTIMATED FY 12 PROJECT BUDGET 2012 -13 2013 -14 2014 -15 2015 -16 2016 -17 BEYOND 2017 A. EXPENDITURE ITEMS $ 7,716 $ 99,986 Design & Engineering Land and R.O.W. $ 17,755 $ 18,874 Construction $ 3,588 Other $ 29,059 $ 118,860 TOTAL $ 24,045 $ 5,014 $ 29,059 B. PROJECT FINANCING $ 15,374 Sales Tax Const (20 %) $ 99,986 General Fund (TIF Recovery) $ 3,500 TIF Debt GDTIF Abated $ 118,860 TOTAL $ 100,000 $ 357,600 $ 5,420,000 100,000 $ 5,777,600 $ $ 100,000 $ 5,777,600 - $ 100,000 $ 5,777,600 $ PROJECT DESCRIPTION In 2008 significant updates to the Historic Federal Building were completed to improve its overall condition and to ensure it remains as a historic structure anchoring downtown. Improvements to the building included: conversion of the former courtroom and two jury rooms on the second floor to the new City Council Chambers, small meeting room and remote broadcast studio for City Channel 8, the City Housing and Community Development Department moved into the completely renovated west half of the third floor, partial steel window renovation, exterior window painting, and exterior building signage. During Phase I the need was identified for the Federal Building to upgrade other major building systems such as the roof and HVAC system. FY 2016 provides preliminary design and engineering funds to replace the cooling and ventilation system. In FY 2017, additional funds are being budgeted to address known long term building operations and maintenance requirements. Projects budgeted for future years include $200,000 for structural repairs to the loading dock and leaking building foundation; $2,535,000 to complete the replacement of the cooling and ventilation systems with a new, energy efficient, high performance system; $1,500,000 for restoration of the existing steel windows; $475,000 for remaining needed updates to the fire alarm system throughout the building and a generator for emergency operations; $230,000 is budgeted to install a new building wide security system that will include electronic locks, additional security cameras and head -end software and hardware upgrades; and $510,000 to reconstruct the buildings rear parking lot which includes adding a stormwater drainage system. 350 t DE , T., P >AR MAN T ,.,,.,,,., ! II ,. \. r ,..91, / /1112 En sneer ,:, G,,.,6( I I ll i\ 7. Itl ,�,, , , . t. ,, r , ,.nr.: r }r I l ! ..... Ol y, ll 11 �.,,,, �_ ,, ,:. ! ".. y :,.,1 t 9 l , { -i N \ u v+ r S'� `fE PROD . A �, � ,� �!4! t , � r 1 r �r , I E P � L. 1 �Y.: 1C) i.11 i -zn. r ,,...>s tf i, v,?14 M1Y � 6lI+n ik ;u s p ., f 1� If ( 7. 1 t � fi dl 1 ,...II 1 , ?>I I (li I) I l ul ! .. , I]� 11t11n� - _ { _�, Irtlnu t- _, ,, .,,.:. ,., Iry ;' PROJ�C7 �" ,,L .� , 1 !I 1 I ,,. .... rr , E: ,rr r r � In :.r r I ,., : ...� �� ,eP 4 e{ 4 ';_ /(l ,.:., 4 1 .. I,..r i..: 5r ' { , � � I ,d; ,-- o r , �e, 0 ,�, u: -:. r.�rr rl F „F" , h n -. 'a ' . r .... ❑ ,._r,V , t 1�7rli�, Fh( I a",. ,h l i f Software,.a , d, ui e : t - t. L, I n ...,.,.::I h ,..ti 4 l '7. lr , IS : {. :..: ...7, .,,, .I !. .11 „✓"• hcNu, n Il llrl,11,n ld;v(Pt'v' R 1. i,l I I.: � , .� i ! d l I � tntJl, v�fVi l.ea�naI lr Y ,1, ,6 ,;, y , ,1. �ROCRAM:�. , It1. 7,....,..r .. p�. -�2T ! .:. ,..� ..,. k .:nil F SIC P. O C � P,,.. h,r,Mfm,I,. ..1J t. d q Ih,r:Pl.. � f, .V. � 1 ,kr , t;.,. to r.u,; 30tl_ _ .22 r, ,,: �- ,COS. n.,.,.. h:. F, i f( ld. �! �,( i.. It .4f ::, ),dd i ll .,. u.. ,.\ n I > �, _ , a ».,.....r. 11 l r F .... pr £L. 1 ,.,:.::. \� :.. ,.n l$., � �O/ 0;d� i ! EXP PRIOR ESTIMATED PROJECT BUDGET BEYOND TO FY 12 FY 12 2012 -13 2013 -14 2014 -15 2015 -16 2016 -17 2017 A. EXPENDITURE ITEMS Design & Engineering Maintenance contract $ 15,000 $ 20,000 $ 20,000 $ 20,000 Construction $65,000 $ 50,000 Other $ - $ - TOTAL $ 65,000 $ 65,000 $ 20,000 $ 20,000 $ 20,000 $ - B. PROJECT FINANCING Sales Tax Fund (30 %) $ 65,000 $ 65,000 $ 20,000 $ 20,000 $ 20,000 $ - $ - TOTAL $ 65,000 $ 65,000 $ 20,000 $ 20,000 $ 20,000 $ - PROJECT DESCRIPTION This project would fund the installation of a new video management system that is located in the Traffic Operations Center. It would include software and hardware that would connect the 130 plus cameras that feed into the TOC and allow for recording and distribution. The first year covers the TOC and at traffic related cameras. The second year covers switching over the remainder of the city cameras to the same system. JUSTIFICATION The viewing of live video feeds along with reviewing of archived footage is a integral part of the day to day operations in the TOC. Currently 130 cameras feed back to the Traffic Operations Center and many more are expected to be added in the future. These cameras are used to view live traffic patterns that can be adjusted remotely from the TOC. These cameras are also used extensively by police for accident investigations and police searches. Often times this footage is requested by legal council and is used in court. We have outgrown the existing video software package that has been built up since 2004. The current system is over capacity and often times locks up and has to be rebooted, each time losing valuable data. This new software would allow simultaneous timelines to be traced and exported. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Transportation Element: Goals 1.1 and 1.2. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES: This project implements the Sustainable Principle of Healthy Air and Reasonable Mobility and Smart Energy Use. 357 D, P".,;, FMM T ;': ; 7 1 14 ( g . ,wing' .; 1, ,, I, ; , ,I , , ,I ;,,; , o $tA7� PR Gj2A etl$pl;y 11 I u� Il Publicll�.0 I, ,, r 'f o I, hROJEGt it E: , .I �� I 1 1 ITS,7raf p,Cbntrol Et{�}iprheht 1 111 .1 1 „ u i ROGkAM C ' .' AMA rl, ,J 11 13EP,A TMEN ; 55 !r F / „I F..0/, P N� 1 �� 2� 1 + I V I S , ..i :;.N �l �> w ,I ,1, Ial ,u „ I� OTAL'', II I � I RAJ T C m�� r ,I(i °,l' ^^ I J $ ,I„ ! ," "250 ",000; EXP PRIOR TO FY 12 ESTIMATED FY 12 PROJECT BUDGET 2012 -13 2013 -14 2014 -15 2015 -16 2016 -17 BEYOND 2017 $ 22,171 $ 27,829 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction Other TOTAL B. PROJECT FINANCING Sales Tax Fund (30 %) TOTAL $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 22,171 $ 22,171 $ 27,829 $ 27,829 $ 50,000 $ 50,000 $ - $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ $ 22,171 $ 27,829 $ 50,000 $ - $ 50;000 $ 50,000 $ 50,000 $ - PROJECT DESCRIPTION This project provides funds for the maintenance and expansion of the Traffic Management Center's ITS Improvements including remote management and monitoring of the City's traffic signals along with automated vehicle counters, cameras, classifiers, variable message boards etc. along key city. corridors along with ITS equipment located within the Traffic Management Center located at City Hall. This fund would also be used as match money in joint projects that are being suggested by the Iowa DOT. JUSTIFICATION ITS Technologies improve the efficiency of traffic control equipment using state of the art electronics, congestion, air improvement, travel improvements, citizen concern, and green communities. Examples of these technologies include traffic counters, traffic monitoring equipment for speeds and occupancy, variable message boards to inform the traveling public. The 1 -80 detour through Dubuque in the Summer of 2008 used some of our existing ITS technologies to aid the flow of traffic through Dubuque. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Element: Goal 11.4; Transportation Element: Goals 1.2, 1.3, 2.3 and 3.3; and City Fiscal Element: Goal 5.1. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use. 369 t. D TMENT i ,.k,�,,,.'` } .,, : -. -. _n� IY. f ,,.v .. V . ,,.:1 t i . ,,,,. V 11 11 ..011:,:,:,: &i,alS En meenn ., /. J ;:,,�,� 1 g. . r �. 1 .'. /.' ;,,.:� lr} . .... ,. ,: I ':. I;` 1 AI 1., ` Il �7,r, 1.: I ti,. ,.. ,. .,.:- ., S: E .I: �. 441 f , r: ,.al „ ,r f 1 1 fll/t 7. .I_ y.,. -„., ,.,a f... ,. , T.. ! a'„ ,/, I. ,.r- „ 11 t t ,ft I:,Ja,, 4"'M1 iL! rlh, �. fv ;. fN t., t. ,, ,,, r f,�r,,I ., �, ,:1 P �o W s 1 (1..• M �.,: ,. r, ::: v . ; m J 1I ,. , t ,t t n..a,:..., a 1 a, .,,, nua Ir,.0 ; , )a ; X11 u I 1 ., � a ,- :11 ,�, n IV, -r ..n I 11 ,. W. .,I ... � . ,.. '•`f YI ( P "tl'. ,l 11 �: l 1111 94 ri,.;r! t Al ! 'F I) ., ...4 -11 f n. i,. 1 .,.,.. .a F.,. „ ( I- :. I.. .7 1. P, EC T'Ctc I/ 1, ,, ., „ ,�4 L I , rl, ,F ::. RdJ T I r ,, 1 N y ( , ,. � t r I, e,. so.,L �I,..,:1.I.S,Ii .._.i f� 1 ,ii4 ,. „.w.:, l lly:, , s r . , r s S r e C eP ,l I o # q I 4 1 . ih I A... ,, n r t 1 ..i.0 . 1., 1.. u.., 1. r'.m II .: ,t „11Itt.. ,.4. Aa, :rvlr> I, ,I;, rl. ,.....1111.. do-.,. 1 5el l �:r:. cvlr,.,,,1a 41 r R, � ua tI L.;i I . ,u . , , �� .: _jl., �! ,, ,4 ar �. .� . .. 1 ,4 , -� r } n., 1. , , , P I i 1 , -: -�J In Il !I I V. :1. T` _ II 1. ,. ) ft... , 1 ,. .: ,::t hll.f.. ,1”. ._GoV4 fll rh. �,h /l( /,N...i1a.R, l ,,.. to ,, ,11, (1 .tt8a .,. ,0. 4,.M'.,11.. ,r1Yat at,l, � . t t: < I,� .r ,1 ,t 1,. ,>d,r �.� ,, ,,. ,, :' ROG , IIA ,11r. 11 _,.. p rt P ' fin -C. , , �!C,!. D P ART ANT= , ,.. nl. , � s,.. D G P. t ,:`; � ,t n��. 44 ,, .li r... t, Y, \r. �.r..., �I f `.,: Ipi IF. ( )7 r {.. I. I. ,. Id I. ,,, 1,La,5.l..l -.i ! .. . I_ S, ,_:1, I,., n. C a � 1 . .. - I , .., 3 h 4 0�_ 42 s 4,.r Ia,:Ad A r. .I I(, I Zil'. l..11lln.i J\f. I)1 f s , ,n ..: ,_ -_ „ ,u r ... , „, . Rb ECT l i A.. ...:., .. .,�. ..,,..... J1. . _AI ■ ...11:1,11 . ,.;.r. I.f.. .I :f l L. ��. vi . -,t: , t,., +F,. Sl, -. 7 -. _ I $,. .�.J135,O;..a.. EXP PRIOR TO FY 12 ESTIMATED FY 12 PROJECT BUDGET 2012 -13 2013 -14 2014 -15 2015 -16 2016 -17 BEYOND 2017 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Equipment Other TOTAL B. PROJECT FINANCING Sales Tax Fund (30 %) TOTAL $ 35,000 $ 50,000 $ 50,000 $ - $ - $ 35,000 $ 35,000 $ - $ - $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ - $ - $ - $ 35,000 $ - $ - $ 50,000 $ 50,000 $ PROJECT DESCRIPTION This project would fund the equipment, installation and software license for 12 fixed and 5 Pan Tilt Zoom (PTZ) cameras per year installed near roadways and signalized intersections throughout the City of Dubuque. JUSTIFICATION Currently, the TOC has communication lines throughout the city along major and minor arterials, city streets and near signalized intersections. Engineering uses these cameras to remotely monitor and adjust traffic operations. Over the last two years engineering and police have worked together using these cameras to aid the police in accident and crime investigations on a daily basis. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Transportation Element: Goals 1.2, 1.3 and 3.3; Infrastructure Element: Goals 4.1, 4.2, 4.3, 4.4 and 4.5; and Public Safety Element: Goals 2.1, 2.2, 2.3, 2.4, 2.5 and 2.7. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES: This project implements the Sustainable Principle of Healthy Air, Reasonable Mobility, and Smart Energy Use. 371 DEPARTMENT: Engineering STATE PROGRA Public Works PROJECT TITLE: Federal Building RenoVa' PROGRAM: 2C' DEPARTMENT: 55 FD/GIP NO: 100 -1841 3504841 102- 184-1 TOTAL PROJECT COST $ 317,986 EXP PRIOR TO FY 11 ESTIMATED FY 11 PROJECT BUDGET 2011 -12 2012 -13 2013 -14 2014 -15 2015 -16 2016 13,448 $ 45,929 $ 10,690 $ 70,067 $ 9,760 $ 60,307 $ 70,067 $ 106,756 $ 41,163 147,919 $ 39,419 $ 3,500 $ 105,000 $ 147,919 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction Other TOTAL B. PROJECT FINANCING Sales Tax Const (20%) General Fund (TIF Recovery) DRA Distrib (TIF Recovery) TOTAL $ $ $ $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 357,600 $ 5,420,000 $ 5,777,600 $ 5,777,600 $ 5,777,600 PROJECT DESCRIPTION Over the past several years significant updates to the Historic Federal Building have been completed to improve its overall condition and to ensure it remains as a historic structure anchoring downtown. Improvements to the building included: conversion of the former courtroom and two jury rooms on the second floor to the new City Council Chambers, small meeting room and remote broadcast studio for City Channel 8, the City Housing and Community Development Department moved into the completely renovated west half of the third floor, partial steel window renovation, exterior window painting, and exterior building signage. During Phase I the need was identified for the Federal Building to upgrade major building systems such as the roof and HVAC system. FY 2016 provides design and engineering funds to replace the cooling and ventilation system. In Beyond FY 2016, additional funds are being budgeted to address known long term building operations and maintenance requirements. Projects budgeted for future years include $200,000 for structural repairs to the loading dock and building foundation, $2,535,000 to complete the replacement of the cooling and ventilation systems with a new energy efficient high performance system, $1,500,000 for building renovation of the existing steel windows, $475,000 for remaining needed updates to the fire alarm system throughout the building and a generator for emergency operations, $230,000 is budget to install a new building wide security system that will include electronic locks, additional security cameras and head -end software and hardware upgrades, and $510,000 to reconstruct the buildings rear parking lot which includes adding a stormwater drainage system. 366 _,;_ I4 _I r �I` 1� ��..• DEPA RT,MENT En ineefin g 1 ,,,• , j�l �� �,; �, , �� ...� , t'� 11 T.1,f s r�T I��oRa,M„ „ .,,,,.1 II!FbJC,T;'� Plat' 16 0'ks r 11 ;, i ,�Ilil III , -; 1 l I „197, 111 , ; 1 ,�J�ti tic, "4�Ia 1•'.�I� /ICI,.,,,,,,/ / I' �;1 JI ,I {. IT►.Er ,, l l , I' ..I, ,,, t ded' ete't t on Ca ere;U ade . J 1, 1I,a,l, ,1 {; 1!d;;. � I 1/I Pg� 11, °• I, ,; �tll H,. 1 , 'icy -�,4 ,I lj�l , f� f,l� 0, ,11 r” ,F ,ia s t4h1 .,,I. rl ,11;1711 ;,. ,1,71nii/„ .0 , tll .�. p 1 ;:, f, Os�., ,l t.c ' , (�EPAIdT EDIT 5*a FD /CIPNO ' 3p0 -2325 , (! t i ..,I/ if , ) ;: 11 III l Il,r. ,OTA� /,,;- , PRCIJECT COS t 1 ,!i. 6.,,,iili 6 � • i 6Lj0� 00is EXP PRIOR TO FY 12 ESTIMATED FY 12 PROJECT BUDGET 2012 -13 2013 -14 2014 -15 2015 -16 2016 -17 BEYOND 2017 $ 40,000 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction Equipment Other TOTAL B. PROJECT FINANCING Sales Tax Fund (30 %) TOTAL $ 25,000 $ - $ 40,000 $ 40,000 $ - $ - $ 25,000 $ 25,000 $ - $ - $ - $ - $ 40,000 $ - $ - $ 25,000 $ - $ - $ - PROJECT DESCRIPTION: This program would fund the upgrade of 24 of the 48 video detection cameras for years FY 2012 and FY 2015. Typically, there are four cameras per intersection (one for each approach). JUSTIFICATION: Currently the City of Dubuque has 12 intersections running on video detection. Many of these were installed along US 20 during the roadway improvements from 2002- 2004. The use of these cameras allows the traffic signals to detect vehicles waiting at lights without placing sensors on the roadway itself, making these very valuable during times of construction. Most of these cameras output a black and white picture. Newer color cameras are available as an upgrade at a reduced cost. These newer cameras operate better during extreme conditions (Snow, fog, ice, etc) and also have improved connector interfaces. These would come with a 3 year warranty. Funding from this program will be used to upgrade the video detection cameras from black and white to the newest version of color cameras. The remaining field equipment is compatible with these cameras after a firmware update. RELATIONSHIP TO OTHER PROJECTS: This project implements the Comprehensive Plan's Transportation Element: Goals 1.2, 1.3 and 3.3; Infrastructure Element: Goals 4.1, 4,2, 4.3, 4.4 and 4.5; and Public Safety Element: Goals 2.1, 2.2, 2.3, 2.4, 2.5 and 2.7. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use. 381 DEPARTM Leisure Service; ParkDi_vision STATE PROGRAM: Culture & Recreation PROJECT TITLE; Security Cameras EXP PRIOR ESTIMATED TOFY11 FY11 PROJECT BUDGET 2011 -12 2012 -13 2013 -14 PROGRAM: 4C I•AMENT 30 FD DE/CIPNO: RT 102 2105' 2014 -15 2015 -16 TOTAL! PROJECT COST $ 71,791 BEYOND 2016 $ 18,250 $ 18,250 $ 18,250 $ 18,250 3,541 $ 3,541 3,541 3,541 A. EXPENDITURE ITEMS Design &Engineering Land and R.O.W. Construction Equipment Other TOTAL B. PROJECT FINANCING DRA Distribution TOTAL $ 25,000 $ 25,000 25,000 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ $ PROJECT DESCRIPTION This project provides for placement of security cameras in areas of immediate need, Comiskey, Veterans' Memorial and McAleece have cameras and we are seeing good results. JUSTIFICATION As a means to reduce vandalism and to improve safety, we would like to establish a program to place security cameras in areas of need. A permanent camera would be placed in parks where we are experiencing the most problems. 2012 will focus on Comisky Park and covering park areas. 2015 will be other areas of need. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Public Safety Element: Goals 3.3, 3.4 and 4.2. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Community Design and Reasonable Mobility. 81 DERg,f; En rnee , P.ubi J r ry 1 , t „Ir i u ,C ri erd�x en' , i ,, n,l, P-1,9: Fbbrc� { 1; 102 1 `c . ?, ■ 1 T G: - 9 J r is i, A r$, fifi4 ,! X128- ,tligr -, EXP PRIOR TO FY 11 ESTIMATED FY 11 PROJECT BUDGET 2011 -12 2012 -13 2013 -14 2014 -15 2015 -16 BEYOND 2016 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction $ 53,078 $ 25,000 Other $ 10,000 $ 10,000 $ 5,000 $ 10,000 $ 15,000 $ 30,000 $ 53,078 $ 25,000 TOTAL $ 10,000 $ 10,000 $ 5,000 $ 10,000 $ 15,000 $ 30,000 B. PROJECT FINANCING DRkDistribution $ 5,000 $ 53,078 $ 25,000 General Fund $ 5,000 $ 10,000 $ 5,000 $ 10,000 $ 15,000 $ 30,000 $ 53,078 $ 25,000 TOTAL $ 10,000 $ 10,000 $ 5,000 $ 10,000 $ 15,000 $ 30,000 PROJECT DESCRIPTION The project will provide for the installation of additional security and surveillance cameras within the Port of Dubuque. The locations identified for surveillance coverage in FY11 include the and Riverfront Marina, Alliant Amphitheatre, the Shot Tower, the Brewery parking lot and the McGraw Hill - Special Events parking lot and Ice Harbor Drive. In FY12 the areas include the McGraw Hill - Special Events parking lot, Ice Harbor Drive and the National Mississippi River Museum and Aquarium Parking Lot. JUSTIFICATION This improvement package will expand and enhance security and surveillance coverage within the Port of Dubuque which will compliment the Riverwalk security camera system which was installed in response to the ongoing vandalism along the Port of Dubuque's Riverwalk. The expanded security and surveillance coverage will curtail vandalism and will also assist law enforcement officials with crowd control monitoring during large public events. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Element: Goal 7.2; and Public Safety Element: Goal 3.3. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Community Design. 361 DEP fiT ENT .4 ...,,! —,� �I.. ,�:,8 I Il:r i._ t,;,, ,�::: .' a.. n inter n .... ! g .._ r.. .. ,. ., } ,. :. 1:.1. ,I... ! .7.r ...:., rt tl( ".,.,,.., I f i•s, .t:r, , II ,,, .,... I !9'1. n'>\4t U.,/il._ , „ r -' -r % I ....i l,�: rl li,ll ,4:.1, ! S ,.:� I l r.. a n n.: , , ?:� 15 turdnust.yu,7 f.. r I I , ( 1 . �. ,n r /.,,. I 1 ,.. �, 1: G.,..,.; ulh aFY ,InLI _.., .. ..,I, . 71 i el (...n.. „ ✓. .,,. .,.1. :III,l�}..l..Pd.t.4l :,.. „ .:, { ,. - fll. ! , .11tl S,f1Y IN1r r"r STAT , . G � ! \ 7�G. ? ,�a. ?u�S4,G�,:� 11�'IP',1!,:dll) 32ur.. Hltl lr 5l�l�.Stz:L. f , , ( , �:l.,t r,: , .. ... d !,. , 11 V. ,,,,�. Y,.I 5 „I : °. tl a, i {_?!:\�iu a „i,,r: � t 7u',_ , b ., , .br s �W r r L �' :,, ,t:�. �., �. ,.: � r1 Y. - r, ( ,. a..)1 :Ir n., Mr. ,�. ft 1 l}io,_tl,. . 7..1. l,W(Ilt(r f19,.,L, 11 u , J., 1 JA, .1 i....(a 1 , .,, ,. ti.,, _ _6..d, ..:. r....:: . 1, .. >✓�L 77 I4 N n ,,..__ .: '.1 .I , n ,.. , .l 1 1 t:.. ,�. a n..f r ,. � � I r, i l I, l.l(S,,:INttrl,,, fi..: -I., tN ( 1 , .., I,L,..IM1 IIh IJ I 6.(x11{ Fa:! ,r�11uL, 1 ,)f e . Ir; `vl II „V(I,13 fl.;r:, U 1111 >,/ „ ": /: ¢JUG, 11, 14 ..f,,, ;.. ,., Y , r II Or=C E r ,PR ,1 � N In G , ., Y . (F.,.71(,..,f /,.., I) rG. n.: 4, J...:IIILl,t , r, I�1 3 ^j :EF4 L4 I ..,.G _ It ! 1 ,..: it I .r r ,; .n(,. � �.:.. ,,.5... r. ista b Mil � .k �i s ri1, ,.. ., .a erg � � „ r f �, , �, : � � � : 1 „11, 7:� �, ,,,,,, , , <. } � l l ,.I , ^I ,.,�' , r, >a r � ( r A>< .d/ t_ ,. �. Y � {U .. h ... ^'L_ t -..4. P -�.� .., at , - - -� t.. .mll. .e..,:, f r i..duvt. lfii �rl.. s...la ,�ttyl lm at.,, ! i _U.,,1 ._ -.. 4,_:., 1.. ..:.: tl te, I 5,, :, IU e( _.,11. ! .r.ri. ._�i I ! ,. b ...c v . ,.. 1 p . I. r ', ” t. r. 1 f ,( 1. I ,. l a. , f f 1 I 1 „\::I.nl,:r ,, \ _ } ,f. ,r,,:.alifll d7 :,; ,.d, '07 \(...,.AU,,.711,1.(,tL.iri�l ltn h.. ne.. §11lf.7...:1t11111, ,_.n,S.L .: f 1 S a .,, � .,.;. , h ,fL_., 1, , l .(., v, . �,— ,...� ,...: .r,;g ,,. .. _ M1I, =r ", 1wj r,11 1 A � �. {,� '{ t +l"� { /RYA,, � '•.,_. .,,.,I D,ERA 55 r I I ,..51. . ,. t. .., ir..,v.4.lh.. t x, f. �., ::,ul(. . G 0. . a P... Gi �„ fl,:,:7: t � 4� / ,, I..., ,,. .:, 71.. ,, 0 � ii { I 1 7.31.a fil, 1. ,, ,.P ,,, ,(_t ,�r. l 4 4 lr __. ri, 6,11x,.,.. / I it ),:,:. . � N� !„ : =: :.. ❑ Iry 1� � ,v ,. ._ - ., .,� � s r r ,a.... } ... t., I n,. IN,, r,1.11; i! 7.4x1 _,I _�...., , ,i g!' `� f 11411l1Y:l, F:r (, ,.. .: Lrz ....JI � ' "r�. Wr�..r .. ..., n,tc, -., ... .,. , ry ..,:.., f1 ..._ .. EXP PRIOR TO FY 11 ESTIMATED FY 11 PROJECT BUDGET 2011 -12 2012 -13 2013 -14 2014 -15 2015 -16 BEYOND 2016 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction Other TOTAL B. PROJECT FINANCING Sales Tax (20 %) TOTAL $ 126,467 $ - $ - $ 126,467 $ 126,467 $ - $ - $ - $ - $ - $ - $ - $ 126,467 $ - $ - $ - $ - $ - PROJECT DESCRIPTION The project will provide for the installation of security and surveillance cameras within the Historic Millwork District. The locations identified for surveillance coverage in FY12 include 10th Street between White and Elm Streets, Washington Street between 9th and 11th Streets, Jackson Street between 5th Street and' 11th Street, and 9th Street between White Street and Elm Street. In addition, security camera will be aimed at the parking areas on 9th and Elm Streets and in the leased Iowa DOT parking lot that is proposed east of Elm Street. JUSTIFICATION This improvement package will expand and enhance security and surveillance coverage within the Historic Millwork District. The security and surveillance coverage will curtail vandalism and will also assist law enforcement officials with crowd control monitoring during public events. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Element: Goal 7.2; and Public Safety Element: Goal 3.3 RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Community Design 362 DEPARTMENT: Engineering STATE PROGRAM: Public Works PROJECT TITLE: Federal Building Renovation PROGRAM: 20 DEPARTMENT: 55 FD /CIP NO: 100 -1841 350 -1841 102 -1841 TOTAL PROJECT COST $ 317,986 EXP PRIOR TO FY 11 ESTIMATED FY 11 PROJECT BUDGET 2011 -12 2012 -13 2013 -14 2014 -15 2015 -16 BEYOND 2016 $ 13,448 $ 45,929 $ 10,690 $ 70,067 $ 9,760 $ 60,307 $ 70,067 $ 106,756 $ 41,163 147,919 $ 39,419 $ 3,500 $ 105,000 $ 147,919 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction Other TOTAL B. PROJECT FINANCING Sales Tax Const (20 %) General Fund (TIF Recovery) DRA Distrib (TIF Recovery) TOTAL $ $ $ $ $ $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 357,600 $ 5,420,000 $ 5,777,600 $ 5,777,600 $ 5,777,600 PROJECT DESCRIPTION Over the past several years, significant updates to the Historic Federal Building have been completed to improve its overall condition and to ensure it remains as a historic structure anchoring downtown. Improvements to the building included: conversion of the former courtroom and two jury rooms on the second floor to the new City Council Chambers, small meeting room and remote broadcast studio for City Channel 8, the City Housing and Community Development Department moved into the completely renovated west half of the third floor, partial steel window renovation, exterior window painting, and exterior building signage. During Phase I the need was identified for the Federal Building to upgrade major building systems such as the roof and HVAC system. FY 2016 provides design and engineering funds to replace the cooling and ventilation system. In Beyond FY 2016, additional funds are being budgeted to address known long term building operations and maintenance requirements. Projects budgeted for future years include $200,000 for structural repairs to the loading dock and building foundation, $2,535,000 to complete the replacement of the cooling and ventilation systems with a new energy efficient high performance system, $1,500,000 for building renovation of the existing steel windows, $475,000 for remaining needed updates to the fire alarm system throughout the building and a generator for emergency operations, $230,000 is budget to install a new building wide security system that will include electronic locks, additional security cameras and head -end software and hardware upgrades, and $510,000 to reconstruct the buildings rear parking lot which includes adding a stormwater drainage system. 366 „ T r�T p pa� ��„ I (Yr Ti ... a 1 ?..nl,': t i.,l n m�enn ,;,,, , E L., i. ry, , ,g;,:, !`J7,1 I, .,.,.. ,..._„ ., � ,i n r4 I i. i � rr ,.1.t rz f „.r., .r )5t., ttl\suu JL�lirrrcr i -. n „.:t l{ 1,'... :CIA,,+ ,, a t 1,,,,,,;,, t r /l,, ,L.,t, , .,..,. J, t..: _:: ,....( ,.,, M1- ,; r , 1 T f`.. }.. rl 4 ,.I.. ), 1 .,,..,, 1..(,•� � I 1 :... ., , , I:. ..1 S"1iE P bG II { : irr.. f ,.., v 4 I�. I�gIV � lu ,n I v} : ,:. J n. .. F � /,:.. r t Y” �, l I I t ". :.. I (, >I. .{i Uipl. , Tr , 1, I 11,,4 { \ „yl 1111 �1 � I !t f, ubhcr :arks , ,. , r. ,, / i /I V:\ ,. , �,,: Y�)v } 1 /f 111)r t /ll v....: ) /"A n3 �1.- ::,,,:: .,;�,{„ P ✓, _, r n.,.,s ,. r I ,� , : = \Ar Il1Y, ,:. 1 i: ) 1 f) Il.r _.1 USI Ir 7 .1. .,, i- _., /,r r .v , t , � , \., ,r , , r y I ,. , ,. J c..l l,f. V. lii..u.7..! 7,1 .1.I.:,.li L, Inf fi. A,,.:.:4l ,rr nGf4, (I v 1 11 r ,.,. It.r.,S � /Y , ,..,11 x ,. 1 . Irl , 1 � J 'C.::,,,� tjl. �tcJ „t/re.,a livu,7r\ I ,,L: _, , , n „!t ,��u a Pi11yQ �. .. : WS.. ,, , I ., r .. / v. 7 r, -. < m ,,. ,.. 1, „ :I,. ,. ,, _ i.. , I. , i ..,. ,,. N urn a llu l ifll I , 4, y,,, l . :, `:: U � ,, . U. a en de dd � h �: er. I � � � G1 :.. r M,.....tll i, l IA ,I JW ,,,,n.l1. � IG �. -:.n gM1 -.s. ,,) t.5, , l r t I .. ll, I a ,..,{JI. ,l, .1. ,5l., �. ,.,.J,,.,,.5 -,I 1. 1u 9T, L.t JI \_ i. Jf. } f (\ „P , d I 1 7 5:..1 ., 1 S. ,V .- k t th 1_., -. ., .,,,%tdlfJ1e�J,�.,.f�: l411,..f l -:. .,. tee- :e...,. , .r 1 vli:.l,.. I. 1 fl.,. r ,, r \x .n1 lu. Il !. ,, :1 ,\r._,rll,;�Il,„ {, {I:,�.z,:r, ii li fll � f713..,1�71r I I\ ,:�. Iti I 3� ,rl ( � -\l ,T ,_.. - r.,r;.�}., s ! ,.:,,. �i ,. ,,.. .. - , ,., ,. , ,. n, r,ra Y,.., ,.. , 14 Ar � , r , 1,, 4 1 I dl ( 1. M1.! ':..1411 1 ?,, ,. .. /, r.,.. :i).id... ..d „r tu.l,t .., .. 1'.ri r...N ,?; a. r..7.l , f�ir ra1111 ,i ,.. ,a +� a vlr .. ... i:.l. e. r.i.,. nf,lu }1.41(1 r.e.. (� . ...t. �l ��` I PR RACth .. _J., �, 1. -, , Z �!)r .. • }!. 1..,f (1..1,,.1,:1,: /, 11 ,. IV:. 1.. �:.: ._._..A- .I k � .41,,..1„ 1.. ,� _ ..__. ,.;L,, .. //, i..._ .. , [. r1,4 C _N 3 0 232,5 \, 4, r.,.,,, \\f ,,, r ,. r ,.,.1lh ,, a%re 3 ,, :L. 1 2 r , -. /,,.:�. rl. o 1 s 11.1 :, ... I. fi I.. I ) !. n IJ, L ,.1 .rd.441a.. R1. .1,7,. ., tt .: Ire, I !!� Ir h� { ! 11 x /,. I 1 , .:f(i:1' �`Qil"AI,., , _.. l i L.d�,. _n ,`+L.. I ,.,. h,,, (.. ., . t.... a „in �,. ,_,, ._, u 1 t , a :1�:4 .... i.. 11 ,, ... $ll ,I 55,00 -0.> EXP PRIOR ESTIMATED BUDGET 2013 2014 2015 BEYOND TO FY 11 FY 11 PROJECT 2011-12 2012 -13 -14 -15 -16 2016 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction Equipment $ 40,000 $ 25,000 Other $ - $ - TOTAL $ 40,000 $ - $ - $ 25,000 $ - $ - B. PROJECT FINANCING Sales Tax Fund (30 %) $ 40,000 $ 25,000 $ - $ - TOTAL $ 40,000 $ - $ - $ 25,000 $ - $ - • PROJECT DESCRIPTION: This program would fund the upgrade of 24 of the 48 video detection cameras per year. There are typically four cameras per intersection (one for each approach). JUSTIFICATION: Currently the City of Dubuque has 12 intersections running on video detection, Many of these were installed along US 20'during the roadway improvements from 2002- 2004. The use of these cameras allows the traffic signals to detect vehicles waiting at lights without placing sensors on the roadway itself, making these very valuable during times of construction. Most of these cameras output a black and white picture. Newer color cameras are available as an upgrade at a reduced cost. These newer cameras operate better during extreme conditions (Snow, fog, ice, etc) and also have improved connector interfaces. These would come with a 3 year warranty. Funding from this program will be used to upgrade the video detection cameras from black and white to the newest version of color cameras. The remaining field equipment is compatible with these cameras after a firmware update. RELATIONSHIP TO OTHER PROJECTS: This project implements the Comprehensive Plan's Transportation Element: Goals 1.2, 1.3 and 3.3; Infrastructure Element: Goals 4.1, 4.2, 4.3, 4.4 and 4.5; and Public Safety Element: Goals 2.1, 2.2, 2.3, 2.4, 2.5 and 2.7. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use. 387 DEPARTMENT: Leisure Services/ Park Division STATE PROGRAM: Culture & Recreation PROGRAM' 4C DEPARTMENT: 30 FD/CIP NO: 102- TOTAL PROJECT COST $ 25,000 EXP PRIOR TO FY 10 ESTIMATED FY 10 PROJECT BUDGET 2010-11 2011-12 2012-13 2013-14 2014-15 BEYOND 2015 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction Equipment Other TOTAL B. PROJECT FINANCING DRA Distribution TOTAL $ $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ $ PROJECT DESCRIPTION This project provides for placement of security cameras in areas of immediate need. Comiskey, Veterans' Memorial and McAleece have cameras and we are seeing good results. JUSTIFICATION As a means to reduce vandalism and to improve safety, we would like to establish a program to place security cameras in areas of need. A permanent camera would be placed in parks where we are experiencing the most problems. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Public Safety Element: Goals 3.3, 3.4 and 4.2. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Community Design and Reasonable Mobility. 95 h P' PT ANT r , ..., 7 , .1..,, � 1 :,, ,,, a . -. ., :.,. 1 a.�.t.. J.. „!., i:. st ,, .,I ,,_.,. ,, .1..,. .LG S „). !,iA. „,9;r4,4v �.. -,t(. L,,.,. ... 1 ,".v {,,. -.:, 1 I ,� r. {I 1 1 , 1, �. � Ir , {{ r,.l� �,,, �r a ,ti, 1 f ,, v ( W(., ,.,.. ,:.!:.. =; t y , ,.. ,.. � , r r i i a . �_ , S. ,, STATE R120GlAM. ,.. c., it r.: x. t....,. ,..,,.,....W c1. .t Jr .pt .r ru-n l -,,., �, .„t .r. d,,Y (.: 3r,. u6,,.. @i u,d r,��7r +tn ,•..,. - . ; ,'. , _ ,) _. , U Y ..nl: i +x, .. ub�icUU . s ,,, � P � k , � ,1.,, ��f,,, � �l v�rr, , sue 1' 1 1 , I ,� ,s 1 a.:a„ f i ,. I .I �: :Ir :. {•- �_„ �, �. n 'iP m d.. rrri,� ,. 1 ,,: t Y.. -....i f 1...,. i, ,.1.,/ ,., t.,. � r ,.rlr7 ,�.,v1..,.�.1^St2ti�,..,. a (: , i ,,. r n1. 1V � �. I .�, ., ,r, n' ......., {�, l ,. TrJ \': f. 8.. !t)l. a/ I. I I.... rw ,r�a�l�,y. a t � � 1 pll ,, SI , 4 1� � I ,:,... ;. ,( � ._ J�,� PROJ�CtPTIT.L l rr I r a , .,,. rd,, ��.. „y1+,v a :, ,r,.,l E.,). ,,. (. �, ', ( ,. v ,: -. e h:.r:� lsio � � . �rrt :� , . �, ��'�,�p mm , to c v. r r .., r .. i.. r... .... T ,� ,.,,i. a ,a I... ,,, �i�ISn7,_..._. 1%+I... tF, ➢ ........ , �h t r „ . , .__ � -<_r.. I w. r Y ,t,Ui( � ,,.pf f l \:,( � 41 M1 i..1 /. i. � -1,,.. �, ,fV. -C�r{, rt,,.z,.Z .,. ..:,�t, 1s� I u 1 r F. afi ^ E r< L k� �,:k tr. r : N,.L.,...1 , 1. r. t! ,,, dl,ril .,�l,,ff�.:�. 1 ..t r.. ., �,�.L 1 t,,v -r n /. , 4... ul 7. ll,uhl tUa v �, , I”. r i (. .{ l,:.l c, .,.., /....,. l._,.x,.1,S .,,, .. ,, I PIRbGRA1Vl •. 'r'�l” 2 IyAIT T r ! , q _ ..�� Ml��► r .,.. ,:. f .�/�I., �- -h;f- C ,,. N 7 - I 9..,7 r, r tw....,._..,.L L,TC f y � -Ytr,1 s ,,,. � . �. I )t. ,v. .M.YI. ..,.. ,: { ' � , ,, __ �, » � .:, $ r ,. �.. _ _. tit � : ,. � Ss Jl,.,r ;::, _ - 1:865 ,. t ,, ni,.. 1 r .:,...i ,lf. L.., � I.,t h r � i ,,, ,fir. I i' ___� i.W..I �b�� -1��3 � 11 O 1 CT R . .. A.. to n al �, .r,. -,.. .. t.,l,. /_._ � X65 96}9 , TO FY O PRIOR ESTIMATED ED PROJECT BUDGE T 2010-11 2011 -12 2012 -13 2013 -14 2014 -15 BEYOND 2015 A. EXPENDITURE ITEMS $ 2,260 Design & Engineering Land and R.O.W. $ 54,704 Construction $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 9,000 Other $ 11,260 $ 54,704 TOTAL $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ - $ - B. PROJECT FINANCING DRA Distribution $ 25,000 $ 11,260 $ 54,704 General Fund $ 25,000 $ 25,000 $ 25,000 $ 11,260 $ 54,704 TOTAL $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ - $ - PROJECT DESCRIPTION The project will provide for the installation of additional security and surveillance cameras within the Port of Dubuque. The locations identified for surveillance coverage in FY11 include the and Riverfront Marina, Alliant Amphitheatre, the Shot Tower, the Brewery parking lot and the McGraw Hill - Special Events parking lot and Ice Harbor Drive. In FY12 the areas include the McGraw Hill - Special Events parking lot, Ice Harbor Drive and the National Mississippi River Museum and Aquarium Parking Lot. JUSTIFICATION This improvement package will expand and enhance security and surveillance coverage within the Port of Dubuque which will compliment the Riverwalk security camera system which was installed in response to the ongoing vandalism along the Port of Dubuque's Riverwalk. The expanded security and surveillance coverage will curtail vandalism and will also assist law enforcement officials with crowd control monitoring during large public events. RELATIONSHIP TO OTHER PROJECTS This project implements the Comprehensive Plan's Infrastructure Element: Goal 7.2; and Public Safety Element: Goal 3.3. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Community Design. 374 DEPARTMENT: Engineering STATE PRQGRAM: Public Works PROJECT TITLE: Federal Building Renovation PROGRAM: 20 DEPARTMENT: 55 FD /CIF) NO 100 -1841 350-1841 102 -1841 TOTAL PROJECT COST $ 493,669; EXP PRIOR TO FY 10 ESTIMATED FY 10 PROJECT BUDGET 2010 -11 2011 -12 2012 -13 2013 -14 2014 -15 BEYOND 2015 $ 30,045 $ 129,623 $ 65,859 $ 225,527 $ 205,738 $ 19,789 $ 225,527 $ 110,000 $ 45,211 $ 7,931 $ 163,142 $ 87,931 $ 75,211 $ 163,142 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction Other TOTAL B. PROJECT FINANCING General Fund (TIF Recovery) DRA Distrib (TIF Recov) TOTAL $ 10,000 $ 95,000 $ 105,000 $ 105,000 $ 105,000 $ $ $ $ $ 457,600 $ 4,920,000 $ 5,377,600 $ 5,377,600 $ 5,377,600 PROJECT DESCRIPTION Over the past several years significant updates to the Historic Federal Building have been completed to improve its overall condition and to ensure it remains as a historic structure anchoring downtown. Improvements to the building included: conversion of the former courtroom and two jury rooms on the second floor to the new City Council Chambers, small meeting room and remote broadcast studio for City Channel 8, the City Housing and Community Development Department moved into the completely renovated west half of the third floor, an information kiosk, partial steel window renovation, exterior building signage, exterior window painting, and new green roof in the second floor lightwell. During Phase I the need was identified for the Federal Building to have a strategic long term capital improvement plan in order to properly budget for the periodic replacement of major building systems such as the roof, HVAC, etc. The FY11 budget includes $25,000 to make additional ADA bathroom upgrades throughout the building and $80,000 to address needed tuckpointing and masonry repairs. FY12 and FY13 provide construction funds to replace the cooling system over two years for a total of $1,100,000 ($550,000 per year). Additional funds are being budgeted to address known long term building operations and maintenance requirements. Projects budgeted for future years include $200,000 for structural repairs to the loading dock and building foundation, $2,035,000 to complete the replacement of the cooling and mechanical systems with a new sustainable design, $1,500,000 for building renovation of the existing steel windows, $475,000 for remaining needed updates to the fire alarm system throughout the building and a generator for emergency operations, $230,000 is budget to install a new building wide security system that will include electronic locks, additional security cameras and head -end software and hardware upgrades, and $510,000 to reconstruct the buildings rear parking lot which includes adding a stormwater drainage system. 375 DEPARTMENT:: Engineer_ STATE PROGRAM: Public, Works, PROJECT TITLE.;; Port of;Dubuque Outdooi of Dubuque Park PROGRAlllf:, - 2( DEPARTMENT:5 FDIC I P NO: 100 -1,855 ,' 360 -1855 - TOTAL 'i PROJECT' COST, $ 719,468 EXP PRIOR TO FY '10 ESTIMATED FY 10 PROJECT BUDGET 2010 -11 2011 -12 2012 -13 2013 -14 2014 -15 BEYOND 2015 $ 19,468 $ 19,468 $ 19,468 $ 19,468 $ A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction Other TOTAL B. PROJECT FINANCING General Fund Sponsorship Naming Opport. TOTAL $ 100,000 $ 600,000 $ 700,000 $ 250,000 $ 450,000 $ 700,000 PROJECT DESCRIPTION During Phase I, the Outdoor Plaza Project involved enhancing the green space in the northwest corner of the intersection adjacent to the new McGraw -Hill office building. The green space is made up of two specific areas, the outdoor plaza which is a 45 ft. by 300 ft. space located west of Bell Street, and the urban park that is an area approximately 100 ft. by 400 ft. in size located north of 5th Street. While Phase II improvements were conceptualized during the Phase I Project, funding limitations required the elimination of virtually all aspects of the urban park. The Outdoor Plaza Phase II project will implement the urban park design concepts in the turfed greenspace that is located south of the McGraw -Hill building and parking lot. The urban park design features include a hard surface, 40 foot wide pedestrian walkway located along the view'corridor to the courthouse, raised limestone planters that provide bench seating, signature monuments located at both entrances to the view corridor, landscaping, decorative lighting features, securitycameras, the potential for a small scale children's activity area and funding for additional landscape features to be added to the Outdoor Plaza along Bell Street. Other items discussed during early design concepts for the urban park include consideration of small scale performance stage, covered seating area and expanded electrical service capabilities for festivals. Funding in FY10 has been established to meet the. City's commitments to the America's River Phase 11 grant for a small park to be developed in the area of the northwest corner of 5th and Bell Street and west of the McGraw -Hill Building. The City has also budgeted $1,058,000 in FY11 to meet final obligations to the America's River Phase II grant ($560,000) plus unfunded Phase I project goals. The final park design may include play equipment, decorative fencing, landscaping and water fountain. 377 ,ij:j DEPA !' E ,,, , RI T I, 1 11 n ....„ .I l -,. ,. :..:Ill - - I ;t. ly;l tllt ld ll Ir;,!, Il" Englneenrt , .;I g (..;.., ,. I! ,r 111 :I.':. e,,, {{ Y III �.,, II:,I:� Ill 1, .,: il111111 ... ;..,.t1 +,._:, ., , .7..... 111 .nt, t ... t.l II0:,.1 �,,. 1 I.. .14' .IIA I ..I 1... ,.)!i n. .n � r:JI V ,, ,n AT • . ut,..,. S .. RO,GR M ,,. h ,.,::.. .:.. r �... ni I... .fi !. I .,. ,r .. I , It 011,1 ),l. ill I (1 (V :111, I, ,I, PO 1ic orks. , W ,p ,I,1 I I h1 „� ,, , II n � 1 4 ,.,:Ills 4i { .:.I. l l 17 -`,1 C )�, .,:, J ,,.. 1...,.1 I r.,,. 1.,:) tirr 1 I..,.L.S. I,I ,. � I ,.1 l.S IW I, d!tr: ,i1,I nl �.:,,�. a01n, I,,,frl;Shl ,7l ,r,lu,...,,7111, II ;i:1.' I ,: . PIOJIE T YTr.l ,, I.,n... faT.. 1. I`.. I:I :d7.1 I1. lyl,., IrJi ! {1, ,....! roll 11J i... J.��...II, I I,�lI1L1 Ih....h U l LI�,;il(I, f,. i 1. .:. 4_,, ;. ..;, t�.:: e ',�It t7i, li. t ,i .. '... Vided Ddtectib.h C eWa .0 add." : I a glPARTMpN !�,y, I, t I �:: 1 .,::� I , I,`E , ,I.,., + , , I r1n, 1, ;, I. I.. I` t l 1. 11. t ) 4 �{: ,t..'�. f.... ) f II I I,I II u lsl 17.1, , i,i1 rrt „ Vin Intl ,,..,.i I, a41,1 , L!.. , , ..: , rl t kn c.,; .. m,,... . .:. .1 l i ilv:.. ,, 'I (.. 1:. h., f 1. ,: , ,:., ,, 1 i. ,l�,lu ,.�„ 111 �� ,,:., n T ,,;L,. I h.,. 11 ,,,at .1..1. l , 1 , If:1 Y. ..� t .., ,.. t4 a�1l1 (1 .,,link 1 I ,I �..:r, 3111111. �,!a::.l¢r,.�J „,..) ,.( I,n &�I'!II, { + I r {t i P_�9;, �]r "jr 2C 1��7 r. .. rl , , t t. �.C�TAL' P \4!.._ ° °r I l' t !i„ I II .;. . "B Is;,.1: t D T =; 5. . 5 ,I a'';;I .,.. P-, FD /C 3Q0 ,. P , I. :.:- .J.,., I ,r l „u u i ,n „r,,.v, a s,) ,,J, z IrIII„ ,!, �. ,. ,.: I r t .,:I.IJ I,I I,IInl41 J{ /.. ,`«j ,I ni(.'. .! ¢fll.d ut'JII II „ 11 nlyp L II ,lll . F I, rl..,. ( l �:, 1, 11 , ,I R JE1 ;� coS , � u ; I ti , I. pp ,Ij$f ft QQQ11; EXP PRIOR TO FY 10 ESTIMATED FY 10 PROJECT BUDGET 2010 -11 2011 -12 2012 -13 2013 -14 2014 -15 BEYOND 2015 A. EXPENDITURE ITEMS Design & Engineering Land and R.O.W. Construction Equipment Other TOTAL B. PROJECT FINANCING Sales Tax Fund (30 %) TOTAL $ 45,000 $ 15,000 $ - $ - $ - $ 45,000 $ 45,000 $ - $ 15,000 $ 15,000 $ - $ - $ - $ - $ - $ 45,000 $ - $ 15,000 $ - $ - PROJECT DESCRIPTION: This program would fund the upgrade of 24 of the 48 video detection cameras per year, There are typically four cameras per intersection (one for each approach). JUSTIFICATION: Currently the City of Dubuque has 12 intersections running on video detection. Many of these were installed along US 20 during the roadway improvements from 2002- 2004. The use of these cameras allows the traffic signals to detect vehicles waiting at lights without placing sensors on the roadway itself, making these very valuable during times of construction. Most of these cameras output a black and white picture. Newer color cameras are available as an upgrade at a reduced cost. These newer cameras operate better during extreme conditions (Snow, fog, ice, etc) and also have improved connector interfaces. These would come with a 3 year warranty, Funding from this program will be used to upgrade the video detection cameras from black and white to the newest version of color cameras. The remaining field equipment is compatible with these cameras after a firmware update. RELATIONSHIP TO OTHER PROJECTS: This project implements the Comprehensive Plan's Transportation Element: Goals 1.2, 1.3 and 3.3; Infrastructure Element; Goals 4.1, 4.2, 4.3, 4.4 and 4.5; and Public Safety Element: Goals 2.1, 2.2, 2.3, 2.4, 2.5 and 2.7. RELATIONSHIP TO SUSTAINABILITY PRINCIPLES This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use. 400 Page 1 of 1 Kevin Firnstahl - "Contact Us" inquiry from City of Dubuque website From: "Citizen Support Center" <dubuqueia @mycusthelp.coln> To: <kfirnsta @cityofdubuque.org> Date: 2/3/2014 9:01 AM Subject: "Contact Us" inquiry from City of Dubuque website Contact Us Name: JoEllen Reed Phone: 563 -582 -7870 Email: sweetjojo100 @yahoo.com City Department: City Council Message: Please move slowly with the use of surveillance cameras. I am 63 years old and have lived in and loved Dubuque for 58 of those years; all without constant surveillance. I can understand putting them in high -crime areas and have learned to accept them in stores. But down by the river or in all the parks just makes me sad. Yes, an occasional crime may happen and a camera would certainly make the job easier for the police. But at what price. Can two young lovers not walk hand -in -hand or steal a kiss while watching the sun set without our city police watching their every move. If solving crimes easily is a good reason why not put them in all the apartments or all the college dorms. Pd bet we would catch a lot of drug activity but again at what price. We are your citizens; please tread carefully on our civil liberties. Thank you for listening. Click here to report this email as spam. Q 4— m DO c 0 co ill CT I I.) `'' m SD 3 rn 5, o w• 0 2 t w file: / / /C:/ Users /kfirnsta/AppData/ Local/ Temp/XPgrpwise /52EF5AE6DBQ_D... 2/3/2014