Loading...
Eagle Point Concrete Replacements 1762_1763THE CITY OF DuB E MEMORANDUM ~-~~ January 29, 2007 TO: The Honorable Mayor and City Council Members ' FROM: Michael C. Van Milligen, City Manager SUBJECT: Eagle Point Park Concrete Replacement Projects, #1762 and #1763 Leisure Services Manager Gil Spence is recommending acceptance of the Eagle Point Park Concrete Replacement Project, as completed by Kluck Construction, in the final contract amount of $91,312.75, which is $31,452.75 over the bid amount due to Change Order #1 for additional concrete replacement at the Shiras Memorial Pavilion ($2,983.53); and Change Order #2 at the East Porch of the Riverfront Pavilion for changing the railing paint from regular painting process to powder coating ($4,655.28), removal of the concrete around the entire Riverfront Pavilion and replacement of the 4" x 6" wood support around the entire building ($21,668.88), and additional saw cuts and caulking ($2,145.06). I concur with the recommendation and respectfully request Mayor and City Council approval. ~f.f~~ 12 ,~----- /~ Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gil D. Spence, Leisure Services Manager THE CITY OF DuB E ~-~~ MEMORANDUM January 26, 2007 TO: Michael C. Van Milligen, City Manager FROM: Gil D. Spence, Leisure Services Manager SUBJECT: Eagle Point Park Concrete Replacement Projects, #1762 and #1763 INTRODUCTION The purpose of this memorandum is to recommend that the City Council accept the Eagle Point Park Concrete Replacement Project. DISCUSSION The Eagle Point Park Concrete Replacement Project has been completed by Kluck Construction in the final contract amount of $91,312.75. This project combined two CIP projects, concrete replacement on the East Porch of the Riverfront Pavilion and Shiras Memorial Pavilion. A summary of the project costs is as follows: Bid Amount Final Cost construction contract $ 59,860.00 $ 59,860.00 change order #1 - 2,983.53 change order #2 - 28.469.22 $ 59,860.00 $ 91,312.75 Change order #1 provided additional concrete replacement at the Shiras Memorial Pavilion. Change order #2 was all at the East Porch and included: changing the railing paint from regular painting process to powder coating ($4,655.28), removal of the concrete around the entire Riverfront Pavilion and replacement of the 4" x 6" wood support around the entire building ($21,668.88), and additional saw cuts and caulking ($2,145.06). continued Eagle Point concrete replacement page two The CIP budget contains $80,000 for these projects. The following is a summary of the project costs: Estimated Actual construction contract $ 59,860.00 $ 91,312.75 contingency 18,300.00 - design fees 1,840.00 4,045.00 $ 80,000.00 $ 95,357.75 The project is $15,357.75 over budget. I recommend funds from Eagle Point Park Stone Work be used to cover this overrun. ACTION STEP The action requested is that the City Council adopt the attached resolutions accepting the improvement and setting the final cost. GDS:et attachments Preparers Gil D. Spence Address: 2200 Bunker Hill Rd Phone: 1563) 589-4263 RESOLUTION NO. 42-07 ACCEPTING IMPROVEMENT WHEREAS, the contract for the Eagle Point Park Concrete Replacement Project has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW, THEREFORE, BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: 1. That. the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the General Fund in amount equal to the amount of his contract, less any retained percentage provided for therein. Passed, approved and adopted this Stn day of February , 2007. Roy D. Buol, Mayor Attest: i ~' '~ eanne F. Schneider, City Clerk PK Preparers Gil D. Spence Address: 2200 Bunker Hill Rd Phone: (563) 589-4263 RESOLUTION NO. 43-07 FINAL ESTIMATE WHEREAS, the contract for the Eagle Point Park Concrete Replacement Project has been completed and the Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs; NOW, THEREFORE, BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $91,312.75, and the said amount shall be paid from the General Fund of the City of Dubuque, Iowa. Passed, approved and adopted this 5th day of February , 2007. 1/ i ~ Roy D. Buol, Mayor Attest: ~~ Jeanne F. Schneider, City Clerk PK