FY 15 Budget Presentation_Public WorksCITY OF DUBUQUE
PUBLIC WORKS
DEPARTMENT
FY15
BUDGET
PRESENTATION
PUBLIC WORKS DEPARTMENT
• 87 FULL -TIME WORKERS
1 FULL -TIME CONTRACT EMPLOYEE
• 4 PART -TIME WORKERS
• 10 SEASONAL WORKERS
• 26 SERVICE ACTIVITIES
• 35 NON -CITY OPERATING PARTNERS
PUBLIC WORKS DEPARTMENT
• PROPOSED FY15 OPERATING BUDGET:
$15,932,784
• 2.7% DECREASE FROM FY14 BUDGET
• $1,571,019 (9.8 %) OF THE PROPOSED
BUDGET WOULD BE PROPERTY TAX
SUPPORTED
i
s
• STREET
MAINTENANCE
• STREET
CLEANING
• SNOW AND ICE
CONTROL
• SANITARY
SEWER
MAINTENANCE
• STORM SEWER
MAINTENANCE
• CITY FLEET
MAINTENANCE
FLOODWALL
OPERATIONS
PORT OF DBQ
MAINTENANCE
RIVERFRONT &
BOAT RAMPS'
MAINTENANCE
• STREET LIGHTS
TRAFFIC LIGHTS
SERVICE ACTIVITIES
• STREET SIGNS
• TRAFFIC SIGNS
• REFUSE
COLLECTION
• YARD DEBRIS &
COMPOSTABLES
COLLECTION
LARGE ITEM
COLLECTION
• RECYCLABLES
COLLECTION
PURINA DRIVE
BARGE
TERMINAL
DMASWA
LANDFILL
OPERATIONS
- DMASWA
HHMRCC
FACILITY
SERVICE ACTIVITIES
• DMASWA
COMPOSTING
FACILITY
DMASWA
CUSTOMER
EDUCATION
DMASWA
ELECTRONICS
RECYCLING
• DMASWA RURAL
RECYCLING
FACILITIES
DMASWA
METHANE
COLLECTION AND
REUSE SYSTEM
• ADMINISTRATION
rIrlaiXkl\11103
NIAraN
}IOS IA}UEEdF1S
E1DNVNE1 INIVJ\t
EFTDIHEEA
S2IOSIA2I�dRS A,I,IAI,LDV
ACTIVITY SUPERVISORS
AGENCY
FACILITY
SUPERVISOR
DOUG
HUGHES
ACTIVITY SUPERVISORS
STREET AND
SEWER
MAINTENANCE
SUPERVISOR
JOHN
KLOSTERMANN
ACTIVITY SUPERVISORS
AGENCY
ADMINISTRATOR
RESOURCE
MANAGEMENT
COORDINATOR
CURRENTLY
VACANT
CURRENTLY
VACANT
CALENDAR 2013 STREET
MAINTENANCE PAVING
i i LA . LA •
54 STREETS
PAVED -
10.65
CENTERLINE
MILES
• 190.55 MILES
PAVED
61% OF
DUBUQUE'S
TOTAL
STREET
MILEAGE
CALENDAR 2013 STREET
MAINTENANCE CONCRETE
STREET PANEL REPLACEMENTS
BELL STREET
• EAST 5TH STREET
• LONG VIEW DRIVE
NORTH STAR
DRIVE
• UNIVERSITY
AVENUE
CALENDAR 2013 STREET
MAINTENANCE CONCRETE
STREET PANEL REPLACEMENTS
• WACKER DRIVE
• WEST 3RD STREET
• WEST 4TH STREET
• WEST 5TH STREET
FISCAL YEAR 2013 SIGN
MAINTENANCE
974 STREET NAME
SIGNS REPLACED
AT 487
INTERSECTIONS
FISCAL YEAR 2013 SIGN
MAINTENANCE
EIGHTY -ONE (81)
VISITOR
INFORMATION
AND VEHICLE
WAYFINDING
SIGNS
INSTALLED OR
REPLACED
* PortoDubuque
+ Diamond Jo Casino
F Welcome Center
•
FISCAL YEAR 2013 SIGN
MAINTENANCE
i i LA . LA ■
1,005 TRAFFIC
REGULATION
SIGNS INSTALLED
OR
REPLACED
FISCAL YEAR 2013 DMASWA
LANDFILL OPERATIONS
i aLA - 1 A •
MATERIALS
BURIED IN THE
DMASWA
LANDFILL IN FY13
(98,120 TONS)
DECREASED BY
18% FROM FY12
(120,371 TONS)
CALENDAR YEAR 2013 DMASWA
CAPITAL PROJECT
t 0 U i• U IL
COMPLETION OF
METHANE
COLLECTION
SYSTEM PHASE 2
PROJECT
$329,423
WV}IDOId
NOI.I,DH'I'IO'J
dV}IDS
0003 SA.I.ID
30 NOISNVdXrd
I Fl m Fl
iM1flOSU1 OZ
2IF��I'IVDSI3 GMV IIVGMEFTVD
CALENDAR AND FISCAL YEAR
2013 RESOURCE MANAGEMENT
IBM /CITY
SMARTER
DISCARD
PILOT
PROJECT
•
2" HALF FY13 & FY14 YTD
MAJOR EQUIPMENT
REPLACEMENT PURCHASE
STREET
MAINTENANCE
TWO 35,000 GVW
DUMP TRUCKS
$106,600 EACH
2 HALF FY13 & FY14 YTD
MAJOR EQUIPMEN
REPLACEMENT PURCHASE
STREET
MAINTENANCE
TWO 12,000 GVW
DUMP TRUCKS
$53,725 EACH
2" HALF FY13 & FY14 YTD
MAJOR EQUIPMENT
REPLACEMENT PURCHASE
STREET
MAINTENANCE
STREET
SWEEPER
$189,459
KEEP OUR CiT( CLEA
—rr of i oe
DUBUQU
NLcc'rrriicc oil ld
MIMIC WORKS
2" HALF FY13 & FY14 YTD
MAJOR EQUIPMENT
REPLACEMENT PURCHASE
SOLID WASTE
COLLECTION
OPERATIONS
FIVE 40,000 GVW
SIDE - LOADER
COLLECTION
TRUCKS
$192,089 EACH
FY14 PENDING MAJOR
EQUIPMENT REPLACEMENT
FY15 REQUESTED MAJOR
EQUIPMENT REPLACEMENT
• SEWER INSPECTION EQUIPMENT
$69,100
• STREET SWEEPER
$187,879
• 35,000 GVW DUMP TRUCK
$111,010
FY15 REQUESTED MAJOR SW
COLLECTION EQUIPMENT
REPLACEMENT PURCHASE
• TWO DIESEL - ENGINE REAR - LOADER
SW COLLECTION VEHICLES
$130,153 EACH
• ALTERNATE - POWER /FUEL
TECHNOLOGIES WILL CONTINUE TO
BE EVALUATED EACH YEAR
PUBLIC WORKS DEPARTMENT'S
TRUCK AND HEAVY EQUIPMENT
FLEETS' AVERAGE AGES IN YEARS
16
14
12
10 -
8
6 -
4
2
0
Y
1
i
Y
FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14
• TRUCK FLEET HEAVY EQUIPMENT FLEET
FY15 REQUESTED FLOODWALL
• PERATI • I ITIATI E
REPLACE BEE BRANCH PUMPING
STATION'S FLOODWALL GATES -
PHASE II $818,067
FOUR (4) PUMPING STATION ALARMS
$16,386 EACH
PURCHASE 10,000 LINEAL FEET OF
HESCO FLOOD BARRIERS $285,000
TOE DRAIN MANHOLE PROJECT $51,750
SIGNIFICAN FY15 NON-
RECURRING NON- DMASWA
IMPROVEMENT INCREMENT
REQUESTS
• SEWER MAINTENANCE ATV $15,500
• 25,000 LB CAPACITY VEHICLE HOIST
$29,000
• PRESSURE WASHER $9,900
FY15: REQUESTED
CONTINUANCE OF STREET
MAINTENANCE PAVING
PROGRAM
CONTINUE ASPHALT PAVING
PROGRAM IN FY15, BUT AT REDUCED
LEVEL OF FIVE (5) CENTERLINE MILES
FY15: REQUESTED
CONTINUANCE OF STREET
MAINTENANCE PAVING
PROGRAM
50 °/a REDUCTION FOR FY15 DUE TO
RECENT FEDERAL DEPARTMENT OF
JUSTICE CLARIFICATION REGARDING
ADA SPECIFICATIONS FOR CURB RAMPS
RELATED TO ASPHALT OVERLAY
PROGRAMS, RESULTING IN $950,000
COST INCREASE FOR 10 CENTERLINE
MILE PAVING PROGRAM
PROPOSED FY15 RESOURCE
MANAGEMENT MONTHLY
BASE FEE
FY15 SOLID WASTE COLLECTION
MONTHLY BASE FEE WOULD
INCREASE BY 3.9% FROM
$12.74 /MONTH TO $13.24 /MONTH
2/14 IOWA SOLID WASTE FEE SURVEY
TEN LARGEST CITIES'
MONTHLY FEES
CITY
ANTICIPATED FY15 FEE
AMES
IOWA CITY
CEDAR RAPIDS
SIOUX CITY
COUNCIL BLUFFS
DUBUQUE
WATERLOO
DAVENPORT
DES MOINES
WEST DES MOINES
$19.55
$15.90
$15.48
$15.30
$14.00
$13.24
$12.50
$11.23
$11.00*
$10.55*
AVERAGE WITHOUT DUBUQUE = $13.95
*FY14 FEE - FY15 FEE YET TO BE DETERMINED
ANTICIPATED FY15
MONTHLY SOLID WASTE FEE
COMPARISONS
• HIGHEST —COST CITY'S (AMES)
COMPOSITE AVERAGE FEE 46% HIGHER
THAN DUBUQUE'S PROPOSED FY15 FEE
• AVERAGE OF OTHER SEVEN (7) CITIES'
THAT HAVE SET THEIR FY15 FEES:
12 "/o HIGHER THAN DUBUQUE'S
PROPOSED FY15 FEE
PUBLIC WORKS DEPARTMENT
FY15 BUDGET PRESENTATION