SRF Green Alley Project_Bid Set 1 - Year 1 AwardMasterpiece on the Mississippi
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: SRF Green Alley Bid Set 1
(CIP 7102450)
DATE: February 11, 2014
Dubuque
band
AI- America City
1
2007 • 2012 • 2013
Sealed bids were received for the SRF Green Alley Bid Set 1 Project. City Engineer
Gus Psihoyos recommends award of the contract to the low bidder, East Iowa
Construction, in the amount of $280,207.75, which is 11.06% under the engineer's
estimate of probable cost.
The average preliminary assessment approved by the City Council on February 3,
2014, was $1,327. Should the project come in at the prices currently projected with this
bid, the average assessment would be approximately $889.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Mic ael C. Van Milligen
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Teri Goodmann, Assistant City Manager
Gus Psihoyos, City Engineer
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
DATE: February 10, 2014
SUBJECT: SRF Green AIIey Bid Set 1
(CIP 7102450)
INTRODUCTION
Dubuque
an- Amatacnr
11 111
2007 • 2012 • 2013
The enclosed resolution authorizes the award of the construction contract for the SRF
Green AIIey Bid Set 1 Project.
DISCUSSION
This project will involve the reconstruction of three alleys in the Bee Branch Watershed.
The alley locations are as follows:
• Johnson Street to Windsor Avenue (Between Providence Street and Windsor
Avenue)
• 14th Street to 15th Street (Between Cedar Street and Maple Street)
• Foye Street to Ellis Street (Between Almond Street and W. Locust Street)
This project will reconstruct the first set of alleys for the SRF Green Alleys in the Bee
Branch Watershed as part of the Bee Branch Watershed Flood mitigation Project. The
Engineering Department is working on the design and construction documents for the
remainder of the alleys. Additional construction bid sets will be developed in 5 to 10 alley
groupings. The first two years of alley reconstruction include no utilities, except sewer
manhole repairs where the project affects them.
The Engineering Department survey staff is currently performing topographic survey on
the first year alleys. Engineering staff plan to initiate alley bid packages on a monthly
basis until all of the alleys are designed.
The reconstruction of the alleys will include:
— Removal of the existing alley pavement
— Excavation of the subgrade to allow the placement of clean stone for a storage
medium
— Installation of a concrete border to hold brick pavers together
— Installation of HMA headers at the alley intersection with the intersecting streets.
— Reconstruction of the pavement surface with interlocking concrete pavers
This project will reconstruct the alleys into green alleys. These alleys allow rainwater to
infiltrate into the pavement rather than runoff into the storm sewers. This infiltration allows
for filtering of the water and recharge back into the aquifer. Monitoring wells are also
planned to be installed so that water quality improvements can be documented.
The project construction documents will follow the Statewide Urban Design and
Specifications (SUDAS).
The Iowa Department of Natural Resources (IDNR) have reviewed and approved the
plans so that the City cost can be covered with SRF funds.
This project will be the second alley project to have special assessments. The first project
was the Green Alley Permeable Pavers Project (17th — 18th between Jackson &
Washington Streets).
BID RESULTS
The City of Dubuque received the following bids for the SRG Green Alley Project - Bid Set
1 on February 6, 2014:
Contractor Bid Results
East Iowa Construction $ 280,207.75
Horsfield Construction, Inc. $ 285,170.50
Portzen Construction, Inc. $ 301,015.50
Connolly Construction, Inc. $ 315,015.10
Tschiggfrie Excavating, Inc. $ 346,475.55
Based on the bid results it is hoped that the final assessments levied to property owners
will be reduced from the original estimates due to the favorable bids received.
RECOMMENDATION
I recommend that the contract for the for the SRF Green Alley Bid Set 1 Project be
awarded to East Iowa Construction of Epworth, Iowa in the amount of $ 280,207.75 which
is 11.06% under the engineer's estimate of probable cost. The majority of the cost
savings was in the bid price of the brick pavers. The IDNR have reviewed the bid tab and
concur with the award of the contract.
2
BUDGET IMPACT
The summary of cost for the SRF Green Alley Bid Set 1 Project is as follows:
Estimate Award
Construction Contract $325,334.00 $280,207.75
Contingency 32,533.00 28,020.78
Construction Engineering & Inspection 53,680.00 46,234.28
Total Project Cost $411,547.00 $354,462.81
The project funding summary is as follows:
Fund
CIP No. Fund Description Amount
7102450 SRF Green Alley Project $ 315,830.14
Special Assessment — Alley Improvement, Residential 44,077.61
Special Assessment — Alley Improvement, Commercial 5,444.94
Total Project Funding $411,547.00
ACTION TO BE TAKEN
I recommend that the City Council adopt the attached resolution awarding for the SRF
Green Alley Project Bid Set 1 to East Iowa Construction in the amount of $280,207.75.
Prepared by Jon Dienst, PE
cc: Jenny Larson, Budget Director
Don Vogt, Public Works Director
John Klostermann, Street & Sewer Maintenance Supervisor
Deron Muehring, Civil Engineer II
Denise Ihrig, Environmental Engineer
3
RESOLUTION NO. 46-14
AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE SRF GREEN ALLEY
BID SET 1 PROJECT
Whereas, sealed proposals have been submitted by contractors for the SRF Green
Alley Bid Set 1 Project (the Project) pursuant to Resolution No. 13 -14 and Notice to
Bidders published in a newspaper published in the City of Dubuque, Iowa on the 24th
day of January, 2014.
Whereas, said sealed proposals were opened and read on the 6th day of February,
2014, and it has been determined that East Iowa Construction of Epworth, Iowa, with a
bid in the amount of $280,207.75, is the lowest responsive, responsible bidder for the
Project.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
DUBUQUE, IOWA:
That a Public Improvement Contract for the Project is hereby awarded to East Iowa
Construction and the City Manager is hereby directed to execute a Public Improvement
Contract on behalf of the City of Dubuque for the Project.
Passed, approved and adopted this 17th day of February, 2014.
Attest:
Ke n S. Firnstahl, CM , ity Clerk
Roy D. Buol, Mayor
LINE
NO.
THE CITY OF
DUB
Masterpiece on the Mississippi
Project Name:
ITEM NUMBER
City of Dubuque, Iowa
Bid Tabulation
SRF ALLEY PROJECT - BID PACK 1
BID ITEM DESCRIPTION
Division 1 - General Provisions
1 1090 -105 -D Mobilization
Division 2010 - Earthwork, Subgrade, and Subbase
2 2010 - 108 -D -3 Topsoil, Off -site
3 2010 - 108 -E -0 Excavation, Class 13
4 2010 - 108 -G -0 Subgrade Preparation
5 2010- 108 -1 -0 Subbase, Special Backfill- Gradation 30
6 2010 - 108 -1 -0 Subbase, Granular Subbase - Gradation 12a
7 2010 - 108 -1 -0 Subbase, Porous Aggregate - Gradation 3 (ASTM 57)
8 2010 - 108 -1 -0 Subbase, Porous Aggregate- Gradation 13 (ASTM 2)
Division 4040 - Subdrains and Footing Drain Collectors
9 4040- 108 -A -0 Subdrain, 6" Perforated CPE
10 4040- 108 -C -0 Groundwater Sampling Port
11 4040- 108 -D -0 Subdrain Outlets and Connections, Core Drill, 6"
Division 7010 - Portland Cement Concrete Pavement
12 7010- 108 -A -0 Pavement, PCC, 7" (Thickness)
13 7010- 108 -E -0 Curb and Gutter, 30" (Width), 6" (Thickness)
Division 7030 - Sidewalks, Shared Use Paths, and Driveways
14 7030- 108 -A -0 Removal of Sidewalk
15 7030- 108 -E -0 Sidewalk, PCC, 4" (Thickness)
16 7030- 108 -E -0 Sidewalk, PCC, 6" (Thickness)
17 7030- 108 -G -0 Detectable Waming
18 7030- 108 -H -1 Driveway, Paved, PCC, 6" (Thickness)
19 7030- 108 -H -1 Driveway, Paved, HMA, 5" (Thickness)
Division 7040 - Pavement Rehabilitation
20 7040- 108 -A -0 Full Depth Patches HMA
21 7040- 108 -H -0 Removal - Pavement
22 7040- 108 -1 -0 Removal - Curb and Gutter
Division 7080 - Permeable Concrete Block Pavers
Bid Date
PLAN
QUANTITY
UNIT
Engineer's Estimate
ESTIMATED
UNIT PRICE
TOTAL PRICE
Eastem Iowa Construction
BID
UNIT PRICE
TOTAL PRICE
Horsfield Companies
BID
UNIT PRICE
TOTAL PRICE
Portzen Construction
BID
UNIT PRICE
TOTAL PRICE
Connolly Construction Inc.
BID
UNIT PRICE
TOTAL PRICE
$ 4,000.00 $ 12,000.00 $ 5,500.00 $ 16,500.00 $ 2400.00 $ 7,200.00 $ 4,000.00 $ 12,000.00 $ 3,366.67 $ 10,100.00
Sub Total $ 12,000.00 Sub Total $ 16,500.00 Sub Total $ 7,200.00 Sub Total $ 12,000.00 Sub Total $ 10,100.00
55 CY $ 63.00 $ 3,465.00 $ 35.00 $ 1,925.00 $ 50.00 $ 2,750.00 $ 50.00 $ 2,750.00 $ 36.95 $ 2,032.25
1840 CY $ 11.00 $ 20,240.00 $ 8.90 $ 16,376.00 $ 11.00 $ 20,240.00 $ 10.00 $ 18,400.00 $ 9.70 $ 17,848.00
975 SY $ 2.00 $ 1,950.00 $ 0.50 $ 487.50 $ 5.00 $ 4,875.00 $ 2.00 $ 1,950.00 $ 3.35 $ 3,266.25
910 TON $ 13.50 $ 12,285.00 $ 16.00 $ 14,560.00 $ 18.00 $ 16,380.00 $ 16.00 $ 14,560.00 $ 23.75 $ 21,612.50
265 TON $ 17.00 $ 4,505.00 $ 16.00 $ 4,240.00 $ 18.00 $ 4,770.00 $ 17.00 $ 4,505.00 $ 23.70 $ 6,280.50
690 TON $ 21.00 $ 14,490.00 $ 19.75 $ 13,627.50 $ 21.00 $ 14,490.00 $ 28.00 $ 19,320.00 $ 26.75 $ 18,457.50
1695 TON $ 28.00 $ 47,460.00 $ 26.00 $ 44,070.00 $ 27.00 $ 45,765.00 $ 23.00 $ 38,985.00 $ 31.25 $ 52,968.75
Sub Total $ 104,395.00 Sub Total $ 95,286.00 Sub Total $ 109,270.00 Sub Total $ 100,470.00 Sub Total $ 122,465.75
1240 LF $ 7.50 $ 9,300.00 $ 10.00 $ 12,400.00 $ 8.00 $ 9,920.00 $ 10.00 $ 12,400.00 $ 12.65 $ 15,686.00
8 EA $ 300.00 $ 2,400.00 $ 400.00 $ 3,200.00 $ 500.00 $ 4,000.00 $ 850.00 $ 6,800.00 $ 525.00 $ 4,200.00
2 EA $ 400.00 $ 800.00 $ 300.00 $ 600.00 $ 300.00 $ 600.00 $ 650.00 $ 1,300.00 $ 602.00 $ 1,204.00
Sub Total $ 12,500.00 Sub Total $ 16,200.00 Sub Total $ 14,520.00 Sub Total $ 20,500.00 Sub Total $ 21,090.00
862 SY $ 55.00 $ 47,410.00 $ 43.00 $ 37,066.00 $ 36.00 $ 31,032.00 $ 41.00 $ 35,342.00 $ 39.35 $ 33,919.70
80 LF $ 25.00 $ 2,000.00 $ 26.00 $ 2,080.00 $ 20.00 $ 1,600.00 $ 22.00 $ 1,760.00 $ 20.85 $ 1,668.00
$ $ 49,410.00 Sub Total $ 39,146.00 Sub Total $ 32,632.00 Sub Total $ 37,102.00 Sub Total $ 35,587.70
53 SY $ 10.00 $ 530.00 $ 5.00 $ 265.00 $ 10.00 $ 530.00 $ 14.00 $ 742.00 $ 7.70 $ 408.10
35 SY $ 35.00 $ 1,225.00 $ 36.00 $ 1,260.00 $ 36.00 $ 1,260.00 $ 35.00 $ 1,225.00 $ 40.50 $ 1,417.50
19 SY $ 40.00 $ 760.00 $ 45.00 $ 855.00 $ 40.00 $ 760.00 $ 39.00 $ 741.00 $ 42.80 $ 813.20
64 SF $ 13.00 $ 832.00 $ 22.00 $ 1,408.00 $ 35.00 $ 2,240.00 $ 25.00 $ 1,600.00 $ 22.00 $ 1,408.00
68 SY $ 45.00 $ 3,060.00 $ 45.00 $ 3,060.00 $ 36.00 $ 2,448.00 $ 32.00 $ 2,176.00 $ 37.05 $ 2,519.40
342 SY $ 30.00 $ 10,260.00 $ 29.50 $ 10,089.00 $ 27.00 $ 9,234.00 $ 29.00 $ 9,918.00 $ 30.95 $ 10,584.90
$ $ 16,667.00 Sub Total $ 16,937.00 Sub Total $ 16,472.00 Sub Total $ 16,402.00 Sub Total $ 17,151.10
169 SY $ 45.00 $ 7,605.00 $ 38.50 $ 6,506.50 $ 36.00 $ 6,084.00 $ 38.00 $ 6,422.00 $ 43.95 $ 7,427.55
2,555 SY $ 4.50 $ 11,497.50 $ 5.50 $ 14,052.50 $ 8.00 $ 20,440.00 $ 8.00 $ 20,440.00 $ 4.75 $ 12,136.25
120 LF $ 8.00 $ 960.00 $ 5.00 $ 600.00 $ 4.00 $ 480.00 $ 8.00 $ 960.00 $ 6.70 $ 804.00
Sub Total $ 20,062.50 Sub Total $ 21,159.00 Sub Total $ 27,004.00 Sub Total $ 27,822.00 Sub Total $ 20,367.80
23 7080 - 108 -A -0 Brick Pavement, Permeable, Type 1 15630 SF $ 5.20 $ 81,276.00 $ 3.85 $ 60,175.50 $ 4.15 $ 64,864.50 $ 4.25 $ 66,427.50 $ 5.05 $ 78,931.50
24 7080 - 108 -A -0 Brick Pavement, Permeable, Type 2 57 SF $ 8.20 $ 467.40 $ 14.75 $ 840.75 $ 4.00 $ 228.00 $ 16.00 $ 912.00 $ 4.65 $ 265.05
25 7080 - 108 -C -1 Waterproofing, Surface Leveling 280 SF $ 2.00 $ 560.00 $ 1.50 $ 420.00 $ 1.50 $ 420.00 $ 10.00 $ 2,800.00 $ 2.00 $ 560.00
26 7080 - 108 -D -1 Waterproofing, Sealer 280 SF $ 1.00 $ 280.00 $ 0.70 $ 196.00 $ 1.00 $ 280.00 $ 10.00 $ 2,800.00 $ 0.85 $ 238.00
27 7080 - 108 -E -1 Geotextile Fabric 3,635 SY $ 3.00 $ 10,905.00 $ 2.50 $ 9,087.50 $ 2.00 $ 7,270.00 $ 2.00 $ 7,270.00 $ 0.75 $ 2,726.25
Sub Total $ 93,488.40 Sub Total $ 70,719.75 Sub Total $ 73,062.50 Sub Total $ 80,209.50 Sub Total $ 82,720.80
IDOT Division 2528 - Traffic Control
28 IDOT 2528.04 -A Traffic Control
Division 9020 - Sodding
29 9020 - 108 -A -0 Sod
Division 9040 - Erosion and Sediment Control
30 9040- 108 -0 -1 Filter Socks, 8"
31 9040- 108 -D -2 Filter Socks, Removal
32 9040- 108 -P -1 Dust Control, Water
3 LS $ 1,000.00 $ 3,000.00 $ eicio 00 $ 1,980.00 $ 650.00 $ 1,950.00 $ 1,000.00 $ 3,000.00 $ 693.33 $ 2,080.00
Sub Total $ 3,000.00 Sub Total $ 1,980.00 Sub Total $ 1,950.00 Sub Total $ 3,000.00 Sub Total $ 2,080.00
21 SQ $ 125.00 $ 2,625.00 $ 80.00 $ 1,680.00 $ 80.00 $ 1,680.00 $ 80.00 $ 1,680.00 $ 89.95 $ 1,888.95
Sub Total $ 2,625.00 $ 1,680.00 Sub Total $ 1,680.00 Sub Total $ 1,680.00 Sub Total $ 1,888.95
90 LF $ 2.00 $ 180.00 $ 3.00 $ 270.00 $ 4.00 $ 360.00 $ 5.00 $ 450.00 $ 5.60 $ 504.00
90 LF $ 4.00 $ 360.00 $ 1.00 $ 90.00 $ 2.00 $ 180.00 $ 2.00 $ 180.00 $ 4.30 $ 387.00
24 MGAL $ 14.50 $ 348.00 $ 10.00 $ 240.00 $ 35.00 $ 840.00 $ 50.00 $ 1,200.00 $ 28.00 $ 672.00
Sub Total $ 888.00 Sub Total $ 600.00 Sub Total $ 1,380.00 Sub Total $ 1,830.00 Sub Total $ 1,563.00
% Overt Under ( -)
Total Est. $ 315,035.90
Total Bid $ 280,207.75 Total Bid $ 285,170.50
Total Bid $ 301,015.50 Total Bid $ 315,015.10
- 11.06% -9.48% - 4.45% -0.01%
Masterpiece on the Mississippi
Project Name:
ITEMNUMBER
City of Dubuque, Iowa
Bid Tabulation
SRF ALLEY PROJECT - BID PACK 1
BID ITEM DESCRIPTION
Division 1 - General Provisions
Bid Date
Tschiggfrie Excavating Co.
PLAN
QUANTITY
UNIT
BID
UNIT PRICE
TOTAL PRICE
BID
UNIT PRICE
TOTAL PRICE
BID
UNIT PRICE
TOTAL PRICE
1090 -105 -0 Mobilization L:- $ 4600.OU $ 13,800.00 $ $
Sub Total $ 13,800.00 Sub Total $ Sub Total $
Division 2010 - Earthwork, Subgrade, and Subbase
2010- 108 -0 -3 Topsoil, Off -site 55 CY $ 27.50 $ 1,512.50 $ $
2010- 108 -E -0 Excavation, Class 13 1840 CY $ 12.00 $ 22,080.00 $ $
2010- 108 -G -0 Subgrade Preparation 975 SY $ 1.65 $ 1,608.75 $ $
2010- 108 -1 -0 Subbase, Special Backfill- Gradation 30 910 TON $ 19.75 $ 17,972.50 $ - $
2010- 108 -1 -0 Subbase, Granular Subbase - Gradation 12a 265 TON $ 19.75 $ 5,233.75 $ - $
2010- 108 -1 -0 Subbase, Porous Aggregate - Gradation 3 (ASTM 57) 690 TON $ 23.00 $ 15,870.00 $ $
2010- 108 -1 -0 Subbase, Porous Aggregate- Gradation 13 (ASTM 2) 1695 TON $ 29.00 $ 49,155.00 $ $
Sub Total $ 113,432.50 Sub Total $ Sub Total $
Division 4040 - Subdrains and Footing Drain Collectors
4040- 108 -A -0 Subdrain, 6" Perforated CPE 1240 LF $ 14.40 $ 17,856.00 $ $
4040- 108 -C -0 Groundwater Sampling Port 8 EA $ 760.00 $ 6,080.00 $ $
4040- 108 -0 -0 Subdrain Outlets and Connections, Core Drill, 6" 2 EA $ 680.00 $ 1,360.00 $ $
Sub Total $ 25,296.00 Sub Total $ Sub Total $
Division 7010 - Portland Cement Concrete Pavement
7010 - 108 -A -0 Pavement, PCC, 7" (Thickness) 862 SY $ 61.80 $ 5 3,271 .60 $ $
7010 - 108 -E -0 Curb and Gutter, 30" (Wide i), 6" (Thickness) 80 LF $ 27.35 $ 2,188.00 $ $
Sub Total $ 55,459.60 Sub Total $ Sub Total $
Division7030 - Sidewalks, Shared Use Paths, and Driveways
7030- 108 -A -0 Removal of Sidewalk 53 SY $ 4.00 $ 212.00 $ $
7030- 108 -E -0 Sidewalk, PCC, 4" (Thickness) 35 SY $ 55.85 $ 1,954.75 $ $
7030- 108 -E -0 Sidewalk, PCC, 6" (Thickness) 19 SY $ 83.50 $ 1,586.50 $ $
7030 - 108 -G -0 Detectable Waming 64 SF $ 50.00 $ 3,200.00 $ $
7030 - 108 -H -1 Driveway, Paved, PCC, 6" (Thickness) 68 SY $ 83.50 $ 5,678.00 $ $
7030 - 108 -H -1 Driveway, Paved, HMA, 5' (Thickness) 342 SY $ 34.45 $ 1 1,781 .90 $ - $
Sub Total $ 24,413.15 Sub Total $ Sub Total $
Division 7040 - Pavement Rehabilitation
7040- 108 -A -0 Full Depth Patches HMA 169 SY $ 43.55 $ 7,359.95 $ - $
7040- 108 -H -0 Removal- Pavement 2555 SY $ 5.70 $ 14,563.50 $ - $
7040- 108 -1 -0 Removal- Curb and Gutter 120 LF $ 5.10 $ 612.00 $ $
Sub Total $ 22,535.45 Sub Total $ Sub Total $
Division7080 - Permeable Concrete Block Pavers
7080 - 108 -A -0 Brick Pavement, Permeable, Type 1 15630 SF $ 4.55 $ 71,116.50 $ $
7080 - 108 -A -0 Brick Pavement, Permeable, Type 2 57 SF $ 9.40 $ 535.80 $ $
7080 - 108 -C -1 Waterproofing, Surface Leveling 280 SF $ 8.00 $ 2,240.00 $ $
7080 - 108 -D -1 Waterproofing, Sealer 280 SF $ 6.00 $ 1,680.00 $ $
7080 - 108 -E -1 Geotextile Fabric 3535 SY $ 2.00 $ 7,270.00 $ $
Sub Total $ 82,842.30 Sub Total $ Sub Total $
IDOT Division 2528 - Traffic Control
IDOT 2528.04 -A Traffic Control 3 LS $ 1,980.00 $ 5,940.00 $ $
Sub Total $ 5,940.00 Sub Total $ Sub Total $
Division 9020 - Sodding
9020 - 108 -A -0 Sod 21 SG $ 85.55 $ 1,796.55 $ $
Sub Total $ 1,796.55 Sub Total $ Sub Total $
Division 9040 - Erosion and Sediment Control
9040 - 108 -D -1 Filter Socks, 8" 90 LF $ 3.50 $ 315.00 $ $
9040- 108 -0 -2 Filter Socks, Removal 90 LF $ 0.50 $ 45.00 $ $
9040- 108 -P -1 Dust Control, Water 24 MGAL $ 25.00 $ 600.00 $ $
Sub Total $ 960.00 Sub Total $ Sub Total $
Total Bid $ 346,475.55
% Over /Under( -)
Total Bid $ Total Bid $